REG - GCM Resources PLC - Power Plant Technical Pre-Feasibility Study <Origin Href="QuoteRef">GCM.L</Origin>
RNS Number : 1630LGCM Resources PLC14 July 201714 July 2017
GCM Resources plc
("GCM" or the "Company")
(AIM:GCM)
Technical Pre-Feasibility Study on Power Plant Proposal
GCM Resources plc ("GCM" or the "Company"), a London based resource exploration and development company, is pleased to announce that in respect to the mine-mouth coal fired power plant proposal being considered jointly by GCM and China Gezhouba Group International Engineering Co. Ltd ("CGGC"), a technical pre-feasibility study ("PFS") has been completed.
The PFS indicates that the development of a mine-mouth coal fired power plant generating up to 2,000MW at the Phulbari Coal and Power Project site is technically feasible. GCM and CGGC are in discussions to further progress the proposal.
This announcement contains inside information as defined in Article 7 of the EU Market Abuse Regulation No 596/2014 and has been announced in accordance with the Company's obligations under Article 17 of that Regulation.
For further information:
GCM Resources plc
James Hobson
Finance Director
+44 (0) 20 7290 1630
Bell Pottinger
Lorna Cobbett
+44 (0) 20 3772 2500
ZAI Corporate Finance Ltd
Nominated Adviser and Broker
Tim Cofman
+44 (0) 20 7060 2220
GCM Resources plc
Tel: +44 (0) 20 7290 1630
info@gcmplc.com; www.gcmplc.com
This information is provided by RNSThe company news service from the London Stock ExchangeENDMSCRIMITMBIBBIR
Recent news on GCM Resources
See all newsREG - GCM Resources PLC - Update regarding Polo Resources Limited
AnnouncementREG - GCM Resources PLC - Total Voting Rights
AnnouncementREG - AIM - AIM Notice - 10/04/2025
AnnouncementREG - GCM Resources PLC - Issue of Equity and PDMR dealing
AnnouncementREG - GCM Resources PLC - Interim Results for the 6 months ended 31 Dec 2024
Announcement