SINGAPORE, Jan 11 (Reuters) - The table lists planned and unplanned refinery shutdowns for 2021-2022 compiled through a survey of Asian oil refiners and
market sources.
(* Marks latest updates on planned maintenance or outages)
For refinery outages in the new Reuters Oil Fundamentals Database, click:
(Search with OILOUT or OIL FUNDAMENTALS DATABASE or go to OFD/INFO )
Latest news:
> Taiwan's Formosa plans to shut 3 refining units in March for maintenance urn:newsml:reuters.com:*:nL1N2T60HO
> Indian Oil says fire at Haldia refinery unit kills 3, injures 44 urn:newsml:reuters.com:*:nL4N2T62HK
> SK Energy, Hyundai Oilbank to shut crude units in March, April urn:newsml:reuters.com:*:nL1N2T702P
For maintenance plans in the following regions click below:
Middle East REF/ME Europe REF/E N. America REF/US
PLANNED TURNAROUND:
Country Company/Location Unit Capacity (in '000 bpd unless Timing
specified)
2022
S KOREA *SK Energy/Ulsan Crude unit 60 March-April
*HyundaiOilbank/Seosan Crude unit 160 April-May
TAIWAN *Formosa/Mailiao No. 1 CDU, No. 2 RDS, & RFCC 180 From March 1. CDU shut for 40 days while
maintenance at the other two units to take longer
due to upgrading works
2021
AUSTRALIA BP/Kwinana refinery 146 planned permanent closure in April
CHINA Sinopec/Changling CDU 160 mid-Feb (55 days)
PetroChina/Yunnan CDU 260 Restart on Jan 26 after 50 day overhaul
INDIA HMEL/Bathinda refinery 226 about 40 days maintenance from Jan 25-26 and prep
work to add petchem units in Sept-Oct
Haldia Petchem/Haldia Naphtha cracker 700,000 tpa from August 1 for about a month
MRPL/Mangalore CDU 60 Aug. 15-Sept. 18
IOC/Haldia CDU 80 mid-Nov; 40 days
VDU NA mid-Nov; 40 days
FCC NA mid-Nov; 50 days
diesel hydro desulphuriser NA mid-Nov; 25 days
JAPAN Eneos/Wakayama CDU 127.5 restarted on Nov. 26 after scheduled maintenance;
the unit was shut on Sept. 21
Idemitsu/Aichi CDU 160 plans to restart in mid- or late-December; was shut
on Sept. 19 for scheduled maintenance
Cosmo/Chiba No. 1 CDU 75 restarted on Nov. 19; unit was shut on Oct. 19 for
scheduled maintenance
Eneos/Negishi No. 1 CDU 120 planned permanent closure in Oct 2022
Eneos/Kashima No. 1 CDU 168 Restarted on July 29 after shutdown on July 6 due
to electrical glitch
Eneos/Oita CDU 136 Restarted on Aug 14 after a fire-led shutdown in
May 2020
Cosmo/Chiba No. 1 CDU 75 Planned maintenance in autumn (one month)
Cosmo/Sakai CDU 100 Planned maintenance in autumn (one month)
Eneos/Sakai refinery 135 May 18 (June)
Eneos/Mizushima-B No. 2 CDU 95.2 Feb. 23 to May 14
No. 3 CDU 105 Feb. 25 to early June
Eneos/Chiba CDU 129 Feb. 5 to April 22
Eneos/Kawasaki refinery 170 April 10 to 25
Idemitsu CDU 100 or 155 Restarted on July 29 after maintenance shutdown on
Kosan/Yokkaichi May 17
Idemitsu Kosan/Chiba CDU 190 1 to 1-1/2 months from April 28
Fuji Oil/Sodegaura CDU 143 May 12-July 8
Taiyo Oil/Shikoku No. 2 CDU 32 Restarts on Aug. 9 after planned work since
mid-July
Eneos/Sendai CDU 145 June 7 until mid-July
PHILIPPINES Petron/Batangas refinery 180 Jan to June
S KOREA SK Energy/Ulsan No.4 CDU 240 from mid-March to mid-April
GS Caltex/Yeosu No.4 CDU 330 March-April
TAIWAN Formosa/Mailiao No. 3 CDU, No. 1 RCC 180, 85 CDU = March -April 10, RCC = Feb 23-end-April
Formosa/Mailiao Reduced runs, 280 kbpd in Feb 540 reduced runs as it delays the restart of a coking
unit to Feb 9
Formosa/Mailiao Delayed coker 36 resume operations Feb 9
Formosa/Mailiao RDS 80 To shut in Oct for 40 days for catalyst change
THAILAND IRPC/Rayong No. 1 ADU, No. 2 ADU 65, 150 13 days in Jan, 10 days in Feb
ARDS unknown 30 days between Jan-Feb
polypropylene (PP) units 775 tpy 13 days in Jan
acrylonitrile butadiene styrene 179 tpy 2 weeks in Feb
(ABS) and styrene acrylonitrile
(SAN) plant
polystyrene (PS) unit 125 tpy 15 days in Feb
ethylbenzene (EB) and styrene 260 tpy 45 days in May-June
monomer (SM) plant
high-density polyethylene (HDPE) 140 tpy 6 days in Feb and another 6 days in Aug
unit
Bangchak/Bangkok refinery 120 mid-Feb-March 25
VIETNAM PetroVietnam/Binh Son Refinery 130 Cuts output to 90% on weak demand
UNPLANNED SHUTDOWN:
Country Company/Location Unit Capacity ('000 bpd unless Timing/Reasons
specified)
2022
2021
INDIA Reliance /Gujrat FCCU NA June 6 for about 2 weeks
*IOC/Haldia gasoline making unit NA Fire during planned maintenance work that began in
early-Dec lasting about 50 days
JAPAN Eneos/Wakayama CDU 127.5 Fire, system failure on March 29; restarted on May
14
Idemitsu/Hokkaido CDU 150 Fire on Jan 7 (restarted on Jan 18)
Idemitsu/Chiba CDU 190 Earthquake on Feb 13
Fuji/Sodegaura CDU 143 Earthquake on Feb 13 (restarted on Feb 16)
Eneos/Sendai CDU 145 Earthquake on Feb 13 (restart May 18)
TAIWAN CPC/Talin No impact to operations 350 Fire at unspecified unit during restart
Formosa/Mailiao RDS 2 80 Restarted in July, a year after the unit was shut
due to a fire
Formosa/Mailiao No. 3 CDU 180 May 17-24
VIETNAM Nghi Son 200 Blackout on Feb 12 (around a week)
Binh Son refinery 130 Output cut to 80%
NB:
AU - Aromatic Unit
CCU - Catalytic Cracker Unit - makes gasoline
CDU - Crude Distillation Unit - refines crude into products
CFU - Condensate Fractionation Unit
CCR - Catalytic Reformer
DCU - Delayed Coking Unit
DHDS - Diesel Hydro Desulphurisation Unit
FCC - Fluid Catalytic Cracker - makes gasoline
FCCU - Fluidized Catalytic Cracker Unit
FOHDS- Fuel Oil Hydro Desulphurisation Unit
HOU - Heavy Oil Upgrading - refines fuel oil to lighter products
HCC - Hydro Catalytic Cracker - produces middle distillate fuels
KHDS - Kerosene Hydro Desulphurisation Unit
KHU - Kerosene Hydrotreating Unit
LRCC - Long Residue Catalytic Cracker
RFCC - Residual Fluid Catalytic Cracker - makes gasoline, propylene
RDS - Residual Desulphuriser - reduces sulphur content in product
RHDS - Residue Hydro Desulfurization Unit
RHDS - Residue Hydro Desulphurisation Unit
TBA - To be announced
VDU - Vacuum Distillation Unit
VGO - Vacuum Gasoil Hydrotreater
VRDS - Vacuum Residual Desulphuriser
VSB - Visbreaker
** - thousand tonnes per year
* Jamnagar - 580,000-bpd refinery adjacent to the older 660,000-bpd Jamnagar refinery
(Reporting by Asia Energy Desk)
((asia.energy@thomsonreuters.com;
+65 6870 3121))
Recent news on Nippon Life India Asset Management
See all newsBrief: Nippon Life India Asset Management March-Quarter Consol Net Profit 3.85 Billion Rupees
Brief: Nippon Life India Asset Management Clarifies On Report "Nippon Life's India Asset Manager To Settle Yes Bank Investment Case"
Nippon Life's India asset manager to settle Yes Bank investment case, document shows