Brief: Calibre Reports High Grade Drill Intercepts At Its Gold Rock Project, Nevada Advances Technical Studies With Positive Metallurgical Results High-Grade Drill Results Include 2.19 G/T Gold Over 44.2 Metres And 3.36 G/T Gold Over 22.9 Metres
June 29 (Reuters) - Calibre Mining Corp CXB.TO :
* CALIBRE REPORTS HIGH GRADE DRILL INTERCEPTS AT ITS GOLD
ROCK
PROJECT, NEVADA; ADVANCES TECHNICAL STUDIES WITH POSITIVE
METALLURGICAL RESULTS; HIGH-GRADE DRILL RESULTS INCLUDE 2.19 G/T
GOLD OVER 44.2 METRES AND 3.36 G/T GOLD OVER 22.9 METRES
Source text for Eikon: ID:nGNXXLxlc
Further company coverage: CXB.TO
((Reuters.Briefs@thomsonreuters.com;))
Recent news on Calibre Mining
See all newsCalibre Mining Corp expected to post earnings of 5 cents a share - Earnings Preview
Brief: ISS, Glass Lewis Recommends Equinox Gold Holders Vote 'For' Caliber Mining Deal
Brief: Calibre Mining Corp Recommends That Securityholders Vote For Combination With Equinox
Calibre Mining rises on higher Q1 gold production
Media: Top Calibre investor Van Eck opposes Equinox's $1.8 billion takeover- Bloomberg News