Picture of Fuji Oil Co (Shinagawa) logo

5017 Fuji Oil Co (Shinagawa) News Story

0.000.00%
jp flag iconLast trade - 00:00
EnergyAdventurousSmall CapTurnaround

Asia refinery 2021-2022 maintenance/outages

(Adds updates on Vietnam, Japan)
    SINGAPORE, March 7 (Reuters) - The table lists planned and unplanned refinery shutdowns for 2021-2022 compiled through a survey of Asian oil refiners and
market sources.
    (* Marks latest updates on planned maintenance or outages)
    
    For refinery outages in the new Reuters Oil Fundamentals Database, click:
    (Search with OILOUT or OIL FUNDAMENTALS DATABASE or go to  OFD/INFO )

Latest news:
> Vietnam to import additional 2.4 mln cu m of petroleum products in Q2          urn:newsml:reuters.com:*:nL4N2V014C
> Vietnam to auction gasoline from reserves, power outage hits refinery          urn:newsml:reuters.com:*:nL1N2UY03B
> Japan's Eneos shuts 120,000-bpd Marifu CDU for maintenance                     urn:newsml:reuters.com:*:nL1N2UZ15V
> India Reliance delays 21-day crude unit shutdown to Sept - sources             urn:newsml:reuters.com:*:nL4N2UR1V5
> Vietnam's largest refinery to resume full operations from March 15 - ministry  urn:newsml:reuters.com:*:nL4N2UK3DH
> Idemitsu has no plan to provide financial aid to Nghi Son refinery -official   urn:newsml:reuters.com:*:nT9N2890AB
> Mexico's Pemex sharply cuts oil supply to India as it readies new refinery     urn:newsml:reuters.com:*:nL1N2UE2HZ
> Japan's Eneos to shut 81-yr-old Wakayama refinery in 2023 as demand falls      urn:newsml:reuters.com:*:nL1N2U50AE
> Taiwan's Formosa shuts hydrocracker following fire                             urn:newsml:reuters.com:*:nL1N2U50N3
> Taiwan's Formosa plans to shut 3 refining units in March for maintenance       urn:newsml:reuters.com:*:nL1N2T60HO
> Indian Oil says fire at Haldia refinery unit kills 3, injures 44               urn:newsml:reuters.com:*:nL4N2T62HK
> SK Energy, Hyundai Oilbank to shut crude units in March, April                 urn:newsml:reuters.com:*:nL1N2T702P

For maintenance plans in the following regions click below: 
Middle East  REF/ME  Europe  REF/E  N. America  REF/US  
          PLANNED TURNAROUND:                                                                                                        
    Country         Company/Location                    Unit                 Capacity (in '000 bpd unless                         Timing
                                                                                      specified)            
      2022                                                                                                                           
                                                                                                            
 S KOREA         SK Energy/Ulsan         Crude unit                                       60                March-April
                 HyundaiOilbank/Seosan   Crude unit                                       160               April-May
                                                                                                                                                               
 TAIWAN          Formosa/Mailiao         No. 1 CDU, No. 2 RDS, & RFCC                     180               From March 1. CDU shut for 40 days while
                                                                                                            maintenance at the other two units to take longer
                                                                                                            due to upgrading works
 VIETNAM         *Nghi Son (NSRP)        Refinery                                         200               To resume full ops by mid-March after running at
                                                                                                            80% capacity from Jan
 INDIA           *Reliance/Jamnagar      Refinery                                         704               March crude unit maintenance delayed to Sept
 JAPAN           Eneos/Wakayama          Refinery                                        127.5              Permanent shutdown of entire refinery in Oct 2023
                 *Eneos/Marifu           CDU                                             120                Shut for scheduled maintenance
                                                                                                            
      2021                                                                                                                                                     
                                                                                                                                                               
 AUSTRALIA       BP/Kwinana              refinery                                         146               planned permanent closure in April
                                                                                                                                                               
 CHINA           Sinopec/Changling       CDU                                              160               mid-Feb (55 days)
                 PetroChina/Yunnan       CDU                                              260               Restart on Jan 26 after 50 day overhaul
                                                                                                                                                               
 INDIA           HMEL/Bathinda           refinery                                         226               about 40 days maintenance from Jan 25-26 and prep
                                                                                                            work to add petchem units in Sept-Oct
                 Haldia Petchem/Haldia   Naphtha cracker                              700,000 tpa           from August 1 for about a month
                 MRPL/Mangalore          CDU                                              60                Aug. 15-Sept. 18
                 IOC/Haldia              CDU                                              80                mid-Nov; 40 days
                                         VDU                                              NA                mid-Nov; 40 days
                                         FCC                                              NA                mid-Nov; 50 days
                                         diesel hydro desulphuriser                       NA                mid-Nov; 25 days
                                                                                                                                                               
 JAPAN           Eneos/Wakayama          CDU                                             127.5              restarted on Nov. 26 after scheduled maintenance;
                                                                                                            the unit was shut on Sept. 21
                 Idemitsu/Aichi          CDU                                              160               plans to restart in mid- or late-December; was shut
                                                                                                            on Sept. 19 for scheduled maintenance
                 Cosmo/Chiba             No. 1 CDU                                        75                restarted on Nov. 19; unit was shut on Oct. 19 for
                                                                                                            scheduled maintenance
                 Eneos/Negishi           No. 1 CDU                                        120               planned permanent closure in Oct 2022
                 Eneos/Kashima           No. 1 CDU                                        168               Restarted on July 29 after shutdown on July 6 due
                                                                                                            to electrical glitch
                 Eneos/Oita              CDU                                              136               Restarted on Aug 14 after a fire-led shutdown in
                                                                                                            May 2020
                 Cosmo/Chiba             No. 1 CDU                                        75                Planned maintenance in autumn (one month)
                 Cosmo/Sakai             CDU                                              100               Planned maintenance in autumn (one month)
                 Eneos/Sakai             refinery                                         135               May 18 (June)
                 Eneos/Mizushima-B       No. 2 CDU                                       95.2               Feb. 23 to May 14
                                         No. 3 CDU                                        105               Feb. 25 to early June
                 Eneos/Chiba             CDU                                              129               Feb. 5 to April 22
                 Eneos/Kawasaki          refinery                                         170               April 10 to 25
                 Idemitsu                CDU                                          100 or 155            Restarted on July 29 after maintenance shutdown on
                 Kosan/Yokkaichi                                                                            May 17
                 Idemitsu Kosan/Chiba    CDU                                              190               1 to 1-1/2 months from April 28
                 Fuji Oil/Sodegaura      CDU                                              143               May 12-July 8
                 Taiyo Oil/Shikoku       No. 2 CDU                                        32                Restarts on Aug. 9 after planned work since
                                                                                                            mid-July
                 Eneos/Sendai            CDU                                              145               June 7 until mid-July
                                                                                                                                                               
 PHILIPPINES     Petron/Batangas         refinery                                         180               Jan to June
                                                                                                                                                               
 S KOREA         SK Energy/Ulsan         No.4 CDU                                         240               from mid-March to mid-April
                 GS Caltex/Yeosu         No.4 CDU                                         330               March-April
                                                                                                                                                               
 TAIWAN          Formosa/Mailiao         No. 3 CDU, No. 1 RCC                           180, 85             CDU = March -April 10, RCC = Feb 23-end-April
                 Formosa/Mailiao         Reduced runs, 280 kbpd in Feb                    540               reduced runs as it delays the restart of a coking
                                                                                                            unit to Feb 9
                 Formosa/Mailiao         Delayed coker                                    36                resume operations Feb 9
                 Formosa/Mailiao         RDS                                              80                To shut in Oct for 40 days for catalyst change
                                                                                                                                                               
 THAILAND        IRPC/Rayong             No. 1 ADU, No. 2 ADU                           65, 150             13 days in Jan, 10 days in Feb
                                         ARDS                                           unknown             30 days between Jan-Feb
                                         polypropylene (PP) units                       775 tpy             13 days in Jan
                                         acrylonitrile butadiene styrene                179 tpy             2 weeks in Feb
                                         (ABS) and styrene acrylonitrile                                    
                                         (SAN) plant                                                        
                                         polystyrene (PS) unit                          125 tpy             15 days in Feb
                                         ethylbenzene (EB) and styrene                  260 tpy             45 days in May-June
                                         monomer (SM) plant                                                 
                                         high-density polyethylene (HDPE)               140 tpy             6 days in Feb and another 6 days in Aug
                                         unit                                                               
                 Bangchak/Bangkok        refinery                                         120               mid-Feb-March 25
                                                                                                                                                               
                 PetroVietnam/Binh Son   Refinery                                         130               Cuts output to 90% on weak demand
                                                                                                            
                                                                                                                                                               
          UNPLANNED SHUTDOWN:                                                                                                        
    Country         Company/Location                    Unit                   Capacity ('000 bpd unless                      Timing/Reasons
                                                                                      specified)            
      2022                                                                                                                           
                                                                                                            
 TAIWAN          *Formosa/Mailiao        Hydrocracker                                     36                Fire on Jan 21, outage may last until mid-March
                                                                                                            
      2021                                                                                                                           
                                                                                                                                     
 INDIA           Reliance /Gujrat        FCCU                                             NA                June 6 for about 2 weeks
                 IOC/Haldia              gasoline making unit                             NA                Fire during planned maintenance work that began in
                                                                                                            early-Dec lasting about 50 days
                                                                                                                                                               
 JAPAN           Eneos/Wakayama          CDU                                             127.5              Fire, system failure on March 29; restarted on May
                                                                                                            14
                 Idemitsu/Hokkaido       CDU                                              150               Fire on Jan 7 (restarted on Jan 18)
                 Idemitsu/Chiba          CDU                                              190               Earthquake on Feb 13
                 Fuji/Sodegaura          CDU                                              143               Earthquake on Feb 13 (restarted on Feb 16)
                 Eneos/Sendai            CDU                                              145               Earthquake on Feb 13 (restart May 18)
                                                                                                                                                               
 TAIWAN          CPC/Talin               No impact to operations                          350               Fire at unspecified unit during restart
                 Formosa/Mailiao         RDS 2                                            80                Restarted in July, a year after the unit was shut
                                                                                                            due to a fire
                 Formosa/Mailiao         No. 3 CDU                                        180               May 17-24
 VIETNAM         Nghi Son                                                                 200               Blackout on Feb 12 (around a week)
                 Binh Son                refinery                                         130               Output cut to 80%
    
    NB:
    AU   - Aromatic Unit
    CCU  - Catalytic Cracker Unit - makes gasoline
    CDU  - Crude Distillation Unit - refines crude into products
    CFU  - Condensate Fractionation Unit 
    CCR  - Catalytic Reformer 
    DCU  - Delayed Coking Unit
    DHDS - Diesel Hydro Desulphurisation Unit
    FCC  - Fluid Catalytic Cracker - makes gasoline
    FCCU - Fluidized Catalytic Cracker Unit 
    FOHDS- Fuel Oil Hydro Desulphurisation Unit
    HOU  - Heavy Oil Upgrading - refines fuel oil to lighter products
    HCC  - Hydro Catalytic Cracker - produces middle distillate fuels
    KHDS - Kerosene Hydro Desulphurisation Unit
    KHU  - Kerosene Hydrotreating Unit
    LRCC - Long Residue Catalytic Cracker
    RFCC - Residual Fluid Catalytic Cracker - makes gasoline, propylene
    RDS  - Residual Desulphuriser - reduces sulphur content in product
    RHDS - Residue Hydro Desulfurization Unit
    RHDS - Residue Hydro Desulphurisation Unit
    TBA  - To be announced
    VDU  - Vacuum Distillation Unit
    VGO  - Vacuum Gasoil Hydrotreater
    VRDS - Vacuum Residual Desulphuriser
    VSB  - Visbreaker
    **   - thousand tonnes per year
    * Jamnagar - 580,000-bpd refinery adjacent to the older 660,000-bpd Jamnagar refinery

 (Reporting by Asia Energy Desk)
 ((asia.energy@thomsonreuters.com; 
+65 6870 3121))

Recent news on Fuji Oil Co (Shinagawa)

See all news