March 2025 Quarterly Activities Report
RNS Number : 8633E Greatland Gold PLC 14 April 2025 Greatland Gold plc (AIM: GGP) E: info@greatlandgold.com W: https://greatlandgold.com : twitter.com/greatlandgold NEWS RELEASE | 14 April 2025 March 2025 Quarterly Activities Report A$253 million free cash flow, debt free and a closing cash balance of A$398 million 90,172oz gold produced at AISC of A$2,126/oz THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION AS STIPULATED UNDER THE UK MARKET ABUSE REGULATIONS. ON PUBLICATION OF THIS ANNOUNCEMENT VIA A REGULATORY INFORMATION SERVICE, THIS INFORMATION IS CONSIDERED TO BE IN THE PUBLIC DOMAIN. Greatland Gold plc (AIM:GGP) (Greatland or the Company), is pleased to provide this Quarterly Activities Report for the period from 1 January 2025 to 31 March 2025 (March Quarter), the first full quarter following completion of Greatland's acquisition of 100% of the Telfer gold-copper mine (Telfer) and Havieron gold-copper project (Havieron). Highlights § Operations ‒ Production of 90,172oz of gold (Au) and 3,511t of copper (Cu) at an all-in-sustaining-cost (AISC)1 of A$2,126/oz Au. § Gold production was 21% higher, and AISC lower than Greatland's initial pre-acquisition mine plan (Pre-Acquisition Plan) quarterly average (74,800oz at A$2,203 AISC). ‒ Significantly improved gold recoveries of 86.7% (compared to assumed average gold recoveries of 78% in the Pre-Acquisition Plan). Continued optimisation of processing remains a key focus. ‒ New West Dome Open Pit mining area, Stage 7 Cutback, was approved and commenced mining. ‒ Greatland's first major dual train planned maintenance of the processing plant was successfully completed in late March to early April. ‒ No Lost Time Injuries during the quarter, 12-month Lost Time Injury Frequency Rate (LTIFR) at quarter end was 0. § Corporate ‒ Sales of 89,125oz Au and 3,705t Cu at weighted average realised prices of A$4,585/oz gold and A$13,140/t copper, generating revenue of A$458m. ‒ Free cash flow of A$253m and A$398m cash balance at 31 March 2025 (A$145.0m at 31 December 2024). ‒ Debt free with undrawn A$75m working capital facility. ‒ Full upside exposure to the gold price, with downside price protection provided from gold put options at A$3,905/oz (CY25) and A$4,200/oz (CY26). ‒ ASX / AIM cross-listing targeted for June 2025. § FY25 guidance ‒ Guidance for FY25: § Gold production: 196,000 - 210,000oz § AISC1: A$2,100 - A$2,250/oz Au § Growth capital: A$95 - 105 million ‒ FY25 guidance represents approximately seven months of Greatland ownership, from completion of the Telfer acquisition on 4 December 2024 to 30 June 2025. § Telfer Mineral Resource (MRE) ‒ Inaugural Telfer MRE completed on 18 March 2025, delivering 3.2Moz Au and 117kt Cu, confirming Telfer life mine life extension potential. ‒ Group MRE including Havieron now totals 10.2Moz Au and 387kt Cu. ‒ Initial Telfer Ore Reserve underway, targeted for completion in April 2025. § Telfer Resource development ‒ Drilling results from the maiden underground drilling campaign at West Dome Underground confirmed high grade near-mine underground opportunity: 16 of 19 holes drilled intercepted >50 gram-metres Au, with the average down hole intercept from these 16 holes of 23.2m @ 2.95g/t Au and 1.07% Cu. The drilling program's success led to a second 1.8km development drive from the Main Dome Underground to West Dome Underground being approved and commenced in March 2025. ‒ High priority Main Dome Underground A-Reef extensions and Eastern Stockwork Corridor (ESC) were drilled during the quarter with encouraging results that will be incorporated into mine life extension studies. ‒ Mobilisation of two additional underground drill rigs to Telfer in the June 2025 quarter will increase total rigs on site to six, the most at Telfer since 2020. Notes: 1. All-in sustaining cost (AISC) is stated per ounce of gold produced, net of by-product (Cu) credits. AISC excludes inventory movements which mainly relate to stockpiles acquired as part of the Telfer acquisition at 4 December 2024 Greatland Managing Director, Shaun Day, commented: "Greatland's first full quarter since acquiring 100% ownership of Telfer and Havieron was a tremendous success and is a great credit to the exceptional work of our operational team. "Production of more than 90,000 ounces of gold and full exposure to the strong gold price resulted in free cash flow of A$253 million for the quarter. "Closing cash of A$398 million and no debt establishes a very robust balance sheet and importantly allows us to invest significantly in organic growth and extension at Telfer. "Our confidence in the outlook for Telfer is demonstrated by the approval of investments in a new mining area at the West Dome Open Pit (Stage 7 Cutback), a second development drive to the new West Dome Underground project and an increase to six drill rigs at Telfer." Overview Gold production of 90,172 oz was 21% higher than the Pre-Acquisition Plan average (74,800 oz per quarter). AISC of A$2,126/oz Au was 3.5% lower than the Pre-Acquisition Plan average (A$2,203/oz Au). This was an excellent quarter relative to historical performance under previous ownership, which is particularly encouraging in Greatland's first full quarter of ownership. The following figure demonstrates this positive effect of full exposure to a strong gold price coupled with reduced AISC, to deliver enhanced cash flow generation. Figure 1: Telfer historical and current quarterly data Notes: 1. For the historical quarterly periods Sep'22-Sep'23, Telfer quarterly data based on Newcrest Mining Limited (Newcrest) quarterly reports. Average Realised Price and AISC quoted originally in US$/oz basis, converted to A$/oz based on respective A$:US$ exchange rates assumed in the quarterly reports. 2. AISC reported under Newcrest period based on gold sold whereas Greatland's March Quarter AISC based on gold produced. 3. Quarters from Dec'23 to Dec'24 not shown, due to processing operations interruptions under Newmont Corporation (Newmont) ownership rendering the periods non-representative. Greatland ownership period commenced from 4 Dec 2024 with the March Quarter being Greatland's first full quarter of ownership. Table 1: Telfer operating results for the March 2025 quarter (1 Jan 2025 - 31 Mar 2025)
| Operations | Unit | Result | |
| Mill production | |||
| Ore milled | kt | 4,584 | |
| Mill head grade | Au | g/t Au | 0.68 |
| Cu | % Cu | 0.10% | |
| Recovery | Au | % | 86.7% |
| Cu | % | 80.0% | |
| Metal produced | Au | oz | 90,172 |
| Cu | t | 3,511 | |
| Sales | |||
| Sales | Au | oz | 89,125 |
| Cu | t | 3,705 | |
| Average Price Received | Au | A$/oz | 4,585 |
| Cu | A$/t | 13,140 | |
| Net Revenue1 | Au revenue | A$m | 409 |
| Cu revenue | A$m | 49 | |
| Total revenue | A$m | 458 | |
| Open Pit mining | |||
| Total material mined | kt | 4,399 | |
| Ore mined (crusher feed) | kt | 2,611 | |
| Mine grade | Au | g/t Au | 0.64 |
| Cu | % Cu | 0.05% | |
| Contained metal | Au | oz | 53,527 |
| Cu | t | 1,266 | |
| Underground mining | |||
| Ore mined | kt | 278 | |
| Mine grade | Au | g/t Au | 1.72 |
| Cu | % Cu | 0.70% | |
| Contained metal | Au | oz | 15,361 |
| Cu | t | 1,945 | |
| Closing ore stockpiles (ROM) | |||
| Ore | Mt | 9.2 | |
| Average grade | Au | g/t Au | 0.64 |
| Cu | % Cu | 0.06 | |
| Contained metal | Au | koz | 188 |
| Cu | kt | 5.9 | |
| Closing ore stockpiles (low grade) | |||
| Ore | Mt | 20.7 | |
| Average grade | Au | g/t Au | 0.33 |
| Cu | % Cu | 0.04 | |
| Contained metal | Au | koz | 220 |
| Cu | kt | 9.0 | |
| Costs | |||
| Mining | A$m | 84.2 | |
| Processing | A$m | 65.5 | |
| G&A | A$m | 16.8 | |
| TC/RC and Freight | A$m | 6.4 | |
| Royalties | A$m | 12.2 | |
| Sustaining Capex | A$m | 49.9 | |
| Rehabilitation | A$m | 2.9 | |
| By-product credits | A$m | (46.1) | |
| AISC | A$m | 191.7 | |
| AISC / oz Au produced 2 | A$/oz | 2,126 | |
| FY2025 | |
| Gold production (oz) | 196,000 - 210,000 |
| AISC (A$/oz Au) | 2,100 - 2,250 |
| Growth capital (A$m) | 95 - 105 |
| Area | Measured | Indicated | Inferred | Combined | ||||||||||||
| Tonnes (Mt) | Au g/t | Cu % | Tonnes (Mt) | Au | Cu% | Tonnes (Mt) | Au g/t | Cu % | Tonnes (Mt) | Au g/t | Cu % | Au (Moz) | Cu (kt) | |||
| Havieron Deposit | - | - | - | 50 | 2.60 | 0.33 | 81 | 1.10 | 0.13 | 131.0 | 1.67 | 0.21 | 7.0 | 270 | ||
| Telfer: West Dome Open Pit | - | - | - | 28.8 | 0.57 | 0.05 | 86.8 | 0.55 | 0.05 | 115.6 | 0.55 | 0.05 | 2.1 | 61 | ||
| Telfer Main Dome Underground | - | - | - | 5.6 | 2.65 | 0.56 | 2.3 | 2.55 | 0.39 | 7.9 | 2.62 | 0.51 | 0.7 | 40 | ||
| Telfer Stockpiles | 10.3 | 0.68 | 0.07 | 20.3 | 0.33 | 0.04 | - | - | - | 30.6 | 0.45 | 0.05 | 0.4 | 16 | ||
| Combined | 10.3 | 0.68 | 0.07 | 104.7 | 1.60 | 0.21 | 170 | 0.84 | 0.09 | 285 | 1.11 | 0.14 | 10.2 | 387 | ||
| Quarter End Date | Gold Volumes Under Put Options (koz) | Weighted Average Strike Price (A$/oz) |
| 30-Jun-2025 | 46,302 | 3,905 |
| 30-Sep-2025 | 38,910 | 3,905 |
| 31-Dec-2025 | 30,792 | 3,905 |
| 31-Mar-2026 | 37,502 | 4,200 |
| 30-Jun-2026 | 37,502 | 4,200 |
| 30-Sep-2026 | 37,502 | 4,200 |
| 31-Dec-2026 | 37,498 | 4,200 |
| Total | 266,008 | 4,071 |
| HOLEID | Prospect | EAST | NORTH | RL | Depth | Dip | Azimuth | From | Too | Width | Au ppm | Cu pct | Au (GM) |
| MUC4540067 | MDU | 60,400 | 11,774 | 4,561 | 42 | 2 | 48 | 10.9 | 28.0 | 17.1 | 1.89 | 0.16 | 32 |
| MUC4540068 | MDU | 60,399 | 11,774 | 4,560 | 42 | 4 | 10 | 8.7 | 25.1 | 16.4 | 3.21 | 0.20 | 53 |
| MUC4556015 | A Reef | 60,216 | 11,225 | 4,564 | 134 | 34 | 302 | 67.6 | 68.8 | 1.1 | 35.54 | 0.11 | 41 |
| MUC4556018a | A Reef | 60,222 | 11,216 | 4,565 | 118 | 41 | 209 | 64.2 | 66.0 | 1.8 | 6.27 | 0.10 | 12 |
| MUC4556019 | A Reef | 60,223 | 11,216 | 4,565 | 137 | 36 | 185 | 85.4 | 88.0 | 2.6 | 5.32 | 0.44 | 14 |
| MUC4556021 | A Reef | 60,224 | 11,217 | 4,567 | 86 | 74 | 230 | 55.9 | 56.9 | 1.0 | 50.29 | 0.93 | 51 |
| MUC4627034 | MDU | 60,290 | 10,986 | 4,622 | 180 | -35 | 128 | 133.0 | 149.0 | 16.0 | 1.23 | 0.24 | 20 |
| MUC4627034 | MDU | 60,290 | 10,986 | 4,622 | 180 | -35 | 128 | 161.0 | 168.0 | 7.0 | 1.79 | 0.22 | 13 |
| MUC4627036 | MDU | 60,289 | 10,986 | 4,622 | 180 | -68 | 113 | 96.0 | 103.1 | 7.1 | 1.92 | 0.36 | 14 |
| MUC4627037 | MDU | 60,290 | 10,989 | 4,623 | 185 | -45 | 99 | 170.7 | 183.5 | 12.8 | 0.80 | 0.21 | 10 |
| MUC4627039 | MDU | 60,290 | 10,989 | 4,623 | 130 | -45 | 66 | 97.0 | 105.0 | 8.0 | 3.33 | 0.88 | 27 |
| MUC4641006 | A Reef | 60,190 | 11,273 | 4,661 | 70 | -42 | 4 | 53.4 | 55.0 | 1.6 | 22.14 | 0.83 | 35 |
| MUC4641007 | A Reef | 60,190 | 11,273 | 4,661 | 120 | -29 | 356 | 76.2 | 78.4 | 2.2 | 16.49 | 12.21 | 36 |
| MUC4641009 | A Reef | 60,190 | 11,273 | 4,661 | 88 | -50 | 340 | 57.8 | 62.0 | 4.2 | 9.10 | 0.30 | 38 |
| MUC4641011 | A Reef | 60,190 | 11,270 | 4,661 | 120 | -75 | 303 | 46.6 | 50.6 | 4.0 | 15.76 | 0.05 | 63 |
| MUC4654003 | A Reef | 60,158 | 11,500 | 4,707 | 82 | -35 | 26 | 43.4 | 48.9 | 5.5 | 2.19 | 0.66 | 12 |
| MUC4654004 | A Reef | 60,158 | 11,499 | 4,707 | 80 | -21 | 33 | 58.0 | 62.5 | 4.5 | 8.64 | 0.17 | 39 |
| MUC4654005A | A Reef | 60,158 | 11,498 | 4,707 | 134 | -46 | 36 | 36.0 | 42.0 | 6.0 | 1.68 | 0.84 | 10 |
| MUC4654006 | A Reef | 60,158 | 11,498 | 4,707 | 80 | -25 | 53 | 48.2 | 52.0 | 3.8 | 9.76 | 0.40 | 37 |
| MUC4654010 | A Reef | 60,137 | 11,422 | 4,698 | 155 | -54 | 147 | 98.6 | 99.4 | 0.7 | 24.25 | 0.62 | 17 |
| MUC4654013 | A Reef | 60,137 | 11,422 | 4,699 | 130 | -11 | 136 | 102.7 | 103.3 | 0.5 | 29.39 | 0.10 | 16 |
| MUC4654014 | A Reef | 60,137 | 11,422 | 4,699 | 165 | -36 | 129 | 102.3 | 103.9 | 1.5 | 11.31 | 0.96 | 17 |
| MUC4654017 | A Reef | 60,137 | 11,422 | 4,698 | 140 | -52 | 123 | 86.5 | 87.0 | 0.5 | 45.64 | 4.32 | 23 |
| MUC4654018 | A Reef | 60,138 | 11,422 | 4,699 | 145 | -38 | 114 | 132.0 | 137.8 | 5.8 | 1.87 | 0.09 | 11 |
| MUC4654019 | A Reef | 60,138 | 11,422 | 4,699 | 70 | -22 | 105 | 59.1 | 60.0 | 0.9 | 19.86 | 1.59 | 18 |
| MUC4655067 | A Reef | 60,270 | 11,663 | 4,662 | 55 | -10 | 48 | 37.7 | 41.3 | 3.6 | 8.67 | 0.14 | 31 |
| MUC4655068 | A Reef | 60,270 | 11,662 | 4,661 | 33 | -30 | 98 | 20.7 | 22.8 | 2.1 | 9.24 | 0.42 | 19 |
| MUC4655069 | A Reef | 60,269 | 11,646 | 4,661 | 23 | -90 | 43 | 4.2 | 4.5 | 0.2 | 53.14 | 0.05 | 13 |
| MUC4655069 | A Reef | 60,269 | 11,646 | 4,661 | 23 | -90 | 43 | 16.0 | 21.0 | 5.0 | 6.14 | 0.15 | 31 |
| MUC4655074 | A Reef | 60,283 | 11,550 | 4,659 | 22 | -90 | 114 | 14.0 | 15.0 | 1.0 | 12.83 | 0.67 | 13 |
| MUC4655076 | A Reef | 60,263 | 11,647 | 4,661 | 65 | -27 | 344 | 49.0 | 51.0 | 2.0 | 6.56 | 1.12 | 13 |
| MUC4695006 | A Reef | 60,325 | 11,507 | 4,699 | 60 | 90 | 263 | 0.7 | 8.1 | 7.5 | 4.92 | 0.29 | 37 |
| MUC4695006 | A Reef | 60,325 | 11,507 | 4,699 | 60 | 90 | 263 | 25.0 | 39.0 | 14.0 | 2.05 | 0.08 | 29 |
| MUC4695007 | A Reef | 60,320 | 11,537 | 4,700 | 37 | 89 | 94 | 0.8 | 22.0 | 21.2 | 4.38 | 0.44 | 93 |
| MUC4695008 | A Reef | 60,315 | 11,574 | 4,701 | 65 | 90 | 357 | 0.0 | 38.0 | 38.0 | 1.90 | 0.20 | 72 |
| MUC4695009 | A Reef | 60,313 | 11,587 | 4,700 | 55 | 73 | 321 | 0.1 | 23.8 | 23.7 | 1.18 | 0.11 | 28 |
| MUC4695010 | A Reef | 60,311 | 11,587 | 4,700 | 65 | 44 | 297 | 14.2 | 24.3 | 10.1 | 1.09 | 0.17 | 11 |
| MUC4695010 | A Reef | 60,311 | 11,587 | 4,700 | 65 | 44 | 297 | 31.0 | 56.8 | 25.8 | 1.63 | 0.70 | 42 |
| MUC4695011 | A Reef | 60,323 | 11,533 | 4,696 | 62 | -27 | 98 | 13.0 | 23.0 | 10.0 | 1.11 | 0.06 | 11 |
| MUC4695011 | A Reef | 60,323 | 11,533 | 4,696 | 62 | -27 | 98 | 45.1 | 47.5 | 2.4 | 7.42 | 0.30 | 18 |
| MUC4695012 | A Reef | 60,322 | 11,533 | 4,695 | 59 | -85 | 100 | 1.0 | 10.0 | 9.0 | 1.97 | 1.30 | 18 |
| MUC4695012 | A Reef | 60,322 | 11,533 | 4,695 | 59 | -85 | 100 | 17.7 | 35.4 | 17.7 | 0.77 | 0.10 | 14 |
| MUC4695014 | A Reef | 60,320 | 11,556 | 4,696 | 63 | -25 | 100 | 49.3 | 49.9 | 0.6 | 24.48 | 0.89 | 15 |
| MUC4695015 | A Reef | 60,320 | 11,556 | 4,696 | 45 | -53 | 78 | 35.5 | 36.0 | 0.5 | 20.44 | 0.26 | 10 |
| MUC4695017 | A Reef | 60,319 | 11,571 | 4,696 | 71 | -24 | 97 | 48.0 | 50.7 | 2.7 | 8.42 | 0.13 | 23 |
| MUC4695019 | A Reef | 60,318 | 11,572 | 4,696 | 60 | -21 | 76 | 51.7 | 54.0 | 2.4 | 5.95 | 0.84 | 14 |
| MUC4695020 | A Reef | 60,316 | 11,584 | 4,696 | 60 | -24 | 70 | 0.0 | 1.0 | 1.0 | 17.04 | 0.33 | 17 |
| MUC4695020 | A Reef | 60,316 | 11,584 | 4,696 | 60 | -24 | 70 | 34.0 | 40.2 | 6.2 | 4.53 | 1.51 | 28 |
| MUC4695020 | A Reef | 60,316 | 11,584 | 4,696 | 60 | -24 | 70 | 50.8 | 52.0 | 1.3 | 20.98 | 2.54 | 26 |
| MUC4695021 | A Reef | 60,316 | 11,584 | 4,696 | 50 | -45 | 61 | 45.0 | 49.0 | 4.0 | 2.85 | 0.31 | 11 |
| MUC4695022 | A Reef | 60,316 | 11,585 | 4,696 | 76 | -18 | 51 | 62.0 | 64.9 | 2.9 | 7.85 | 0.17 | 22 |
| MUC4695023 | A Reef | 60,316 | 11,585 | 4,696 | 95 | -12 | 37 | 0.0 | 1.6 | 1.6 | 15.34 | 2.00 | 25 |
| MUC4695023 | A Reef | 60,316 | 11,585 | 4,696 | 95 | -12 | 37 | 57.9 | 58.6 | 0.7 | 46.29 | 0.15 | 33 |
| MUC4695023 | A Reef | 60,316 | 11,585 | 4,696 | 95 | -12 | 37 | 85.7 | 94.0 | 8.3 | 4.63 | 0.23 | 38 |
| MUC4695024 | A Reef | 60,316 | 11,585 | 4,696 | 56 | -35 | 32 | 32.8 | 39.0 | 6.3 | 5.30 | 0.28 | 33 |
| MUC4695025A | A Reef | 60,314 | 11,585 | 4,696 | 50 | -72 | 27 | 25.0 | 29.1 | 4.1 | 3.21 | 1.59 | 13 |
| MUC4710016 | A Reef | 60,303 | 11,439 | 4,715 | 27 | 83 | 218 | 17.9 | 23.0 | 5.1 | 2.22 | 0.09 | 11 |
| MUC4710019 | A Reef | 60,316 | 11,403 | 4,712 | 38 | -18 | 55 | 4.8 | 36.2 | 31.4 | 2.02 | 0.37 | 64 |
| MUC4710020 | A Reef | 60,316 | 11,401 | 4,712 | 35 | -23 | 104 | 24.1 | 31.0 | 6.9 | 3.35 | 1.05 | 23 |
| MUC4710021 | A Reef | 60,312 | 11,401 | 4,716 | 26 | 80 | 185 | 17.7 | 20.0 | 2.4 | 6.66 | 0.03 | 16 |
| MUC4710022 | A Reef | 60,325 | 11,364 | 4,712 | 30 | -28 | 57 | 18.0 | 27.0 | 9.0 | 1.13 | 0.27 | 10 |
| MUC4710023 | A Reef | 60,320 | 11,364 | 4,717 | 26 | 84 | 279 | 13.6 | 15.6 | 1.9 | 15.53 | 0.15 | 30 |
| MUC4710024 | A Reef | 60,325 | 11,364 | 4,712 | 33 | -27 | 118 | 25.1 | 26.5 | 1.4 | 11.34 | 2.56 | 16 |
| MUC4710026 | A Reef | 60,331 | 11,336 | 4,711 | 34 | -26 | 84 | 16.4 | 23.6 | 7.2 | 1.47 | 0.18 | 11 |
| MUC4710027 | A Reef | 60,335 | 11,322 | 4,711 | 36 | -28 | 103 | 22.2 | 25.0 | 2.9 | 6.24 | 0.71 | 18 |
| MUC4710028 | A Reef | 60,331 | 11,321 | 4,715 | 24 | 60 | 245 | 12.8 | 15.3 | 2.5 | 4.51 | 0.04 | 11 |
| MUC4883054 | ESC | 60,995 | 11,172 | 4,896 | 40 | 41 | 89 | 0.2 | 28.0 | 27.8 | 2.32 | 0.11 | 65 |
| MUC4883055 | ESC | 60,991 | 11,169 | 4,897 | 35 | 58 | 270 | 1.7 | 17.0 | 15.3 | 5.54 | 0.30 | 85 |
| MUC4883056 | ESC | 60,993 | 11,162 | 4,898 | 24 | 80 | 85 | 1.0 | 18.0 | 17.0 | 1.29 | 0.03 | 22 |
| MUC4883057 | ESC | 60,996 | 11,156 | 4,898 | 36 | 47 | 84 | 0.0 | 26.0 | 26.0 | 1.23 | 0.27 | 32 |
| MUC4883058 | ESC | 60,996 | 11,149 | 4,899 | 25 | 71 | 91 | 0.0 | 8.0 | 8.0 | 1.38 | 0.10 | 11 |
| MUC4883059 | ESC | 60,993 | 11,141 | 4,900 | 35 | 58 | 270 | 0.7 | 16.0 | 15.3 | 3.33 | 0.19 | 51 |
| MUC4883060 | ESC | 61,000 | 11,118 | 4,902 | 26 | 64 | 89 | 1.0 | 23.0 | 22.0 | 1.96 | 0.18 | 43 |
| MUC4883061 | ESC | 60,997 | 11,104 | 4,904 | 37 | 58 | 270 | 0.1 | 20.6 | 20.5 | 1.29 | 0.09 | 26 |
| MUC4883062 | ESC | 61,002 | 11,103 | 4,904 | 25 | 63 | 90 | 0.2 | 17.0 | 16.9 | 3.98 | 0.32 | 67 |
| MUC4883063 | ESC | 60,984 | 11,087 | 4,904 | 30 | 32 | 83 | 0.0 | 15.0 | 15.0 | 3.30 | 0.20 | 49 |
| MUC4883063 | ESC | 60,984 | 11,087 | 4,904 | 30 | 32 | 83 | 22.0 | 30.0 | 8.0 | 2.86 | 0.40 | 23 |
| MUC4942006 | ESC | 61,070 | 11,031 | 4,940 | 90 | -60 | 270 | 25.0 | 39.0 | 14.0 | 1.91 | 0.41 | 27 |
| MUC4942006 | ESC | 61,070 | 11,031 | 4,940 | 90 | -60 | 270 | 46.0 | 57.0 | 11.0 | 0.99 | 0.29 | 11 |
| MUC4942009 | ESC | 61,069 | 11,041 | 4,939 | 110 | -54 | 13 | 48.7 | 71.0 | 22.3 | 4.98 | 0.93 | 111 |
| MUC4942010 | ESC | 61,069 | 11,040 | 4,939 | 80 | -76 | 42 | 35.1 | 53.0 | 17.9 | 6.54 | 0.73 | 117 |
| MUC4942011 | ESC | 61,081 | 11,026 | 4,939 | 80 | -76 | 312 | 35.2 | 49.7 | 14.5 | 11.53 | 0.65 | 167 |
| MUC4942012 | ESC | 61,081 | 11,026 | 4,939 | 70 | -71 | 227 | 34.0 | 46.3 | 12.3 | 1.32 | 0.42 | 16 |
| MUC5066029 | ESC | 61,055 | 11,116 | 5,066 | 250 | -56 | 344 | 18.0 | 37.0 | 19.0 | 0.62 | 0.09 | 12 |
| MUC5066029 | ESC | 61,055 | 11,116 | 5,066 | 250 | -56 | 344 | 226.0 | 227.0 | 1.0 | 10.53 | 0.76 | 11 |
| MUC5066038 | ESC | 61,102 | 11,118 | 5,059 | 260 | -51 | 337 | 77.2 | 80.0 | 2.8 | 4.65 | 0.01 | 13 |
| MUC5066038 | ESC | 61,102 | 11,118 | 5,059 | 260 | -51 | 337 | 99.6 | 102.7 | 3.1 | 4.39 | 0.92 | 14 |
| MUC5066038 | ESC | 61,102 | 11,118 | 5,059 | 260 | -51 | 337 | 193.3 | 222.0 | 28.7 | 0.52 | 0.12 | 15 |
| MUC5066038 | ESC | 61,102 | 11,118 | 5,059 | 260 | -51 | 337 | 229.0 | 236.0 | 7.0 | 1.61 | 0.07 | 11 |
| MUC5066049 | ESC | 61,118 | 11,111 | 5,057 | 250 | -71 | 343 | 48.0 | 51.0 | 3.0 | 4.74 | 0.00 | 14 |
| MUC5066049 | ESC | 61,118 | 11,111 | 5,057 | 250 | -71 | 343 | 64.0 | 87.0 | 23.0 | 1.32 | 0.12 | 30 |
| MUC5066049 | ESC | 61,118 | 11,111 | 5,057 | 250 | -71 | 343 | 204.2 | 211.4 | 7.1 | 2.95 | 0.58 | 21 |
| MUC5095001A | ESC | 60,940 | 10,772 | 5,091 | 220 | -60 | 130 | 45.4 | 53.8 | 8.4 | 1.67 | 0.49 | 14 |
| MUC5095001A | ESC | 60,940 | 10,772 | 5,091 | 220 | -60 | 130 | 152.0 | 174.0 | 22.0 | 0.93 | 0.20 | 21 |
| MUC5095003 | ESC | 60,940 | 10,772 | 5,091 | 230 | -72 | 145 | 82.0 | 98.0 | 16.0 | 2.49 | 0.43 | 40 |
| MUC5095003 | ESC | 60,940 | 10,772 | 5,091 | 230 | -72 | 145 | 138.0 | 158.0 | 20.0 | 1.16 | 0.13 | 23 |
| MUC5095005 | ESC | 60,940 | 10,773 | 5,091 | 179 | -65 | 112 | 126.0 | 178.5 | 52.5 | 1.56 | 0.32 | 82 |
| WR26814 | WDO | 58,449 | 12,687 | 5,228 | 138 | -64 | 250 | 35.0 | 43.0 | 8.0 | 2.25 | 0.99 | 18 |
| WR26814 | WDO | 58,449 | 12,687 | 5,228 | 138 | -64 | 250 | 59.0 | 90.0 | 31.0 | 0.66 | 0.08 | 20 |
| WR26814 | WDO | 58,449 | 12,687 | 5,228 | 138 | -64 | 250 | 113.0 | 138.0 | 25.0 | 2.86 | 0.07 | 71 |
| WR27104 | WDO | 58,466 | 12,715 | 5,228 | 186 | -89 | 76 | 105.0 | 142.0 | 37.0 | 3.44 | 0.45 | 127 |
| WR41232 | WDO | 58,705 | 14,222 | 5,532 | 280 | -55 | 76 | 217.0 | 221.0 | 4.0 | 5.15 | 0.26 | 21 |
| WR41601 | WDO | 58,739 | 14,156 | 5,532 | 270 | -70 | 97 | 241.0 | 252.0 | 11.0 | 0.95 | 0.04 | 10 |
| WR41601 | WDO | 58,739 | 14,156 | 5,532 | 270 | -70 | 97 | 258.0 | 268.0 | 10.0 | 1.01 | 0.01 | 10 |
| WR41721 | WDO | 58,729 | 14,184 | 5,532 | 330 | -55 | 91 | 144.0 | 146.0 | 2.0 | 6.33 | 0.03 | 13 |
| WR42063 | WDO | 58,717 | 14,204 | 5,531 | 320 | -55 | 91 | 281.0 | 289.0 | 8.0 | 1.33 | 0.47 | 11 |
| WUC4550018 | WDU | 58,770 | 13,105 | 4,420 | 423 | -21 | 278 | 175.0 | 183.0 | 8.0 | 1.27 | 0.10 | 10 |
| WUC4550018 | WDU | 58,770 | 13,105 | 4,420 | 423 | -21 | 278 | 294.0 | 325.0 | 31.0 | 1.18 | 0.38 | 36 |
| WUC4550030 | WDU | 58,783 | 13,063 | 4,421 | 429 | -14 | 271 | 341.0 | 364.3 | 23.3 | 1.64 | 0.54 | 38 |
| WUC4550030 | WDU | 58,783 | 13,063 | 4,421 | 429 | -14 | 271 | 370.0 | 381.8 | 11.8 | 2.09 | 0.15 | 25 |
| WUC4550032 | WDU | 58,783 | 13,062 | 4,422 | 425 | -10 | 268 | 157.5 | 163.0 | 5.5 | 1.92 | 0.06 | 11 |
| WUC4550032 | WDU | 58,783 | 13,062 | 4,422 | 425 | -10 | 268 | 282.3 | 294.0 | 11.7 | 0.86 | 0.01 | 10 |
| WUC4550032 | WDU | 58,783 | 13,062 | 4,422 | 425 | -10 | 268 | 305.5 | 326.4 | 20.9 | 4.07 | 0.49 | 85 |
| WUC4550032 | WDU | 58,783 | 13,062 | 4,422 | 425 | -10 | 268 | 336.9 | 360.0 | 23.1 | 1.13 | 0.49 | 26 |
| WUC4550032 | WDU | 58,783 | 13,062 | 4,422 | 425 | -10 | 268 | 399.0 | 408.0 | 9.0 | 2.91 | 0.24 | 26 |
| Criteria | Commentary |
| Sampling techniques | Resource definition drilling at Telfer involves a combination of reverse circulation (RC) and diamond drilling throughout the mining period. For diamond drilling, samples are taken according to lithological boundaries, with geologists defining sample intervals and selecting the assay methodology. Historically, high-grade reef samples were sent for screen fire assay, while other samples underwent fire assay for gold and additional elements. Core sizes for resource drilling usually range from NQ to PQ, while smaller sizes (NQ or LTK60) are used for grade control. Diamond drilling typically samples lithological units with lengths between 0.2 to 1.2 meters, with 1-meter intervals being most common and they are barcoded and submitted for laboratory analysis. Historically, RC drilling typically produces 1-meter samples, from which a 2-5 kg sub-sample is taken using a riffle splitter, then pulverised for gold assay. Earlier RC drilling involved samples from 0.5-meter to 2-meter intervals, with the small intervals were used to target reefs. Recent RC drilling for resource definition uses 1-meter intervals and split using cone splitter from which a 2-5 kg sub-sample is taken with bulk reject material stored temporarily. While grade control uses 2-meter intervals and split using cone splitter. All RC drilling has field duplicates conducted at a 1:20 ratio. Rock chip samples, collected manually from exposed development faces, are typically 2-3 kg, collected perpendicular to bedding, and include all relevant domains (reef, hanging wall, footwall). These samples are stored in pre-numbered bags for analysis. |
| Drilling techniques | Drilling at the Telfer has evolved over time, following industry-standard protocols. Before 1998, drilling targeted mainly previously mined areas, while from 1998 to 2002, diamond drilling formed the primary data source for current Mineral Resource estimates, supplemented by RC drilling. Currently, RC drilling is the primary data source for the open pit resources and diamond drilling for underground resources. Currently, NQ2 is the dominant drill size for diamond drilling and RC Drilling is drilled with a pre-collar of 143mm then reduced to 134mm diameter. Additional core sizes, including NQ, HQ, HQ3, LTK60, and limited PQ and BQ, have also been used at Telfer. LTK60 and BQ have mainly been used for grade control. The Reflex orientation tool is used by drillers, with all core being oriented using Ezy-Mark to mark the bottom of the hole. The core is then re-constructed in V-Rail, where the orientation line is drawn along the core. |
| Drill sample recovery | Core recovery data from diamond drilling is systematically recorded by comparing drillers' depth blocks with database records and is stored in the geological database. If excessive core loss occurs, a wedge hole is often drilled to recover the lost interval. A review in 2019 confirmed no significant relationship between sample recovery and grade for either core or RC samples, with high core recovery minimising potential loss effects.Following the review, weighing each RC sample at the rig was implemented to ensure consistent sample support in resource estimation. |
| Logging | Geological logging is conducted for all diamond and reverse circulation (RC) drill holes, capturing lithology, alteration, mineralisation, veining, and structure (for diamond core). Diamond drill holes are also quantitatively logged for veining, vein percentage, and structure. All drill core is photographed before sampling, using either slide film or digital cameras. Logged data is validated before merging into the database, which contains over 1,000 km of logged geology, covering approximately 80% of total drilling. Rock Quality Designation (RQD) is routinely recorded, with around 900 diamond holes geotechnically assessed. The level of logging detail is appropriate for resource estimation and related studies. |
| Sub-sampling techniques and sample preparation | Sampling and quality control procedures are designed for the material being tested. Geologists define sample intervals to avoid crossing key lithological contacts and select appropriate assay methods. Diamond core is typically sampled as half-core, while RC samples are collected dry, with conditions recorded. Since 2015, cone splitters have replaced riffle splitters for RC sampling, with field duplicates taken at a 1:20 ratio. Core samples are processed through drying, crushing, and pulverising, with historical standards requiring 90% passing 75 µm. Older RC drilling used 0.5-2 m intervals, while recent resource definition drilling follows 1 m intervals (2 m for grade control), with a 5 kg primary split collected. Samples are prepared at the Telfer lab, where they are crushed, sub-split, and pulverised to 95% passing 106 µm. Gold is analysed via 30 g fire assay, while base metals, sulphur, and arsenic are tested by ICP. Cyanide-soluble copper is determined by bottle roll leach with AAS analysis. To ensure accuracy, 1 in 20 samples undergo external lab verification. |
| Quality of assay data and laboratory tests | Assay and quality control protocols at the Telfer deposit have evolved to align with industry standards. Before 1998, quality control procedures followed industry norms of the time, with no major concerns identified. From 1998 onwards, protocols were enhanced, particularly during prefeasibility and feasibility studies conducted between 1998 and 2002. Samples are primarily prepared at the Telfer laboratory and then sent to external commercial labs for analysis.Currently, all resource definition samples have been assayed through a combination of the Telfer Laboratory and the Bureau Veritas (BV) Commercial Lab in Perth and all grade control samples have been sent through Telfer Laboratory.Gold is analysed using fire assay, while multi-element analyses-including silver, arsenic, bismuth, copper, iron, nickel, lead, sulphur, and zinc-are conducted using ICP techniques. Cyanide-soluble copper is assessed via bottle roll leach with AAS analysis. Since 1998, comprehensive quality control measures have been in place, including the use of Certified Reference Materials (CRMs), blanks, duplicate assays, blind pulp re-submissions and checks at independent laboratories. Matrix-matched CRMs were introduced in 1999, and transition to multi client CRMs in 2018. Since 2000, Telfer's laboratory was managed by commercial organisations until Telfer re-opening in 2002 has been managed by Newcrest and now, Greatland. Regular reviews of Quality Assurance and Quality Control (QAQC) procedures, including sample resubmissions and bias assessments, help ensure data accuracy and reliability. Monthly reports document any anomalies, with corrective actions taken as needed. Comparison studies, including analyses of duplicate pulp samples sent to external laboratories, confirm data precision, with a 90% repeatability rate. The QAQC protocols and assay techniques used are considered reliable for Mineral Resource estimation. During the 2002 feasibility study, 13,570 pulp duplicate samples were dispatched from the Telfer preparation laboratory for analysis at a check laboratory. Insignificant bias was identified between the original and check laboratories for gold (-0.8%) and copper (0.5%). |
| Verification of sampling and assaying | Drill hole data is securely stored in an acQuire database, with stringent controls to ensure data integrity and prevent errors or duplication. Data collection, including collar coordinates, drill hole designation, logging, and assaying, follows strict protocols to maintain accuracy. Validation involves multiple stages, with input from geologists, surveyors, assay laboratories, and down-hole surveyors where applicable. Data entry has evolved from manual methods to direct digital input, incorporating automated validation checks. Internal and external reviews further enhance data quality before resource estimation. Resource data is managed daily by site geologists, with additional verification by a centralised resource team. Sampling details are recorded digitally, utilising barcode and tracking systems to monitor sample integrity throughout the process. Recent drilling programs employ numbered bags for tracking consistency. Regular audits of both internal and commercial laboratories ensure compliance with quality standards. No assay data adjustments have been made in the Mineral Resource estimate. |
| Location of data points | Mining operations at Telfer Gold Mine adhere to periodic reporting requirements for the WA Department of Mines, Industry Regulation and Safety (DMIRS), using the MGA94/AHD coordinate system for official submissions. However, site operations utilise the Telfer Mine Grid (TMG) and Telfer Height Datum (THD), requiring coordinate transformations between the national and operational coordinate systems. This has been supplied by AAM Surveys in 1995 (AMG84 to Telfer Mine Grid) and AAMHATCH in February 2007 (Telfer Mine Grid to MGA Transformation). Both reports also addressed the height datum and in 2007 established the THD=AHD + 5193.7m. A local grid covers the whole of the Telfer mine area (Telfer Mine Grid 2002). It is oriented with grid north at 44o03'12' west of magnetic north. Topographic control is maintained through a combination of surface and aerial surveys, with routine updates for pits and underground voids. Drill hole collars are surveyed upon completion by mine surveyors. The natural surface topography, along with current pit surveys and underground voids (development, stopes and vertical openings) are used to deplete the resources and account for changes in mining areas at Telfer. Downhole survey methods have evolved over time, progressing from early single-shot cameras to modern electronic tools. Currently, drilling programs include multi-shot surveys at regular intervals, with post-completion surveys conducted at finer resolutions. Specific drilling campaigns may incorporate gyroscopic surveys where required. Routine in-pit drilling, particularly for pre-production and grade control, typically excludes downhole surveys, relying on collar surveys for accuracy. |
| Data spacing and distribution | The drill hole spacing is sufficient to demonstrate geological continuity appropriate for the Mineral Resource and the classifications applied under the 2012 JORC Code. The drill spacing applied to specific domains within the overall resource is variable and is considered suitable for the style of mineralisation and mineral resource estimation requirements. |
| Orientation of data in relation to geological structure | The Telfer mine site topography is dominated by two large scale asymmetric dome structures with steep west dipping axial planes. Main Dome is in the southeast portion of the mine and is exposed over a strike distance of 3 km north-south and 2 km east-west before plunging under transported cover. West Dome forms the topographical high in the northwest quadrant of the mine and has similar dimensions to Main Dome. Both fold structures have shallow to moderately dipping western limbs and moderate to steep dipping eastern limbs. Surface drilling is orientated to ensure optimal intersection angle for the reefs. Underground drilling orientation may be limited by available collar locations, but acceptable intersection angles are considered during the drill hole planning process. No orientation bias has been indicated in the drilling data.. |
| Sample security | Sample security is maintained through a tracking system from drilling to database entry. While barcoding was previously used, it has been replaced with pre-numbered calico bags for resource development and underground drilling samples. All sample movements, including dispatch details, drill hole identification, sample ranges, and analytical requests, are recorded in a database. Any discrepancies identified upon receipt by the laboratory are validated to ensure data integrity. |
| Audits or reviews | In-house reviews of data, QAQC results, sampling protocols and compliance with corporate and site protocols are carried out at various frequencies by company employees not closely associated with the Telfer projects. Procedure audits and reviews are carried out by corporate employees during site visits. |
| Criteria | Commentary |
| Mineral tenement and land tenure status | Mining and ore processing at Telfer operate under granted leases and licenses covering all key infrastructure, including open pits, underground resources, processing facilities, waste storage, and support services. The Telfer Main Dome Underground Mineral Resource is within mining leases M45/6 and M45/8, while the West Dome Mineral Resource, approximately 3km northwest of the Main Dome open pit, lies within leases M45/7 and M45/33. These leases are currently under renewal. An Indigenous Land Use Agreement (ILUA) has been in place since December 2015, covering all operational aspects of the site. Telfer operations also remain compliant with the Mining Rehabilitation Fund (MRF) levy. |
| Exploration done by other parties | The Telfer district was first geologically mapped by the Bureau of Mineral Resources in 1959, though no gold or copper mineralization was identified. In 1971, regional sampling by Day Dawn Minerals NL detected anomalous copper and gold at Main Dome. From 1972 to 1975, Newmont Pty Ltd conducted extensive exploration and drilling, defining an open pit reserve primarily in the Middle Vale Reef. In 1975, BHP Gold acquired a 30% stake in the project, and in 1990, Newmont and BHP Gold merged their Australian assets to form Newcrest Mining Limited. Newcrest managed exploration and resource drilling from 1990 until its acquisition by Newmont Corp on November 6, 2023. Newmont later divested Telfer, selling it to Greatland Gold on December 4, 2024, which now oversees exploration and drilling activities. |
| Geology | Telfer is located within the northwestern Paterson Orogen and is hosted by the Yeneena Supergroup, a 9 km thick sequence of marine sedimentary rocks. Gold and copper mineralization occurs in stratiform reefs and stockworks within the Malu Formation of the Lamil Group, controlled by both structure and lithology. Mineralisation styles include high-grade narrow reefs, reef stockwork corridors, sheeted vein sets, and extensive low-grade stockwork, which forms most of the sulphide resource. Sulphide mineralisation consists mainly of pyrite and chalcopyrite, with copper minerals including chalcopyrite, chalcocite, and bornite. Gold is primarily free-grained or associated with sulphides and quartz/dolomite gangue, with a correlation between vein density and gold grade. The highest gold and copper grades occur within bedding sub-parallel reef systems, including multiple reef structures in Main Dome, such as E-Reefs, MVR, M10-M70 reefs, A-Reef, and B-Reefs (notably B30). Additional mineralisation occurs in northwest-trending and north-dipping veins. Stockwork mineralisation, found in open pits, Telfer Deeps, and the Vertical Stockwork Corridor (VSC), is best developed in the axial zones of Main Dome and West Dome, often extending over large areas (0.1 km to 1.5 km). It can include brecciated zones filled with quartz, carbonate, and sulphides |
| Drill hole Information | Refer to table 5 - Significant Intercepts. |
| Data aggregation methods | Significant assay intercepts are reported using length-weighted averages based on predefined thresholds, with a maximum allowable internal dilution. For Open pit (RC) significant intercepts a maximum of 5m of internal dilution, minimum width of 3m, minimum grade of 0.5g/t and a gram metre (grade x length) of greater than 10gm. or Underground diamond significant intercepts a maximum of 5m of internal dilution, minimum width of 1m, minimum grade of 0.5g/t and a gram metre (grade x length) of greater than 20gm. |
| Relationship between mineralisation widths and intercept lengths | Significant assay intervals represent apparent widths, as drilling is not always perpendicular to the dip of mineralisation. True widths are typically less than downhole widths and can only be estimated once all results are received and final geological interpretations are completed. Where access permits all holes are drilled to intercept as close to true width as possible. |
| Diagrams | As provided |
| Balanced reporting | This is the first quarterly report released by Greatland Gold since taking ownership of the Telfer Gold mine. Drilling results will be reported regularly released to the market Earlier reporting of exploration programs conducted by Newcrest and Greatland Gold have previously been reported. Drilling programmes are ongoing and further material results will be reported in subsequent releases. |
| Other substantive exploration data | NIL |
| Further work | Drilling is ongoing with further work is planned to evaluate exploration opportunities that extend the known mineralisation. |