RNS Number : 4888M Corre Energy B.V. 23 May 2022
Corre Energy B.V.
Preliminary Results for the Period ended 31 December 2021
Corre Energy B.V. (EURONEXT: CORRE) (the "Company"), is a leader in
origination, development, construction, operation, and commercialisation of
long duration energy storage ("LDES") projects, technologies and products that
accelerate the transition to net zero and enhance security and flexibility of
energy systems.
The Company announces its preliminary results for the period ended 31 December
2021.
HIGHLIGHTS
Developments in the year
· Successful Initial Public Offering (IPO) on Euronext Growth in
September 2021, raising €12m.
· Equity-linked funding drawdown on schedule:
o €11m of a €20m fund from Italian Energy Efficiency Fund II (IEEF II),
an Italian reserved alternative investment fund set-up and managed by Fondo
Italiano per L'Efficienza Energetica SGR S.p.A. (FIEE) was drawn down in 2021,
with drawdowns pending of €4m upon reaching of key milestones with
optionality to €9m.
· Financing of Dutch Project ZW1 (partnership with Infracapital):
o Collaboration to select senior debt providers for ZW1 through 2022 and
beyond.
o Application submitted / €1.7m grant with strong expectation of receipt
from CINEA (European Climate, Infrastructure and Environment Executive
Agency).
· 2021 financial results (unaudited) - in line with expectation:
o EBITDA Loss of €6.6m driven by employee expenses of €2.8m and legal
& professional costs of €4.8m offset by €0.9m of grant income.
o €13.4m cash at bank.
o €23m in funding received during the period.
o Cumulative development costs capitalised at ZW1 of €5.2m in total
€2.1m in year.
o €115m Market Capitalisation (17 May 22).
Operational Highlights
· Projects designation: ZW1 (Netherlands) and GHH (Denmark) designated
as key Energy Transition investment projects by the European Clean Hydrogen
Alliance following engagement with European Governments.
· Strategic collaboration agreements:
o Geostock: Signed 10-year collaboration agreement to facilitate and
expedite end-to-end design, development, financing, and operation of
underground hydrogen-based energy storage projects in Europe and beyond.
o Siemens Energy: project and technology collaboration MOU signed in 2021 to
facilitate technology sharing. The collaboration, which will also feature a
strong joint advocacy approach will demonstrate the value and benefits of LDES
in the form of underground compressed air storage to a much wider stakeholder
audience.
· Offtake agreement: Negotiations for an offtake agreement on ZW1 are
at an advanced stage following receipt of proposals for 10-15-year contracts
from a range of investment-grade partners.
Performance review and outlook
Keith McGrane, Group CEO, commented:
"I am pleased to report that Corre Energy has today published its first full
year results as a listed business following our successful and oversubscribed
IPO in September 2021.
"During this largely capacity-building and development phase our EBITDA
outturn was comfortably within plan reflecting strong execution, delivery, and
deployment in a period that also saw strong progress towards financial close
on our flagship project in the Netherlands and important collaborative
agreements aimed at expanding and expediting our project development pipeline.
"In light of climate and geopolitical tailwinds in favour of renewables and
energy self-sufficiency, energy storage markets remain highly dynamic with
strong overall demand and an increasingly supportive environment. That
supportive policy and market environment underpins our positive outlook and
our ambition to accelerate our project development pipeline as also evidenced
by our planned equity-raise announced separately this morning.
"Finally, in a period that saw significant supply and operational constraints
as a result of COVID 19 pandemic and of course the ongoing energy crisis I am
incredibly proud of how our growing team has responded to ensure our projects
are planned and execution remains on track.
"We are seeing a fundamental shift around energy production, supply, security,
and affordability and we believe that providing an energy storage solution
creates a societal benefit with significant impacts:
· Supply: electricity costs and system savings. Market based
socio-economic welfare.
· Ancillary services: security of supply, system flexibility,
curtailment avoidance, improved stability.
· Transmission: capacity deferral/minimisation of intrazonal
congestion/reduction in grid losses.
· Decarbonisation and sustainability: management of excess renewable
electricity, carbon abatement."
ABOUT CORRE ENERGY
Corre Energy B.V. is a leader in origination, development, construction,
operation, and commercialisation of LDES projects, technologies and products
that accelerate the transition to net zero and enhance security and
flexibility of energy systems.
CAES technology has over 50 years of successful operation. A proven grid-scale
energy storage solution which integrates the H2 value chain: a co-location of
air and hydrogen storage caverns with electrolysers provides a low-cost
storage solution.
The symbiosis of H2 and CAES provides balancing into electricity market. Our
products are scalable by adding new caverns and increasing existing cavern
capacity across European jurisdictions.
There is a large and growing market for renewable energy storage across Europe
and globally. This results in multiple potential revenue streams from
combining compressed air storage with green hydrogen.
We have first mover advantage with EU designated pipeline and tier-1 project
partners including Infracapital (M&G) as partner for our ZW1 flagship
project.
Our customers and partners include, amongst others: Siemens, Nobian, TenneT,
Energinet, Gas Storage Denmark, and we have the support of EASE, LDES Council
and the European Clean Hydrogen alliance.
Our funding partners include the EU, Infracapital, IEEF II and the equity
markets.
We have a highly experienced management team and a pipeline of 11 TYNDP
projects across northern Europe.
In June 2021 Corre Energy B.V. entered into an equity linked funding agreement
with IEEF II. Under the terms of this agreement the Company has drawn down
€3m in June 2021 and €8m in October 2021, with a further €4m or €9m
(at the sole discretion of IEEF II) payable at commercial close of the ZW1
project.
On 23 September 2021 the Company completed its IPO, issuing 12,018,846 new
shares at €1 per share. Incremental costs directly attributable to the IPO
that otherwise would have been avoided have been accounted for as a deduction
from equity.
For further information please visit https://corre.energy/
(https://corre.energy/) or contact:
Corre Energy B.V.
Stephanie Casey, Head of Investor Relations (stephanie.casey@corre.energy +44 7587 748402
(mailto:stephanie.casey@corre.energy) )
Davy (Euronext Growth Listing Sponsor)
Barry Dixon, Head of Decarbonization Finance (barry.dixon@davy.ie +353 87 689 9195
(mailto:barry.dixon@davy.ie) )
Murray PR (Financial PR and IR)
Pat Walsh, Managing Director (pwalsh@murraygroup.ie + 353 1 498 0300
(mailto:pwalsh@murraygroup.ie) )
CEO STATEMENT
MARKET & OPERATIONS REVIEW
A new context
Storage is a critical part of any industrial supply chain. It provides
resilience, economic efficiency, and affordability, enabling flexibility
throughout the value chain for customers and suppliers. In short, supply
chains cannot function properly without it. The Russia/Ukraine war has exposed
deep structural weaknesses in European electricity and gas markets and
demonstrates once again that "just in time" economics do not work. Society is
having to bear an undue burden of increasing electricity prices as a
consequence.
As energy markets move toward an accelerated renewables future, the role of
storage and specifically LDES is critical. LDES in the form of hydrogen based
CAES can integrate large-scale renewables, enhance security of supply, reduce
electricity prices whilst significantly reducing greenhouse gas emissions
("GHGs").
Resulting from the current geopolitical situation, several profound measures
are being proposed by the European Commission under the REPowerEU proposal. It
is proposed that renewable energy capacities double and treble from 2025 to
2030. Essentially, bringing forward the 2040 to 2050 renewables targets by 15
to 20 years. That implies an achievement of a near 100% renewables target from
2030 to 2035, across member states.
In addition, the proposal also makes clear recommendations and recognises the
need to adequately pay for security of supply. This will be dealt with in a
market redesign, where flexibility and energy security will likely be paid-for
services. Market design will need to reform rapidly to enable an accelerated
build-out of renewable energy.
Developments in Corre Energy's markets
In March 2022, subsequent to the period end, the Dutch government announced a
doubling of its offshore wind targets to 21 gigawatts ("GW") by 2030. This is
an extraordinary target, given the original target of approximately 10.5 GW by
2030. A 21 GW target puts the Netherlands out in front in terms of offshore
wind. Corre Energy is the developer of the only 300+ megawatt ("MW") CAES
project currently in the Netherlands, with the ability to store renewables
electricity for 3.5 days. The increased importance of the project cannot be
overstated in the context of an accelerated and larger build-out of offshore
wind within the next nine years.
Subsequent to period end, there is also increasing pressure in Denmark to
accelerate the delivery of the Green Hydrogen Hub and the possibility of
increasing project capacity. The hydrogen fuelled CAES is co-located with
hydrogen storage in a salt cavern with onsite hydrogen production through
electrolysis. This approach unlocks the full hydrogen value chain comprising
hydrogen production, storage and use in CAES, redelivering stored renewables
back onto the electricity grid as 100% green power. The CAES project is a
Project of Common European Interest (PCI), affording it a strategic
designation as national infrastructure and also affording the consortium, for
which Corre Energy is the lead developer, to apply for grant assistance and EU
co-financing from the European Commission and associated institutions such as
the European Investment Bank
Consequently, the value of LDES to society is considerable. Imperial College
London estimates that the system value of CAES in 2035 in the UK is on average
£4500/KW per year (€5300/KW per year) or c £4.5bn (€5.3bn) per annum, in
the base case scenario for the first 1 GW, reducing total system costs by 13%.
More specifically, the societal value of Corre Energy's ZW1 project in the
Netherlands was estimated to be circa €2.1 billion. These estimates exclude
additional value attributable to improvements in human health through GHG
reduction, enhanced economic resilience, reduced reliance on imported fossil
fuels and so on.
Corre Energy's purpose is to unlock this value for society through its
pipeline of projects, empowering future generations to benefit from a clean
energy system which is renewable, regenerative, and circular. It is our
mission to achieve this future and it's a future we believe in.
Our operations and risk
As Corre Energy grows, we recognise the need to develop an operations function
that has the scale to oversee a growing project list and work is underway to
strengthen the existing team. Our approach involves an appetite for balanced
risk management as we build out our risk framework to listed standards, and
work with our partners in the EU. We will report on our progress in this area
in next year's annual report.
Our people
We have a highly experienced, and growing, team of people with extensive
knowledge of the renewable energy industry and specialist experience in
compressed air energy storage. I am proud of the resilient way that they
adapted to the restrictions of COVID-19 while continuing to deliver for Corre
Energy and our partners. They have demonstrated our values: Collaborative,
Visionary, Challenging, Empowering and Integrity which are key to delivering
our mission to support the transition to net-zero and deliver material
progress toward a decarbonised energy sector.
Keith McGrane
CEO
ENVIRONMENTAL, SOCIAL & GOVERNANCE
We are excited by the knowledge of the tremendous impact LDES can make, and by
playing an active role our aim is to deliver real change in the communities we
serve, adding value to society.
We aim to report our ESG performance in accordance with relevant disclosure
standards, including those of the Value Reporting Foundation/Sustainability
Accounting Standards Board, the Task force on Climate-related Financial
Disclosures and the Carbon Disclosure Project. UN Sustainable Development
Goals #1 No Poverty, #7 Affordable & Clean Energy, #9 Industry, Innovation
& Infrastructure, #11 Sustainable Cities & Communities and #13 Climate
Action are most relevant to our business.
Corre Energy will align its sustainable activities with EU taxonomy
classifications so shareholders, stakeholders and customers can assess if
Group's activities are environmentally sustainable, in the context of the
European Green Deal.
OUR PROJECTS IN DEVELOPMENT
Zuidwending 1 (ZW1), the Netherlands
Keith McGrane says: "ZW1 has achieved significant progress to date"
Project type Hydrogen CAES
Location The Netherlands
CAES capacity Design improvements can yield up to 84hrs (3.5 days) output capacity of 320MW
in contrast to previous 12hr duration design
CAES generator 320 MW
Grid 640 MW reserved
Customer offtake Offers of 10-15yrs for 100% of output with revenue sharing
· Customer contract and primary engineering, procurement, and
construction ("EPC") framework is due to be completed by H2 2022 to optimise
pricing and contract terms.
· Our key development milestones of design, land and grid reserved are
on track for completion Q2 2022.
· Strong customer demand is expected to continue into H2 2022 allowing
for optimal offtake arrangements to be achieved with customers.
Green Hydrogen Hub (GHH), Denmark
Patrick McClughan says "GHH is a world first and will act as the blueprint for
remaining projects in the pipeline".
Project type Green Hydrogen Hub
Location Denmark
CAES capacity Design improvements increased output capacity to 84 hours (3.5 days) from 12
hours at 320MW scale
CAES generator 320 MW
H(2) capacity 250 GWh
Electrolyser capacity 350 MW
Targeted construction 2023
· Whilst early stage we see significant emerging customer demand with
investment-grade entities currently engaging under a similar contractual model
to ZW1.
· Final customer contracts for offtake to be targeted for completion Q4
2022.
· Given emerging drivers for accelerating renewables and green hydrogen
in Denmark, increasing customer demand is expected into H2 2022.
BUSINESS ENVIRONMENT
· Corre Energy is a market leader in Europe and the one of the few
listed LDES developers globally.
· Northern Europe is the largest regional market (~140 GW) where Corre
Energy enjoys cavern exclusivity for long duration CAES with green hydrogen.
· Low base-case estimate of addressable market for CAES in Northern
Europe is 5 - 10 GW*.
· These EU Green Deal calls for the acceleration of renewables, green
hydrogen, and storage, stating these are needed for decarbonisation and
achievement of 2050 targets.
· Primary LDES markets globally forecast to be the U.S. and Europe.
· Circa 400 GW of LDES is required by 2030 mostly in the U.S. and
Europe.
FINANCIAL POSITION
Group
Following its incorporation in March 2021, Corre Energy B.V. acquired Corre
Energy Storage B.V., Corre Energy ApS and Corre Energy Ltd and incorporated
Corre Energy Storage Limited later the same month collectively "the Group".
Corre Energy Storage B.V. owns the development of the ZW1 project and Corre
Energy ApS owns the development of the GHH project, whilst Corre Energy Ltd
and Corre Energy Storage Limited primarily provide shared services to other
group companies, with some less developed income streams.
Since these acquisitions, the Group has continued its core objectives of
progressing existing projects, identifying growth opportunities, and raising
funding for these activities.
Projects
Through the acquisition of Corre Energy Storage B.V., the Group acquired
€3.2m of capitalised project costs on the ZW1 project, classified as caverns
under construction in the financial statements. During the period a further
€2.1m was spent and capitalised on this project. Following the development
and construction phases, Corre Energy expects the project to be operational in
2026, requiring in the region of €340m Capital expenditure.
The Group also obtained options to develop four more caverns in the
Netherlands and Denmark, which are recognised as intangible assets at
€0.6m.
The GHH project is not yet at a capitalisable stage, so no costs have been
capitalised for this project. This project will accelerate significantly in
2022 following appointment of a project director with construction targeted
for 2023.
The business continues to expand its interests and is in negotiations
regarding additional projects in Germany, the UK and U.S.
Funding
During the period the Group raised funding to support the continued
development of the business from a variety of sources, demonstrating the
market's and our funding partners faith in our proposition and business
model.
In June 2021 we received the first instalment of €3m of convertible loan
funding from IEEF II, an Italian reserved alternative investment fund set-up
and managed by FIEE. A second instalment of €8m was received in October
2021.
IEEF II will lend a further €4m or €9m at its discretion at commercial
close of the ZW1 project provided commercial close takes place before 1 June
2024. This convertible loan shall bear no interest provided that the Group
does not breach its obligations under the agreement. In the event of a breach
under the agreement, an interest rate of 10% applies.
IEEF II may convert the loans to share capital at €1 per share at any point
from 12 months after the tranche paid out to 30 June 2028 or, if it chooses
not to, the full amount is repayable on 28 June 2028. This convertible loan is
recognised at €11.6m in the financial statements.
The Group also raised €12m through the successful IPO and Listing of the
Company on Euronext Growth Dublin in September 2021, by issuing new shares
representing 19.4% of the share capital. This is recognised net of transaction
costs at €10.8m in the financial statements.
Further funding for the ZW1 project has been agreed in principle with
Infracapital Greenfield Partners II ("Infracapital"). Under the proposed terms
Infracapital will fund the project to reach financial close, at which point
Infracapital will have exclusive rights to acquire a majority stake in the
project through acquisition of shares in Corre Energy Storage B.V., and the
exclusive right and obligation to fund 100% of the projected construction
costs of the project through commitments for ordinary equity and or
shareholder loans. Corre Energy B.V. will retain a significant minority
shareholding in Corre Energy Storage B.V.
Other key figures
The Group's operating result before tax for the period was €6.6m loss,
primarily driven by employee expenses of €2.8m and legal & professional
costs of €4.8m that are not directly attributable to a capitalisable
project, offset by €0.9m of grant income. These costs relate primarily to
strategic growth of the wider business and strengthening of back-office
functions to support future growth.
In the period, the Group capitalised development costs of €2.1m (2020: N/A).
This was for the development of the caverns in ZW1.
At year end, Corre Energy B V had current assets totalling €15.9m (2020:
N/A).
Funds in the bank totalled €13.4m (2020: N/A).
Matthew Savage
Interim CFO
KEY FINANCIALS
Financial key performance indicators
A summary of the financial key performance indicators is set out in the table
below:
Full year Results Presentation FY 2021
€'000
Revenue 5
Other Operating income 903
EBITDA (6,628)
Operating result (6,643)
Result before tax (7,600)
Loss after tax (3,947)
Cumulative Project Costs Capitalised 5,224
Cash at Bank 13,375
Net Debt 3,675
Comparatives for the financial statements are not available as the group was
constituted in March 2021.
Non-financial key performance indicators
As the business is still in its formative stage, it has not yet formalised its
key performance indicators related to non-financial information.
Events after the reporting period
In March 2022 the Group submitted a claim for a final payment of €1,7m to
the European Climate, Infrastructure and Environment Agency for money under a
grant awarded to Corre Energy Storage B.V. See note 2 for further explanation
of the grant.
On 28 April 2022 the Company's parent Corre Energy Group Holdings C.V.
approved the following contracts with related parties of the Group:
· Contract with Procorre UK Ltd, a company controlled by Darren Green a
Director, for £35,000 per month for office space and HR, CRM, business
administration, marketing, and social media services. This replaces the
Company's contract that terminated on 28 February 2022 and expires in December
2022.
· Contract with Gibson Watts Limited, a company controlled by
Darren Green a Director, to provide recruitment services that were previously
provided by Procorre UK Ltd. This contract expires in December 2022.
Under transfer pricing agreements between Corre Energy Group Holdings C.V. and
the Group, costs incurred under these contracts will be recharged to the Group
with no mark-up.
On 23 May 2022 the Directors approved the Company's intention to raise up to
€15m through the issue of ordinary shares. The effect of this transaction
will be to increase share capital and share premium, but at time of signing
these financial statements the precise terms of the issuance including the
number of shares to be issued and the issue price are not known.
Consolidated summarised statement of comprehensive income for the period ended 31 December 2021
Note 2021
€'000
Revenue 1 5
Other operating income 2 903
Expenses
Employee expenses 3 (2,755)
Project costs 4 (7)
Other administrative expenses 5 (4,789)
Operating result (6,643)
Finance expense 6 (957)
Result before tax (7,600)
Corporation Tax 7 3,653
Loss after tax (3,947)
Other comprehensive income
Items that may be reclassified subsequently to profit or loss
Foreign exchange differences on translation of foreign operations (4)
Total comprehensive income (3,951)
All results presented above are derived from continuing operations and are
attributable to owners of the Company.
Consolidated summarised balance sheet on 31 December 2021
Note 2021
€'000
Assets
Non-current assets
Intangible fixed assets 9 618
Tangible fixed assets 10 5,261
Lease right of use assets 11 99
Deferred tax assets 7 3,641
Total non-current assets 9,619
Current assets
Cash 12 13,375
Receivables, prepayments, and accrued income 13 2,582
Total current assets 15,957
Total assets 25,576
Equity
Share capital 16 279
Share premium 16 11,501
Retained earnings (3,250)
Foreign currency translation (4)
Total equity 8,526
Liabilities
Non-current liabilities
Long-term loans 14 11,646
Long-term lease liability 14 79
Long-term payables to participating interests 14 1,845
Total non-current liabilities 13,570
Current liabilities
Trade creditors 15 823
Payables to participating interests 15 1,123
Other current liabilities 15 1,534
Total current liabilities 3,480
Total liabilities 17,050
Total equity and liabilities 25,576
Consolidated summarised statement of changes in equity
Share capital Share premium Retained earnings Foreign currency translation Total
€'000 €'000 €'000 €'000 €'000
Incorporation on 1 March 2021 0 - - - 0
Capital contribution - 742 - - 742
Issue of share capital 225 10 - - 235
Business combinations 8 - - 664 - 664
Initial public offering (IPO) 54 11,965 - - 12,019
IPO transaction costs 17 - (1,216) 33 - (1,183)
Loss for the period - - (3,947) - (3,947)
Other comprehensive income - - - (4) (4)
At 31 December 2021 279 11,501 (3,250) (4) 8,526
Consolidated summarised cash flow statement
2021
€'000
Cash flow from operating activities
Operating result (6,643)
Depreciation 15
Increase in receivables from participating interests (2,330)
Increase in trade creditors 234
Increase in other payables 1,096
Tax refunds received (107)
Total cash flow from operating activities (7,735)
Cash flow from investment activities
Investments in tangible fixed assets (2,107)
Investments in intangible fixed assets (618)
Investments in right of use assets (109)
New consolidations 538
Total cash flow from investment activities (2,296)
Cash flow from financing activities
Inflows from capital increases 10,837
Proceeds from borrowings 12,597
Interest paid (24)
Total cash flow from financing activities 23,410
Effect of changes in foreign exchange rates (4)
Total cash flow 13,375
Cash at start of period -
Cash at end of period 13,375
NOTES
1. General Information
The members of the Board ("Directors") present the unaudited consolidated
financial statements of the Company for the ten-month period ended 31 December
2021. The Company was incorporated in the Netherlands on 1 March 2021. The
Company is a private company with limited liability (besloten vennootschap met
beperkte aansprakelijkheid), with its corporate seat in Groningen, the
Netherlands, with its place of business at Helperpark 278 3, 9723 ZA
Groningen, the Netherlands, and registered with the Dutch trade register
number 82068046.
The Company is engaged in the development and construction of energy storage
facilities with projects currently being developed in the Netherlands and
Denmark, with others in the pipeline.
These consolidated financial statements were authorised for issue.
2. Presentation of financial information
These consolidated financial statements have been prepared in accordance with
International Financial Reporting Standards ("IFRS") as adopted by the
European Union ("EU").
The principal accounting policies are summarised below and have been applied
consistently throughout the year, unless stated otherwise.
Comparative information for 2020 is not available, as the Group was
incorporated in March 2021.
All figures in this report are unaudited. The consolidated financial
statements were discussed and approved by the Board. These financial
statements have been authorised for issue in accordance with a resolution of
the Board dated 22 May 2022. The consolidated financial statements have not
yet been audited nor published by law, and still have to be adopted by the
annual general meeting of shareholders.
3. New and revised IFRS standards adopted by the EU
3.1 New and revised IFRS standards adopted by the EU in issue but not yet effective
At the date of authorisation of these financial statements, the Group has not
applied the following new standards and amendments to existing standards that
have been issued and adopted by the EU but are not yet effective in the EU:
· IFRS 17 (including the June 2020 amendments to IFRS 17)
· Amendments to IFRS 3 Business Combinations
· Amendments to IAS 16 Property, Plant and Equipment
· Amendments to IAS 37 Provisions, Contingent Liabilities and
Contingent Assets
· Annual Improvements to IFRS 2018-2020 cycle
The Directors do not expect that the adoption of the amendments to the
existing standards listed above will have a material impact on the
consolidated financial statements of the Group in future periods. Each new
standard or amendment is summarised below.
3.2 New and revised IFRS standards issued by the IASB but not yet adopted by the EU
The following amendments to the existing standards have not been endorsed for
use in the EU yet and could not therefore be adopted by the Group. The
effective dates stated below are for IFRS as issued by IASB. The EU is
expected to approve the amendments with the same effective dates.
· Amendments to IFRS 10 Consolidated Financial Statements and IAS 28
Investments in Associates and Joint Ventures
· Amendments IFRS 17 Insurance contracts
· Amendments to IAS 1 Presentation of Financial Statements
· Amendments to IAS 1 Presentation of Financial Statements and IFRS
Practice Statement 2 Making Materiality Judgements
· Amendments to IAS 8 Accounting Polices, Changes in Accounting
Estimates and Errors
· Amendments to IAS 12 Income Taxes -Deferred Tax related to Assets and
Liabilities arising from a Single Transaction
The Directors do not expect that the adoption of the amendments to the
existing standards listed above will have a material impact on the
consolidated financial statements of the Group in future periods.
4. Going Concern
The business is at an early stage of development, and as such requires future
funding to continue its activities. The Group has been successful to date in
raising the required funding and has a clear plan to achieve milestones to
unlock liquidity to allow the business to continue to trade until it becomes
cash generative in itself. The Directors have assessed the Group's ability to
continue as a going concern and are satisfied that the Group has sufficient
resources to continue into the foreseeable future. Therefore, these financial
statements have been prepared on the going concern basis.
5. Basis of preparation
The consolidated financial statements have been prepared on the historical
cost basis. Historical cost is generally based on the fair value of the
consideration given in exchange for goods and services.
Fair value is the price that would be received to sell an asset or paid to
transfer a liability in an orderly transaction between market participants at
the measurement date, regardless of whether that price is directly observable
or estimated using another valuation technique. In estimating the fair value
of an asset or a liability, the Company takes into account the characteristics
of the asset or liability if market participants would take those
characteristics into account when pricing the asset or liability at the
measurement date. Fair value for measurement and/or disclosure purposes in
these financial statements is determined on such a basis.
For financial reporting purposes, fair value measurements are categorised into
Level 1, 2 or 3 based on the degree to which the inputs to the fair value
measurements are observable and the significance of the inputs to the fair
value measurement in its entirety, which are described as follows:
· Level 1 inputs are quoted prices (unadjusted) in active markets for
identical assets or liabilities that the entity can access at the measurement
date.
· Level 2 inputs are inputs, other than quoted prices included within
level 1, that are observable for the asset or liability, either directly or
indirectly: and
· Level 3 inputs are unobservable inputs for the asset or liability
6. Basis of consolidation
These consolidated financial statements incorporate the financial statements
of the Company and entities controlled by the Company. Control is achieved
when the Company is exposed, or has rights, to variable returns from its
involvement with the entity, and has the ability to affect those returns
through its power to direct the activities of the entity. The Company
reassesses whether or not it controls an entity if facts and circumstances
indicate that there are changes to one or more of the elements of control.
Consolidation of an entity begins when the Company obtains control over the
entity and ceases when the Company loses control of the entity. Specifically,
income and expenses of a subsidiary acquired or disposed of during the year
are included in the Consolidated Statement of Comprehensive Income from the
date the Company gains control until the date when the Company ceases to
control the subsidiary.
All intra group assets and liabilities, equity, income expenses and cash flows
relating to transactions between members of the Group are eliminated in full
on consolidation.
List of participating interests
Corre Energy B.V. is the holding company of the group of legal entities. The
overview of the data as required in accordance with sections 2:379 and 2:414
of the Dutch Civil Code is included below:
Name Country of registration Share in issued capital Included in consolidation
Corre Energy Storage B.V. The Netherlands 100% Yes
Corre Energy ApS Denmark 100% Yes
Corre Energy Ltd United Kingdom 100% Yes
Corre Energy Storage Limited Ireland 100% Yes
7. Foreign currency
Items included in the financial statements of group companies are measured
using the currency of the primary economic environment in which the respective
group company operates (the functional currency). The consolidated financial
statements are presented in Euros, which is the functional and presentation
currency of Corre Energy. All amounts have been rounded to the nearest
thousands, except when otherwise indicated.
Transactions in foreign currencies are stated in the financial statements at
the exchange rate ruling on the transaction date.
Assets, liabilities, income, and expenses of consolidated subsidiaries with a
functional currency other than the presentation currency are translated at the
closing rate of exchange prevailing at the balance sheet date. Foreign
currency differences are recognised in Other comprehensive income and
accumulated in the foreign currency translation reserve within equity.
The following exchange rates for the most significant countries in which the
Group operates were used in the preparation of these financial statements:
In € Year end 2021 Average 2021
UK Pounds Sterling 1.1768 1.1734
Danish Krone 0.1345 0.1345
8. Significant judgements and estimates
The preparation of these consolidated financial statements requires the Group
to make estimates and assumptions that affect the reported amounts of assets
and liabilities at the balance sheet date, and the reported profit or loss for
the period. The Group uses estimates, assumptions and judgements which can
have a significant impact on the amounts recognised in the financial
statements in applying these accounting policies. These estimates and
assumptions are based on the most recent information available, and the actual
amounts may differ in the future.
Estimates and underlying assumptions are reviewed on a regular basis.
Revisions to accounting estimates are recognised in the period in which the
estimate is revised or in the period of revision and future periods if the
revision impacts both the reporting period and future periods.
The judgements that the Directors consider to be the most important to these
financial statements are described below.
8.1 Business combinations
During the period 100% of the share capital of Corre Energy Storage B.V.,
Corre Energy ApS and Corre Energy Ltd were transferred from Corre Energy
Partnership SCSp to the Company. At the time Corre Energy Partnership SCSp was
the Company's direct parent, so this was a common control transaction, outside
the scope of IFRS 3. A judgement was made in determining the appropriate
values at which to recognise the assets and liabilities transferred.
Management's judgement is that it is most appropriate to recognise all assets
and liabilities at inherited book values, including the accounting history
since initial recognition. The difference of €664,000 between the
consideration paid and the net book value of assets and liabilities was
recognised directly in retained earnings.
8.2 Capitalisation of project costs
IAS 16 requires costs that are directly attributable to bringing an asset to
the location and condition necessary for it to be capable of operating in the
manner intended by management to be capitalised. The Group is developing and
building two energy storage facilities: ZW1 and GHH, so costs that are
incremental to the development of these projects must be capitalised.
There is some judgement required to determine the point at which
capitalisation should begin. Management's judgement is that project costs
should be capitalised from the date that management committed to proceed with
the project in this specific location. ZW1 costs have therefore been
capitalised from December 2019 onwards, and no GHH costs have yet been
capitalised.
The Directors currently expect ZW1 to be operational from 2026, and when
operational cash flows are expected to exceed the carrying values capitalised.
There are no indicators of impairment, so project costs incurred are
recognised in full at historical cost.
8.3 Deferred tax
Due to the early stage of the business, some group companies are loss-making
as they incur costs to develop projects and to grow the business more
generally. This gives rise to deferred tax assets because losses can be offset
against future profits of the companies involved.
Management's judgement is that in all cases there will be sufficient future
profits against which to offset these losses, so deferred tax assets are
recognised in full for Corre Energy B.V., Corre Energy Storage B.V., Corre
Energy ApS and Corre Energy Ltd.
8.4 Option valuation
As described in more detail in note 14 to the financial statements, as part of
a financing agreement IEEF II has been granted the option to convert debt
instruments to shares in the Company. The valuation of these options requires
the use of complex models operated by an external valuer, and management
judgement to be applied when selecting inputs. The key estimates are
projections of the Company's dividend yield, share price volatility and
probability of default.
Notes to the consolidated financial statements
1. Revenue
2021
€'000
Revenue from related parties 5
Total revenue 5
During the period the Group earned revenue from related parties for IT and
administrative services.
2. Other operating income
2021
€'000
Grant income 903
Total other operating income 903
In December 2019 Corre Energy Storage B.V. was awarded a grant by the European
Innovation and Networks Executive Agency (now the European Climate,
Infrastructure and Environment Agency, CINEA) for the development of its ZW1
project. Under this agreement a prefinancing amount of €1,8m was received in
March 2020, and in March 2022 a claim for a final payment of €1,7m was
submitted to CINEA.
The portion of the grant that relates to expenses incurred has been recognised
in the statement of comprehensive income resulting in accrued income in the
balance sheet. The remainder of the grant relates to cavern construction
costs, which have been capitalised on the balance sheet. This has not been
accrued, and when received the amount will be deferred on the balance sheet
and will be recognised over the life of the asset when construction is
completed.
3. Employee expenses
2021
€'000
Salaries (1,907)
Pension costs (48)
Social security costs (220)
Other benefits (8)
Capitalise staff costs 247
Staff costs (1,936)
Management fees (720)
Other employee expenses (99)
(2,755)
Capitalised staff costs represent the value of staff costs capitalised to
caverns under construction as part of the ZW1 project.
The average number of full-time equivalent employees during the period is
broken down below.
2021
Corre Energy Storage B.V. 1
Corre Energy Ltd 13
Corre Energy Storage Limited 5
Total 19
The Group operates defined contribution pension schemes, and as such the
commitment to the participating employees consists of paying any outstanding
contribution. Participation in the pension scheme is optional: employees are
automatically enrolled but can choose to opt out.
4. Project costs
2021
€'000
Commercial development 7
Total 7
Project costs represent amounts spent on the GHH project in Denmark that are
not capitalisable due to its stage of development.
5. Other administrative expenses
2021
€'000
Legal & professional costs (4,144)
Travel costs (259)
IT costs (87)
Office costs (52)
Marketing & Communications costs (92)
Other operating expenses (81)
Foreign exchange losses (74)
(4,789)
Included in legal and professional costs are costs relating to advisory and
consultancy, support from participating interests and other legal costs that
are related to the IPO but not incremental and directly attributable to the
IPO, therefore not accounted for as a deduction from equity.
Furthermore, included in legal and professional costs are the following
amounts payable to the auditor, Blue Line Accountants en Belastingadviseurs
B.V.:
2021
€'000
Financial statements audit 47
Other audit services 32
79
Fees for financial statements audit comprise the audit of the financial
statements of the Company and its subsidiary Corre Energy Storage B.V. Fees
for other audit services comprise review of special purpose financial
statements.
6. Finance expense
2021
€'000
Interest and similar expenses (24)
Option revaluation (933)
(957)
The option revaluation charge relates to the equity linked funding agreement
with IEEF II. See note 14 for further information on the agreement.
7. Corporation tax
7.1 Income tax recognised in statement of comprehensive income
2021
€'000
Corporation tax to pay (4)
Deferred tax income 3,657
3,653
There is no income tax relating to foreign exchange differences on translation
of foreign operations, which are recognised in other comprehensive income.
7.2 Current tax receivable and payable
2021
€'000
Other taxes receivable 222
Corporate tax payable 4
Other taxes payable 84
88
In the balance sheet other taxes receivable are included in receivables,
prepayments and accrued income, and other taxes payable are included in other
current liabilities.
7.3 Reconciliation of effective tax rate
2021
€'000
Loss before tax 7,600
Statutory tax rate 25.2%
Tax at statutory tax rate 1,915
Deferred tax assets recognised in respect of prior years 442
Deferred tax assets recognised in respect of capital expenditure 990
Expenses not recognised in accounting records 314
Non-taxable income 233
Expenses not deductible (241)
Effective tax amount 3,653
The statutory tax rate of 25.2% has been calculated taking into account the
statutory tax rates in the Netherlands, Denmark, the UK, and the Republic of
Ireland.
The reconciling items are explained as follows:
· Prior year losses are now recognised on the balance sheet in respect
of the brought forward losses of Corre Energy Storage B.V. following a change
in legislation such that losses can now be carried forward indefinitely.
· A deferred tax asset has been recognised in respect of differences in
the accounting value and tax basis value of caverns under construction,
specifically the Zuidwending 1 (ZW1) project.
· The expenses not recognised in the accounting records are the
incremental costs directly attributable to the IPO that have been accounted
for as a deduction from equity.
· Non-taxable income is grant income, which for the purpose of the tax
computation is offset against caverns under construction.
· Expenses not deductible are the cost of revaluation of the options
contained in the equity linked funding agreement with IEEF II.
7.4 Deferred tax assets
Deferred tax assets have arisen due to temporary differences attributable to
tax losses. The Group is in a start-up phase, resulting in high initial
expenditure on development and limited revenues in early years. Management has
performed tax planning and expects that based on the profit forecasts; profits
will be generated in upcoming years sufficient to offset the accumulated tax
losses.
A deferred tax asset has also arisen due to differences in the accounting
value and tax basis value of caverns under construction, specifically the ZW1
project.
The deferred tax asset may be analysed as follows:
Tax losses carried forward ZW1 cavern costs Total
€'000 €'000 €'000
At 1 March 2021 - - -
Acquired through business combinations - - -
Credited to the income statement 2,667 990 3,657
At 31 December 2021 2,667 990 3,657
Of which current: 16 - 16
Of which non-current: 2,651 990 3,641
No deferred tax asset was recognised at acquisition of any subsidiary.
Deferred tax assets of Corre Energy Storage B.V. are now recognised in full
following a change in legislation such that losses can now be carried forward
indefinitely. The Directors consider it probable that future taxable profit
will be available against which unused tax losses can be utilised.
8. Business combinations
During the period the Company acquired 100% of the share capital of the
following companies:
· The Company acquired 100% of the share capital of Corre Energy Ltd on
12 March 2021 for £100, at the time equivalent to €111. The shares were
acquired from Corre Energy Partnership SCSp, which at that time was the
Company's parent company. Corre Energy Ltd provides administrative support to
other group companies.
· The Company acquired 100% of the share capital of Corre Energy ApS on
12 March 2021 for DKK 40,000, at the time equivalent to €5,377. The shares
were acquired from Corre Energy Partnership SCSp, which at that time was the
Company's parent company. Corre Energy ApS is engaged in the development of
the Green Hydrogen Hub in Denmark.
· The Company incorporated a new 100% owned subsidiary Corre Energy
Storage Limited on 23 March 2021. Corre Energy Storage Limited provides
administrative support to other group companies.
· The Company acquired 100% of the share capital of Corre Energy
Storage B.V. on 29 March 2021 as a contribution with an attributed value of
€742,110. Corre Energy Storage B.V. is engaged in the development of the ZW1
project in the Netherlands.
The transfers from Corre Energy Partnership SCSp were actioned as part of a
Group reorganisation to enable the subsequent initial public offering of Corre
Energy B.V. At the time of the transfer Corre Energy Partnership SCSp owned
100% of the Company's share capital so these were common control transactions,
outside the scope of IFRS 3.
The assets and liabilities transferred in each of the three transfers from
Corre Energy Partnership SCSp are summarised in the below table:
Corre Energy Ltd Corre Energy ApS Corre Energy Storage B.V. Total
€'000 €'000 €'000 €'000
Fixed assets
Tangible fixed assets - - 3,159 3,159
Current assets
Cash 2 - 536 538
Receivables, prepayments, and accrued income 1 5 41 47
Non-current liabilities
Long-term loans - - (270) (270)
Current liabilities
Trade creditors (1) - (588) (589)
Other current liabilities - (8) (1,465) (1,473)
Net assets/(liabilities) 2 (3) 1,413 1,412
Consideration paid 0 5 743 748
Transferred to Retained earnings (2) 8 (670) (664)
The difference between the net book value of the assets transferred and the
consideration paid is recognised directly in equity in retained earnings.
9. Intangible fixed assets
The movement in intangible fixed assets is as follows:
Cavern options
€'000
Cost and net book value
At 1 March 2021 -
Additions 618
At 31 December 2021 618
Cavern options represent the cost of entering into a contract with Nouryon
Salt B.V., which forms part of the Nobian group ("Nobian"), to develop caverns
for the purpose of the energy storage business in the Netherlands and Denmark.
These contracts are exclusive, preventing the Group or Nobian from entering
into discussions concerning CAES projects in the Netherlands or Denmark with
any other party.
These are held as intangible assets until such time as a project reaches a
capitalisable stage of development, at which point these are transferred to
tangible assets as caverns under construction. Cavern options are not in use;
therefore, they are not amortised.
During the period the Group acquired the rights to four sites that have not
yet reached capitalisation from its related party Corre Energy Limited, a
company registered in Malta.
10. Tangible fixed assets
The movement in tangible fixed assets is as follows:
Caverns under construction Furniture IT equipment Total
€'000 €'000 €'000 €'000
Cost
At 1 March 2021 - - - -
Acquired through business combination 3,159 - - 3,159
Additions 2,065 3 39 2,107
At 31 December 2021 5,224 3 39 5,266
Accumulated depreciation
At 1 March 2021 - - - -
Charge for the period - (1) (4) (5)
At 31 December 2021 - (1) (4) (5)
Net book value at 31 December 2021 5,224 2 35 5,261
Caverns under construction comprises costs that are directly attributable to
development or construction of caverns for use in the energy storage business.
These are not depreciated but are reviewed for indicators of impairment at
each reporting date.
11. Leases
Leases with a contractual term of less than one year and/or a value less than
€5,000 are considered short-term and/or leases of low value items. The Group
has elected not to recognise right of use assets and lease liabilities for
these leases. Apart from these the Group leases two cars in the Netherlands.
Information about leases is presented below.
11.1 Lease right of use assets
Vehicles
€'000
Cost
At 1 March 2021 -
Additions 109
At 31 December 2021 109
Accumulated depreciation
At 1 March 2021 -
Charge for the period (10)
At 31 December 2021 (10)
Net book value at 31 December 2021 99
11.2 Lease liabilities
2021
€'000
Current 22
Non-current 78
100
11.3 Amounts recognised in the statement of comprehensive income
2021
€'000
Interest on lease liabilities 3
Depreciation of right of use assets 10
Short-term lease expenses 187
200
11.4 Amounts recognised in the cash flow statement
The total cash outflow for leases in the period was €211,000.
12. Cash
2021
€'000
Cash 13,375
13,375
All cash is held in on demand facilities and is at free disposal. The Group
has no current account credit facilities with its banks.
13. Receivables, prepayments, and accrued income
Amounts falling due within one year:
2021
€'000
Accrued grant income 164
Receivables from participating interests 1,466
Receivables from other related parties 16
Prepayments 698
Taxes receivable 238
2,582
See note 7 for information on items included in taxes receivable and note 19
for information on items included in receivables from participating interests
and receivables from other related parties.
Prepayments includes €383,000 of legal and advisory costs incremental to
obtaining a loan facility with Infracapital, this facility is described in
note 22.4. When the loan is drawn these costs will be recognised over the life
of the loan using the effective interest rate method.
The Directors consider that the carrying amount of receivables, prepayments
and accrued income approximates their fair value.
14. Non-current liabilities
2021
€'000
IEEF II loan 11,553
N.V. NOM loan 93
Long-term loans 11,646
Long-term lease liability 79
Long-term payables to participating interests 1,845
14.1 IEEF II equity linked funding agreement
In June 2021 Corre Energy B.V. entered into an equity linked funding agreement
with IEEF II. Under the terms of this agreement the Company has drawn down
€3m in June 2021 and €8m in October 2021, with a further €4m or €9m
(at the sole discretion of IEEF II) payable at commercial close of the ZW1
project.
No interest shall accrue and be paid on the principal amount of the funding
outstanding, unless Corre Energy B.V. is in breach of certain obligations
under the equity linked funding agreement, in which case interest is payable
at 10%. The principal amount and any accrued interest shall be repaid no later
than the funding end date of 30 June 2028.
IEEF II has the option to convert the instruments to shares in Corre Energy
B.V. at €1 per share at any point from 12 months after a tranche has paid
out to 30 June 2028.
If the Company pays a dividend IEEF II is entitled to receive the same amount
per "share" as if the amount paid by IEEF II under the equity linked funding
agreement had been converted to shares at that point in time.
14.2 N.V. NOM loan
In August 2021 Corre Energy Storage B.V. drew down €360,000 on a loan
facility from N.V. NOM, Investerings- en Ontwikkelingsmaatschappij voor
Noord-Nederland ("N.V. NOM"). The loan is repayable in eight quarterly
instalments beginning on 30 September 2021, with interest payable at 3% per
annum.
14.3 Long-term payables to participating interests
Loans from participating interests represents amounts payable to Corre Energy
Partnership SCSp. See note 19 for further information.
14.4 Fair value
The Directors consider that the fair value of the N.V. NOM loan and the
non-current lease liability are not materially different to their carrying
amounts, since the interest payable is close to the current market rates and
the values are relatively low.
In accordance with our accounting policies, the embedded derivative in the
IEEF II loan is held at fair value, and the host loan is held at amortised
cost.
The below table compares the fair value of the whole instrument with it
carrying value. It is classified as level 3 in the fair value hierarchy due to
the use of unobservable inputs, including own credit risk.
2021
€'000
Carrying amount 11,553
Fair value 15,839
15. Current liabilities
Amounts falling due within one year:
2021
€'000
Third party creditors 765
Payables to related parties 58
Trade creditors 823
Corre Energy Group Holdings C.V. 1,123
Payables to participating interests 1,123
Long-term debt due within 12 months 186
Taxes payable 88
Accruals and other liabilities to third parties 642
Accruals and other liabilities to related parties 618
Other current liabilities 1,534
Long-term debt due within 12 months represents the portion of the N.V. NOM
loan that is repayable within one year. See note 14 for further information on
the N.V. NOM loan.
For further information on payables to related parties, payables to
participating interests and accruals and other liabilities to related parties
see note 19.
The Directors consider that the carrying amount of current liabilities
approximates their fair value.
16. Called up share capital
The below table shows the movements in allotted, called up and fully paid
shares of Corre Energy B.V.:
Number Nominal value Share capital Share premium
€ € €
At 1 March 2021 100 €0.1000 10 -
Capital contribution 742,110
Capital conversion 2,300 €0.0045 10 742,110
Issued share capital 49,997,700 €0.0045 224,990 10,004
Initial public offering (IPO) 12,018,846 €0.0045 54,085 11,964,761
IPO transaction costs (1,215,548)
At 31 December 2021 62,018,846 €0.0045 279,085 11,501,327
On 1 March 2021 the Company was incorporated with an initial issued share
capital of 100 shares of €0.10, which were issued to Corre Energy
Partnership SCSp.
On 29 March 2021 the Company acquired 100% of the share capital of Corre
Energy Storage B.V. as a contribution with an attributed value of €742,110.
On 7 May 2021:
· Corre Energy Partnership SCSp transferred the 100 shares to Corre
Energy Group Holdings C.V. by means of a deed of transfer of shares.
· The Company executed a deed of amendment to its Articles of
Association to divide the issued share capital of 100 shares of €0.10 each
into 2,300 shares of €0.0045 each: and
· The Company issued a further 49,997,700 shares with a nominal value
of €0.0045 each to Corre Energy Group Holdings C.V., which settled these by
payment of €234,994, the additional €10,004 above the nominal value being
accounted for as share premium.
On 23 September 2021 the Company completed its initial public offering (IPO),
issuing 12,018,846 new shares at €1 per share. Incremental costs directly
attributable to the IPO that otherwise would have been avoided have been
accounted for as a deduction from equity.
As documented more fully in note 14, the Company has entered into an equity
linked funding arrangement with IEEF II. Under the terms of this agreement
IEEF II may provide up to €20m of funding and has the option to convert the
funding to shares in Corre Energy B.V. at €1 per share. If the Company pays
a dividend IEEF II is entitled to receive the same amount per "share" as if
the amount paid by IEEF II under the equity linked funding agreement had been
converted to shares at that point in time.
17. Cameron Barney share options
Included in IPO transaction costs in the statement of changes in equity are
€33,000 of cost for share options issued to Cameron Barney LLP ("Cameron
Barney"), a financial advisor. As part of their remuneration for work
performed on the IPO Cameron Barney were granted share options in the Company,
which will be filled using shares held by the Company's parent, Corre Energy
Group Holdings C.V. This has been recognised as a deduction to share premium
and an increase in retained earnings in accordance with the requirements of
IFRS 2 and IAS 32.
18. Earnings per share
2021
€ cents
Basic (9.2)
Diluted (6.4)
The calculation of the basic and diluted earnings per share is based on the
following data:
Earnings 2021
€'000
Earnings for the purpose of basic earnings per share
- Net loss attributable to owners of the Company (3,947)
Effect of dilutive potential shares:
- Finance costs of equity linked funding agreement 944
Earnings for the purpose of diluted earnings per share (3,003)
Number of shares
Number
Weighted average number of shares for basic earnings per share 42,918,098
Effect of dilutive potential shares:
- Equity linked funding agreement 3,770,492
Weighted average number of shares for diluted earnings per share 46,688,590
The equity linked funding agreement with IEEF II, which is described in more
detail in note 14, gives rise to potential shares. These have been included in
the determination of diluted earnings per share but not basic earnings per
share.
19. Related party transactions
Balances and transactions between the Company and its subsidiaries, which are
related parties of the Company, have been eliminated on consolidation and are
not disclosed in this note. Details of transactions between the Group and
other related parties are disclosed below.
19.1 Remuneration of key management personnel
The Group's key management personnel are considered to be the executive
directors, the non-executive directors. The remuneration of key management
personnel is set out below in aggregate for each of the categories specified
in IAS 24 Related Party Disclosures, with additional disclosures in the
Directors' remuneration report. Note that some key management personnel were
remunerated via management companies, and this is included here to improve
disclosure.
2021
€'000
Short-term employee benefits 630
Post-employment benefits 10
Remuneration via group companies 328
Remuneration via management companies 390
1,358
19.2 Other transactions with related parties
The following other transactions occurred with related parties:
2021
€'000
Sales
Sales to entities controlled by key management personnel 5
Purchases
Reimbursement of expenses 31
Purchases of services from participating interests 3,113
Purchases of services from other entities controlled by key management 1,191
personnel
Capital purchase from other entity controlled by key management personnel 618
The Group sold IT and other support services to a related party.
Purchases of services from participating interests represent the following
services acquired from the Company's parent, Corre Energy Group Holdings C.V.:
· Consultancy and management services
· Recruitment services
· IT services
· Use of office space
Corre Energy Group Holdings C.V. is the head office of the wider group and as
such incurs the majority of corporate costs, either on its own account or
through its general partner Corre Energy General Partner B.V. Invoiced costs
relating to activities of the Group are recharged to Group companies at cost
with no mark-up. Staff costs relating to activities of the Group are recharged
with a small mark-up, appropriate to compensate Corre Energy Group Holdings
C.V. for its work performed.
The Group acquired the following services from Procore UK Ltd, which is
controlled by Darren Green, a Director:
· Consultancy and management services
· Administrative and other support
· Marketing and social media services
· Use of office space
The capital purchase from other entities controlled by key management
personnel is the purchase of cavern options from Corre Energy Limited, a
related party company registered in Malta and controlled by Darren Green, a
Director.
19.3 Balances with related parties
At the end of the period the following balances were outstanding with related
parties:
2021
€'000
Current receivables:
- Participating interests 1,466
- Companies controlled by key management personnel 16
Current payables
- Payables to key management personnel 30
- Payables to companies controlled by key management personnel 28
- Payables to participating interests 1,123
- Accruals and other liabilities to companies controlled by key management 618
personnel
Loans from related parties
- Participating interests 1,845
Receivables from participating interests comprises €1,216,000 due from Corre
Energy General Partner B.V. and €250,000 due from Corre Energy Partnership
SCSp, a partner in Corre Energy Group Holdings C.V., which is the Company's
immediate parent. The €250,000 was repaid to the Company on 4 January 2022.
Payables to participating interests represents amounts payable to Corre Energy
Group Holdings C.V., the Company's immediate parent, resulting from purchases
of services described in note 19.2. No interest is payable on this amount and
there is no repayment schedule.
Accruals and other liabilities to Companies controlled by key management
personnel represents €618,000 payable to Corre Energy Limited, a related
party company registered in Malta, for the purchase of cavern options.
Loans from participating interests represents amounts payable to Corre Energy
Partnership SCSp under the following facilities:
· On 28 March 2021, Corre Energy Partnership SCSp provided Corre Energy
Storage B.V. with an interest free shareholder loan in the amount of €1,8m.
At the balance sheet date €1,6m was outstanding. The loan has a term of five
years and is repayable in full at the end of the term or as the parties may
otherwise agree.
· On 19 April 2021 Corre Energy Partnership SCSp provided the Company
with an interest free shareholder loan in the amount of €500,000. At the
balance sheet date €245,000 was outstanding. The latest date for full
repayment of this loan is 30 April 2026 unless otherwise agreed by the
parties.
20. Financial risk management
This note explains the Group's exposure to financial risks and how these risks
could affect the Group's future financial performance. Current year profit and
loss information has been included where relevant to add further context.
The Group's financial risk management is controlled by Group Finance under
policies approved by the Board. Group Finance identifies, evaluates, and
manages financial risks in close cooperation with other teams across the Group
as required, reporting risk exposures and actions to the Board. The key
financial risks facing the Group are market risk (including foreign exchange
risk and interest rate risk) and liquidity risk.
20.1 Market risk
20.1.1 Foreign exchange risk
The Group operates internationally and is exposed to foreign exchange risk,
primarily from UK Pounds Sterling (GBP). Foreign exchange risk arises from
future commercial transactions and recognised assets and liabilities
denominated in a currency that is not the functional currency of the relevant
group entity.
The Group's balance sheet exposure to foreign exchange risk at the end of the
period, expressed in Euro, was as follows:
2021
GBP DKK USD
€'000 €'000 €'000
Cash 14 7 2
Receivables, prepayments, and accrued income 11 6 -
Trade creditors (49) (61) -
Other current liabilities (103) - -
The aggregate foreign exchange loss recognised in the statement of
comprehensive income was €74,000.
The sensitivity of profit or loss to changes in the exchange rates arises
mainly from GBP denominated salaries and supplier costs. The impact on pre-tax
loss of an increase or decrease of 10% in the Euro/GBP exchange rate would
have been €314,000 increase or decrease respectively.
20.1.2 Interest rate risk
The Group has no borrowings or deposits that are directly exposed to changes
in interest rates; therefore, profit or loss is not directly affected by
higher or lower interest cost as a result of changes in interest rates.
20.2 Liquidity risk
Liquidity risk is the risk that the Group is unable to meet its financial
obligations as they fall due.
Developing projects requires large amounts of funding to be raised and spent
to reach milestones that unlock further liquidity. In some cases, these
milestones are formally agreed with funding providers, and in other cases
these are the milestones that management judge to be most important. Funding
comes from a variety of sources including institutional investors, high net
worth individuals, the general public following the IPO and grants.
The Board is ultimately responsible for liquidity management, with day-to-day
management performed by Group Finance. The key controls to manage liquidity
risk are robust budgeting and purchase approval processes, and the Directors
monitor key liquidity risk metrics including comparison of cash flow with
budget and review of downside forecasts.
The following table sets out the earliest possible contractual maturities of
the Group's financial liabilities and financial assets. Deferred tax assets
are shown in the period that the Directors expect them to reverse.
2021
Carrying amount Contractual cash flows < 1 year 1 to 2 years 2 to 5 years > 5 years
€'000 €'000 €'000 €'000 €'000 €'000
Deferred tax assets 3,657 3,657 16 2,362 314 965
Other receivables, prepayments, and accrued income 2,566 2,566 2,566 - - -
Cash 13,375 13,375 13,375 - - -
Total inflows 19,598 19,598 15,957 2,362 314 965
Long-term loans 11,832 11,279 186 93 - 11,000
Lease liability 100 146 35 35 76 -
Trade creditors 823 823 823 - - -
Payables to participating interests 2,968 2,968 1,123 - 1,845 -
Other current liabilities 1,534 1,534 1,534 - - -
Total outflows 17,257 16,750 3,701 128 1,921 11,000
20.3 Credit risk
The Group's exposure to credit risk arises from holdings of cash, and if a
counterparty fails to meet its contractual obligations.
The Group's primary objective when managing credit risk from its holdings of
cash is to minimise the risk of a loss of capital and eliminate loss of
liquidity having a detrimental effect on the business. Of the Group's year-end
cash holding of €13,375,000, €13,340,000 was held with UBS Switzerland AG,
which has a credit rating of AA- (Fitch). All funds are instant access.
Receivables at the period end relate to group companies and related parties.
The Directors therefore have good insight into the creditworthiness of these
counterparties, and do not consider that they add significantly to the Group's
credit risk exposure. All trade receivables are due within the agreed credit
terms for the current period and preceding year and are consequently stated at
cost.
The Group applies the IFRS 9 simplified approach to measuring expected credit
losses which uses a lifetime expected loss allowance for all receivables. To
measure expected credit losses, receivables are analysed based on their credit
risk characteristics including days past due to determine a suitable
historical loss rate. The historical loss rates are adjusted to reflect
current and forward-looking information on macro-economic factors that the
Group considers could affect the ability of its customers to settle the
receivables. Following this approach, the Group has not recognised a loss
allowance for receivables.
21. Capital management
The Company's capital comprises ordinary shares which carry one vote each. The
shares are entitled to dividends when declared.
Under the terms of the equity linked funding agreement entered into with IEEF
II described more fully in note 14, if the Company pays a dividend IEEF II is
entitled to receive the same amount per "share" as if the amount paid by IEEF
II under the terms of the equity linked funding agreement had been converted
to shares at that point in time.
The Group's policy is to maintain a strong capital base so as to maintain
investor, creditor, and market confidence and to sustain future development of
the business, ultimately providing returns for shareholders and benefits for
other stakeholders.
The Group is not subject to any externally imposed capital requirements.
22. Commitments
22.1 Capital commitments
Capital expenditure that has been contracted but not provided for in the
financial statements amounts to €428,000 as of 31 December 2021, in respect
of caverns under construction.
22.2 Cavern development agreement
The Group has entered into a series of agreements with Nouryon Salt B.V.,
which forms part of the Nobian group and is hereafter referred to as Nobian.
These give the Group exclusive access to salt caverns in Denmark and the
Netherlands for CAES and/or hydrogen storage projects and set out the terms of
development of the ZW1 project.
Under the cavern development agreement with Nobian, the Group is liable for
the costs of abandonment of the ZW1 cavern from the point that the cavern is
handed over by the supplier, with the exception of any liabilities
attributable to historical activities of the supplier. At the balance sheet
date, the cost of abandonment is nil, so no allowance has been made.
The cavern development agreement with Nobian also includes extensive
provisions which apply in the event of termination, including in situations
where Corre Energy fails to deliver according to the contract or is unable to
continue as party to the contract. These include relinquishment of the mining
and/or storage licence to Nobian free of charge if co-held by Corre Energy at
the time of termination and payment of liquidated damages to Nobian equal to
€10m minus all fees paid and increased with costs incurred in abandoning the
first CAES cavern.
22.3 Pledge of shares in Corre Energy Storage B.V.
Corre Energy Storage B.V. has agreed a loan facility of £2m with Lucht SLP LP
("Lucht"), an affiliate of Infracapital. No funds are currently drawn on this
facility.
As part of this agreement the Company has created a right of pledge to and in
favour of Lucht over all shares, distributions, and rights in Corre Energy
Storage B.V. as security for the loan. Lucht is entitled to collect dividends
and other distributions and hold these as security for payment of the loan.
Neither the Company nor Corre Energy Storage B.V. is permitted to sell, factor
transfer, discount or otherwise dispose of shares in Corre Energy Storage B.V.
Corre Energy Storage B.V. has also granted a right of pledge over its present
and future moveable assets as security for the loan. This includes machinery,
equipment, stock and inventory, computer hardware and vehicles.
These rights are revoked at the point that the loan facility is repaid in
full.
22.4 Infracapital agreement
In addition to the loan facility described above the Company entered into a
non-binding head of terms with Infracapital in March 2021 documenting the
terms on which the parties propose to jointly develop the ZW1 project, subject
to the satisfaction of certain milestones by the Company.
Under the proposed terms Infracapital will fund the project to reach financial
close. At financial close Infracapital will have exclusive rights to acquire a
majority stake in the project through acquisition of shares in Corre Energy
Storage B.V., and the exclusive right and obligation to fund 100% of the
projected construction costs of the project through commitments for ordinary
equity and/or shareholder loans (of up to €276.2m) at a proposed rate of 10%
per annum. The Company will retain a significant minority shareholding in
Corre Energy Storage B.V.
22.5 Lease commitments
Note 20 shows the undiscounted commitment for lease payments for vehicles
recognised as a lease liability on the balance sheet, totalling €146,000.
In addition to this the Group has contractual commitments of €136,000 for
short-term leases of office space, all payable in 2022.
22.6 Other commitments
The Group has the following commitments in addition to those already
mentioned:
· Commitment to pay its related party Procorre UK Ltd £40,000 per
month for office space and HR, CRM, business administration, marketing, and
social media services. On 28 February 2022 this contract terminates
automatically without notice. Any renewal of this agreement is subject to
mutual agreement between the parties.
· Commitment to pay Air Core Limited €25,000 per month for various
services including infrastructure project and management services. The
duration of the agreement is one year commencing on 1 April 2021 and shall be
extended annually until such time as mutually agreed by the parties.
23. Events after the reporting period
In March 2022 the Group submitted a claim for a final payment of €1,726,000
to the European Climate, Infrastructure and Environment Agency for money under
a grant awarded to Corre Energy Storage B.V.
On 28 April 2022 the Company's parent Corre Energy Group Holdings C.V.
approved the following contracts with related parties of the Group:
· Contract with Procorre UK Ltd for £35,000 per month for office
space and HR, CRM, business administration, marketing, and social media
services. This replaces the Company's contract that terminated on 28 February
2022 and expires in December 2022.
· Contract with Gibson Watts Limited, a company controlled by
Darren Green, a Director to provide recruitment services that were previously
provided by Procorre UK Ltd. This contract expires in December 2022.
Under intercompany agreements between Corre Energy Group Holdings C.V. and the
Group, costs incurred under these contracts will be recharged to the Group
with no mark-up.
On 23rd May 2022 the Directors approved the company's intention to raise up to
€15m through the issue of ordinary shares. The effect of this transaction
will be to increase share capital and share premium, but at time of signing
these financial statements the precise terms of the issuance including the
number of shares to be issued and the issue price are not known.
FORWARD LOOKING STATEMENTS
This announcement contains forward-looking statements. Forward-looking
statements are statements that are not historical facts, including but not
limited to statements expressing or implying Corre Energy's beliefs,
expectations, intentions, forecasts, estimates, targets, projections, or
predictions (and the assumptions underlying them). Without limitation, any
statements including words such as "intend", "expect", "anticipate", "target",
"may", "believe", "plan", "estimate" and other expressions which imply
indications or predictions of future development or trends, and which are not
based on historical facts, are forward-looking statements.
Forward-looking statements necessarily involve known and unknown risks and
uncertainties as they depend on future events and circumstances.
Forward-looking statements do not guarantee future results or development and
the actual future results and situations may therefore differ materially from
those expressed or implied in any forward-looking statements. Such differences
may be caused by various factors.
Any forward-looking statements contained in this announcement are based on
information currently available to Corre Energy's management. Corre Energy
assumes no obligation to in each case make a public announcement if there are
changes in that information or if there are otherwise changes or developments
in respect of the forward-looking statements in this announcement. Neither
Corre Energy nor any of its affiliates assumes any obligations to update any
forward-looking statements.
-ends-
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
or visit
www.rns.com (http://www.rns.com/)
.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
. END ISEMZGZKKFNGZZM