Picture of Adriatic Metals logo

ADT1 Adriatic Metals News Story

0.000.00%
gb flag iconLast trade - 00:00
Basic MaterialsAdventurousMid CapSucker Stock

REG - Adriatic Metals - HIGH GRADE INTERCEPT AT RUPICE





 




RNS Number : 9462Z
Adriatic Metals PLC
16 January 2020
 

16 January 2020

 

Adriatic Metals PLC 

('Adriatic Metals' or the 'Company')

 

HIGH GRADE INTERCEPT EXTENDS KNOWN MINERALISATION TO SOUTH AT RUPICE

 

HIGHLIGHTS

·   BR-49-19 intersected exceptionally high-grade mineralisation in the southern extension of the Rupice mineralisation returning: 

•   11.3m @ 4.37g/t Au, 406g/t Ag, 16.1% Zn, 9.8% Pb, 1% Cu and 50% BaSO4 from 244.7m. 

·   BR-44-19, 95 metres down-dip on the same drill section as BR-49-19 also returned mineralised drill results:

•   6m @ 1.34g/t Au, 223g/t Ag, 2.1% Zn, 2.4% Pb, 0.3% Cu and 41% BaSO4 from 298m. 

·   These two mineralised intercepts, BR-49-19 and BR-44-19 confirm a robust extension of the high-grade mineralisation, that still remains open along strike to the south towards the Jurasevac-Brestic prospect.

 

Adriatic Metals PLC (ASX:ADT, LON:ADT1) ("Adriatic" or the "Company") is pleased to announce that it has received assay results from a number of holes from its programme at Rupice and Jurasevac-Brestic. Figure 1 illustrates a plan view of the drilling locations.

Paul Cronin, Adriatic's Managing Director and CEO commented, "The latest drill results continue to extend the known mineralisation at Rupice and provide valuable information needed to continue to assess the structural controls inherent in this world class deposit. We have mobilised 4 rigs following the holiday break to continue to chase this mineralisation to the south and at Jurasevac-Brestic as well as commence exploration drilling at the Veovača satellite prospects where soil sampling and historical drilling data warrants further drill testing. A great start to 2020."

 

OVERVIEW

Drill hole BR-49-19 was the final hole drilled in 2019 campaign. It is the most southern drill hole and the highest grade intercept drilled at Rupice to date, successfully intersecting robust mineralisation approximately 15m south of the closest hole BR-41-19, released on 28 November 2019. Mineralisation remains open up dip and to the south into previously untested ground outside of the current ore block model.

Previously reported drill hole BR-41-19 intersected the central part of this mineralised zone. The two new drill holes being reported; BR-49-19 and BR-44-19 have confirmed the up-dip and down-dip extensions of the zone intersected by BR-41-19 (Figure 2).

Drill hole BR-44-19 was drilled from the same location as BR-49-19 and intersected a 6-metre-wide mineralised zone, 95 metres down-dip from BR-49-19, adding substantial volume to the mineralised zone in the southern section of Rupice.

Further drilling in 2020 will target the western side of the interpreted fault to test for the continuation of the known mineralisation.

Drilling at the Jurasevac-Brestic prospect continued with BJB-5-19 and BJB-6-19 drilled into the PDP3D IP anomaly. Drilling intersected a sequence of brecciated and laminated sediments returning anomalous lead and zinc mineralization with visible pyrite. This style of mineralisation is indicative of what has been seen on the fringes of the high-grade zones at Rupice. The prospect is structurally complex and the information obtained from this recent drilling will enable better targeting of high-grade mineralisation during the 2020 exploration programme.

The mineralised intervals of the drill holes are shown in Table 1 with further information in Appendix 1.

Table 1 - Drill hole results for the reported holes; Lead or Zinc greater than 1%, including higher-grade intersection with Lead or Zinc > 5%

FROM

TO

INTERVAL

Zn

Pb

Au

Ag

Cu

BaSO4

M

M

M

%

%

g/t

g/t

%

%

BR-44-19

298

304

6

2.10

2.44

1.34

223

0.3

41

BR-47-19

390

392

2

1.60

0.81

0.05

64

0.4

5

BR-47-19

410

412

2

2.35

3.10

0.13

66

0.4

6

BR-49-19

244.7

256

11.3

16.06

9.82

4.37

406

1.0

50

BJB-5-19

84

90

6

3.29

0.19

0.01

1

0

0

BJB-6-19

144

146

2

1.12

0.90

0.53

442

0.1

19

 

Figure 1:  Plan Map showing the Location of the Rupice Drill Holes

Figure 2: Cross Section illustrating Drill Hole BR-49-19 and BR-44-19

 

Please follow the link to see Figure 1 and 2 - http://www.rns-pdf.londonstockexchange.com/rns/9462Z_1-2020-1-15.pdf

 

Drill hole BR-46-19, on the eastern margin of Rupice, which was drilled to a depth of 411m on the eastern side of the interpreted fault to test the down dip extent of hole BR-41-19 returned no significant mineralisation. Drill hole BR-47-19 at Rupice North returned insignificant anomalous lead and zinc mineralisation. However, the structural complexities of the deposit in this northern-most drill hole are now much better understood as a result of the data collected from BR-47-19 and should enable targeting of high-grade mineralisation further northward.‎

 

 

For further information please visit  www.adriaticmetals.com,  @AdriaticMetals on Twitter, 

or contact:

 

Adriatic Metals Plc

Tel: +44 (0)20 7993 0066

Paul Cronin / Emma Chetwynd Stapylton

 

 

 

Blytheweigh (IR/PR Contact)

Tel: +44 (0)20 7138 3204

Camilla Horsfall / Megan Ray

 

 

MARKET ABUSE REGULATION DISCLOSURE

The information contained within this announcement is deemed by the Company (LEI: 549300OHAH2GL1DP0L61) to constitute inside ‎information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. The person ‎responsible for arranging the release of this announcement on behalf of the Company is Paul Cronin, Managing Director and CEO.

 

COMPETENT PERSONS REPORT

The information in this report which relates to Exploration Results is based on information compiled by Mr Phillip Fox, who is a member of the Australian Institute of Geoscientists (AIG).  Mr Fox is a consultant to Adriatic Metals PLC, and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the "Australian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves".  Mr Fox consents to the inclusion in this report of the matters based on that information in the form and context in which it appears.

 

ABOUT ADRIATIC METALS

Adriatic Metals PLC (ASX:ADT, LON:ADT1) ("Adriatic" or the "Company") is a dual listed (ASX and LSE) precious and base metals explorer and developer via its 100% interest in the Vareš Project in Bosnia & Herzegovina. The Project comprises a historic open cut mine at Veovača and brownfield exploration at Rupice, an advanced proximal deposit which exhibits exceptionally high grades of base and precious metals. Adriatic's short-term aim is to expand the current JORC resource at high-grade Rupice deposit, as well as conduct exploration on a number of other prospects within the expanded Concession. Adriatic has attracted a world class team to expedite its exploration efforts and to rapidly advance the Company into the development phase and utilise its first mover advantage and strategic assets in Bosnia. 

 

DISCLAIMER

Forward-looking statements are statements that are not historical facts. Words such as "expect(s)", "feel(s)", "believe(s)", "will", "may", "anticipate(s)", "potential(s)"and similar expressions are intended to identify forward-looking statements. These statements include, but are not limited to statements regarding future production, resources or reserves and exploration results. All of such statements are subject to certain risks and uncertainties, many of which are difficult to predict and generally beyond the control of the Company, that could cause actual results to differ materially from those expressed in, or implied or projected by, the forward-looking information and statements. These risks and uncertainties include, but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as plans continue to be refined, (iii) the potential for delays in exploration or development activities or the completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of development or construction activities, and (vi) other risks and uncertainties related to the Company's prospects, properties and business strategy. Our audience is cautioned not to place undue reliance on these forward-looking statements that speak only as of the date hereof, and we do not undertake any obligation to revise and disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.

 

Table 2 - Collar Information for reported drill holes (MGI Balkans Z6)

Drill Hole

Easting

Northing

Elevation

Average Azimuth (TN)

Average Dip

BR-44-19

6519404

4894626

1264

215

-83.8

BR-46-19

6519447

4894702

1250

222.6

-83.2

BR-47-19

6519163

4895063

1096

243.4

-66.7

BR-49-19

6519404

4894626

1264

212.2

-66.9

BJB-5-19

6519904

4894210

1133

217.4

-66.4

BJB-6-19

6519769

4894285

1189

217.2

-63.1

 

Table 3 - Assay Results for reported drill holes

 

Hole ID

From

To

Interval

Zn %

Pb %

Cu %

Ag g/t

Au g/t

BaSO4 %

BR-44-19

0

292

292

No sample

BR-44-19

292

294

2

0.0

<0.005

0.0

<1

<0.01

0

BR-44-19

294

296

2

0.0

<0.005

0.0

<1

0.01

0

BR-44-19

296

298

2

0.1

0.0

0.0

<1

0.02

0

BR-44-19

298

300

2

0.7

0.8

0.1

39

0.25

11

BR-44-19

300

302

2

3.5

4.5

0.7

421

2.4

76

BR-44-19

302

304

2

2.0

2.0

0.2

210

1.37

36

BR-44-19

304

306

2

0.0

0.0

0.0

1

0.01

0

BR-44-19

306

308

2

0.0

0.0

0.0

1

<0.01

1

BR-44-19

308

310

2

0.0

<0.005

0.0

<1

<0.01

0

BR-44-19

310

312

2

0.0

0.0

0.0

<1

0.01

0

BR-44-19

312

326.8

14.8

No sample

BR-46-19

330

332

2

0.0

<0.005

0.0

<1

0.06

0

BR-46-19

332

334

2

<0.002

<0.005

<0.001

<1

0.10

0

BR-46-19

334

336

2

0.0

0.0

0.2

<1

0.17

0

BR-46-19

336

338

2

<0.002

<0.005

0.0

<1

0.10

0

BR-46-19

338

340

2

0.0

<0.005

0.0

<1

0.11

0

BR-46-19

340

342

2

<0.002

0.0

0.0

<1

0.14

0

BR-46-19

342

344

2

0.0

<0.005

<0.001

<1

0.06

0

BR-46-19

344

346

2

0.0

<0.005

0.0

<1

0.02

0

BR-46-19

346

348

2

<0.002

<0.005

<0.001

<1

0.04

0

BR-46-19

348

350

2

0.0

<0.005

0.0

<1

0.01

0

BR-46-19

350

352

2

0.0

<0.005

<0.001

<1

0.01

0

BR-46-19

352

354

2

0.0

0.0

0.0

<1

0.02

0

BR-46-19

354

356

2

0.0

0.0

0.0

<1

0.01

1

BR-46-19

356

358

2

0.0

<0.005

0.0

<1

0.01

0

BR-46-19

358

360

2

<0.002

<0.005

<0.001

<1

0.01

0

BR-46-19

360

411

51

No sample

BR-47-19

0

332

332

No sample

BR-47-19

332

334

2

0.0

0.1

0.0

<1

0.03

0

BR-47-19

334

336

2

0.0

0.1

0.0

3

0.06

0

BR-47-19

336

338

2

0.1

0.0

0.0

2

0.04

0

BR-47-19

338

340

2

0.0

0.0

0.0

1

0.03

0

BR-47-19

340

342

2

0.2

0.0

0.0

2

0.09

0

BR-47-19

342

344

2

0.2

0.0

0.0

2

0.09

0

BR-47-19

344

346

2

0.0

<0.005

0.0

<1

0.04

0

BR-47-19

346

348

2

0.2

0.0

0.0

<1

0.03

0

BR-47-19

348

350

2

0.1

0.0

0.0

1

0.04

1

BR-47-19

350

352

2

0.6

0.1

0.0

4

0.06

2

BR-47-19

352

354

2

0.5

0.1

0.0

3

0.06

2

BR-47-19

354

356

2

0.6

0.1

0.0

5

0.05

1

BR-47-19

356

358

2

0.3

0.0

0.0

1

0.05

1

BR-47-19

358

360

2

0.2

0.1

0.0

3

0.05

1

BR-47-19

360

362

2

0.6

0.4

0.2

20

0.06

3

BR-47-19

362

364

2

0.1

0.0

0.0

<1

0.02

1

BR-47-19

364

366

2

0.1

0.1

0.0

1

0.02

0

BR-47-19

366

368

2

0.0

<0.005

<0.001

<1

0.02

0

BR-47-19

368

370

2

0.0

0.0

0.0

2

0.03

0

BR-47-19

370

372

2

0.0

0.0

0.0

<1

0.02

0

BR-47-19

372

374

2

0.1

<0.005

0.0

1

0.02

0

BR-47-19

374

376

2

0.1

0.0

0.0

<1

0.03

0

BR-47-19

376

378

2

0.0

0.0

0.0

1

0.04

0

BR-47-19

378

380

2

0.1

0.1

0.0

10

0.04

0

BR-47-19

380

382

2

0.1

0.1

0.0

8

0.02

0

BR-47-19

382

384

2

0.3

0.1

0.0

2

0.03

1

BR-47-19

384

386

2

0.1

0.0

0.0

1

0.03

1

BR-47-19

386

388

2

0.0

0.0

0.0

2

0.04

0

BR-47-19

388

390

2

0.0

0.0

0.0

<1

0.02

0

BR-47-19

390

392

2

1.6

0.8

0.4

64

0.05

5

BR-47-19

392

394

2

0.0

0.0

0.0

2

0.04

1

BR-47-19

394

396

2

0.1

0.0

0.0

1

0.05

1

BR-47-19

396

398

2

0.0

0.0

0.0

1

0.04

0

BR-47-19

398

400

2

0.1

0.1

0.0

2

0.02

0

BR-47-19

400

402

2

0.1

0.0

0.0

<1

0.02

0

BR-47-19

402

404

2

0.1

0.1

0.0

1

0.02

0

BR-47-19

404

406

2

0.0

0.0

0.0

<1

0.02

0

BR-47-19

406

408

2

0.0

<0.005

<0.001

<1

0.02

0

BR-47-19

408

410

2

0.0

0.0

0.0

<1

0.02

0

BR-47-19

410

412

2

2.4

3.1

0.4

66

0.13

6

BR-47-19

412

414

2

0.2

0.2

0.0

8

0.02

0

BR-47-19

414

416

2

0.0

0.0

0.0

<1

0.01

0

BR-47-19

416

418

2

0.0

0.0

0.0

<1

0.01

0

BR-47-19

418

420

2

0.0

0.0

<0.001

<1

0.02

0

BR-47-19

420

455.5

35.5

No sample

BR-49-19

0

237

237

No sample

BR-49-19

237

239

2

0.0

<0.005

<0.001

<1

0.04

0

BR-49-19

239

241

2

0.0

<0.005

<0.001

<1

0.04

0

BR-49-19

241

243

2

0.0

<0.005

0.0

3

0.01

1

BR-49-19

243

244.7

1.7

No sample - core loss

BR-49-19

244.7

246

1.3

7.3

5.1

1.7

225

2.02

34

BR-49-19

246

248

2

15.9

10.4

1.0

394

3.62

54

BR-49-19

248

250

2

31.9

18.5

1.4

495

5.52

26

BR-49-19

250

252

2

21.1

10.7

0.8

298

4.95

44

BR-49-19

252

254

2

12.4

7.8

0.9

662

5.26

61

BR-49-19

254

256

2

4.8

4.8

0.3

299

4.03

74

BR-49-19

256

258

2

0.1

0.3

0.0

3

0.10

5

BR-49-19

258

260

2

0.0

0.0

0.0

<1

0.01

0

BR-49-19

260

262

2

0.0

0.0

0.0

<1

0.01

0

BR-49-19

262

316

54

No sample

BR-49-19

316

318

2

0.0

0.0

0.0

<1

0.02

0

BR-49-19

318

320

2

0.0

0.0

0.0

<1

0.01

0

BR-49-19

320

322

2

0.0

<0.005

0.0

<1

<0.01

0

BJB-5-19

0

76

76

No sample

BJB-5-19

76

78

2

0.0

<0.00

0.0

<1

<0.01

0

BJB-5-19

78

80

2

0.0

<0.00

0.0

<1

<0.01

0

BJB-5-19

80

82

2

0.0

0.0

0.0

<1

0.01

0

BJB-5-19

82

84

2

0.1

0.0

0.0

<1

<0.01

0

BJB-5-19

84

86

2

7.6

0.1

0.0

<1

0.01

0

BJB-5-19

86

88

2

1.5

0.3

0.0

1

<0.01

0

BJB-5-19

88

90

2

0.7

0.2

0.0

<1

<0.01

0

BJB-5-19

90

92

2

0.1

0.2

0.0

<1

0.01

0

BJB-5-19

92

138

46

No sample

BJB-5-19

138

140

2

0.0

0.0

0.0

<1

<0.01

0

BJB-5-19

140

142

2

0.0

0.0

0.0

1

<0.01

0

BJB-5-19

142

144

2

0.6

0.2

0.0

<1

<0.01

0

BJB-5-19

144

146

2

1.2

0.5

0.0

<1

<0.01

0

BJB-5-19

146

148

2

0.6

0.0

<0.001

2

<0.01

0

BJB-5-19

148

150

2

0.9

0.4

0.0

1

<0.01

0

BJB-5-19

150

152

2

0.2

0.0

0.0

<1

<0.01

0

BJB-5-19

152

154

2

0.2

0.0

0.0

<1

0.02

0

BJB-5-19

154

156

2

0.1

0.0

0.0

<1

<0.01

0

BJB-5-19

156

158

2

0.1

0.0

0.0

<1

<0.01

0

BJB-5-19

158

160

2

0.1

0.0

0.0

<1

<0.01

0

BJB-5-19

160

162

2

0.1

0.0

0.0

<1

<0.01

0

BJB-5-19

162

164

2

0.0

0.0

<0.001

<1

0.01

0

BJB-5-19

164

166

2

0.1

0.0

0.0

<1

<0.01

0

BJB-5-19

166

168

2

0.0

0.0

0.0

<1

<0.01

0

BJB-5-19

168

170

2

0.0

0.0

0.0

<1

<0.01

1

BJB-5-19

170

178

8

No sample

BJB-5-19

178

180

2

0.0

0.0

0.0

1

0.09

1

BJB-5-19

180

182

2

0.5

0.5

0.1

17

0.07

1

BJB-5-19

182

184

2

1.5

0.5

0.1

16

0.11

0

BJB-5-19

184

186

2

0.0

0.0

0.0

1

0.04

0

BJB-5-19

186

247.6

61.6

No sample

BJB-6-19

0

52

52

No sample

BJB-6-19

52

54

2

<0.002

<0.005

<0.001

<1

0.02

0

BJB-6-19

54

56

2

0.0

0.0

0.0

<1

0.02

0

BJB-6-19

56

58

2

0.0

<0.005

<0.001

<1

0.01

0

BJB-6-19

58

60

2

0.1

0.0

0.0

<1

<0.01

0

BJB-6-19

60

62

2

0.5

0.0

<0.001

<1

<0.01

0

BJB-6-19

62

64

2

0.9

0.1

0.0

<1

0.01

0

BJB-6-19

64

66

2

0.1

0.0

0.0

<1

0.02

0

BJB-6-19

66

68

2

0.0

0.0

0.0

<1

0.01

0

BJB-6-19

68

70

2

0.0

0.1

0.0

<1

<0.01

0

BJB-6-19

70

72

2

0.1

0.1

0.0

<1

<0.01

0

BJB-6-19

72

74

2

0.0

0.1

0.0

1

<0.01

0

BJB-6-19

74

76

2

0.1

0.1

0.0

<1

0.01

0

BJB-6-19

76

78

2

0.1

0.0

0.0

<1

<0.01

0

BJB-6-19

78

80

2

0.0

0.0

0.0

<1

<0.01

0

BJB-6-19

80

82

2

0.0

0.0

<0.001

<1

<0.01

0

BJB-6-19

82

84

2

0.0

0.0

0.0

<1

<0.01

0

BJB-6-19

84

86

2

0.0

0.1

0.0

<1

0.01

0

BJB-6-19

86

88

2

0.0

0.0

0.0

<1

0.01

0

BJB-6-19

88

90

2

0.0

0.0

0.0

<1

0.01

0

BJB-6-19

90

92

2

0.0

0.0

0.0

<1

0.02

0

BJB-6-19

92

94

2

0.1

0.0

0.0

<1

0.01

0

BJB-6-19

94

96

2

0.1

0.1

0.0

<1

0.02

0

BJB-6-19

96

98

2

0.1

0.0

0.0

<1

0.01

0

BJB-6-19

98

100

2

0.1

0.0

0.0

<1

0.01

0

BJB-6-19

100

102

2

0.2

0.1

0.0

<1

0.01

0

BJB-6-19

102

104

2

0.2

0.1

0.0

<1

0.01

0

BJB-6-19

104

106

2

0.3

0.1

0.0

<1

0.01

0

BJB-6-19

106

108

2

0.0

0.0

<0.001

<1

0.01

0

BJB-6-19

108

140

32

No sample

BJB-6-19

140

142

2

0.1

0.1

0.0

<1

0.01

0

BJB-6-19

142

144

2

0.0

0.1

0.0

<1

<0.01

0

BJB-6-19

144

146

2

1.1

0.9

0.1

442

0.53

19

BJB-6-19

146

148

2

0.1

0.2

0.1

141

0.16

3

BJB-6-19

148

150

2

0.0

0.0

0.1

2

0.01

1

BJB-6-19

150

160

10

No sample

BJB-6-19

160

162

2

0.0

0.1

0.0

<1

0.01

0

BJB-6-19

162

164

2

0.0

0.4

0.0

<1

<0.01

1

BJB-6-19

164

166

2

0.1

0.3

0.0

<1

<0.01

0

BJB-6-19

166

168

2

0.0

0.0

0.0

<1

0.01

0

BJB-6-19

168

170

2

0.0

0.0

<0.001

<1

0.01

0

BJB-6-19

170

172

2

0.0

<0.005

<0.001

<1

<0.01

0

BJB-6-19

172

174

2

0.0

0.0

<0.001

<1

<0.01

0

BJB-6-19

174

176

2

0.0

0.0

0.0

<1

0.01

0

BJB-6-19

176

178

2

0.0

<0.005

0.0

<1

0.01

0

BJB-6-19

178

180

2

0.0

<0.005

<0.001

<1

<0.01

0

BJB-6-19

180

224

44

No sample

BJB-6-19

224

226

2

<0.002

<0.005

<0.001

<1

0.01

0

BJB-6-19

226

228

2

<0.002

<0.005

<0.001

<1

<0.01

0

BJB-6-19

228

230

2

<0.002

<0.005

0.0

<1

0.01

0

BJB-6-19

230

232

2

<0.002

<0.005

<0.001

<1

<0.01

0

BJB-6-19

232

234

2

<0.002

<0.005

0.0

<1

0.01

0

BJB-6-19

234

288.6

54.6

No sample

 

APPENDIX 1- SAMPLING TECHNIQUES AND DATA

(Criteria in this section apply to all succeeding sections.)

 

 

Section 1 Sampling Techniques and Data

 

(Criteria in this section apply to all succeeding sections.)

 

 

 

 

Criteria

JORC Code explanation

Commentary

Sampling techniques

      Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

HQ diamond core was cut in half to provide a sample for assay typically weighing around 8-10kg.  Samples were submitted to the ALS facility in Bor, Serbia for industry standard analytical analysis.

 

      Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

The half core and weight of the sample provides sufficient representivity. 

 

No calibration of any equipment was required as all samples were sent for assay by commercial laboratory.

      Aspects of the determination of mineralisation that are Material to the Public Report. In cases where 'industry standard' work has been done this would be relatively simple (eg 'reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.

HQ3 diamond core was used to obtain nominally 2m samples from which 8-10kg of material was pulverised to produce sample for fire assay, ICP-MS and X-ray Fluorescence (XRF). 

Drilling techniques

      Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc).

Drill Type is as follows:

Drill Hole

Non-Core (m)

Diamond Core (m)

BR-44-19

0 - 100.0

100.0 - 326.8

BR-46-19

0 - 100.0

100.0 - 411.0

BR-47-19

0 - 62.3

62.3 - 455.5

BR-49-19

0 - 100.0

100.0 - 342.6

BJB-5-19

 

0 - 247.6

BJB-6-19

 

0 - 288.6

 

Drill sample recovery

      Method of recording and assessing core and chip sample recoveries and results assessed.

All core was logged for geology and RQD with recovery in the mineralised and sampled zone greater than 90%.  The HQ diameter and sampling of half core ensured the representative nature of the samples.

There is no observed relationship between sample recovery and grade, and with little to no loss of material there is considered to be little to no sample bias.

      Measures taken to maximise sample recovery and ensure representative nature of the samples.

      Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

Logging

      Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

Sufficient geotechnical logging of the core has been taken and in sufficient detail to support a Mineral Resource estimate however, no Mineral Resource estimate is being reported, only assay results.

 

All core is photographed and logging is qualitative.

 

All core is logged.

      Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

      The total length and percentage of the relevant intersections logged.

Sub-sampling techniques and sample preparation

      If core, whether cut or sawn and whether quarter, half or all core taken.

The HQ diameter core was cut in half using a diamond saw.

      If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

The sampled material is HQ3 half core. 

      For all sample types, the nature, quality and appropriateness of the sample preparation technique.

Collection of around 8-10kg of half core material with subsequent pulverisation of the total charge provided an appropriate and representative sample for analysis.  Sample preparation was undertaken at the ALS laboratory in Bor, to industry best practice.

      Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

Industry best practice was adopted by ALS for laboratory sub-sampling and the avoidance of any cross contamination.

      Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

The half core sampling is considered a reasonable representation of the in-situ material.  No duplicate material was collected although a Certified Reference Material was inserted every 15 samples or less. 

      Whether sample sizes are appropriate to the grain size of the material being sampled.

Sample size of around 8-10kg is considered to be appropriate to reasonably represent the material being tested. 

Quality of assay data and laboratory tests

      The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.

Analyses were undertaken at the accredited laboratory of ALS in Bor, Serbia which has full industry certification.  Multi elements were assayed by an ICP-MS technique following an aqua regia digest.  Gold was determined using a fire assay on a nominal 30g charge.  Barite was determined from a fusion followed by dissolution and ICP-AES analysis.

All techniques were appropriate for the elements being determined.  Samples are considered a partial digestion when using an aqua regia digest.

      For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

There was no reliance on determination of analysis by geophysical tools.

      Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established.

Certified Reference Material (CRM) appropriate for the elements being analysed were added at a rate better than 1 in 15.  All results reported by ALS on the CRMs were to better than 2 standard deviation (2SD), it is considered that acceptable levels of accuracy have been achieved.

Verification of sampling and assaying

      The verification of significant intersections by either independent or alternative company personnel.

There has been no independent logging of the mineralised interval however, it has been logged by several company personnel and verified by senior staff using core photography. 

      The use of twinned holes.

None of the reported holes are twin holes.

      Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.

Field collection data was uploaded using the Micromine software and verified at point of entry.  Data is also uploaded into the GeoBank software.  Data is stored on the Virtual Cloud and at various locations including Perth, WA.  It is regularly backed-up.

      Discuss any adjustment to assay data.

No adjustments were necessary.

Location of data points

      Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

Sampling sites were surveyed using Total Station to better than 0.05m accuracy in the local BiH coordinate system. 

      Specification of the grid system used.

The grid system used MGI 1901 / Balkans Zone 6.

      Quality and adequacy of topographic control.

The topographic surface of the immediate area was generated from a LiDAR survey to an accuracy of approximately 0.05m. It is considered sufficiently accurate for the Company's current activities. 

Data spacing and distribution

      Data spacing for reporting of Exploration Results.

Results from two drill holes are being reported.  All samples were collected at 2m intervals down hole.  

      Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.

No Mineral Resource or Ore Reserve are being reported.

      Whether sample compositing has been applied.

Sample composite was not employed.

Orientation of data in relation to geological structure

      Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

Reported holes were drilled at an average declination and azimuth as stated in Table 2 of the accompanying report.

The drill holes are considered to be reasonably orthogonal to the interpreted dip of the mineralisation. 

      If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

It is not considered that the drilling orientation has introduced a sampling bias, as the drilling is considered to be orthogonal to the strata bound mineralisation. 

Sample security

      The measures taken to ensure sample security.

Chain of Custody of digital data is managed by the Company.  Physical material was stored on site and, when necessary, delivered to the assay laboratory.  Thereafter laboratory samples were controlled by the nominated laboratory.  All sample collection was controlled by digital sample control file(s) and hard-copy ticket books. 

Audits or reviews

      The results of any audits or reviews of sampling techniques and data.

A Site and Laboratory (ALS and SGS, Bor) visit was made by Dr Belinda van Lente, an employee of CSA Global in January 2018.  There were no material issues found for the 2017 drill campaign.

 

 


This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLDELFFBFLFBBX

Recent news on Adriatic Metals

See all news