The Board of Ormonde is very pleased to report the results of the recently completed drilling program at the Barruecopardo Tungsten Project in Salamanca, Spain ("Barruecopardo" or the "Project"). The purpose of this drilling program was to further confirm the potential for the mineral resources to be expanded and extended at depth, with a view to enabling development of a "Stage 2" underground mine at the Project.
Highlights
Excellent results obtained from 2,000m drilling program commenced during Q4 2015 including:
BAR83: 23m @ 0.26% WO3 from 172m (including 4m @ 1.23% WO3)
BAR83: 5m @ 1.95 % WO3 from 404m
BAR85: 25m @ 0.21% WO3 from 334m (including 5m @ 0.59% WO3)
BAR86: 6m @ 2.59% WO3 from 253m
Results further support the current resource interpretation at Barruecopardo;
Confirm the significant potential to extend tungsten mineralisation at the Project: and
Demonstrate the potential to extend the nine year mine life at Barruecopardo substantially through the development of a "Stage 2" underground mine at the Project
Steve Nicol,Ormonde's Managing Director,commented:
"The excellent drilling results achieved from the recently completed drilling program below the base of the planned open pit are most satisfying, confirming our belief that there is significant potential to substantially extend the mine life at Barruecopardo through the development of a Stage 2 underground mine. Works in this regard, including further drilling, will continue during the project construction and initial production periods."
Drilling Results
The five hole drill program was carried out with the objective of confirming extensions to the mineralisation at depth beneath the main central part of the planned 9 year open pit, whilst also following up a potentially expanded zone of mineralisation under the shallow northern end of the planned open pit which was identified by drilling in 2012.
An opportunity exists to significantly extend the currently defined nine year mine life of the Project through the development of a Stage 2 underground operation, with the identification of additional mineral resources below the central part of the planned open pit being the primary focus in this regard. The results of this initial drilling program lends growing support to this potential. The Project Company will continue to advance its goal of establishing and developing a fast track Stage 2 underground mine at the Project.
Drilling in the Northern area (BAR83, BAR84, and BAR87), below the shallow end of the currently defined open pit confirmed that this part of the resource is more complex, with multiple schist blocks present within the granite being intersected during drilling. Further drill testing is warranted to follow up on the original results from the 2012 drilling, but such work will not be immediately prioritised.
A full table of significant intercepts is provided below.
Project Timeline Update
In February the Company reported upon an administrative appeal in relation to an element of the compulsory land acquisition process underway which the Company considered to be merely vexatious. This belief has been supported by a recent negative finding (favourable to the Company's position) at the initial administrative level of this appeal process, however Project timelines remain likely to be impacted. Following receipt of updated specialist legal advice related to the relevant appeals process and timelines the Company is now finalising discussions with its project partner and debt provider on the optimisation of the project delivery schedule with details to be announced in due course.
Table of Significant Intercepts
Hole
Length of Hole
From
To
Length
WO3
Cut WO3
(m)
(m)
(m)
(m)
(%)
(%)
BAR83
473.5
101
105
4
0.16
BAR83
172
195
23
0.26
including
172
176
4
1.23
BAR83
291
298
7
0.37
BAR83
354
359
5
0.11
BAR83
404
409
5
1.95
1.02
BAR83
439
443
4
0.14
BAR83
451
455
4
0.12
BAR84
341.5
307
311
4
0.13
BAR84
329
333
4
0.29
BAR85
401.8
303
317
14
0.14
BAR85
334
359
25
0.21
including
334
337
3
0.53
including
354
359
5
0.59
BAR85
378
382
4
0.50
BAR86
418.5
180
184
4
0.25
BAR86
203
208
5
0.12
BAR86
253
259
6
2.59
1.68
BAR86
290
302
12
0.14
including
290
291
1
1.03
BAR86
330
334
4
0.90
BAR87
359.6
331
336
5
0.11
Notes to table:
All lengths are down-hole lengths.
Significant intercepts at 0.1% WO3 cut-off (4m minimum width of intercept).
Where cut grades are shown these are after application of a 5% WO3 top cut.
Sampling, Assaying and Quality Control Measures were implemented as part of the drilling program.
All core has been routinely logged by an experienced geologist. Relevant core intervals were split in half by diamond saw, with half being sent for assay and the other half being retained in the core boxes for reference. Sampling is carried out over one metre intervals.
Sample preparation and analyses were performed at ALS Chemex (Spain). Assays are reported using the fusion XRF method. Reference samples (blanks, duplicates and certified standards) are routinely included in each sample batch as quality control measures. In addition check assays are performed on selected mineralised samples.
EurGeol Dr. Mark Holdstock, PGeo, a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, June 2009, of the London Stock Exchange, acting in his capacity as consultant geologist, has reviewed and approved the technical information contained in this announcement.
Aglossary explainingtechnicaltermscontainedinthisannouncement canbefoundat www.ormondemining.com/en/investors/technical_glossary.
Formore information please visit www.ormondemining.com.
Enquiries to: OrmondeMining plc
Steve Nicol,ManagingDirectorTel:+353 (0)18253570
CapitalM Consultants
Simon RothschildMob:+44 (0)7703 167065
MurrayConsultants
MarkBrennock Tel:+353(0)14980300Mob:+353(0)872335923
DavyCorporateFinance(Nomad / ESMAdviser,JointBrokerand FinancialAdviser) Eugene Mulhern/Roland FrenchTel:+353 (0)16796363
SP AngelCorporateFinance LLP(JointBroker)
Ewan LeggatTel:+44 (0)20 3 470 0470
About Ormonde
Ormonde Mining plc is admitted to trading on the AIM market in London and the ESM market in Dublin and is a mineral development and exploration company focused on Spain (Ticker: ORM). In partnership with funds managed by Oaktree Capital Management ("Oaktree") through the joint venture company Barruecopardo JV BV (Ormonde 30%/Oaktree 70%), the parties are developing a low cost tungsten mining operation at Barruecopardo in the Salamanca Province to become a major European supplier of tungsten. Ormonde also has other exploration projects for gold and copper.
This information is provided by RNSThe company news service from the London Stock ExchangeENDDRLSEWFADFMSESI
Recent news on Ormonde Mining
See all newsREG - Ormonde Mining PLC - Publication of Investor Presentation and Webcast
AnnouncementREG - Ormonde Mining PLC - Investee Company Update: TRU Precious Metals
AnnouncementREG - Ormonde Mining PLC - Ormonde to Present at Aquis Showcase Event
AnnouncementREG - Ormonde Mining PLC - Investee Company Update: TRU Precious Metals
AnnouncementREG - Ormonde Mining PLC - Interim Results
Announcement