RNS Number : 5979E Pharos Energy PLC 18 September 2024
Pharos Energy plc
("Pharos" or the "Company" or, together with its subsidiaries, the "Group")
Interim results for the six months ended 30 June 2024
Pharos Energy plc, an independent energy company with assets in Vietnam and
Egypt, announces its interim results for the six months ended 30 June 2024. A
conference call for analysts will take place at 09.00 BST today.
Katherine Roe, Chief Executive Officer, commented:
"Since joining as CEO in July, I have found a solid operational business with
quality assets delivering stable production and robust cash flows, an
impressive team, and a strong financial base. Alongside this, the improving
macro environment in Egypt has seen our receivables position improve
significantly with over $20m received year to date. This financial strength
allows us to announce today the intention to pay an interim dividend of 0.363
pence per share for the current financial year, a continuation of the existing
share buyback programme and, importantly, the repayment of all our outstanding
debt. We are proud of our Company moving to a net cash position of $17.5m at
30 June and, subsequent to that, is now debt-free.
"We have a solid foundation from which to build on and move forward to grow
value in both Vietnam and Egypt. We benefit from having assets with catalysts.
In Vietnam, actively progressing the license extensions will unlock appraisal
potential. In Egypt, our consolidation proposal will provide enhanced fiscal
terms to encourage appropriate re-investment. This will all be considered
within the framework of a strict and transparent capital allocation policy
that is balanced appropriately and with the priority on evaluating
opportunities that can deliver the highest return to shareholders.
"I want to thank shareholders for their continued support and look forward to
updating the market on our upcoming activity."
1H Operational Highlights
· Group working interest 1H production was 5,851 boepd net (1H
2023: 6,915 boepd net), in line with full year guidance:
o Vietnam 1H production 4,456 boepd (1H 2023: 5,566 boepd)
o Egypt 1H production 1,395 bopd (1H 2023: 1,349 bopd)
· In Vietnam:
o Surface and subsurface optimisation to ensure stable TGT and CNV 1H
production
o Approval of the TGT Revised Field Development Plan (RFDP) by the Ministry
of Industry and Trade (MOIT)
o Agreement between Partners and PetroVietnam (PVN) on the terms and work
programme commitments for the extension period of the TGT and CNV five-year
licence extension applications; which now await formal approval
o Progressing the opportunity in Block 125 with long lead items ordered in
August 2024
· In Egypt:
o Focus on workovers, recompletions, and water injection to bring low-cost
barrels to production and build reservoir energy for future drilling
o Preparation for exploration and development drilling programmes
o Processing and interpretation of the recently acquired 3D Seismic in NBS
1H Financial and Corporate Highlights
· Net cash as at 30 June 2024 of $17.5m(1,2) (30 June 2023: net
debt of $16.4m)(1,2)
· Group revenue $65.0m(3) (1H 2023: $86.2m)(3)
· Net profit $15.3m (1H 2023: $14.3m net loss), including $12.6m of
restructuring expenses, re-measurements and impairments (1H 2023:
$(15.2m))
· Cash generated from operations $44.3m(3) (1H 2023: $43.4m)(3)
· Egypt receivables reduced with $14.8m received from EGPC in 1H
2024 and an additional $4m received on 1 July 2024
· Operating cash flow $27.9m(4) (1H 2023: $21.3m)(4)
· Cash operating costs $17.09/bbl(1) (1H 2023: $14.14/bbl)(1 )
· Cash balances as at 30 June 2024 of $30.7m (30 June 2023: $35.9m)
· Forecast cash capex for the full year is $31m ($26m after
Egyptian carry by IPR), of which $6.8m had been incurred by 30 June 2024
· Katherine Roe appointed CEO and Mohamed Sayed promoted to COO
effective 1 July 2024
· Commitment to shareholder returns continues with an interim
dividend of 0.363 pence per share in respect of the year ended 31 December
2024 and continuation of the current phase of the share buyback programme,
with $1.1m of the $3m incurred by the end of June 2024
(1) See Non-IFRS measures on page 31
(2) Includes RBL and National Bank of Egypt working capital drawdown
(3) Stated after realised hedge losses of $0.1m in the period (1H 2023: no
realised hedge gains or losses)
(4) Operating cash flow = Net cash from operating activities, as set out in
the Cash Flow Statement
Outlook
· 2024 production guidance of 5,200 - 6,500 boepd net remains
unchanged:
o Vietnam 2024 production guidance 3,900 - 5,000 boepd net; Egypt 2024
production guidance 1,300 - 1,500 bopd net
· Vietnam
o Two-well TGT infill drilling programme commenced on 26 August 2024
o Awaiting CNV RFDP approval, expected in Q4 2024, enabling further
development drilling on CNV to commence in 2025
o TGT and CNV five-year licence extensions well advanced; once signed, this
will enable commitment to further investment in both fields
o Discussions ongoing with potential farm-in partners and rig contractors
required to progress Block 125
· Egypt
o Expected completion of the exploration commitment well on El Fayum in 4Q
o Processing of c.130km(2) of 3D seismic data on NBS underway and expected
to complete in 4Q
o Discussions ongoing on the consolidation proposal following the initial
feedback from EGPC
Enquiries
Pharos Energy plc
Tel: 020 7747 2000
Katherine Roe, Chief Executive Officer
Sue Rivett, Chief Financial Officer
Mohamed Sayed, Chief Operating Officer
Camarco
Tel: 020 3757 4980
Billy Clegg | Georgia Edmonds | Violet Wilson | Kirsty Duff
Notes to editors
Pharos Energy plc is an independent energy company with a focus on sustainable
growth and returns to stakeholders, which is listed on the London Stock
Exchange. Pharos has production, development and/or exploration interests in
Egypt and Vietnam. In Egypt, Pharos holds a 45% working interest share in the
El Fayum Concession in the Western Desert, with IPR Lake Qarun, part of the
international integrated energy business IPR Energy Group, holding the
remaining 55% working interest. The El Fayum Concession produces oil from 10
fields and is located 80 km southwest of Cairo. It is operated by Petrosilah,
a 50/50 joint stock company between the contractor parties (being IPR Lake
Qarun and Pharos) and the Egyptian General Petroleum Corporation (EGPC).
Pharos also holds a 45% working interest share in the North Beni Suef (NBS)
Concession in Egypt, which is located immediately south of the El Fayum
Concession. The first development lease on the NBS Concession was awarded in
September 2023 and production started in December 2023. IPR Lake Qarun
operates and holds the remaining 55% working interest in the NBS Concession.
In Vietnam, Pharos has a 30.5% working interest in Block 16-1 which contains
97% of the Te Giac Trang (TGT) field and is operated by the Hoang Long Joint
Operating Company. Pharos' unitised interest in the TGT field is 29.7%. Pharos
also has a 25% working interest in the Ca Ngu Vang (CNV) field located in
Block 9-2, which is operated by the Hoan Vu Joint Operating Company. Blocks
16-1 and 9-2 are located in the shallow water Cuu Long Basin, offshore
southern Vietnam. Pharos also holds a 70% interest in, and is designated
operator of, Blocks 125 & 126, located in the moderate to deep water Phu
Khanh Basin, north east of the Cuu Long Basin, offshore central Vietnam.
Operational Review
Health and Safety
We are pleased to report that in Egypt and Vietnam, we have worked with our
partners to maintain our record of zero Lost Time Injury
(LTI) frequency rate and zero spillage incidents through the first half of
2024. Safety continues to be the top priority for our business, and we are
committed to operating safely and responsibly at all times to provide a safe
and healthy working environment for staff and contractors working closely with
our JV/JOC.
Vietnam
Vietnam Production
Production for the first half of 2024 from the TGT and CNV fields net to the
Group's working interest averaged 4,456 boepd (1H 2023: 5,566 boepd), in line
with our previously published guidance.
TGT 1H 2024 production averaged 11,086 boepd gross and 3,289 boepd net to
Pharos (1H 2023: 13,423 boepd gross and 3,983 boepd net). CNV 1H 2024
production averaged 4,667 boepd gross and 1,167 boepd net to Pharos (1H 2023:
6,333 boepd gross and 1,583 boepd net).
Working interest production guidance in Vietnam for 2024 remains unchanged at
3,900 - 5,000 boepd.
Vietnam Development and Operations
TGT & CNV Fields
There were no new wells drilled on either field in 1H 2024. Overall production
remained stable due to well interventions, including adding zonal perforations
and the shut-off of high-water producing zones.
On Block 16-1 - TGT Field, operational activities in the first half of 2024
focused on adding low-cost production through well interventions and
production optimisation opportunities. The TGT RFDP was approved by MOIT on 9
January 2024, enabling the two-well drilling programme to commence on 26
August 2024.
On Block 9-2 - CNV Field, the CNV RFDP, which includes two infill wells, was
agreed by all partners in 1H 2024. Approval from MOIT is expected in Q4 2024.
Final discussions with PVN to agree terms and work programmes for the
five-year licence extensions at TGT and CNV are well advanced. The extension,
when granted, will allow the HLHVJOC to commit to further investment in both
fields.
Vietnam Exploration
Blocks 125 & 126
On Blocks 125 & 126, discussions with potential farm-in parties and
drilling contractors are ongoing. In 1H 2024, the Company continued to
optimise its prospects and leads portfolio, and progress options to secure a
drilling slot in Block 125. Detailed drilling engineering studies for the well
on Prospect A commenced in 3Q 2024. Purchase orders placed for long lead items
in August 2024.
Egypt
Egypt Production
Production for the first half of 2024 from the El Fayum and NBS fields net to
the Group's working interest averaged 1,395 bopd (1H 2023: 1,349 bopd), in
line with guidance.
El Fayum 1H 2024 production averaged 2,867 bopd gross and 1,290 bopd net to
Pharos (1H 2023: 2,997 bopd gross and 1,349 bopd net). NBS 1H 2024 production
averaged 232 bopd gross and 105 bopd net to Pharos.
Egypt production in the first half has been stable due to a strong focus on
workovers, recompletions, and water injection to bring low-cost barrels to
production and build reservoir energy for future drilling.
Working interest production guidance in Egypt for 2024 remains unchanged at
1,300 - 1,500 bopd net.
Egypt Development and Operations
El Fayum
One workover rig is in the field to contribute to El Fayum production in 1H
2024 through low-cost well repairs, recompletions, and deployment of water
injection.
North Beni Suef
The NBS-SW1X well, which was declared a commercial discovery and put on
production in December 2023, continued to contribute to total production in
2024.
Egypt Commercial
A proposal to combine both the El Fayum and NBS into one concession provided
to EGPC in May 2024. Discussions on the proposal, which are aimed to achieve
improved fiscal terms and longer licence duration for the new concession, were
held between Pharos and our partner IPR following the initial feedback from
EGPC.
Egypt Exploration
El Fayum
A high-impact exploration commitment well on El Fayum commenced drilling in
August. The East Saad 1X well is located between the Saad and Ain Assillien
producing fields and is targeting the Abu Roash "G" reservoir.
North Beni Suef
The processing of c.130 km(2) of 3D seismic data on NBS is ongoing and
expected to complete by the end of 2024.
Financial Review
Finance strategy
Our finance strategy of building shareholder value through capital growth and
sustainable dividends is supported by the Group's business model.
The first half of 2024 has seen strong financial performance from our
operations and continued strengthening of our liquidity position, where we
have moved into a positive net cash position of $17.5m compared to net debt of
$6.6m previously reported at the end of December 2023. We have achieved solid
USD cash flow from our Vietnam and Egypt portfolios and this has enabled us to
accelerate the repayment of our borrowings. Following the farm down of Egypt
concessions in 2022, the Company continued to benefit from a full carry of all
contractor costs for G&A, opex and the capital programme through to April
2024. Whilst revenues are down when compared to 1H 2023, reductions in costs
have resulted in a profit for the period of $6.8m versus a loss of $(4.2)m
(prior to impairment). Returns to shareholders have been delivered through the
commencement of an additional $3m share buyback programme and the payment of
an interim dividend for 2023 of 0.33 pence per share in January 2024. A final
dividend for 2023 of 0.77 pence per share was paid to shareholders in July
2024 and the Board is pleased to also announce a 2024 interim dividend of
0.363 pence per share in respect of the year ended 31 December 2024.
Highlights
1H 2024 1H 2023
Production Volumes (boepd) 5,851 6,915
Production Volumes - Vietnam (boepd) 4,456 5,566
Production Volumes - Egypt (bopd) 1,395 1,349
Oil Price Realised ($/bbl) 87.31 84.89
Oil & Gas Price Realised ($/boe) 77.71 76.29
Oil & Gas Sales ($m) 65.1 86.2
Total Revenue ($m)(1) 65.0 86.2
Gross Profit ($m) 32.0 28.0
Operating profit ($m) 35.2 13.3
Operating profit excluding impairment (reversal)/charge ($m)² 26.7 23.4
Net cash from operating activities (OCF $m) 27.9 21.3
Shareholder returns ($m) (2 3) 3.0 0.7
Cash operating cost per ($/boe)(2) 17.09 14.14
Net cash/(debt) ($m)(2) 17.5 (16.4)
EBITDAX ($m)(2) 50.6 53.4
Gearing(2) 0.05 0.17
(1) Realised hedge losses of $0.1m in the period (1H 2023: no realised hedge
gains or losses)
(2) See Non-IFRS measures on page 31
(3) For 2024, includes continuation of $3m share buyback programme (the Second
Programme Extension), $1.1m of which had been incurred by 30 June 2024. Also,
Interim Group dividends of $1.9m in respect of the year ended 31 December
2024, announced in September 2024, will be paid to shareholders in January
2025.
Operating Performance - Income Statement
Revenue
Oil & gas revenues for the period were down 24% to $65.1m (1H 2023:
$86.2m). Production volumes were within guidance, though Group sales volumes
were down which has led to an inventory build of $11.7m for the Vietnam
producing fields. Additionally, the 2023 revenues were considerably enhanced
by the new lateral CNV-2PST1 well drilled in February 2023. This peaked at c.
3,000 bopd (gross) and has now stabilised at c. 1,300 bopd (gross) which was
the expected outcome. The well continues to contribute strongly to CNV
revenues.
In Vietnam, revenues decreased 28% to $55.8m (1H 2023: $77.6m), which was
predominantly due to 28% reduction in TGT sales volumes as a result of
maintenance work to the receiving facilities at the BSR refinery. The average
realised crude oil price, including the premium received over Brent, was
$89.07/bbl (1H 2023: $86.14/bbl), a 3% increase. The premium to Brent fell to
just over $5/bbl (1H 2023: just under $8/bbl).
In Egypt, revenues increased 8% to $9.3m (1H 2023: $8.6m). The average
realised crude oil price, after discounts, was $78.30/bbl (1H 2023:
$75.21/bbl), an increase of 4%. There are two discounts applied to Egypt crude
production - a general Western Desert Discount and one related specifically to
El Fayum. Both are set by EGPC (the in-country regulator) and together
increased to just under $6/bbl (1H 2023: $5/bbl).
Hedging
For 2024, Pharos entered into zero cost collar hedges to protect the Brent
component of forecast oil sales and to ensure future compliance with its
obligations under the RBL over the producing assets in Vietnam and to provide
downside protection to cash flows in the event of commodity prices falling.
The commodity hedges run until June 2025 and are settled monthly. Our hedging
positions for the period resulted in $0.1m realised loss (1H 2023: no realised
hedge gains or losses). Additionally, the fair value as at 30 June 2024 was an
unrealised loss of $0.8m for the remaining hedges in place (1H 2023:
unrealised gain of $0.2m).
For 2024, 30% of the Group's total oil entitlement production has been hedged,
securing average floor and ceiling prices for the hedged volumes at $63.4/bbl
and $89.2/bbl, respectively. The Group's RBL requires the Company to hedge at
least 35% of Vietnam RBL production volumes and the current hedging programme
meets this requirement through to June 2025, leaving 71% of Group production
unhedged as at 30 June 2024.
Please see below a summary of hedges outstanding as at 30 June 2024, which are
all zero cost collar.
3Q24 4Q24 1Q25 2Q25
Production hedge per quarter - 000/bbls 150 120 150 60
Average floor price of hedges - $/bbl 64.4 63.0 63.6 64.0
Average ceiling price of hedges - $/bbl 88.5 89.0 88.9 90.2
Group operating costs, DD&A and expenses
Cost of Sales were 43% lower at $33.0m (1H 2023: $58.2m), inclusive of
impairment reversal/(charge) of financial asset in relation to EGPC
receivables, and this was primarily driven by the $13.0m higher inventory
build from Vietnam. Operating costs in Egypt fell 70% to $2.0m (1H 2023:
$6.6m) and this was principally due to $5.1m reduction in the EGPC trade
receivable risk factor provision, in light of improved liquidity and economic
outlook in-country.
DD&A charges on production and development assets decreased to $23.8m (1H
2023: $29.9m), driven by a lower depreciating cost base following 2023
impairment charges taken on both TGT in Vietnam and the Egypt producing
assets, combined with 15% reduction in group production volumes. DD&A per
bbl is currently $22.35/boe (1H 2023: $23.89/boe).
Administrative expenses of $4.7m (1H 2023: $4.6m) are comparable period on
period and include non-cash items such as depreciation and IFRS 2 Share Based
Payments of $0.3m (1H 2023: $0.4m). Other operating expenses of $0.6m (1H
2023: $nil) relate to the posthumous vesting of share scheme awards to the
former CEO of the Company, settled in cash and paid to his estate with the
agreement of the executor.
Cash Operating Costs
Cash operating costs at Group level, defined in the Non-IFRS measures section
on page 31, amounted to $18.2m (1H 2023: $17.7m), a 3% increase over the same
period last year. On a barrel of oil equivalent basis, this was $17.09/boe (1H
2023: $14.14/boe).
Cash operating costs in Vietnam increased marginally to $13.6m (1H 2023:
$13.4m) in the period which equates to $16.77/bbl (1H 2023: $13.30/bbl). The
increase is primarily driven by lower production in 1H 2024 and higher costs
relating to the FPSO as a result of lower production from TLJOC, which shares
the facilities and the costs of the FPSO based on production rates. TLJOC had
a 23.0% cost share in 1H 2024 compared to 26.0% in 1H 2023.
Cash operating costs in Egypt were $4.6m (1H 2023: $4.3m) in the period, which
equates to $18.12/bbl (1H 2023: $17.61/bbl). The 3% increase in cost per bbl
was mainly related to higher Petrosilah cost allocations as a result of
minimal drilling and capital expenditure during 1H 2024, higher crude oil
processing fees and chemical costs, offset by a decrease in fixed costs due to
further EGP devaluation following full flotation of the currency by the
Egyptian Government in March 2024.
Cash operating cost per barrel 1H 2024 1H 2023
$m $m
Cost of sales (1) 33.0 58.2
Less
Depreciation, depletion and amortisation (23.8) (29.9)
Production based taxes (4.9) (6.3)
Inventories movement 11.9 (1.1)
Other cost of sales (0.7) (0.8)
Trade Receivable risk factor provision 2.7 (2.4)
Cash operating costs 18.2 17.7
Production (BOEPD) 5,851 6,915
Cash operating cost per BOE ($) 17.09 14.14
Cash operating cost per barrel by Segment Vietnam Egypt Total
$m $m $m
Cost of sales (1) 28.7 4.3 33.0
Less
Depreciation, depletion and amortisation (21.5) (2.3) (23.8)
Production based taxes (4.8) (0.1) (4.9)
Inventories movement 11.7 0.2 11.9
Other cost of sales (0.5) (0.2) (0.7)
Trade Receivable risk factor provision - 2.7 2.7
Cash operating costs 13.6 4.6 18.2
Production (BOEPD) 4,456 1,395 5,851
Cash operating cost per BOE ($) 16.77 18.12 17.09
(1) Includes impairment reversal/(charge) of financial asset
Financing costs
Finance costs for the period were significantly lower at $2.6m (1H 2023:
$6.9m) due to accelerated, voluntary repayments on the Group's reserve based
lending facility (RBL). Finance costs included a non-cash credit of $(0.1)m
(1H 2023: $2.3m charge) following the June 2024 redetermination of the RBL,
which led to a change in estimated future cash flows. There was also interest
expense and similar fees of $1.2m (1H 2023: $3.1m), unwinding of discount of
provisions $1.0m (1H 2023: $1.0m) and foreign exchange losses of $0.5m (1H
2023: $0.5m) primarily driven by the devaluation of EGP against USD.
Taxation
The overall net tax charge of $18.3m (1H 2023: $19.6m) relates to tax charges
in Vietnam of $18.3m (1H 2023: Vietnam tax charges of $19.9m less the deferred
tax credit on net impairment charge of $(0.3)m).
The Group's effective tax rate approximates the statutory tax rate in Vietnam
of 50%, after adjusting for non-deductible expenditure and tax losses not
recognised. The Egypt concessions are subject to corporate income tax at the
standard rate of 40.55%, however responsibility for payment of corporate
income taxes falls upon EGPC on behalf of PEF. The Group records a tax charge,
with a corresponding increase in revenue, for the tax paid by EGPC on its
behalf. However, this is only valid if PEF is in a tax paying position and no
such tax has been recorded in the period.
One of the Group's companies entered into commodity zero cost collars
designated as cash flow hedges. In accordance with IAS 12, a deferred tax
asset has not been recognised in relation to the hedging losses of $0.1m
(2023: $nil) recorded in the period as it is unlikely that the UK tax group
will generate sufficient taxable profit in the future, against which the
deductible temporary differences can be utilised.
Net profit/(loss)
The post-tax profit for the period of $15.3m (1H 2023: $(14.3)m post-tax loss)
included $12.6m of restructuring expenses, re-measurements and impairments (1H
2023: $(15.2)m) which are shown in the table below. Business performance
post-tax profit for the period was $2.7m (1H 2023: $0.9m).
Financial Statements Impact: 1H 2024 1H 2023
$m $m
Profit/(loss) for the period 15.3 (14.3)
Impact of restructuring expense, re-measurements and impairments
Revenue (0.1) - Realised hedging losses
Impairment reversal/(charge) - Financial asset 2.7 (2.4) Trade receivable risk factor provision in Egypt
Impairment reversal/(charge) - Property, plant and equipment 8.5 (10.1)
Other/restructuring expenses (0.4) - Egypt redundancy cost following farm down
Gain/(loss) on fair value movement of financial asset 1.2 (1.3) Revision of contingent consideration in relation to Egypt farm-out
Finance costs 0.7 (1.7) Adjustment and amortisation of capitalised borrowing costs
Income tax credit - 0.3 Deferred tax on net impairment charge
12.6 (15.2)
Business performance post-tax profit * 2.7 0.9
* A non-GAAP measure of underlying net profit from operations, which takes out
the impact of unusual, non-recurring transactions and the impact of non-cash
re-measurements and impairments.
Balance Sheet
Impairments and Impairment Reversals
As a result of previously recognised impairment losses, review of oil prices,
considerations on economic uncertainty leading to high inflation globally,
changes in discount rates, and review of movements in 2P reserves, we have
considered each of our oil and gas producing properties for impairment or
impairment reversal triggers. For each producing property with such triggers,
the recoverable amount has been determined using the value in use method. The
recoverable amount is calculated using a discounted cash flow valuation of the
2P production profile.
The reserves and cost profiles for TGT and CNV fields remained consistent with
2023 year end. The average Brent price forecast for H1 2024 rose marginally by
1%, the discount rate fell to 11.6% (Dec 2023: 12.6%) and there was no change
in the Vietnam economic or legal environment. As a result, for both TGT and
CNV, management concluded that there were no impairment triggers and an
impairment test was not considered necessary.
In Egypt, the weighted average cost of capital (WACC) fell to 15.1% as at June
2024 (Dec 2023: 18.0%) following a reduction in country risk premium and this
led to an impairment reversal for El Fayum as follows:
Summary of Impairments - Oil and Gas properties TGT CNV El Fayum NBS Total
$m $m $m $m $m
1H 2024
Pre-tax impairment reversal - - 8.5 - 8.5
Deferred tax credit/(charge) - - - - -
Post-tax impairment reversal - - 8.5 - 8.5
Reconciliation of carrying amount:
As at 1 January 2024 158.6 65.0 54.7 1.0 279.3
Additions 0.6 0.3 0.9 0.4 2.2
Changes in decommissioning asset (1) (1.5) (0.4) - - (1.9)
DD&A (16.5) (5.0) (2.1) (0.2) (23.8)
Impairment reversal - - 8.5 - 8.5
As at 30 June 2024 141.2 59.9 62.0 1.2 264.3
1H 2023
Pre-tax impairment (charge)/reversal (11.2) 10.6 (9.5) - (10.1)
Deferred tax credit/(charge) 4.3 (4.0) - - 0.3
Post-tax impairment (charge)/reversal (6.9) 6.6 (9.5) - (9.8)
Reconciliation of carrying amount:
As at 1 January 2023 242.4 76.4 62.5 - 381.3
Additions 0.7 2.6 5.8 - 9.1
Changes in decommissioning asset (1) - (2.3) - - (2.3)
DD&A (21.0) (6.8) (2.1) - (29.9)
Impairment (charge)/reversal (11.2) 10.6 (9.5) - (10.1)
As at 30 June 2023 210.9 80.5 56.7 - 348.1
(1) Changes in decommissioning asset for TGT and CNV is due to a change in
discount rate only (1H 2023: change in discount rate and field abandonment
plan for CNV and change in discount rate only for TGT)
Net cash/debt
Strong financial performance from our operations contributed to significantly
improved liquidity and the Group moved into a net cash position (31 Dec 2023:
$6.6m net debt). As at the balance sheet date, $13.2m (RBL $10.0m and NBE
$3.2m) was drawn under the Group's borrowing facilities and there was cash of
$30.7m, giving a net cash figure of $17.5m (1H 2023: RBL $42.6m and NBE $9.7m;
cash $35.9m and net debt of $16.4m). Gearing has been calculated as total
debt to equity of 0.05x (1H 2023: 0.17x).
As at 30 June 2024, the trade receivables with EGPC stood at $31.3m (31 Dec
2023: $37.4m), of which $30.0m was overdue. $14.8m was received from EGPC in
1H 2024 and an additional $4m was received on 1 July 2024.
PEF is entitled under contract to be paid for hydrocarbon sales in US dollars.
Until March 2024, the Group had opted to reject payment of any part of PEF's
receivables balance in Egyptian Pounds (EGP) and continue to hold USD
denominated receivables for two reasons: the continued devaluation of the
currency to the USD and we had no need for EGP funds since our share of
operational expenditures was covered by the carry with IPR. Following a
decision by the Egyptian Government in early March 2024 to let the EGP fully
float, the currency has devalued against the USD. Considering this
devaluation, and in view of our carry being fully utilised, starting from
April 2024 the Group opted to accept the payment of part receivables balance
in EGP in order to cover operational expenditure and other expenses in local
currencies.
Following the landmark agreement with ADQ (an Abu Dhabi sovereign wealth
fund), whereby the latter invested $35 billion for the development of the new
coastal city of Ras El Hekma, the significantly expanded new loan from the IMF
($8 billion, including the original $3 billion originally secured in December
2022, with an additional $1.2 billion from the IMF's Resilience and
Sustainability Facility) and other concessional loans granted by the World
Bank ($8 billion), the EU ($6 billion) and other institutions, the Egyptian
Government's FX reserves have significantly improved ($46.5 billion at the end
of July 2024 versus $35.2 billion at year end) and are expected to improve
further by the end of 2024 (c. $53 billion according to Fitch). This has
allowed EGPC to make industry wide payments of c. 20-25% of each Company's
receivables balance (PEF received $10 million in March 2024 and $4 million on
1 July 2024) and the new Minister of Petroleum (Karim Badawi, who replaced
Tarek El Molla in early July 2024) has committed to table a payment plan to
progressively reduce arrears in the short term. In light of these
considerations, the Group remains optimistic that its receivable position will
continue to improve during 2024, through a combination of payments in USD,
payments in EGP (to the extent needed to cover operational expenditures in
local currency) and offsets.
Borrowings
Reserve Based Lending
The RBL is secured over the Vietnam producing assets only and, as at 30 June
2024, has a one-year term maturing in June 2025. The maximum borrowing base
available under the RBL is revised every six months via a redetermination
process by the relevant banks, based on an estimate of the value of the
Group's reserves from its producing assets in Vietnam. For 1H 2024, the Group
made voluntary early principal repayments of $20.0m to reduce finance costs
(1H 2023: $22.4m) and the borrowing base as at 30 June 2024 was $11.6m (30
June 2023: $42.6m). After voluntary cancellation of $21.8m to date, the
facility amount stood at $11.6m.
The loan bears a per annum interest rate of Compound SOFR plus CAS (Credit
Adjustment Spread) plus 5.25%.
Uncommitted Revolving Credit Facility (National Bank of Egypt - NBE)
The amount repayable under the agreement at 30 June 2024 was $3.2m (30 June
2023: $9.7m) and it is presented as borrowings under current liabilities.
The facility was put in place to mitigate the risk of late payment of our
debtors. Under this arrangement, Pharos is able to access cash from the
facility, of up to 60% of the value of each El Fayum oil sales invoice,
presenting the invoices as evidence to support its ability to repay the
facility. The oil sales invoices remain due to Pharos and it retains the
credit risk. The Group therefore continues to recognise the receivables in
their entirety in its balance sheet.
In January 2024, the Group renegotiated the uncommitted revolving credit
facility of up to $10m until 30 May 2025.
The loan bears a per annum interest rate of Term SOFR plus 3.50% for initial
advances and 4.00% for any extensions beyond 180 days from the date of the
utilisation.
Cash flow
Cash generated from operations was $44.3m (1H 2023: $43.4m) and prior to
working capital movements was $50.9m (1H 2023: $53.7m). This highlights the
strong operating performance from the producing fields in Vietnam and Egypt,
combined with higher commodity prices, despite the 26% fall in Group sales
volumes.
The decrease in receivables was $6.8m for the period (1H 2023: increase of
$11.7m). The 2024 movement is mainly driven by $3.4m reduction in Egypt trade
receivables, following increased recovery from EGPC during the period as a
result of improved liquidity in-country. Vietnam trade receivables decreased
by $3.3m, primarily linked to the timing of liftings (2 cargoes in June 2024
compared to 3 cargoes in December 2023). Inventory increased significantly by
$11.9m (1H 2023: decrease of $1.1m) and this was driven by Vietnam operations
and the timing of liftings from TGT. Vietnam revenue volumes overall were down
30% compared to 1H 2023, and the impact of the inventory build is expected to
lead to a higher number of liftings in 2H 2024.
Share Buyback and Dividends
Following a period of relatively stable commodity prices and a strengthening
of the Group's liquidity position, the Company committed to shareholder
returns in the form of share buybacks and dividends. On 6 December 2023, the
Company announced the continuation of a further $3m share buyback programme in
2024 (the Second Programme Extension), of which $1.1m had been incurred by the
end of June 2024.
Pharos has a clear sustainable policy for regular dividend payments and this
has been set at returning no less than 10% of Operating Cash Flow (OCF) each
year in two tranches
- An interim dividend of 33% of the prior period's full year
dividend, payable in January of the following year; and
- A final dividend payable in July of the following year.
On 6 December 2023, an interim dividend of 0.33 pence per share, $1.8m
equivalent, was declared by the Board in respect of the year ended 31 December
2023 and paid on 24 January 2024 to shareholders on the register at the close
of business on 22 December 2023. A final dividend of 0.77 pence per share in
respect of the year ended 31 December 2023, $4.1m equivalent, was approved by
the shareholders at the Company's AGM in May 2024 and subsequently paid on 19
July 2024 to shareholders on the register at the close of business on 14 June
2024. This took the 2023 full year dividend to 1.10 pence per share, an
increase of 10% on the prior year.
The Board has resolved to pay an interim dividend of 0.363 pence per share,
$1.9m equivalent, in respect of the year ended 31 December 2024 and this will
be paid on 22 January 2025 to shareholders on the Company's register as at 20
December 2024.
Liquidity risk management and going concern
The Group continuously monitors its business activities, financial position,
cash flow and liquidity. Cash forecasts are regularly produced, and stress
tested for a number of scenarios including a downturn in the oil price,
changes in production rates and capital expenditure. Given the current rapidly
changing global political and economic landscape, and fluctuations in oil
price, inflation and interest rates, the scope of our scenario planning
remains extensive. Accordingly, stress tests have been run for oil prices down
to $55/bbl in October 2024, rising gradually over a year until in line with
our base oil price curve, concurrent with reductions in Vietnam and Egypt
production compared to our base case of 5%. As at 30 June 2024, the Group had
a cash balance of $30.7m and improved liquidity with a net cash position of
$17.5m. Forecasts show that the Group will have sufficient financial headroom
for the period of 15 months from the date of approval of these half-year
results. The Directors therefore have a reasonable expectation that the
Company has adequate resources to continue in operational existence for the
foreseeable future. Thus, they continue to adopt the going concern basis of
accounting in preparing these half-year results.
Sue Rivett
Chief Financial Officer
Corporate Review
ESG
Climate remains a principal risk and uncertainty for Pharos. That is why we
published a detailed Net Zero Roadmap in December 2023, which models emissions
pathways - including interim targets - to achieve net zero in Scope 1 and 2
GHG emissions from all existing and future assets by no later than 2050.
In 1H 2024, the Group measured an approximate decline in Scope 1 and 2
emissions by 11% compared to the same time last year, partly driven by
measures to reduce the consumption of carbon-intensive fuel in its field
operations, and partly by a lower production volume. Pharos will continue to
work closely with our operating partners to identify opportunities to reduce
emissions to ensure we achieve our climate targets.
We are proud of our social initiatives which have been an important part of
Pharos since inception. For 1H 2024, the HLHVJOC Donation Programme invested
in 7 long-term social projects, ranging from providing educational support for
children with disabilities to supporting low-income communities. In the first
quarter, donations were focused on providing medical checks and essential
medications for patients in need in rural areas, while support in 2Q was
dedicated towards building adequate sanitation systems in public medical
centres. Pharos will continue to work closely with our local partners and
joint ventures to ensure our social initiatives bring positive, sustainable
impacts to host countries and the local communities.
Principal and emerging risks and uncertainties for the second half of 2024
The Board continues to fulfil its role in risk oversight by developing
policies and procedures around risks that are consistent with the
organisation's strategy and risk appetite.
Pharos carried out an assessment of its principal and emerging risks at half
year 2024. The key principal and emerging risks are:
· HSE & Social
· Political and regional instability, including conflicts and
ensuing sanctions
· Risk of rising inflation and stagflation
· Climate change
· Commodity price volatility
· Partners' alignment
· Sub-optimal capital allocation
· Cyber security
· Reserves downgrades
· Insufficient funds to meet commitments
Responsibility Statement
The Directors confirm that to the best of their knowledge:
1. The interim condensed consolidated set of financial statements
immediately following this report has been prepared in accordance with United
Kingdom adopted International Accounting Standard IAS 34 'Interim Financial
Reporting' and gives a true and fair view of the assets, liabilities,
financial position and profit or loss of the Company; and
2. The interim report includes a fair review of the information
required by:
· DTR 4.2.7R of the Disclosure Guidance and Transparency Rules,
being an indication of important events that have occurred during the first
six months of the financial year and their impact on the condensed
consolidated set of financial statements; and a description of the principal
risks and uncertainties for the remaining six months of the year; and
· DTR 4.2.8R of the Disclosure Guidance and Transparency Rules,
being related party transactions that have taken place in the first six months
of the current financial year and that have materially affected the financial
position or performance of the entity during that period; and any changes in
the related party transactions described in the last annual report that could
do so.
INDEPENDENT REVIEW REPORT TO PHAROS ENERGY PLC
Conclusion
We have been engaged by the Company to review the condensed set of financial
statements in the half-yearly financial report for the six months ended 30
June 2024 which comprises the interim condensed consolidated income statement,
the interim condensed consolidated statement of other comprehensive income,
the interim condensed consolidated balance sheet, the interim condensed
consolidated statement of changes in equity, the interim condensed
consolidated cash flow statement and the related explanatory notes 1 - 16. We
have read the other information contained in the half-yearly financial report
and considered whether it contains any apparent misstatements or material
inconsistencies with the information in the condensed set of financial
statements.
Based on our review, nothing has come to our attention that causes us to
believe that the condensed set of financial statements in the half-yearly
financial report for the six months ended 30 June 2024 is not prepared, in all
material respects, in accordance with UK adopted International Accounting
Standard 34 and the Disclosure Guidance and Transparency Rules of the United
Kingdom's Financial Conduct Authority.
Basis for Conclusion
We conducted our review in accordance with International Standard on Review
Engagements 2410 (UK) "Review of Interim Financial Information Performed by
the Independent Auditor of the Entity" (ISRE) issued by the Financial
Reporting Council. A review of interim financial information consists of
making enquiries, primarily of persons responsible for financial and
accounting matters, and applying analytical and other review procedures. A
review is substantially less in scope than an audit conducted in accordance
with International Standards on Auditing (UK) and consequently does not enable
us to obtain assurance that we would become aware of all significant matters
that might be identified in an audit. Accordingly, we do not express an audit
opinion.
As disclosed in note 2, the annual financial statements of the group are
prepared in accordance with UK adopted international accounting standards. The
condensed set of financial statements included in this half-yearly financial
report has been prepared in accordance with UK adopted International
Accounting Standard 34, "Interim Financial Reporting".
Conclusions Relating to Going Concern
Based on our review procedures, which are less extensive than those performed
in an audit as described in the Basis for Conclusion section of this report,
nothing has come to our attention to suggest that management have
inappropriately adopted the going concern basis of accounting or that
management have identified material uncertainties relating to going concern
that are not appropriately disclosed.
This conclusion is based on the review procedures performed in accordance with
this ISRE, however future events or conditions may cause the entity to cease
to continue as a going concern.
Responsibilities of the Directors
The directors are responsible for preparing the half-yearly financial report
in accordance with the Disclosure Guidance and Transparency Rules of the
United Kingdom's Financial Conduct Authority.
In preparing the half-yearly financial report, the directors are responsible
for assessing the company's ability to continue as a going concern,
disclosing, as applicable, matters related to going concern and using the
going concern basis of accounting unless the directors either intend to
liquidate the company or to cease operations, or have no realistic alternative
but to do so.
Auditor's Responsibilities for the Review of the Financial Information
In reviewing the half-yearly report, we are responsible for expressing to the
Company a conclusion on the condensed set of financial statements in the
half-yearly financial report. Our conclusion, including our Conclusions
Relating to Going Concern, are based on procedures that are less extensive
than audit procedures, as described in the Basis for Conclusion paragraph of
this report.
Use of our Report
This report is made solely to the Company in accordance with guidance
contained in International Standard on Review Engagements 2410 (UK) "Review of
Interim Financial Information Performed by the Independent Auditor of the
Entity" issued by the Financial Reporting Council. To the fullest extent
permitted by law, we do not accept or assume responsibility to anyone other
than the company, for our work, for this report, or for the conclusions we
have formed.
Ernst & Young LLP
London
17 September 2024
interim Condensed consolidated income statement
(unaudited) (unaudited) Year ended
Six months ended Six months ended
30 Jun 2024 30 Jun 2023 31 Dec 2023
Notes $ million $ million $ million
Continuing operations
Revenue 3, 13 65.0 86.2 167.9
Cost of sales 4 (35.7) (55.8) (109.0)
Impairment reversal/(charge) - Financial asset 2.7 (2.4) (2.2)
Gross profit 32.0 28.0 56.7
Administrative expenses (4.7) (4.6) (9.0)
Pre-licence Costs 3 - - (0.4)
Impairment (charge)/reversal - Intangibles 3, 9 - - (6.5)
Impairment reversal/(charge) - PP&E 3, 10 8.5 (10.1) (58.9)
Other operating costs 5 (0.6) - -
Operating profit/(loss) 35.2 13.3 (18.1)
Other/restructuring expense 5 (0.4) - (0.6)
Gain/(loss) on fair value movement of financial asset 15 1.2 (1.3) (0.3)
Interest income 0.2 0.2 0.2
Finance costs 6 (2.6) (6.9) (10.2)
Profit/(loss) for the period before tax 3 33.6 5.3 (29.0)
Tax 7 (18.3) (19.6) (19.8)
Profit /(loss) for the period 15.3 (14.3) (48.8)
Profit/(loss)per share (cents) 8
Basic 3.7 (3.3) (11.4)
Diluted 3.6 (3.3) (11.4)
interim Condensed consolidated statement of OTHER comprehensive income
(unaudited) (unaudited) Year ended
Six months ended Six months ended
30 Jun 2024 30 Jun 2023 31 Dec 2023
Notes $ million $ million $ million
Profit /(loss) for the period 15.3 (14.3) (48.8)
Items that may be subsequently reclassified to profit or loss:
Fair value (loss)/gain arising on hedging instruments during the (0.9) 0.9 0.6
period 13
Less: Loss arising on hedging instruments reclassified to profit or loss 0.1 - 0.2
Total comprehensive income/(loss) for the period 14.5 (13.4) (48.0)
The above interim condensed consolidated income statement and interim
condensed consolidated statement of other comprehensive income should be read
in conjunction with the accompanying notes.
interim CONDENSED CONSOLIDATED Balance sheets
(unaudited) (unaudited)
30 Jun 24 30 Jun 23 31 Dec 23
Restated (1)
Notes $ million $ million $ million
Non-current assets
Intangible assets 9 20.1 21.6 18.2
Property, plant and equipment 10 264.3 347.9 279.3
Right-of-use assets 10 0.4 0.7 0.5
Other assets 57.3 56.4 58.6
342.1 426.6 356.6
Current assets
Inventories 15.2 6.1 3.3
Trade and other receivables 52.4 62.6 62.2
Derivative financial instruments 13 - 0.3 0.1
Tax receivables 0.3 2.3 2.2
Cash and cash equivalents 30.7 35.9 32.6
98.6 107.2 100.4
Total assets 440.7 533.8 457.0
Current liabilities
Trade and other payables (14.6) (19.2) (12.5)
Derivative financial instruments 13 (0.7) - -
Borrowings 14 (13.8) (33.1) (29.5)
Lease Liabilities (0.3) (0.3) (0.3)
Tax payables (5.3) (4.6) (5.8)
(34.7) (57.2) (48.1)
Net current assets 63.9 50.0 52.3
Non-current liabilities
Trade and other payables (0.2) (0.4) (0.5)
Deferred tax liabilities (69.2) (90.4) (68.2)
Borrowings 14 - (20.9) (11.0)
Lease Liabilities (0.1) (0.4) (0.2)
Long term provisions (52.9) (52.9) (53.8)
(122.4) (165.0) (133.7)
Total liabilities (157.1) (222.2) (181.8)
Net assets 283.6 311.6 275.2
Equity
Share capital 33.4 34.1 33.7
Share premium 58.0 58.0 58.0
Other reserves 255.9 254.4 255.4
Retained deficit (63.7) (34.9) (71.9)
Total equity 283.6 311.6 275.2
(1) Refer to Note 2.
The above interim condensed consolidated balance sheets should be read in
conjunction with the accompanying notes.
interim CONDENSED consolidated STATEMENTs OF CHANGES IN EQUITY
(1) Includes $137.1m as Merger Reserve which is fully distributable.( )
(2) During 1H 2024, the Company repurchased 4,073,265 shares at an average
price of 22.01 pence per share (1H 2023: 2,716,308 shares at average price of
23.22 pence per share; 2023: 10,035,962 at an average price of 22.84 pence per
share).
(3) Refer to Note 2.
The above interim condensed consolidated statements of changes in equity
should be read in conjunction with the accompanying notes.
Called up share capital Share Premium Other reserves Retained (deficit)/ Total
earnings
$ million $ million $ million $ million $ million
As at 1 January 2023 34.3 58.0 253.6(1) (15.3) 330.6
Loss for the period - - - (14.3) (14.3)
Other comprehensive income - - 0.9 - 0.9
Share buy back (2) (0.2) - 0.2 (0.8) (0.8)
Distributions to shareholders - - - (5.3) (5.3)
Share-based payments - - 0.5 - 0.5
Transfer relating to share-based payments - - (0.8) 0.8 -
As at 30 June 2023 (unaudited) 34.1 58.0 254.4(1) (34.9) 311.6
Loss for the period - - - (34.5) (34.5)
Other comprehensive loss - - (0.1) - (0.1)
Share buy back (2) (0.4) - 0.4 (2.0) (2.0)
Distributions to shareholders - - - (0.3) (0.3)
Share-based payments - - 0.5 - 0.5
Transfer relating to share-based payments - - 0.2 (0.2) -
As at 1 January 2024, Restated (3) 33.7 58.0 255.4(1) (71.9) 275.2
Profit for the period - - - 15.3 15.3
Other comprehensive loss - - (0.8) - (0.8)
Share buy back (2) (0.3) - 0.3 (1.1) (1.1)
Distributions to shareholders - - - (5.8) (5.8)
Share-based payments - - 0.8 - 0.8
Transfer relating to share-based payments - - 0.2 (0.2) -
As at 30 June 2024 (unaudited) 33.4 58.0 255.9(1) (63.7) 283.6
interim condensed consolidated cash flow statements
(unaudited) (unaudited) Year ended
Six months ended Six months
ended
30 Jun 2024 30 Jun 2023 31 Dec 2023
Notes $ million $ million $ million
Net cash from operating activities 12 27.9 21.3 44.9
Investing activities
Purchase of intangible assets (1.9) (4.4) (9.7)
Purchase of property, plant and equipment (3.8) (9.3) (13.5)
Consideration in relation to farm out of Egyptian assets(1) 15 5.0 7.8 15.6
Contingent consideration received in relation to farm out of Egyptian assets 15 3.6 5.0 5.0
Assignment fee in relation to farm out of Egyptian assets 15 (0.4) (0.5) (0.5)
Payment to abandonment fund (1.1) (1.7) (3.5)
Net cash from/(used in) investing activities 1.4 (3.1) (6.6)
Financing activities
Proceeds from borrowings 14 2.2 1.9 9.2
Interest paid on borrowings 14 (1.8) (3.7) (6.4)
Repayment of borrowings 14 (28.2) (23.8) (44.2)
Lease payments (0.2) (0.2) (0.3)
Share buy back (1.1) (0.8) (2.8)
Share-based payments 0.1 - -
Dividends paid to shareholders (1.8) - (5.6)
Net cash used in financing activities (30.8) (26.6) (50.1)
Net decrease in cash and cash equivalents (1.5) (8.4) (11.8)
Cash and cash equivalents at beginning of period 32.6 45.3 45.3
Effect of foreign exchange rate changes (0.4) (1.0) (0.9)
Cash and cash equivalents at end of period 30.7 35.9 32.6
(1) During 2024 IPR, acting as operator and agent, was authorised to settle
its operating liabilities of $3.7m (1H 2023: $3.4m) and investing liabilities
of $1.3m (1H 2023: $4.4m) against the consideration due from the associated
carry (see Note 15) debtor amounting to $5.0m (1H 2023: $7.8m). The Company
has disclosed the underlying cash flows as operating, investing or financing
according to their nature on the basis that, as a principal, the entity has
the right to the cash inflows and/or the obligation to settle the liability
and ensure clarity of disclosure of the operating cash costs of the business.
The above interim condensed consolidated cash flow statements should be read
in conjunction with the accompanying notes.
Notes to the interim condensed consolidated financial statements
1. General information
The Interim condensed financial statements for the six-month period ended 30
June 2024 have been prepared in accordance with International Accounting
Standards ("IAS") 34 Interim Financial Reporting as adopted by the UK and the
requirements of the Disclosure and Transparency Rules ("DTR") of the Financial
Conduct Authority (FCA) in the United Kingdom as applicable to interim
financial reporting.
The interim condensed financial statements represent a 'condensed set of
financial statements' as referred to in the DTR issued by the FCA.
Accordingly, they do not include all the information required for a full
annual financial report and are to be read in conjunction with the Group's
financial statements for the year ended 31 December 2023, which were prepared
in accordance with UK-adopted International Accounting Standards ("IFRSs").
The interim condensed financial statements are unaudited and do not constitute
statutory accounts as defined in section 434 of the Companies Act 2006. The
financial information for the year ended 31 December 2023 does not constitute
statutory accounts as defined in section 434 of the Companies Act 2006. This
information was derived from the statutory accounts for the year ended 31
December 2023, a copy of which has been delivered to the Registrar of
Companies. The auditor's report on these accounts was unqualified, did not
include a reference to any matters to which the auditor drew attention by way
of an emphasis of matter and did not contain a statement under sections 498
(2) or (3) of the Companies Act 2006.
The half-year financial report for the six months ended 30 June 2024 was
approved by the Directors on 17 September 2024.
2. Accounting policies
The annual financial statements of Pharos Energy plc will be prepared in
accordance with UK-adopted IFRSs. The interim condensed set of financial
statements included in this half-yearly financial report has been prepared in
accordance with IAS 34 'Interim Financial Reporting' as adopted by the UK and
the Disclosure Guidance and Transparency Rules of the United Kingdom's FCA
DTR. The accounting policies adopted in the June 2024 interim condensed set of
financial statements are the same as those adopted in the Group's Annual
Report and Accounts as at 31 December 2023.
The interim report does not include all the notes of the type normally
included in an annual financial report. Accordingly, this report is to be read
in conjunction with the annual report for the year ended 31 December 2023 and
any public announcements made by Pharos during the interim reporting period.
Restatement
As at 31 December 2023, a $1.7m current liability was recognised in respect of
the interim dividend announced in December 2023 and paid in January 2024.
While preparing these interim financial statements the Group noted the
guidance set out in the ICAEW Technical Release 02/17BL regarding "Guidance on
Realised and Distributable Profits under the Companies Act 2006" (TR 02/17BL)
which requires a legally binding liability to be established prior to the
recognition of an interim dividend. Since this obligation was not legally
binding as at 31 December 2023, the comparatives in the Interim Condensed
Consolidated Balance Sheet and the Interim Condensed Consolidated Statement of
Changes in Equity as at 31 December 2023 have been restated to remove the
interim dividend liability. Going forward, the Group will recognise interim
dividends only in the period in which they are paid unless applicable
accounting practice, standards or guidance changes. This does not constitute
any change in the Group's previously announced dividend policy.
Going Concern
The Directors consider the going concern assessment period to be fifteen
months up to 31 December 2025, which takes into account the commitment well
due to be drilled on Block 125 by November 2025. A number of judgements were
taken in concluding that this basis of preparation was appropriate and that
there were no material uncertainties in this regard. These included applying
appropriate estimates of future production and oil price together with
ensuring that the forecasts included all expenditure that was either committed
or expected to be incurred in relation to estimated production volumes.
The Group continuously monitors its business activities, financial position,
cash flows and liquidity through detailed forecasts. Scenarios and
sensitivities are also regularly presented to the Board, including changes in
commodity prices and in production levels from the existing assets, plus other
factors that could affect the Group's future performance and position. A base
case forecast has been considered that utilises oil prices of $82.6/bbl in
2024 and $79.8/bbl in 2025. The key assumptions and related sensitivities
include a "Reasonable Worst Case" (RWC) scenario, where the Board has taken
into account the risk of an oil price crash broadly similar to what occurred
in 2020. It assumes the Brent oil price down by a third to $55.0/bbl in
October 2024 and gradually recovers to base price in next 12 months,
concurrent with 5% reductions in Vietnam and Egypt production compared to our
base case from October 2024. Both the base case and RWC take into account
effect of hedging that has already been put in place at 30 June 2024 and
subsequent hedges placed in 2024, now covering c.30% for the full year 2024
and c.28% from July 2024 to June 2025 of the Group's total oil entitlement
production. We have therefore secured an average floor price and ceiling price
of c. $63/bbl and c. $89/bbl for 2024 and c. $64/bbl and c. $89/bbl for 2025,
respectively, for the entire hedged volumes. Under the RWC scenario, we have
included certain mitigating actions within our control, which could look to
reduce head office G&A by $2.4m for 2025 and not making any dividend
distributions during 2025.
In addition, we have conducted a reverse stress test sensitivity analysis that
indicates the magnitude of the oil price decline required to breach our
financial headroom, assuming all other variables remain unchanged and
including the mitigation actions noted above. The likelihood of this scenario
occurring was assessed as being remote.
As at 30 June 2024, the Group had a cash balance of $30.7m and improved
liquidity with a net cash position of $17.5m (Jun 2023: $16.4m net debt; Dec
2023: $6.6m net debt), and on the basis of the forecasts provided above, the
Group will have sufficient financial headroom for the period of 15 months from
the date of approval of these half-year results.
The Directors therefore have a reasonable expectation that the Company has
adequate resources to continue in operational existence for the foreseeable
future. Thus, they continue to adopt the going concern basis of accounting in
preparing these half-year results.
New and amended standards adopted by the Group
A number of new or amended standards became applicable for the current
reporting period. The Group did not have to change its accounting policies or
make retrospective adjustments as a result of adopting these standards.
Several amendments apply for the first time in 2024, but do not have an impact
on the interim condensed consolidated financial statements of the Group:
· Classification of Liabilities as Current or Non-current and
Non-current Liabilities with Covenants - Amendments to IAS 1
· Lease Liability in a Sale and Leaseback - Amendments to IFRS 16
· Disclosures: Supplier Finance Arrangements - Amendments to IAS 7
and IFRS 7
Critical judgements and accounting estimates
The preparation of condensed consolidated financial statements requires
management to make judgements, estimates and assumptions which affect the
application of accounting policies and the reported amounts of assets,
liabilities, income and expense. Actual results may differ from these
estimates.
(a) Critical judgement in applying the Group's accounting policies
In the process of applying the Group's accounting policies, management has
made judgements that may have a significant effect on the amounts recognised
in the financial statements. These are: (i) oil and gas assets and (ii) going
concern.
(b) Key sources of estimation uncertainty
The key assumptions concerning the future, and other key sources of estimation
uncertainty, other than those mentioned above, that may have a significant
risk of causing a material adjustment to the carrying amounts of assets and
liabilities within the next financial year continue to be: (i) oil & gas
reserves and DD&A; (ii) impairment of producing oil & gas assets; and
(iii) climate change and the energy transition.
3. Segment information
The Group has one principal business activity being oil and gas exploration
and production. The Group's continuing operations are located in South East
Asia (SE Asia) and Egypt and these areas form the basis on which the Group
reports its segment information (the Group's operating segments). There are no
inter-segment sales.
Six months ended 30 June 2024 (unaudited) SE Asia Egypt Unallocated(1) Group
$ million $ million $ million $ million
Oil and gas sales 55.8 9.3 - 65.1
Realised loss on commodity hedges (see Note 13) - - (0.1) (0.1)
Total Revenue 55.8 9.3 (0.1) 65.0
Depreciation, depletion and amortisation - oil and gas (21.5) (2.3) - (23.8)
Depreciation, depletion and amortisation - other - (0.1) - (0.1)
Impairment reversal - PP&E (see Note 10) - 8.5 - 8.5
Gain on fair value movement of financial asset - 1.2 - 1.2
Profit/(Loss) before tax 25.9 14.0 (6.3) 33.6
Tax charge on operations (see Note 7) (18.3) - - (18.3)
Non-current assets(2) 219.2 65.6 - 284.8
Six months ended 30 June 2023 (unaudited) SE Asia Egypt Unallocated(1) Group
$ million $ million $ million $ million
Oil and gas sales 77.6 8.6 - 86.2
Realised loss on commodity hedges (see Note 13) - - - -
Total Revenue 77.6 8.6 - 86.2
Depreciation, depletion and amortisation - oil and gas (27.8) (2.1) - (29.9)
Depreciation, depletion and amortisation - other - (0.1) - (0.1)
Impairment charge - PP&E (0.6) (9.5) - (10.1)
Loss on fair value movement of financial asset - (1.3) - (1.3)
Profit/(Loss) before tax 26.6 (11.7) (9.6) 5.3
Tax charge on operations (see Note 7) (19.9) - - (19.9)
Tax credit on impairment charge (see Note 7) 0.3 - - 0.3
Non-current assets(2) 306.8 63.4 - 370.2
Year end 31 December 2023 SE Asia Egypt Unallocated(1) Group
$ million $ million $ million $ million
Oil and gas sales 149.2 18.9 - 168.1
Realised loss on commodity hedges - - (0.2) (0.2)
Total Revenue 149.2 18.9 (0.2) 167.9
Depreciation, depletion and amortisation - oil and gas (51.0) (4.4) - (55.4)
Depreciation, depletion and amortisation - other - (0.2) - (0.2)
Pre-licence costs - (0.4) - (0.4)
Impairment charge - Intangibles assets - (6.5) - (6.5)
Impairment charge - PP&E (46.0) (12.9) - (58.9)
Loss on fair value movement of financial asset - (0.3) - (0.3)
Profit/(Loss) before tax 5.6 (18.4) (16.2) (29.0)
Tax charge on operations (see Note 7) (36.0) - - (36.0)
Tax credit on impairment charge (see Note 7) 16.2 - - 16.2
Non-current assets(2) 240.4 57.6 - 298.0
( )
(1) Unallocated amounts included in profit/(loss) before tax comprise
corporate costs not attributable to an operating segment, investment and
hedging revenue, other gains and losses and finance costs.
(2) Excludes Other assets.
4. Cost of sales
(unaudited) six months ended (unaudited) six months ended Year ended 31 Dec 2023
30 Jun 2024 30 Jun 2023
$ million $ million $ million
Depreciation, depletion and amortisation 23.8 29.9 55.4
Production based taxes 4.9 6.3 10.5
Production operating costs 18.9 18.5 39.1
Inventories movement (11.9) 1.1 4.0
35.7 55.8 109.0
5. Other Operating Costs and Other/restructuring expense
In 1H 2024, other operating costs of $0.6m relate to the posthumous vesting of
share scheme awards to the former CEO of the Company, settled in cash and paid
to his estate with the agreement of the executor. This cash settlement was
provided for in the relevant share scheme rules and formally approved by the
Remuneration Committee.
In 1Y 2024, Other/restructuring expenses included $0.4m of restructuring
costs. In 2023, other expenses of $0.6m were due to changes in the best
estimate of the adjustment relating to the interim period between the economic
date of 1 July 2020 and the completion date of the disposal of 55% interest in
the Egypt concessions.
6. Finance Costs
(unaudited) six months ended (unaudited) six months ended Year ended 31 Dec 2023 2019 2018
30 Jun 2024 30 Jun 2023
$ million $ million $ million
Unwinding of discount on provisions 1.0 1.0 2.0
(1)
Interest expense and similar fees (2) (see Note 1.1 5.4 7.7
14)
Net foreign exchange losses 0.5 0.5 0.5
2.6 6.9 10.2
2019
2018
(1) For 1H 2024, $1.0m relates to the unwinding of discount on the provisions
for decommissioning (1H 2023: $1.0m). The provisions are based on the net
present value of the Group's share of the expenditure which will be incurred
at the end of the life of TGT and CNV (currently estimated to be 7-8 years) in
the removal and decommissioning of the facilities currently in place.
(2) Following the June 2024 redetermination and the $20.0m repayment of
principal in relation to the Group's reserve based lending facility, there was
a change in estimated future cash flows. As a result, in June 2024, a credit
of $(0.1)m (1H 2023: $2.3m charge; Dec 2023: $2.7m charge) was recognised in
the income statement (see Note 14).
7. Tax
(unaudited) six months ended (unaudited) six months ended Year ended 31 Dec 2023
30 Jun 2024 30 Jun 2023
$ million $ million $ million
Current tax 17.3 22.2 44.5
Deferred tax charge/(credit) on operations 1.0 (2.3) (8.5)
Deferred tax credit on impairment charge - (0.3) (16.2)
Total tax charge 18.3 19.6 19.8
The Group's corporation tax is calculated at 50% (1H 2023: 50%) of the
estimated assessable profit for the year in Vietnam. In Egypt, under the terms
of the concession any local taxes arising are settled by EGPC on behalf of the
Group. During each period, both current and deferred taxation have arisen in
overseas jurisdictions only.
The charge for the year can be reconciled to the profit / (loss) per the
income statement as follows:
2019 2018
(unaudited) six months ended (unaudited) six months ended Year ended 31 Dec 2023 $ million
30 Jun 2024 $ million 30 Jun 2023 $ million
Profit/(Loss) before tax 33.6 5.3 (29.0)
Profit/(Loss) before tax at 50% (2023: 50%) 16.8 2.6 (14.5)
Effects of:
Non-deductible expenses 4.0 6.5 18.0
Tax losses not recognised (4.0) 10.5 16.5
Adjustments to tax charge in respect of previous periods 1.5 - (0.2)
Tax charge for the period 18.3 19.6 19.8
2019
2018
The prevailing tax rate in Vietnam, where the Group produces oil and gas, is
50% (1H 2023: 50%). The tax charge in future periods may also be affected by
the factors in the reconciliation above.
Non-deductible expenses primarily relate to Vietnam DD&A charges
for costs previously capitalised, which are non-deductible for Vietnamese tax
purposes of $3.8m (1H 2023: $6.3m; Dec 2023: $10.4m). A further $0.2m (1H
2023: $0.2m; Dec 2023: $0.8m) relates to non-deductible corporate costs
including share scheme incentives. In the year ended 31 December 2023,
non-deductible expenses also included the tax impact of Vietnam impairment
charges of $6.8m.
Tax losses not recognised of $3.0m (1H 2023: $4.6m; Dec 2023: $7.3m) relate to
costs deductible for tax in the UK but not expected to be utilised in the
foreseeable future, as the UK tax group is loss-making. In addition, tax
losses not recognised of $(7.0)m (1H 2023: $5.9m; Dec 2023: $9.2m) relate to
Egypt. During 1H 2024, Egypt concessions recorded a net profit before tax of
$14.0m (profit after tax impact of $7.0m) which has been offset against tax
losses not recognised, as Egypt is in a historic loss making position. The
group did not recognise deferred tax assets in relation to historical tax
losses available to offset future taxable profits on the basis that there will
be no future benefits arising from these losses as any taxes in the future
will be paid by EGPC on behalf of the group.
8. Earnings/(loss) per share
The calculation of the basic and diluted earnings/(loss) per share is based on
the following data:
(unaudited) six months ended (unaudited) Year ended 31 Dec 2023 2019 2018
30 Jun 2024 six months ended
30 Jun 2023
$ million $ million $ million
Profit/(Loss) for the purposes of basic (loss)/profit per share 15.3 (14.3) (48.8)
Effect of dilutive potential ordinary shares - Cash settled share awards and (0.3) - -
options
Profit/(Loss) for the purposes of diluted profit/(loss) per share 15.0 (14.3) (48.8)
(unaudited) six months ended 2019 2018
30 Jun 2024 (unaudited) six months ended Year ended 31 Dec 2023
30 Jun 2023
million million million
Weighted average number of ordinary shares 419.3 429.5 427.2
Effect of dilutive potential ordinary shares - Share awards and options 1.8 - -
Weighted average number of ordinary shares for the purpose of diluted 421.1 429.5 427.2
(loss)/profit per share
2019
2018
(unaudited) six months ended
30 Jun 2024 (unaudited) six months ended Year ended 31 Dec 2023
30 Jun 2023
million million million
Weighted average number of ordinary shares 419.3 429.5 427.2
Effect of dilutive potential ordinary shares - Share awards and options 1.8 - -
Weighted average number of ordinary shares for the purpose of diluted 421.1 429.5 427.2
(loss)/profit per share
2019
2018
In accordance with IAS 33 "Earnings per Share", the effects of 1.7m and 2.8m
antidilutive potential shares have not been included when calculating dilutive
earnings per share for the period ended 30 June 2023 and the year ended 31
December 2023 respectively, as the Group was loss making.
9. Intangible assets
Intangible assets comprise the Group's exploration and evaluation projects
which are pending determination. Included in the additions is Blocks 125 &
126 in Vietnam $1.2m and Egypt $0.7m, of which $0.3m relates to North Beni
Suef.
In June 2024, having reviewed the triggers for impairment or impairment
reversal, Management are of the view that none of the impairment indicators
under IFRS 6 have been triggered and therefore no impairment testing is
required for Vietnam or Egypt.
Whilst ongoing costs for exploration are therefore forecast and funds are
available for future exploration, there is insufficient certainty of full
recovery to justify the reversal of the previous impairment charges in 2020.
The accumulated impairment charges against exploration and evaluation
expenditure at 30 June 2024 stands at $26.8m (30 June 2023: $25.6m). This will
be kept under review as the exploration activity continues.
10. Property, plant and equipment
As a result of previously recognised impairment losses, combined with a
reduction in discount rate, we have tested our Egypt oil and gas producing
properties for impairment or impairment reversal. For each producing property,
the recoverable amount has been determined using the value in use method. The
recoverable amount is calculated using a discounted cash flow valuation of the
2P production profile. No impairment triggers have been identified for other
cash generating units in the Group.
Egypt
The key assumptions to which the recoverable amount measurement is most
sensitive are oil price, discount rate, capital spend and 2P reserves. As at
30 June 2024, the fair value of the assets have been estimated based on a
post-tax nominal discount rate of 15.1% (30 Jun 2023:
17.2%; 31 Dec 2023: 18.0%) and a Brent oil price of $82.6/bbl in 2H 2024 down
to $77.2/bbl in 2027 plus inflation of 2% thereafter (30 Jun 2023: a Brent oil
price of $84.2/bbl in 2H 2023 down to $75.2/bbl in 2026 plus inflation of 2%
thereafter; 31 Dec 2023: a Brent oil price of $81.5/bbl in 2024 down to
$76.3/bbl in 2027 plus inflation of 2% thereafter).
For El Fayum, an impairment reversal (pre and post-tax) in the amount of $8.5m
has been reflected in the income statement, driven by the decrease in discount
rate. As at 30 June 2024, the carrying amount of the El Fayum oil and gas
producing property, after additions of $0.9m, DD&A $(2.1)m and after the
impairment reversal of $8.5m, is $62.0m.
For NBS, no material impairment arose as a result of the above impairment
considerations. As at 30 June 2024, the carrying amount of the NBS oil and gas
producing property, after additions of $0.4m and DD&A $(0.2)m, is $1.2m.
Management consider fluctuations in Brent price and discount rates will have a
material impact on the value of oil and gas producing assets. A reduction or
increase of $5/bbl, based on average historical prices, and 1% change in
post-tax discount rates, based on historical analysis of the Group's and peer
group companies' impairments, could be reasonably possible for the purposes of
sensitivity analysis. Testing of sensitivity cases for El Fayum indicated that
a $5/bbl reduction in long term oil price used would result in an impairment
of $7.0m (compared to new NBV). A 1% increase in discount rate would result in
an impairment charge of $2.5m.
Vietnam
For TGT and CNV, there were no impairment triggers as at 30 June 2024 and the
assets were not tested for impairment. As at 30 June 2024, the carrying amount
of the TGT oil and gas producing property, after additions of $0.6m, changes
in decommissioning asset $(1.5)m and DD&A $(16.5)m, is $141.2m. As at 30
June 2024, the carrying amount of the CNV oil and gas producing property,
after additions of $0.3m, changes in decommissioning asset $(0.4)m and
DD&A $(5.0)m, is $59.9m.
Other considerations
It is not considered possible to provide meaningful sensitivities in relation
to 2P reserves and capital spend for any of the Group's oil and gas producing
properties, as the impact of any changes in 2P reserves on recoverable amount
would depend on a variety of factors, including the timing of changes in
production profile and the consequential effect on the expenditure required to
both develop and extract the reserves.
Other fixed assets comprise office fixtures and fittings and computer
equipment of $0.4m (Dec 2023: $0.5m).
11. Distribution to Shareholders
On 6 December 2023, an interim dividend of 0.33 pence per share, $1.8m
equivalent, was declared by the Board in respect of the year ended 31 December
2023 and paid on 24 January 2024 to shareholders on the register at the close
of business on 22 December 2023.
A final dividend of 0.77 pence per share in respect of the year ended 31
December 2023, $4.1m equivalent, was formally approved by the shareholders at
the Company's AGM in May 2024. The final dividend was paid in full on 19 July
2024 to shareholders on the register at the close of business on 14 June 2024.
In accordance with dividend policy, the Board has resolved to pay an interim
dividend of 0.363 pence per share, $1.9m equivalent, in respect of the year
ended 31 December 2024 and this will be paid on 22 January 2025 to
shareholders on the Company's register as at 20 December 2024.
12. Reconciliation of operating profit to operating cash flows
(unaudited) six months ended (unaudited) six months ended Year ended
30 Jun 2024 30 Jun 2023 31 Dec 2023
$ million $ million $ million
Operating profit 35.2 13.3 (18.1)
Share-based payments 0.3 0.3 0.9
Depreciation, depletion and amortisation 23.9 30.0 55.6
Impairment charge - Intangibles - - 6.5
Impairment (reversal)/charge - PP&E (8.5) 10.1 58.9
Operating cash flows before movements in working capital 50.9 53.7 103.8
(Increase)/decrease in inventories (11.9) 1.1 3.9
Decrease/(increase) in receivables(1) 6.8 (11.7) (19.1)
(Decrease)/increase in payables (1.5) 0.3 0.2
Cash generated by operations 44.3 43.4 88.8
Interest received 0.2 0.2 0.4
Other/redundancy expense outflow (0.4) - -
Income taxes paid (16.2) (22.3) (44.3)
Net cash from operating activities 27.9 21.3 44.9
( )
(1) Includes $2.7m decrease (1H 2023: $2.4m increase) in risk factor provision
in respect of Egypt trade receivables.
During the six months ended 30 June 2024, a total of $0.4m (1H 2023: $0.7m) of
trade receivables due from EGPC in Egypt were settled by way of non-cash
offset and relates to the assignment bonus settled upon receipt of contingent
consideration in relation to IPR Farm out (1H 2023: $0.5m relates to the
assignment bonus and $0.2m subscription to Egypt Upstream Gateway together
with the purchase of the exploration and operation data package; there were no
offsets against trade payables, see Note 15).
13. Hedge transactions
During 1H 2024, Pharos entered into zero cost collar hedges to protect the
Brent component of forecast oil sales and to ensure future compliance with its
obligations under the RBL over the producing assets in Vietnam. The commodity
hedges run until June 2025 and are settled monthly.
Our hedging positions for the period resulted in $0.1m realised loss (1H 2023:
no realised hedge gains or losses). The outstanding unrealised loss on open
positions at 30 June 2024 amounts to $0.8m (1H 2023: outstanding unrealised
gain of $0.2m).
During 1H 2024, 30% of the Group's total oil entitlement production has been
hedged, securing average floor and ceiling prices for the hedged volumes at
$63.4/bbl and $89.2/bbl, respectively. The Group's RBL requires the Company to
hedge at least 35% of Vietnam RBL production volumes and the current hedging
programme meets this requirement through to June 2025, leaving 71% of Group
production unhedged as at 30 June 2024.
Pharos has designated the zero cost collars as cash flow hedges. This means
that the effective portion of unrealised gains or losses on open positions
will be reflected in other comprehensive income. Every month, the realised
gain or loss will be reflected in the revenue line of the income statement.
The carrying amount of the zero cost collars are based on the fair value
determined by an external, third party commodities consultant. As all material
inputs are observable, they are categorised within Level 2 in the fair value
hierarchy. It is presented in "Derivative financial instruments" in the
consolidated statement of financial position. The net liability position as at
30 June 2024 was $0.7m (30 Jun 2023: net receivable position of $0.3m; 31 Dec
2023: net receivable position of $0.1m).
Please see below for a summary of hedges outstanding as at 30 June 2024, which
are all zero cost collar.
3Q24 4Q24 1Q25 2Q25
Production hedge per quarter - 000/bbls 150 120 150 60
Average floor price of hedges - $/bbl 64.4 63.0 63.6 64.0
Average ceiling price of hedges - $/bbl 88.5 89.0 88.9 90.2
14. Borrowings
Changes in liabilities arising from financing activities:
(unaudited)
six months (unaudited) six months ended
ended 30 Jun 2023
30 Jun 2024 $ million
$ million
Credit RBL Total Total Borrowings
facility Borrowings
Carrying value as of 1 January 9.2 31.3 40.5 74.2
Proceeds from Uncommitted Revolving credit facility 2.2 - 2.2 1.9
Repayments of borrowings (8.2) (20.0) (28.2) (23.8)
Interest expense and similar fees (see Note 6) 0.3 0.8 1.1 5.4
Interest paid during the year (0.3) (1.5) (1.8) (3.7)
Carrying value as of 30 June 3.2 10.6 13.8 54.0
Current 3.2 10.6 13.8 33.1
Non-current - - - 20.9
Reserve Based Lending facility (RBL)
The RBL is secured over the Vietnam producing assets only and, as at 30 June
2024, has a one-year term maturing in June 2025. The loan bears a per annum
interest rate of 5.25% plus Compound SOFR plus CAS (Credit Adjustment Spread).
Until June 2023, the RBL bore a per annum interest of 4.75% plus USD LIBOR.
For 1H 2024, the Group made voluntary early repayments of $20.0m ahead of the
half year redetermination process.
The RBL is subject to a number of financial covenants, all of which have been
complied with during the 1H 2024 and 2023 reporting periods.
Uncommitted revolving credit facility - National Bank of Egypt (Credit
facility)
In January 2024, the Group renegotiated the uncommitted revolving credit
facility with National Bank of Egypt for discounting (with recourse) of up to
$10m until 30 May 2025 (1H 2023: $18m).
Loans are available for up to one year from the date of utilisation. The loan
bore a per annum interest rate of USD LIBOR plus 3.00% for initial advances
and 3.50% for any extensions beyond 180 days from the date of the utilisation
until 30 June 2023. From 1 July 2023, the loan bears a per annum interest rate
of Term SOFR plus 3.50% for initial advances and 4.00% for any extensions
beyond 180 days from the date of the utilisation.
The carrying amount of the trade receivables include receivables in Egypt
which are subject to an Uncommitted Revolving Credit Facility for Discounting
(with Recourse) arrangement. This facility was put in place to mitigate the
risk of late payment. Under this arrangement, Pharos is able to access cash
from the facility using the El Fayum oil sales invoices as evidence to support
its ability to repay the facility. The oil sales invoices remain due to Pharos
and it retains the credit risk. The Group therefore continues to recognise
the receivables in their entirety in its balance sheet.
15. Disposal of 55% interest in Egypt Concessions and fair value movement
Following the completion of the farm-out transaction of Egyptian assets to
IPR, the accounting for the assets reflect the following:
The economic date of the transaction was 1 July 2020, with completion on 21
March 2022.
Pharos owned and managed the business up to completion. On completion, an
adjustment to compensate for net cash flows since the economic date has been
adjusted for in the level of carry to be provided by IPR to Pharos.
In the financial statements, for the period post completion, Pharos 45% share
of field costs - capex, opex and G&A - are accounted for as incurred by
Pharos, although all such costs are paid by IPR and set off against the carry.
All revenues earned are paid direct to Pharos.
The firm consideration was received in two tranches, $2.0m in September 2021
and $3.0m on 30 March 2022.
The carry of $35.9m is disproportionate funding contribution from IPR adjusted
for working capital and interim period adjustments from the effective economic
date of 1 July 2020 to the completion date.
The carry decreases every month against the cash calls received from IPR. The
total amount utilised as at 30 June 2024 amounts to $35.9m, which reflects the
full amount of the carry (2023: $23.2m). The movement during 1H 2024 was
$5.0m, which has been disclosed in "Consideration in relation to farm out of
Egyptian assets" in the cash flow as part of investing activities (combined
with $3.6m contingent consideration received on 1 June 2023).
The Group is entitled to contingent consideration depending on the average
Brent Price each year from 2022 to the end of 2025 (with floor and cap at
$62/bbl and c.$90/bbl respectively). The contingent consideration is
calculated yearly and is capped at a maximum total payment of $20.0m. On 1
June 2024, contingent consideration of $3.6m in respect of average Brent price
during 2023 was received from IPR. As at 30 June 2024, the contingent
consideration receivable amounts to $6.3m, $3.8m in current trade and other
receivables and $2.5m in non-current other assets (1H 2023: $7.9m, $3.5m in
current trade and other receivables and $4.4m in non-current other assets).
Testing of sensitivity for a $5/bbl reduction in long-term oil price used
would result in $0.3m decrease in contingent consideration to $6.0m.
The fair value movement of $1.2m was credited to the income statement during
2024. This is due to $1.3m revision of the contingent consideration, partially
offset by $0.1m reduction in contingent liability (assignment fee).
As at 30 June 2024, $0.6m (2023: $2.6m) relates to the assignment fee payable
to EGPC for the sale of 55% of the Group's operated interest in each of our
Egyptian Concessions, El Fayum and North Beni Suef, to IPR. $0.4m is booked as
current other payable and $0.2m as non-current other payable. Following
receipt of contingent consideration amounting to $3.6m, an assignment bonus of
$0.4m was offset against trade receivables from EGPC.
The final consideration is still being finalised between IPR and Pharos. The
financial exposure from finalising the consideration to Pharos, reflecting the
remaining amounts still under discussion, is considered immaterial to the
financial statements.
16. Subsequent events
The RBL loan facility was repaid in full on 17 September 2024. The facility is
currently scheduled to mature in July 2025.
Non-IFRS measures
The Group uses certain measures of performance that are not specifically
defined under IFRS or other generally accepted accounting principles. These
Non-IFRS measures include cash operating costs per barrel, DD&A per
barrel, gearing, free cash flow, operating cash per share and shareholder
returns.
For the RBL covenant compliance, three Non-IFRS measures are included: Net
cash/(debt), EBITDAX and Net debt/EBITDAX.
Cash operating costs per barrel
Cash operating costs are defined as cost of sales less DD&A, production
based taxes, movement in inventories and certain other immaterial cost of
sales.
Cash operating costs for the period is then divided by barrels of oil
equivalent produced. This is a useful indicator of cash operating costs
incurred to produce oil and gas from the Group's producing assets.
(unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million $ million
Cost of sales (1) 33.0 58.2 111.2
Less:
Depreciation, depletion and amortisation (23.8) (29.9) (55.4)
Production based taxes (4.9) (6.3) (10.5)
Inventories movement 11.9 (1.1) (4.0)
Trade Receivable risk factor provision 2.7 (2.4) (2.2)
Other cost of sales (0.7) (0.8) (1.8)
Cash operating costs 18.2 17.7 37.3
Production (BOEPD) 5,851 6,915 6,508
Cash operating cost per BOE ($) 17.09 14.14 15.70
(1) Includes impairment reversal/(charge) of financial asset
Cash operating costs per barrel by segment (1H 2024)
Vietnam Egypt Total
$ million $ million $ million
Cost of sales 28.7 4.3 33.0
Less:
Depreciation, depletion and amortisation (21.5) (2.3) (23.8)
Production based taxes (4.8) (0.1) (4.9)
Inventories movement 11.7 0.2 11.9
Trade Receivable risk factor provision - 2.7 2.7
Other cost of sales (0.5) (0.2) (0.7)
Cash operating cost 13.6 4.6 18.2
Production (BOEPD) 4,456 1,395 5,851
Cash operating cost per BOE ($) 16.77 18.12 17.09
Vietnam (unaudited) (unaudited)
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million
Cost of sales 28.7 49.4
Less:
Depreciation, depletion and amortisation (21.5) (27.8)
Production based taxes (4.8) (6.2)
Inventories movement 11.7 (1.3)
Other cost of sales (0.5) (0.7)
Cash operating costs 13.6 13.4
Production (BOEPD) 4,456 5,566
Cash operating cost per BOE ($) 16.77 13.30
Egypt (unaudited) (unaudited)
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million
Cost of sales 4.3 8.8
Less:
Depreciation, depletion and amortisation (2.3) (2.1)
Production based taxes (0.1) (0.1)
Inventories movement 0.2 0.2
Trade Receivable risk factor provision 2.7 (2.4)
Other cost of sales (0.2) (0.1)
Cash operating costs 4.6 4.3
Production (BOEPD) 1,395 1,349
Cash operating cost per BOE ($) 18.12 17.61
DD&A per barrel
DD&A per barrel is calculated as net book value of oil and gas assets in
production, together with estimated future development costs over the
remaining 2P reserves. This is a useful indicator of ongoing rates of
depreciation and amortisation of the Group's producing assets.
(unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million $ million
Depreciation, depletion and amortisation 23.8 29.9 55.4
Production (BOEPD) 5,851 6,915 6,508
DD&A per BOE ($) 22.35 23.89 23.32
DD&A per barrel by segment (1H 2024)
Vietnam Egypt Total
$ million $ million $ million
Depreciation, depletion and amortisation 21.5 2.3 23.8
Production (BOEPD) 4,456 1,395 5,851
DD&A per BOE ($) 26.51 9.06 22.35
Vietnam (unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million $ million
Depreciation, depletion and amortisation 21.5 27.8 51.0
Production (BOEPD) 4,456 5,566 5,127
DD&A per BOE ($) 26.51 27.59 27.25
Egypt (unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million $ million
Depreciation, depletion and amortisation 2.3 2.1 4.4
Production (BOEPD) 1,395 1,349 1,381
DD&A per BOE ($) 9.06 8.60 8.73
Gearing
Debt to equity ratio is calculated by dividing interest-bearing bank loans by
stockholder's equity. The debt to equity ratio expresses the relationship
between external equity (liabilities) and internal equity (stockholder
equity).
(unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended Restated (1)
30 Jun 24 30 Jun 23
$ million $ million $ million
Total Debt 13.2 52.3 39.2
Total Equity 283.6 311.6 275.2
Debt to Equity 0.05 0.17 0.14
(1) Refer to Note 2.
Free cash flow
Free cash flow is calculated by subtracting capital cash expenditure from net
cash from operating activities.
(unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million $ million
Net cash from operating activities 27.9 21.3 44.9
Capital cash expenditure (6.8) (15.4) (26.7)
Free cash flow 21.1 5.9 18.2
Operating cash per share
Operating cash per share is calculated by dividing net cash from continuing
operations by number of shares.
(unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million $ million
Net cash from continuing operating activities 27.9 21.3 44.9
Weighted number of shares in the year 427,953,678 439,346,597 427,170,044
Operating cash per share 0.07 0.05 0.11
Shareholder returns
Shareholder returns are calculated as a total of distributions to Shareholders
and share buy backs.
(unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million $ million
Interim dividend 1.9 - 1.8
Final dividend - - 4.1
Share buy backs 1.1 0.8 2.8
Shareholder returns 3.0 0.8 8.7
Net Cash/(Debt)
Net Cash/(Debt) comprises cash and cash equivalents, less interest-bearing
bank loans.
(unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million $ million
Cash and cash 30.7 35.9 32.6
equivalents
Borrowings* (13.2) (52.3) (39.2)
Net Cash/(Debt) 17.5 (16.4) (6.6)
*Excludes unamortised capitalised finance costs
EBITDAX
EBITDAX is earnings from continuing activities before interest, tax, DD&A,
impairment charge/(reversal) of PP&E and intangibles, exploration
expenditure including pre-licence costs and Other/restructuring expense items.
(unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million $ million
Operating profit/(loss) 35.2 13.3 (18.1)
Depreciation, depletion and amortisation 23.9 30.0 55.6
Pre-licence costs - - 0.4
Impairment (reversal)/charge (8.5) 10.1 65.4
EBITDAX 50.6 53.4 103.3
Net Debt/EBITDAX
Net Debt/EBITDAX ratio expresses how many years it would take to repay the
debt, if net debt and EBITDAX stay constant. For H1 2024, the Company is in a
net cash position overall and no data has therefore been presented.
(unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million $ million
Net Debt - (16.4) (6.6)
EBITDAX - 53.4 103.3
Net Debt/EBITDAX - (0.31) (0.06)
Operating profit excluding impairment (reversal)/charge
Operating profit excluding impairment (reversal)/charge is calculated by
adding back the impairment (reversal)/charge to the operating profit.
(unaudited) (unaudited) Year ended 31 Dec 23
six months ended six months ended
30 Jun 24 30 Jun 23
$ million $ million $ million
Operating profit/(loss) 35.2 13.3 (18.1)
Impairment charge - 20.7 65.4
Impairment reversal (8.5) (10.6) -
Operating profit excluding impairment (reversal)/charge 26.7 23.4 47.3
Glossary of Terms
boepd
Barrels of oil equivalent per day
bopd
Barrels of oil per day
CASH or cash
Cash, cash equivalent and liquid investments
CAPEX or capex
Capital expenditure
CNV
Ca Ngu Vang field located in Block 9-2, Vietnam
Company
Pharos Energy plc
EGP
Egyptian Pound
EGPC
Egyptian General Petroleum Corporation, an Egyptian state oil and gas company
and the industry regulator
El Fayum or the El Fayum Concession
The concession agreement for petroleum exploration and exploitation entered
into on 15 July 2004 between the Arab Republic of Egypt, EGPC and Pharos El
Fayum in respect of the El Fayum area, Western Desert, as amended from time to
time
FPSO
Floating production, storage and offloading vessel
GHG
Greenhouse gas(es)
Group
Pharos and its direct and indirect subsidiary undertakings
HLJOC
Hoang Long Joint Operating Company, the operator of TGT
HVJOC
Hoan Vu Joint Operating Company, the operator of CNV
IPR or IPR Energy Group
The IPR Energy group of companies, including IPR Lake Qarun and IPR Energy AG,
or such of them as the context may require
IPR Lake Qarun
IPR Lake Qarun Petroleum Co, an exempted company with limited liability
organised and existing under the laws of the Cayman Islands (registration
number 379306), a wholly owned subsidiary of IPR Energy AG
JOC
Joint Operating Company
km
Kilometre
km(2)
Square kilometre
m
Million
mmbbl
Million barrels
mmboe
Million barrels of oil equivalent
MOIT
Ministry of Industry and Trade of Vietnam
NBS, North Beni Suef or the North Beni Suef Concession
The concession agreement for petroleum exploration and exploitation entered
into on 24 December 2019 between the Arab Republic of Egypt, EGPC and Pharos
El Fayum in respect of the North Beni Suef area, Nile Valley
Petrosilah
An Egyptian joint stock company held 50/50 between the El Fayum Contractor
parties (being the Pharos Group and IPR Lake Qarun) and EGPC
Prospect and lead
An identified trap that may contain hydrocarbons. A potential hydrocarbon
accumulation may be described as a lead or prospect depending on the degree of
certainty in that accumulation. A prospect is generally mature enough to be
considered for drilling
PSC
Production sharing contract or production sharing agreement
PVN
PetroVietnam, the principal state oil and gas company of Vietnam
RBL
Reserve Based Lending facility
RFDP
Revised Field Development Plan
Share
Ordinary share of 5p in the capital of the Company
TGT
Te Giac Trang field located in Block 16-1, Vietnam
$ or USD
United States Dollar
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
or visit
www.rns.com (http://www.rns.com/)
.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
. END IR KZGMLMNGGDZZ