============
Ørsted A/S (Orsted)
Ørsted takes final investment decision on its first Irish solar farm
05-Dec-2023 / 11:00 CET/CEST
══════════════════════════════════════════════════════════════════════════
5.12.2023 11:00:01 CET | Ørsted A/S | Investor News
Ørsted has taken final investment decision (FID) on phase one of
Garreenleen Solar Farm, which marks the company’s first solar investment
in Ireland.
Located 15 km outside of Carlow town, this 81 MW solar development is
expected to be operational by 2026 and will bring Ørsted’s operational
capacity on the island of Ireland to almost 500 MW.
Today’s FID follows the project’s successful win under the Irish
Government’s Renewable Electricity Support Scheme 3 (RESS 3) auction in
September 2023. RESS 3 was a successful auction for Ørsted, with
two projects (wind and solar) totalling 124 MW clearing. The RESS 3
auction average strike price was EUR 100.47 per MWh, which is consistent
with similar regimes in other European markets.
Commenting on the investment decision, Kieran White, Senior Vice President
of Onshore in Region Europe at Ørsted, said:
“Solar energy is an essential component for enabling the Irish power
system to run entirely on green energy, and I’m delighted to confirm that
Ørsted now will invest in our first Irish solar farm.“
He continued: “While this will be our first solar project in Ireland, our
strong pipeline of other projects, which continue to progress through
consenting and grid access, gives us the confidence that more will
follow.”
“Garreenleen is an attractive solar project because it has a short grid
route to a strong meshed node in the existing national electricity
network, in an area of the grid where constraints are forecast to be low.
With this investment decision, the project will also install the necessary
grid infrastructure to facilitate the connection of a second phase of the
project, which we hope to commit to within the next year,” he concluded.
For further information, please contact:
Media Relations
Thor R. Wilkens
+45 99 55 44 07
1 thrwi@orsted.com
Investor Relations
Rasmus Keglberg Hærvig
+45 99 55 90 95
2 ir@orsted.com
About Ørsted
The Ørsted vision is a world that runs entirely on green energy. Ørsted
develops, constructs, and operates offshore and onshore wind farms, solar
farms, energy storage facilities, renewable hydrogen and green fuels
facilities, and bioenergy plants. Ørsted is recognised on the CDP Climate
Change A List as a global leader on climate action and was the first
energy company in the world to have its science-based net-zero emissions
target validated by the Science Based Targets initiative (SBTi).
Headquartered in Denmark, Ørsted employs approx. 8,700 people. Ørsted's
shares are listed on Nasdaq Copenhagen (Orsted). In 2022, the group's
revenue was DKK 132.3 billion (EUR 17.8 billion). Visit 3 orsted.com or
follow us on 4 Facebook, 5 LinkedIn, Instagram, and 6 X.
Attachments
• 7 Investor News Garreenleen FID.pdf
News Source: Ritzau
══════════════════════════════════════════════════════════════════════════
Dissemination of a Regulatory Announcement, transmitted by EQS Group.
The issuer is solely responsible for the content of this announcement.
══════════════════════════════════════════════════════════════════════════
ISIN: DK0060094928
Category Code: MSCM
TIDM: Orsted
Sequence No.: 289866
EQS News ID: 1789709
End of Announcement EQS News Service
══════════════════════════════════════════════════════════════════════════
8 fncls.ssp?fn=show_t_gif&application_id=1789709&application_name=news&site_id=reuters8
References
Visible links
1. mailto:thrwi@orsted.com
2. mailto:ir@orsted.com
3. https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=redirect&url=7fe08b34cc7f42aaf969a4f56cdef5c6&application_id=1789709&site_id=reuters8&application_name=news
4. https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=redirect&url=31b74ef0d1ca91bb36c74066af005426&application_id=1789709&site_id=reuters8&application_name=news
5. https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=redirect&url=82b9569885306f3c2233604193d34668&application_id=1789709&site_id=reuters8&application_name=news
6. https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=redirect&url=26b66c3701378f14b5b5ac023ec025b0&application_id=1789709&site_id=reuters8&application_name=news
7. https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=redirect&url=74c6694d6fc8d339b22e4ced56719994&application_id=1789709&site_id=reuters8&application_name=news
============