Picture of Falcon Oil & Gas logo

FO — Falcon Oil & Gas News Story

0.000.00%
ca flag iconLast trade - 00:00
EnergyAdventurousSmall CapMomentum Trap

Beetaloo Operations Update

For best results when printing this announcement, please click on link below:
https://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20241118:nGNE2yF8Zs&default-theme=true


Falcon Oil & Gas Ltd.
(“Falcon” or “Company”)

Beetaloo Operations Update

18 November 2024 – Falcon Oil & Gas Ltd. (TSXV: FO, AIM: FOG) is pleased to
announce that the Shenandoah South 2H sidetrack (“SS2H ST1”) well has been
cased and suspended at a total measured depth of 16,182 feet (4,932 metres) in
the Beetaloo Sub-basin, Northern Territory, Australia. This includes a
5,906-foot (1,800-metre) horizontal section within the Amungee Member B-Shale,
of which ~5,577 feet (1,700 metres) is planned to be stimulated with Falcon
Oil & Gas Australia Limited’s (“Falcon Australia”) joint venture
partner, Tamboran (B2) Pty Limited (“Tamboran B2”).

The decision to case and suspend SS2H ST1 comes following consultation with
Tamboran B2 on the failure of a directional drilling tool while drilling the
horizontal section. This decision avoids additional rig costs and will enable
the immediate drilling of the Shenandoah South 3H (“SS3H”) well from the
same well pad, which is planned to be drilled with a 10,000-foot (3,000 metre)
horizontal section in the Amungee member B-Shale.

Following the drilling of the SS3H well, Liberty Energy will complete the
stimulation of the SS2H ST1 and SS3H wells with 34 and 60 stages planned at
the respective wells. Stimulation of both wells is expected to commence in Q1
2025 with 30 day initial production flow rates expected in the same period.

The successful stimulation of SS2H ST1 will create a drilling spacing unit of
20,480 acres.

Falcon Australia will continue its participation in both wells in the
Shenandoah South Pilot Project at its elected participating interest of 5%.

Philip O’Quigley, CEO of Falcon commented: 
“We look forward to updating the market over the coming weeks as we continue
with these drilling operations in the Beetaloo ”
                                                   
                                                   
                    Ends.

CONTACT DETAILS:

 Falcon Oil & Gas Ltd.     +353 1 676 8702   
 Philip O’Quigley, CEO     +353 87 814 7042  
 Anne Flynn, CFO           +353 1 676 9162   
 Cavendish Capital Markets Limited (NOMAD & Broker) 
 Neil McDonald / Adam Rae  +44 131 220 9771  



This announcement has been reviewed by Dr. Gábor Bada, Falcon Oil & Gas
Ltd’s Technical Advisor. Dr. Bada obtained his geology degree at the
Eötvös L. University in Budapest, Hungary and his PhD at the Vrije
Universiteit Amsterdam, the Netherlands. He is a member of AAPG.

About Falcon Oil & Gas Ltd. 
Falcon Oil & Gas Ltd is an international oil & gas company engaged in the
exploration and development of unconventional oil and gas assets, with the
current portfolio focused in Australia. Falcon Oil & Gas Ltd is incorporated
in British Columbia, Canada and headquartered in Dublin, Ireland.

Falcon Oil & Gas Australia Limited is a c. 98% subsidiary of Falcon Oil & Gas
Ltd.

For further information on Falcon Oil & Gas Ltd. Please visit
www.falconoilandgas.com

About Beetaloo Joint Venture (EP 76, 98 and 117)

 Company                                                Interest  
 Falcon Oil & Gas Australia Limited (Falcon Australia)  22.5%     
 Tamboran (B2) Pty Limited                              77.5%     
 Total                                                  100.0%    

Shenandoah South Pilot Project -2 Drilling Space Units – 46,080 acres(1)

 Company                                                Interest  
 Falcon Oil & Gas Australia Limited (Falcon Australia)  5.0%      
 Tamboran (B2) Pty Limited                              95.0%     
 Total                                                  100.0%    

(1)Subject to the completion of the SS2H and SS3H wells on the Shenandoah
South pad 2.

About Tamboran (B2) Pty Limited
Tamboran (B1) Pty Limited (“Tamboran B1”) is the 100% holder of Tamboran
(B2) Pty Limited, with Tamboran B1 being a 50:50 joint venture between
Tamboran Resources Limited and Daly Waters Energy, LP.

Tamboran Resources Limited, is a natural gas company listed on the ASX (TBN)
and U.S. OTC markets (TBNNY). Tamboran is focused on playing a constructive
role in the global energy transition towards a lower carbon future, by
developing the significant low CO(2) gas resource within the Beetaloo Basin
through cutting-edge drilling and completion design technology as well as
management’s experience in successfully commercialising unconventional shale
in North America.

Bryan Sheffield of Daly Waters Energy, LP is a highly successful investor and
has made significant returns in the US unconventional energy sector in the
past. He was Founder of Parsley Energy Inc. (“PE”), an independent
unconventional oil and gas producer in the Permian Basin, Texas and previously
served as its Chairman and CEO. PE was acquired for over US$7 billion by
Pioneer Natural Resources Company (“Pioneer”), itself a leading
independent oil and gas company and with the PE acquisition became a Permian
pure play company. Pioneer has a current market capitalisation of c. US$60
billion.

Advisory regarding forward-looking statements
Certain information in this press release may constitute forward-looking
information. Any statements that are contained in this news release that are
not statements of historical fact may be deemed to be forward-looking
information. Forward-looking information typically contains statements with
words such as “may”, “will”, “should”, “expect”, “intend”,
“plan”, “anticipate”, “believe”, “estimate”, “projects”,
“dependent”, “consider” “potential”, “scheduled”,
“forecast”, “outlook”, “budget”, “hope”, “suggest”,
“support” “planned”, “approximately”, “potential” or the
negative of those terms or similar words suggesting future outcomes. In
particular, forward-looking information in this press release includes, but is
not limited to, information relating to the casing and suspension of the SS2H
ST1 well, the decision to case and suspend SS2H ST1; avoidance of additional
rig costs, ability to immediate drill the SS3H well from the same well pad;
Liberty Energy’s ability to complete the stimulation of the SS2H ST1 and
SS3H wells of 34 and 60 stages planned at the respective wells; stimulation
expected to commence in Q1 2025 with 30 day initial production flow rates
expected in the same period and the creation of a DSU of 20,480 acres.

This information is based on current expectations that are subject to
significant risks and uncertainties that are difficult to predict. The risks,
assumptions and other factors that could influence actual results include
risks associated with fluctuations in market prices for shale gas; risks
related to the exploration, development and production of shale gas reserves;
general economic, market and business conditions; substantial capital
requirements; uncertainties inherent in estimating quantities of reserves and
resources; extent of, and cost of compliance with, government laws and
regulations and the effect of changes in such laws and regulations; the need
to obtain regulatory approvals before development commences; environmental
risks and hazards and the cost of compliance with environmental regulations;
aboriginal claims; inherent risks and hazards with operations such as
mechanical or pipe failure, cratering and other dangerous conditions;
potential cost overruns, drilling wells is speculative, often involving
significant costs that may be more than estimated and may not result in any
discoveries; variations in foreign exchange rates; competition for capital,
equipment, new leases, pipeline capacity and skilled personnel; the failure of
the holder of licenses, leases and permits to meet requirements of such;
changes in royalty regimes; failure to accurately estimate abandonment and
reclamation costs; inaccurate estimates and assumptions by management and
their joint venture partners; effectiveness of internal controls; the
potential lack of available drilling equipment; failure to obtain or keep key
personnel; title deficiencies; geo-political risks; and risk of litigation.

Readers are cautioned that the foregoing list of important factors is not
exhaustive and that these factors and risks are difficult to predict. Actual
results might differ materially from results suggested in any forward-looking
statements. Falcon assumes no obligation to update the forward-looking
statements, or to update the reasons why actual results could differ from
those reflected in the forward-looking statements unless and until required by
securities laws applicable to Falcon. Additional information identifying risks
and uncertainties is contained in Falcon’s filings with the Canadian
securities regulators, which filings are available at www.sedarplus.com,
including under "Risk Factors" in the Annual Information Form.

Any references in this news release to initial production rates are useful in
confirming the presence of hydrocarbons; however, such rates are not
determinative of the rates at which such wells will continue production and
decline thereafter and are not necessarily indicative of long-term performance
or ultimate recovery. While encouraging, readers are cautioned not to place
reliance on such rates in calculating the aggregate production for Falcon.
Such rates are based on field estimates and may be based on limited data
available at this time.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that
term is defined in the policies of the TSX Venture Exchange) accepts
responsibility for the adequacy or accuracy of this release

Recent news on Falcon Oil & Gas

See all news