REG-Polymetal International plc Polymetal: Ore Reserves, Mineral Resources and Exploration update as at 1 January 2020

============

Polymetal International plc (POLY)
Polymetal: Ore Reserves, Mineral Resources and Exploration update as at 1 January 2020

27-Feb-2020 / 10:00 MSK
Dissemination of a Regulatory Announcement, transmitted by EQS Group.
The issuer is solely responsible for the content of this announcement.

═══════════════════════════════════════════════════════════════════════════════════════════════════════

Release time IMMEDIATE                                LSE, MOEX: POLY / ADR: AUCOY
Date         27 February 2020

 

 

Polymetal International plc

Ore Reserves, Mineral Resources and Exploration update as at 1 January 2020

 

Polymetal International plc announces its  Ore Reserves and Mineral Resources  as at 1 January 2020  in
accordance with the JORC Code (2012) 1  1   and exploration update for the year ended 31 December 2019.

"Significant growth in Ore Reserves at Kyzyl and a two-fold increase in reserves at Veduga were the key
drivers behind the  Group's Ore Reserves  extension", said Vitaly  Nesis, Group CEO  of Polymetal.  "In
2020, we will focus on reserves and resources updates at some of our key development projects and  will
continue exploration activities to extend the life of existing mines".

2019 HIGHLIGHTS

  • Group Ore  Reserves increased  by  5% year-on-year  to 25.2  Moz  of gold  equivalent (GE)  due  to
    successful exploration results with the subsequent re-evaluation of Ore Reserves at Kyzyl,  Veduga,
    Kutyn and initial estimate at Primorskoye (Dukat hub). GE Ore Reserves per share also grew by 5%.
  • Mineral Resources (additional to Ore Reserves) declined by  4% year-on-year to 25.4 Moz of GE.  The
    Lichkvaz disposal and conversion  of Mineral Resources  to Ore Reserves  at Kyzyl, Primorskoye  and
    Veduga were largely compensated by initial Mineral Resources estimate of Elevator (Varvara hub) and
    increase of resources at Albazino and Svetloye.
  • The average grade in Ore Reserves remained largely  unchanged over the previous year at 3.7 g/t  of
    GE. It continues to be one of the highest within the sector globally. The average Mineral Resources
    grade also remained stable at 5.2 g/t of GE.
  • In 2019, the Company  maintained conservative price  assumptions for both  Ore Reserve and  Mineral
    Resource estimates at US$ 1,200/oz for gold and US$ 15/oz for silver.
  • Polymetal completed 198 km of exploration drilling in 2019. Drilling expenses amounted to US$  18.1
    million.

 

 

 

 

 

 

 

 

 

 

 

Ore Reserves and Mineral Resources summary (1), (2)

                                                                1 January 2020 1 January 2019 Change, %
                                                                                                   
Ore Reserves (Proved + Probable), gold equivalent Moz                25.2           24.0         +5%
Gold, Moz                                                            23.7           22.3         +6%
Silver, Moz                                                         116.0          135.0        -14%
Average reserve grade, g/t                                           3.7            3.8          -2%
                                                                                                   
Ore Reserves per share, GE oz/per share                             0.054          0.051         +5%
                                                                                                   
Mineral Resources (Measured + Indicated + Inferred), gold            25.4           26.3         -4%
equivalent Moz
Gold, Moz                                                            20.3           21.0         -3%
Silver, Moz                                                         337.7          354.9         -5%
Average resources grade, g/t                                         5.2            5.1          +1%

 1. Ore Reserves and  Mineral Resources  from continuing  operations. Kapan  mine was  classified as  a
    discontinued operation as  at 01.01.2019 and  is not  included in this  estimate; Lichkvaz,  Oroch,
    Sopka Kvartsevaya, Dalneye  and Irbychan  mines were classified  as discontinued  operations as  at
    01.01.2020 and are not included in this estimate.
 2. Mineral Resources are additional to Ore Reserves. Total Ore Reserves and Mineral Resources  numbers
    include base metals (copper, zinc and lead). PGM Mineral Resources are presented separately and are
    not included in the calculation of the  gold equivalent. Any discrepancies in calculations are  due
    to rounding.

2020 OUTLOOK

In 2020, Polymetal will  continue to invest  in both near-mine and  greenfield exploration projects  in
order to increase Ore Reserves.

The key objectives are as follows:

  • Prepare initial Ore Reserve estimate for East Bakyrchik (Kyzyl)
  • Prepare initial Ore Reserve estimate for Prognoz
  • Complete Ore Reserve estimate update at Veduga
  • Prepare initial Ore Reserve estimate for Voro refractory ore
  • Prepare initial Mineral Resource estimate at Talgiy (Albazino)
  • Upgrade Mineral Resources categories at Elevator.

The Company also plans to further develop  its cooperation with junior exploration companies and  enter
into several new strategic partnerships. In 2020, the results of the first field season of the work  of
existing junior partners are expected.

 

 

 

 

 

 

Ore Reserves and Mineral Resources structure by metal as at 1 January 2020 (1)

            Ore Reserves Mineral Resources
                          
Gold            94%             80%
Silver           5%             17%
Base metals      1%             3%
Total           100%           100%

 1. Ore Reserves and Mineral Resources from continuing operations. Lichkvaz, Oroch, Sopka  Kvartsevaya,
    Dalneye and Irbychan mines were classified as discontinued operations as at 01.01.2020 and are  not
    included in this estimate.

Ore Reserves reconciliation, GE Moz (1)

Ore Reserves,     Metals to gold                                  Change in   Initial Ore Ore Reserves,
 01.01.2019    equivalent conversion  Depletion Revaluation (2) ownership (3)   Reserve    01.01.2020
              price ratio change (1)                                           estimate
    24.0               +0.1             -1.8         +2.5           -0.1         +0.5         25.2

 1. For the gold equivalent conversion ratios and applicable processing technology, please refer to the
    Appendix.
 2. Including the effect of the expected sale and stockpiles write-off of Sopka Kvartsevaya (-199  Koz)
    and Dalneye (-58 Koz) deposits.
 3. Lichkvaz sale.

Ore Reserves and Mineral Resources as at 1 January 2020 (1)

                                Tonnage           Grade  Content
                                  Mt             GE, g/t GE, Moz
Ore Reserves                                    
Proved                           64.3         2.5          5.2
Probable                         145.3        4.3         20.0
Proved + Probable                209.5        3.7         25.2
                                                             
Mineral Resources                               
Measured                         16.5         3.2          1.7
Indicated                        44.8         5.0          7.1
Measured + Indicated             61.2         4.5          8.8
Inferred                         91.7         5.6         16.5
Measured + Indicated + Inferred  152.9        5.2         25.4

 1. Ore Reserves and Mineral Resources from continuing operations. Lichkvaz, Oroch, Sopka  Kvartsevaya,
    Dalneye and Irbychan mines were classified as discontinued operations as at 01.01.2020 and are  not
    included in this estimate. Mineral Resources and  Ore Reserves are reported in accordance with  the
    JORC Code (2012). Mineral  Resources are additional  to Ore Reserves. A  detailed table of  Mineral
    Resources and  Ore Reserves  on a  by-mine basis  are presented  below. PGM  Mineral Resources  are
    presented separately and not included in the calculation of the gold equivalent. Any  discrepancies
    in calculations are due to rounding.

 

 

Exploration areas and volumes (mine site exploration excluded) (1)  

                             Drilling, km
                              2019  2018
Brownfield                             
                                       
Kyzyl                         5.3    7.3
                                       
Albazino                      13.2  26.8
                                       
Mayskoye                       -    29.5
                                       
Varvara hub                   45.3  53.2
                                       
Voro hub                      23.3  32.9
                                       
Omolon hub                    11.8  21.3
                                       
Svetloye hub                  2.8    5.9
                                       
Dukat hub                     0.6   27.6
                                       
Okhotsk (sold December 2018)   -    15.9
                                       
Subtotal                     102.4  220.6
                                       
Greenfield                             
                                       
Yakutia                       43.1  85.7
Nezhda                        1.8   25.9
Prognoz                       41.4  59.8
                                       
Veduga                        19.2    -
                                       
Kutyn                         16.1  19.8
                                       
Viksha                        11.9  14.7
                                       
Urals                         3.9    9.3
                                       
Other                         1.9     -
                                       
Subtotal                      96.1  129.6
Total                        198.5  350.2

 1. Any discrepancies in calculations are due to rounding.

EXPLORATION RESULTS

In 2019,  exploration was  focused  on areas  in  close proximity  to  the Company's  existing  assets.
Exploration activities were carried out  at 52 licensed properties. 13  new licenses were obtained  for
geological studies, exploration and production  of gold, silver, PGMs and  copper. In total, 198 km  of
drilling was completed.

Kyzyl

  • The updated Ore Reserve and Mineral Resources estimate for Bakyrchik conducted in 2019 incorporates
    data from additional 239 diamond drill holes, 41.5 km of drilling, which resulted in the  extension
    of mineralization zones within the existing ore bodies and update of the resource model.  According
    to the updated estimate, open-pit reserves  now equal to 3.9 Moz of  gold with an average grade  of
    5.6 g/t. Underground reserves  increased to 4.3 Moz  with an average grade  of 7.1 g/t.  Additional
    Mineral Resources declined by 374 Koz to 3.5 Moz with an average grade of 5.4 g/t due to conversion
    to Ore Reserves. Life of open-pit increased from 10 years to 14 years.
  • In 2019,  Polymetal continued  exploration drilling  at  Kyzyl's second  ore zone,  East  Bakyrchik
    (Promezhutochniy and Glubokiy Log sections), to study the possibility of the open-pit expansion. 24
    drill holes totaling 5.3 km  of drilling were completed resulting  in clarification of ore  bodies'
    contours and the mineralization boundaries.
  • In 2020, the  Company plans  to update Ore  Reserve and  Mineral Resource estimate  to include  the
    results of East Bakyrchik evaluation.

Albazino

  • In 2019, exploration activities were focused on additional prospecting of the Mineral Resources  at
    Ekaterina 2 mine. Additional Mineral Resources increased by  159 Koz to 1.8 Moz GE with an  average
    grade of 4.6 g/t
  • Exploration was carried out at the Talgiy section of the Urkachik area (47 thousand m3 of trenches,
    4.7 km of drilling). In 2020, Polymetal plans  to continue exploration drilling at Talgiy in  order
    to prepare initial Mineral Resource estimate.  Additional resources are expected to be  established
    on the flanks of  the deposit due  to the identification of  new ore bodies  and evaluation of  new
    prospective areas (Pikhtovy site).

Varvara hub

  • At Elevator, 4.8  km of drilling  was completed, aiming  to explore primary  gold ore for  open-pit
    mining. Based on  exploration activity  in 2019  and previous  years, an  initial Mineral  Resource
    estimate was prepared. Resources  amounted to 402  Koz of gold  with an average  grade of 1.8  g/t.
    Inclusion  of  Elevator's  resources  offset  the  decrease  in  resources  at  Varvara  and  Komar
    attributable to changes in the boundaries of the Mineral Resources. Total hub's additional  Mineral
    Resources decreased by 150 Koz to 1.5 Moz of GE. 
  • At Vostochno-Tarutinsky gold-copper deposit, 28.3 km were drilled, including 21.7 km of exploration
    drilling, in order to prepare an initial Mineral Resource estimate.
  • In 2020, the Company plans to continue exploration on the flanks of the Elevator deposit aiming  to
    upgrade the categories of Mineral Resources and convert them into Ore Reserves.

Voro hub

  • Additional Mineral Resources of Voro  hub remained mostly unchanged over  the previous year at  1.3
    Moz of GE with an average grade of 4.9 g/t.
  • At Voro, a total of 10.5 km of  exploration drilling was completed in 2019 to estimate  underground
    mineral resources on the northern flank and to estimate mineral resources of the oxidized ores  for
    open-pit mining on the western flank.
  • At Pescherny,  12.4 km  was  drilled. Technological  studies  and a  set  of field  and  laboratory
    hydrogeological and engineering-geological studies were completed.
  • In 2020,  Polymetal plans  to prepare  an  initial Ore  Reserve and  the updated  Mineral  Resource
    estimate of Pescherny deposit, as well as  to complete exploration of the underground resources  at
    Voro deposit and to continue exploration in its surrounding area.

Omolon hub

  • 5.6 km of  exploration drilling was  completed at the  Nevenrekan deposit to  close the ore  bodies
    along the strike at zone 1 and assess their extension. Mineral Resources increased by 78 Koz to 242
    Koz of GE with an average grade of 19.3 g/t.

Svetloye hub

  • In 2019, exploration  was carried  out on the  remote flanks  of Svetloye deposit.  An increase  in
    additional Mineral Resources  of 109 Koz  at Emmy  and Lyudmila ore  zones was obtained  due to  an
    improvement in the quality of the ore and wider ore bodies.
  • In 2020, the Company plans to continue exploration drilling and trenching on the flanks of Emmy and
    Lyudmila ore zones aiming to further increase mineral resources base.

Dukat hub

  • According to the initial estimate, Ore Reserves of Primorskoye deposit amounted to 12.2 Moz  silver
    equivalent with an average grade of 3,113 g/t at a cut-off grade of 1,115 g/t of silver  equivalent
    (for processing at  Lunnoye plant).  Additional Mineral  Resources as  a result  of the  conversion
    decreased by 20.3 Moz in silver equivalent.

Nezhda

  • In 2019,  exploration  activities were  focused  on the  southern  flanks of  the  Nezhda  deposit.
    According to the preliminary estimates, an increase in the open-pit Mineral Resources is possible.
  • In 2020,  Polymetal plans  to continue  exploration  activities on  the flanks  of the  deposit  to
    identify new mineralized zones and update the mineralization estimates of the known ore bodies.

Prognoz

  • In 2019, the Company conducted 41.4 km of drilling, including 31.1 km of exploration drilling,  5.3
    km of geotechnical drilling for plant construction,  2.5 km of hydrogeological drilling and 2.4  km
    of technological drilling.
  • In 2020,  Polymetal plans  to  prepare an  initial  Ore Reserve  and  an updated  Mineral  Resource
    estimates of Prognoz deposit as well as to carry additional exploration activity out on the  flanks
    and surrounding areas of the deposit.

Veduga

  • In 2019,  the Company  prepared an  updated  Mineral Resource  and Ore  Reserve estimate  based  on
    exploration activities conducted in 2017-2018. As  at 01.01.2020, the deposit's Ore  Reserves 2  2 
    totaled 2.7 Moz  of gold  with an average  grade of  4.5 g/t,  which is 1.4  Moz more  than in  the
    previous evaluation.  Additional Mineral  Resources halved  to 200  Koz due  to conversion  to  Ore
    Reserves.
  • In 2019, the Company carried out 19.2 km of exploration drilling at the deeper levels of the  known
    ore bodies.
  • In 2020, Polymetal  plans to evaluate  the potential ore  body 1 to  a horizon of  -650 m and  also
    continue to identify  new resources  at the Strelka  ore zone.  The Company expects  to achieve  an
    increase of at least 1 Moz of gold in Mineral Resources as a result of this exploration campaign.

Kutyn

  • In 2019, 16.1 km of exploration drilling and 56.9 thousand m3 of trenches were completed at  Kutyn.
    Based on the results of  drilling conducted in 2017-2019, an  updated geological model and  Mineral
    Resource and Ore Reserve estimate were prepared.
  • Ore Reserves increased by 425 Koz compared to the previous estimate and amounted to 812 Koz of gold
    with an average grade of 3.0  g/t. Mineral Resources totaled 785 Koz  with an average grade of  3.7
    g/t.
  • In 2020, additional  exploration and  evaluation work  will be  carried out  on the  flanks of  the
    explored ore zones to verify new promising areas.  Detailed drilling will be performed in the  main
    ore zones within the expected  open-pit oxidized boundaries to  convert Mineral Resources into  Ore
    Reserves.

PGMs

  • Exploration drilling was carried  out at Kenti and  Shargi ore zones at  the Viksha PGM deposit  in
    Karelia aiming  to upgrade  the Mineral  Resources categories.  The resource  model of  the  Viksha
    deposit was updated, reflecting changing metal prices as well. As a result, total Mineral Resources
    decreased to 5.7 Moz of  PdEq, while the share of  Measured and Indicated Resources increased  from
    13% to 65%.
  • In 2020, exploration activities are set to continue at the flanks of the Kenti and Shargi ore zones
    with a view to upgrade the resources of the deposit.

 

Ore Reserves as at 1 January 2020 (1)

                            Tonnage                    Grade                            Content
                                    Au,  Ag    Cu   Zn   Pb  GE         Au     Ag   Cu   Zn  Pb    GE
                              Kt    g/t  g/t   %                g/t    Koz    Koz   Kt            Koz
                                                    %    %                               Kt  Kt
  Proved                                                                                            
  Standalone mines           6,510                             4.4     924     -     -   -    -   924
  Albazino                   4,430  3.5   -    -    -    -     3.5     492     -     -   -    -   492
  Mayskoye                   1,220  7.1   -    -    -    -     7.1     282     -     -   -    -   282
  Kyzyl project (Bakyrchik)   860   5.4   -    -    -    -     5.4     150     -     -   -    -   150
  (2)
                                                                                                    
  Dukat hub                  6,020                             3.7     113   50,989  -  0.5  0.5  725
  Dukat                      4,680  0.5  261   -    -    -     3.6      69   39,247  -   -    -   542
  Lunnoye                    1,070  1.1  271   -    -    -     4.3      39   9,350   -   -    -   148
  Goltsovoye                  60     -   355   -    -    -     4.4      -     671    -   -    -    8
  Arylakh                     180   0.7  260   -    -    -     3.9      4    1,462   -   -    -    22
  Perevalnoye                 30     -   247   -   1.62 1.43   3.9      0     259    -  0.5  0.5   4
                                                                                                    
  Varvara hub               18,090                             1.0     545     -    8.6  -    -   600
  Varvara (3)               13,700  0.8   -   0.46  -    -     0.9     363     -    8.6  -    -   417
  Komar                      4,390  1.3   -    -    -    -     1.3     183     -     -   -    -   183
                                                                                                    
  Omolon hub                 4,660                             3.0     436   1,166   -   -    -   449
  Birkachan                  3,610  2.2   7    -    -    -     2.3     260    862    -   -    -   269
  Olcha                       240   7.2  21    -    -    -     7.4      53    152    -   -    -    54
  Tsokol Kubaka               370   5.0   7    -    -    -     5.0      59     83    -   -    -    59
  Yolochka (4)                440   4.6   5    -    -    -     4.7      65     68    -   -    -    66
                                                                                                    
  Voro hub                  13,600                             1.7     724    849    -   -    -   730
  Voro                       8,790  1.5   3    -    -    -     1.5     429    849    -   -    -   436
  Maminskoye (5)             4,810  1.9   -    -    -    -     1.9     295     -     -   -    -   295
                                                                                                    
  Svetloye hub               1,290                             2.7     110     -     -   -    -   110
  Svetloye                   1,290  2.7 -      -    -    -     2.7     110     -     -   -    -   110
                                                                                                    
  Development and           14,080                             3.8    1,626  7,603   -   -    -  1,706
  exploration projects
  Nezhda (6)                11,730  3.6  20    -    -    -     3.9    1,372  7,603   -   -    -  1,452
  Veduga (7)                  490   2.7   -    -    -    -     2.7      42     -     -   -    -    42
  Kutyn (8)                  1,860  3.5   -    -    -    -     3.5     211     -     -   -    -   211
                                                                                                    
  Total Proved              64,250                             2.5    4,478  60,607 8.6 0.5  0.5 5,243
  Probable                                                                                          
  Standalone mines          58,420                             6.0    11,254   -     -   -    -  11,254
  Albazino                  11,080  4.1   -    -    -    -     4.1    1,446    -     -   -    -  1,446
  Mayskoye                   7,640  7.0   -    -    -    -     7.0    1,716    -     -   -    -  1,716
  Kyzyl project (Bakyrchik) 39,700  6.3   -    -    -    -     6.3    8,092    -     -   -    -  8,092
  (2)
                                                                                                    
  Dukat hub                  4,310                             4.6     126   42,460  -  12.9 9.7  641
  Dukat                      2,710  0.5  252   -    -    -     3.5      43   21,961  -   -    -   307
  Lunnoye                     770   1.9  227   -    -    -     4.7      47   5,591   -   -    -   115
  Arylakh                     130   0.8  327   -    -    -     4.9      4    1,389   -   -    -    21
Perevalnoye                   580    -   258   -   2.24 1.69   4.3      -    4,764   -  12.9 9.7   79
Primorskoye (9)               120   8.3 2,227  -    -    -     30.2     33   8,754   -   -    -   119
                                                                                                    
                                                                                                  

 

                Tonnage                 Grade                                 Content                  
                        Au,  Ag    Cu   Zn    Pb    GE           Au      Ag    Cu    Zn    Pb    GE
                  Kt    g/t  g/t   %                   g/t      Koz     Koz    Kt               Koz    
                                        %      %                                     Kt    Kt
Varvara hub     20,600                                 1.6     1,033     -     9.1    -    -   1,090   
Varvara (3)      4,390  1.1   -   0.59  -      -       1.5      161      -     9.1    -    -    218    
Komar           16,210  1.7   -    -    -      -       1.7      872      -      -     -    -    872    
                                                                                                       
Omolon hub       1,150                                 7.9      283     933     -     -    -    293    
Birkachan         700   7.4  23    -    -      -       7.6      166     518     -     -    -    171    
Olcha             60    6.7  19    -    -      -       6.9       14      41     -     -    -     15    
Tsokol Kubaka     90    5.9   9    -    -      -       6.0       18      28     -     -    -     18    
Burgali           300   9.1  37    -    -      -       9.5       86     347     -     -    -     89    
                                                                                                       
Voro hub        10,210                                 2.4      688    1,056  18.9  18.1   -    797    
North Kaluga      320   6.7  101  5.81 5.58    -      17.1       70    1,056  18.9  18.1   -    179    
(10)
Maminskoye (5)   9,890  1.9   -    -    -      -       1.9      618      -      -     -    -    618    
                                                                                                       
Svetloye hub     4,320                                 2.7      376      -      -     -    -    376    
Svetloye         4,320  2.7   -    -    -      -       2.7      376      -      -     -    -    376    
                                                                                                       
Development and
exploration     46,240                                 3.7     5,434   10,981   -     -    -   5,549   
projects
Nezhda (6)      26,290  3.4  13    -    -      -       3.5     2,844   10,981   -     -    -   2,960   
Veduga (7)      13,410  4.6   -    -    -      -       4.6     1,989     -      -     -    -   1,989   
Kutyn (8)        6,540  2.9   -    -    -      -       2.9      601      -      -     -    -    601    
                                                                                                       
Total Probable  145,250                                4.3     19,194  55,431 28.0  31.0  9.7  20,000  
                                                                                                       
Proved +  Probable                                                                                     
Standalone      64,930                                 5.8     12,178    -      -     -    -   12,178  
mines
Albazino        15,510  3.9   -    -    -      -       3.9     1,938     -      -     -    -   1,938   
Mayskoye         8,860  7.0   -    -    -      -       7.0     1,998     -      -     -    -   1,998   
Kyzyl project   40,560  6.3   -    -    -      -       6.3     8,242     -      -     -    -   8,242   
(Bakyrchik) (2)
                                                                                                       
Dukat hub       10,330                                 4.1      239    93,449   -   13.4  10.2 1,366   
Dukat            7,390  0.5  258   -    -      -       3.6      112    61,209   -     -    -    849    
Lunnoye          1,840  1.5  253   -    -      -       4.5       87    14,941   -     -    -    264    
Goltsovoye        60     -   355   -    -      -       4.4       -      671     -     -    -     8     
Arylakh           310   0.7  289   -    -      -       4.4       7     2,852    -     -    -     43    
Perevalnoye       610    -   257   -   2.21  1.68      4.2       -     5,023    -   13.4  10.2   83    
Primorskoye (9)   120   8.3 2,227  -    -      -      30.2       33    8,754    -     -    -    119    
                                                                                                       
Varvara hub     38,690                                 1.4     1,578     -    17.7    -    -   1,690   
Varvara (3)     18,090  0.9   -   0.52  -      -       1.1      523      -    17.7    -    -    635    
Komar           20,600  1.6   -    -    -      -       1.6     1,055     -      -     -    -   1,055   
                                                                                                       
Omolon hub       5,810                                 4.0      720    2,100    -     -    -    741    
Birkachan        4,310  3.1  10    -    -      -       3.2      426    1,380    -     -    -    440    
Olcha             300   7.1  20    -    -      -       7.3       67     193     -     -    -     69    
Tsokol Kubaka     460   5.1   7    -    -      -       5.2       76     111     -     -    -     77    
Burgali           300   9.1  37    -    -      -       9.5       86     347     -     -    -     89    
Yolochka (4)      440   4.6   5    -    -      -       4.7       65      68     -     -    -     66    
                                                                                                       
Voro hub        23,810                                 2.0     1,412   1,904  18.9  18.1   -   1,527   
Voro             8,790  1.5   3    -    -      -       1.5      429     849     -     -    -    436    
North Kaluga      320   6.7  101  5.81 5.58    -      17.1       70    1,056  18.9  18.1   -    179    
(10)
Maminskoye (5)  14,700  1.9   -    -    -      -       1.9      913      -      -     -    -    913    
            Tonnage                       Grade                                     Content
                     Au,   Ag   Cu    Zn   Pb   GE           Au      Ag     Cu    Zn    Pb       GE
               Kt    g/t  g/t    %                 g/t       Koz     Koz    Kt                  Koz
                                      %    %                                      Kt    Kt
Svetloye     5,610   2.7                           2.7       486      -      -     -     -      486
hub
Svetloye     5,610   2.7   -     -    -    -       2.7       486             -     -     -      486
                                                                                                  
Development
and          60,320                                3.7      7,059  18,585    -     -     -     7,255
exploration
projects
Nezhda (6)   38,020  3.4   15    -    -    -       3.6      4,216  18,585    -     -     -     4,412
Veduga (7)   13,900  4.5   -     -    -    -       4.5      2,032     -      -     -     -     2,032
Kutyn (8)    8,400   3.0   -     -    -    -       3.0       812      -      -     -     -      812
                                                                                                  
Total
Proved +    209,500                                3.7     23,672  116,038 36.6  31.6  10.2    25,243
 Probable
                                                                                                       

 1. Ore Reserves  are  reported  in accordance  with  the  JORC Code  (2012).  Lichkvaz,  Oroch,  Sopka
    Kvartsevaya, Dalneye and Irbychan mines were classified as discontinued operations as at 01.01.2020
    and are not included in this estimate. Any discrepancies in calculations are due to rounding.
 2. Previous estimate prepared by Polymetal as at 01.07.2019. Price: Au = US$1,200/oz. Revised estimate
    prepared by Polymetal as at 01.01.2020 (accounts only for depletion).
 3. Cu grade  in Ore  Reserves  only represents  average  grade in  flotation  feed. Ore  Reserves  for
    flotation: 1.9 Mt Proved and 1.6 Mt Probable.
 4. Stockpiled Ore Reserves. Price: Au = US$1,400/oz and Ag = US$17/oz.
 5. Estimate prepared by Polymetal as at 01.01.2014. Price: Au = US$1,300/oz. Revised estimate was  not
    performed due to lack of material changes.
 6. Estimate prepared by  CSA as  at 01.04.2018. Price:  Au =  US$1,200/oz and Ag  = US$16/oz.  Revised
    estimate was not performed due to lack of material changes.
 7. Previous estimate  prepared  by  Polymetal as  at  01.03.2019.  Revised estimate  was  prepared  by
    Polymetal as at 01.01.2020 (accounts only  for depletion).Ore Reserves are presented in  accordance
    with the Company's ownership equal to 74.3%.
 8. Estimate prepared by Polymetal as  at 01.10.2019. Price: Au =  US$1,300/oz. Revised estimate as  at
    01.01.2020 was not performed due to lack of material changes.
 9. Initial estimate prepared by Polymetal as at 01.01.2020. Price: Au = US$1,400/oz, Ag = US$16/oz.
10. Initial estimate prepared by Polymetal as at 01.07.2014. Price: Au = US$1,300/oz, Ag = US$20/oz, Cu
    = US$7,000/t and  Zn =  US$1,700/t. Revised  estimate was  not performed  due to  lack of  material
    changes.

 

Mineral Resources as at 1 January 2020 (1)

 

           
                       Tonnage                    Grade                               Content
           
                              Au   Ag    Cu   Zn   Pb         GE         Au     Ag    Cu  Zn Pb  GE
                        Kt   g/t   g/t   %                          g/t  Koz   Koz    Kt         Koz   
                                              %    %                                      Kt Kt
Measured                                                                                               
Standalone mines      4,620                                  5.3         792    -     -   -  -   792   
Albazino              3,440  2.7    -    -    -    -         2.7         296    -     -   -  -   296   
Mayskoye (2)          1,180  13.0   -    -    -    -         13.0        496    -     -   -  -   496   
                                                                                                       
Dukat hub             1,360                                  7.1         53   21,149  -   -  -   309   
Dukat                  670   0.9   443   -    -    -         6.2         19   9,505   -   -  -   133   
Lunnoye                530   1.8   422   -    -    -         6.9         31   7,126   -   -  -   116   
Goltsovoye              80    -   1,018  -    -              12.7         -   2,625   -   -      33    
Arylakh                 80   1.4   717   -    -    -         10.4         4   1,893   -   -  -   27    
                                                                                                       
Varvara hub           6,660                                  1.5         172    -    22.4 -  -   314   
Varvara (3)           6,520  0.8    -   0.39  -    -         1.5         163    -    22.4 -  -   305   
Komar                  140   2.0    -    -    -    -         2.0          9     -     -   -  -    9    
                                                                                                       
Omolon hub             680                                   3.5         75    183    -   -  -   77    
Birkachan              410   1.4    5    -    -    -         1.5         19     71    -   -  -   19    
Olcha                  160   4.9   15    -    -    -         5.0         25     77    -   -  -   25    
Tsokol Kubaka          110   9.6   10    -    -    -         9.7         31     34    -   -  -   32    
                                                                                                       
Voro hub              1,230                                  1.6         65     45    -   -  -   65    
Voro                   250   2.6    6    -    -    -         2.6         20     45    -   -  -   21    
Maminskoye (4)         980   1.4    -    -    -    -         1.4         44     -     -   -  -   44    
                                                                                                       
Svetloye hub           740                                   1.0         23     -     -   -  -   23    
Svetloye               740   1.0    -    -    -    -         1.0         23     -     -   -  -   23    
                                                                                                       
Development and       1,160                                  3.1         115    61    -   -  -   115   
exploration projects
Nezhda (5)             220   4.0    9    -    -    -         4.1         28     61    -   -  -   29    
Veduga (6)             380   0.7    -    -    -    -         0.7          9     -     -   -  -    9    
Kutyn (7)              560   4.3    -    -    -    -         4.3         77     -     -   -  -   77    
                                                                                                       
Total Measured        16,450                                 3.2        1,295 21,438 22.4 -  -  1,696  
                                                                                                       
                                                                                                       

 

          
                     Tonnage                 Grade                              Content                
 
                             Au   Ag   Cu   Zn   Pb       GE       Au     Ag     Cu   Zn  Pb    GE
                       Kt    g/t  g/t  %                           Koz    Koz    Kt             Koz    
                                            %    %       g/t                          Kt  Kt
Indicated                                                                                              
Standalone mines     8,400                               5.4      1,466    -     -    -    -   1,466   
Albazino             3,910   4.6   -   -    -    -       4.6       581     -     -    -    -    581    
Mayskoye (2)         1,190  10.0   -   -    -    -       10.0      382     -     -    -    -    382    
Kyzyl (Bakyrchik,    3,300   4.7   -   -    -    -       4.7       503     -     -    -    -    503    
Bolshevik) (8)
                                                                                                       
Dukat hub             780                                6.9       27   11,850   -   1.9  1.4   172    
Dukat                 430    0.9  457  -    -    -       6.4       13    6,372   -    -    -    90     
Lunnoye               140    2.3  270  -    -    -       5.6       10    1,200   -    -    -    25     
Goltsovoye             90     -   796  -    -            9.9        -    2,331   -    -    -    29     
Arylakh                50    1.2  519  -    -    -       7.7        2     820    -    -    -    12     
Perevalnoye            50     -   446  -   3.98 2.94     7.4        -     682    -   1.9  1.4   11     
Primorskoye  (9)       20    3.8  879  -    -    -       10.0       2     445    -    -    -     5     
                                                                                                       
Varvara hub          13,090                              1.9       759     -    5.2   -    -    792    
Varvara (3)          2,960   1.4   -  0.49  -    -       1.7       130     -    5.2   -    -    163    
Komar                5,770   2.0   -   -    -    -       2.0       372     -     -    -    -    372    
Elevator (10)        4,360   1.8   -   -    -    -       1.8       257     -     -    -    -    257    
                                                                                                       
Omolon hub            560                                17.1      226   7,255   -    -    -    308    
Birkachan             160   14.7  23   -    -    -       14.9      74     113    -    -    -    75     
Olcha                  50    9.2  28   -    -    -       9.5       15     45     -    -    -    15     
Tsokol Kubaka          10    6.1  11   -    -    -       6.2        2      4     -    -    -     2     
Burgali                50    8.4  19   -    -    -       8.6       14     32     -    -    -    15     
Nevenrekan            290   13.2  770  -    -    -       21.9      121   7,061   -    -    -    201    
                                                                                                       
Voro hub             6,150                               5.5       775   2,523  26.8 42.6   -   1,082  
Voro                   50    2.7   4   -    -    -       2.7        5      6     -    -     -     5    
Tamunier (11)        2,190   3.4  10   -    -    -       3.5       242    690    -    -     -    245   
Maminskoye (4)       1,150   1.5   -   -    -    -       1.5       55      -     -    -     -    55    
Saum (12)            1,260   2.4  45  2.14 3.39  -       9.9       96    1,827  26.8 42.6   -    399   
Pescherny (13)       1,500   7.8   -   -    -    -       7.8       378     -     -    -     -    378   
                                                                                                       
Svetloye hub         4,450                               3.4       492     -     -    -     -    492   
Svetloye             2,270   2.8   -   -    -    -       2.8       201     -     -    -     -    201   
Levoberezhny (14)    2,180   4.1   -   -    -    -       4.1       291     -     -    -     -    291   
                                                                                                       
Development and      11,360                              7.7       727  146,134  -    -   119.8 2,823  
exploration projects
Nezhda (5)           2,770   3.7  16   -    -    -       3.9       331   1,423   -    -     -    346   
Kutyn (7)            3,020   4.1   -   -    -    -       4.1       396     -     -    -     -    396   
Prognoz (15)         5,570   -    808  -    -   2.15     11.6      -    144,710  -    -   119.8 2,081  
                                                                                                       
Total Indicated      44,790                              5.0      4,472 167,762 32.0 44.5 121.2 7,134  
                                                                                                  
                                                                                                       

 

           
                       Tonnage                 Grade                              Content
           
                              Au  Ag   Cu   Zn   Pb                Au     Ag     Cu   Zn   Pb    GE
                        Kt   g/t  g/t  %             GE       g/t  Koz    Koz    Kt              Koz   
                                            %    %                                    Kt   Kt
Measured + Indicated                                                                                   
Standalone mines      13,020                             5.4      2,258    -     -    -     -   2,258  
Albazino              7,350  3.7   -   -    -    -       3.7       877     -     -    -     -    877   
Mayskoye (2)          2,370  11.5  -   -    -    -       11.5      879     -     -    -     -    879   
Kyzyl (Bakyrchik,     3,300  4.7   -   -    -    -       4.7       503     -     -    -     -    503   
Bolshevik) (8)
                                                                                                       
Dukat hub             2,140                              7.0       80   32,999   -   1.9   1.4   481   
Dukat                 1,100  0.9  448  -    -    -       6.3       32   15,876   -    -     -    223   
Lunnoye                670   1.9  391  -    -    -       6.6       41    8,326   -    -     -    141   
Goltsovoye             170    -   900  -    -    -       11.2       -    4,956   -    -     -    62    
Arylakh                130   1.3  643  -    -    -       9.4        6    2,713   -    -     -    40    
Perevalnoye             50    -   446  -   3.98 2.94     7.4        -     682    -   1.9   1.4   11    
Primorskoye (9)         20   3.8  879  -    -    -       10.0       2     445    -    -     -     5    
                                                                                                       
Varvara hub           19,750                             1.7       932     -    27.6  -     -   1,106  
Varvara (3)           9,480  1.0   -  0.40  -    -       1.5       293     -    27.6  -     -    467   
Komar                 5,910  2.0   -   -    -    -       2.0       381     -     -    -     -    381   
Elevator (10)         4,360  1.8   -   -    -    -       1.8       257     -     -    -     -    257   
                                                                                                       
Omolon hub            1,240                              9.6       301   7,438   -    -     -    384   
Birkachan              570   5.1  10   -    -    -       5.2       92     185    -    -     -    94    
Olcha                  210   5.9  18   -    -    -       6.1       40     122    -    -     -    41    
Tsokol Kubaka          120   9.2  10   -    -    -       9.3       34     38     -    -     -    34    
Burgali                 50   8.4  19   -    -    -       8.6       14     32     -    -     -    15    
Nevenrekan             290   13.2 770  -    -    -       21.9      121   7,061   -    -     -    201   
                                                                                                       
Voro hub              7,380                              4.8       840   2,569  26.8 42.6   -   1,147  
Voro                   300   2.6   5   -    -    -       2.6       25     52     -    -     -    25    
Tamunier (11)         2,190  3.4  10   -    -    -       3.5       242    690    -    -     -    245   
Maminskoye (4)        2,130  1.4   -   -    -    -       1.4       99      -     -    -     -    99    
Saum (12)             1,260  2.4  45  2.14 3.39  -       9.9       96    1,827  26.8 42.6   -    399   
Pescherny (13)        1,500  7.8   -   -    -    -       7.8       378     -     -    -     -    378   
                                                                                                       
Svetloye hub          5,190                              3.1       515     -     -    -     -    515   
Svetloye              3,010  2.3   -   -    -    -       2.3       224     -     -    -     -    224   
Levoberezhny (14)     2,180  4.1   -   -    -    -       4.1       291     -     -    -     -    291   
                                                                                                       
Development and       12,520                             7.3       842  146,195  -    -   119.8 2,938  
exploration projects
Nezhda (5)            2,990  3.7  15   -    -    -       3.9       359   1,484   -    -     -    375   
Veduga (6)             380   0.7   -   -    -    -       0.7        9      -     -    -     -     9    
Kutyn (7)             3,580  4.1   -   -    -    -       4.1       473     -     -    -     -    473   
Prognoz (15)          5,570   -   808  -    -   2.15     11.6       -   144,710  -    -   119.8 2,081  
                                                                                                       
Total Measured +      61,240                             4.5      5,768 189,200 54.5 44.5 121.2 8,830  
Indicated
                                                                                                       

 

            
                        Tonnage               Grade                              Content
 
                                 Au   Ag    Cu   Zn   Pb   GE    Au      Ag      Cu   Zn   Pb    GE
                          Kt    g/t   g/t   %                   Koz      Koz     Kt             Koz    
                                                 %    %   g/t                         Kt   Kt
Inferred                                                                                               
Standalone mines        26,570                            6.8  5,772      -      -    -    -   5,772   
Albazino                 4,710  6.1    -    -    -    -   6.1   922       -      -    -    -    922    
Mayskoye (2)             5,180  11.3   -    -    -    -   11.3 1,884      -      -    -    -   1,884   
Kyzyl (Bakyrchik,       16,680  5.5    -    -    -    -   5.5  2,967      -      -    -    -   2,967   
Bolshevik) (8)
                                                                                                       
Dukat hub                2,640                            7.0    68    41,662    -   14.7 14.2  595    
Dukat                    1,520  0.8   487   -    -    -   6.7    39    23,762    -    -    -    326    
Lunnoye                   320   1.8   409   -    -    -   6.8    18     4,064    -    -    -     68    
Goltsovoye                120    -    703   -    -    -   8.8    -      2,689    -    -    -     34    
Arylakh                   180   0.3   473   -    -    -   6.2    2      2,703    -    -    -     36    
Perevalnoye               460    -    418   -   3.17 3.07 6.8    -      6,225    -   14.7 14.2  102    
Primorskoye (9)           40    7.0  1,713  -    -    -   24.3   9      2,221    -    -    -     31    
                                                                                                       
Varvara hub              5,770                            1.9   342       -     2.8   -    -    359    
Varvara (3)              1,560  1.7    -   0.61  -    -   2.0    86       -     2.8   -    -    103    
Komar                    1,450  2.4    -    -    -    -   2.4   111       -      -    -    -    111    
Elevator (10)            2,760  1.6    -    -    -    -   1.6   145       -      -    -    -    145    
                                                                                                       
Omolon hub                340                             13.3  132     1,199    -    -    -    145    
Olcha                     60    10.3  41    -    -    -   10.7   19      75      -    -    -     20    
Tsokol Kubaka             30    9.2   15    -    -    -   9.3    10      16      -    -    -     10    
Burgali                   150   15.5  23    -    -    -   15.8   74      110     -    -    -     75    
Nevenrekan                100   8.9   299   -    -    -   12.3   30      998     -    -    -     41    
                                                                                                       
Voro hub                 1,030                            5.4   177      88      -    -    -    178    
Tamunier (11)             480   3.2    4    -    -    -   3.3    50      69      -    -    -     50    
Saum (12)                 10    1.9   45    -    -    -   2.3    1       20      -    -    -     1     
Pescherny (13)            540   7.3   -     -    -    -   7.3   127      -       -    -    -    127    
                                                                                                       
Svetloye hub              330                             2.1    22       -      -    -    -     22    
Svetloye                  290   2.0    -    -    -    -   2.0    19       -      -    -    -     19    
Levoberezhny (14)         40    2.3    -    -    -    -   2.3    3        -      -    -    -     3     
                                                                                                       
Development and         54,980                            5.4  8,003    105,502  -    -   77.9 9,474   
exploration projects
Nezhda (5)              46,440  5.1    9    -    -    -   5.2  7,552    13,679   -    -    -   7,696   
Veduga (6)                980   4.4    -    -    -    -   4.4   139       -      -    -    -    139    
Kutyn (7)                3,060  3.2    -    -    -    -   3.2   312       -      -    -    -    312    
Prognoz (15)             4,500   -    635   -    -   1.73 9.2    -       91,822  -    -   77.9 1,327   
                                                                                                       
Total Inferred          91,660                            5.6  14,517  148,451  2.8  14.7 92.2 16,546  
 

 
                                                                                                       
 

 
                                                                                                       

 

                   Tonnage                  Grade                                  Content
                            Au   Ag    Cu   Zn   Pb                 Au     Ag     Cu   Zn   Pb     GE
                     Kt    g/t   g/t   %             GE       g/t  Koz     Koz    Kt              Koz
                                            %    %                                     Kt   Kt
Measured + Indicated + Inferred                                                                   
Standalone mines   39,590                                6.3      8,030     -     -    -     -   8,030
Albazino           12,060  4.6    -    -    -    -       4.6      1,798     -     -    -     -   1,798
Mayskoye (2)        7,550  11.4   -    -    -    -    11.4        2,763     -     -    -     -   2,763
Kyzyl (Bakyrchik,  19,980  5.4    -    -    -    -     5.4        3,470     -     -    -     -   3,470
Bolshevik) (8)
                                                                                                    
Dukat hub           4,780                                7.0       149   74,661   -   16.6 15.6  1,077
Dukat               2,620  0.8   471   -    -    -       6.5        71   39,638   -    -     -    548
Lunnoye              990   1.9   396   -    -    -       6.7        59   12,390   -    -     -    208
Goltsovoye           290    -    819   -    -    -    10.2          -     7,645   -    -     -     96
Arylakh              310   0.8   545   -    -    -       7.6        8     5,415   -    -     -     75
Perevalnoye          510    -    420   -   3.25 3.06     6.9        -     6,907   -   16.6 15.6   113
Primorskoye (9)      60    6.1  1,478  -    -    -    20.3          11    2,666   -    -     -     37
                                                                                                    
Varvara hub        25,520                                1.8      1,274     -    30.4  -     -   1,465
Varvara (3)        11,040  1.1    -   0.42  -    -       1.6       379      -    30.4  -     -    570
Komar               7,360  2.1    -    -    -    -       2.1       493      -     -    -     -    493
Elevator (10)       7,120  1.8    -    -    -    -       1.8       402      -     -    -     -    402
                                                                                                    
Omolon hub          1,580                                10.4      433    8,637   -    -     -    529
Birkachan            570    5.1  10    -    -    -     5.2          92     185    -    -     -     94
Olcha                270   6.9   23    -    -    -       7.1        58     197    -    -     -     60
Tsokol Kubaka        150   9.2   11    -    -    -       9.3        43     54     -    -     -     44
Burgali              200   13.7  22    -    -    -    13.9          88     142    -    -     -     89
Nevenrekan           390   12.1  644   -    -    -    19.3         151    8,059   -    -     -    242
                                                                                                    
Voro hub            8,410                                4.9      1,017   2,657  26.8 42.6   -   1,325
Voro                 300   2.6    5    -    -    -       2.6        25     52     -    -     -     25
Tamunier (11)       2,670  3.4    9    -    -    -       3.4       292     759    -    -     -    296
Maminskoye (4)      2,130  1.4    -    -    -    -       1.4        99      -     -    -     -     99
Saum (12)           1,270  2.4   45   2.11 3.36  -       9.8        97    1,846  26.8 42.6   -    400
Pescherny (13)      2,040  7.7    -    -    -    -       7.7       505      -     -    -     -    505
                                                                                                    
Svetloye hub        5,520                                3.0       537      -     -    -     -    537
Svetloye            3,300  2.3    -    -    -    -       2.3       243      -     -    -     -    243
Levoberezhny (14)   2,220  4.1    -    -    -    -       4.1       294      -     -    -     -    294
                                                                                                    
Development and
exploration        67,500                                5.7      8,845  251,697  -    -   197.8 12,412
projects
Nezhda (5)         49,430  5.0   10    -    -    -       5.1      7,911  15,164   -    -     -   8,071
Veduga (6)          1,360  3.4    -    -    -    -       3.4       149      -     -    -     -    149
Kutyn (7)           6,640  3.7    -    -    -    -       3.7       785      -     -    -     -    785
Prognoz (15)       10,070   -    731   -    -   1.96  10.5          -    236,533  -    -   197.8 3,408
                                                                                                    
Total Measured +
Indicated +        152,900                               5.2      20,285 337,651 57.2 59.2 213.4 25,376
Inferred
                                                                                                  

 1. Мineral Resources are reported in  accordance with the JORC Code  (2012) and are additional to  Ore
    Reserves. Lichkvaz, Oroch, Sopka Kvartsevaya, Dalneye and Irbychan as of 01.01.2020 are  classified
    as discontinued operations and  excluded from the estimate.  Any discrepancies in calculations  are
    due to rounding.
 2. Previous estimate prepared by Polymetal as at 01.01.2019. Revised estimate prepared by Polymetal as
    at 01.01.2020 (accounts only for depletion).
 3. Cu grade estimate  is presented for  rock and  powder ore with  high Cu grade  only (total  Mineral
    Resources of rock and powder ore with high Cu grade are 5.1 and 5.9 Mt of ore respectively).
 4. Estimate prepared by Polymetal as at 01.01.2014. Price: Au = US$1,300/oz. Revised estimate was  not
    performed due to lack of material changes.
 5. Estimate prepared by CSA as at 01.04.2018. Price: Au= US$1,200/oz, Ag = US$16/oz. Revised  estimate
    was not performed due to lack of material changes.
 6. Previous estimate prepared by Polymetal as at 01.03.2019. Revised estimate prepared by Polymetal as
    at 01.01.2020 (accounts  only for depletion).  Mineral Resources are  presented in accordance  with
    Company's ownership equal to 74.3%.                           
 7. Previous estimate prepared by Polymetal as at 01.10.2019. Price: Au = US$1,300/oz. Revised estimate
    was not performed due to lack of material changes.
 8. Previous estimate of Zone 1 was prepared  by Polymetal as at 01.07.2019. Revised estimate  prepared
    by Polymetal as  at 01.01.2020 (accounts  only for depletion).  Previous estimate of  Zone 2  (East
    Bakyrchik) prepared by RPA  Inc. as at  01.01.2015. Estimate of Bolshevik  section was prepared  by
    Polymetal as at 01.01.2019, revised estimate was not performed due to lack of material changes.
 9. Revised estimate prepared by Polymetal as at 01.01.2020. Price: Au= US$1,400/oz, Ag = US$16/oz.
10. Initial estimate prepared by Polymetal as at 01.01.2020.
11. Estimate prepared by Polymetal as  at 01.01.2018. Price: Au =  US$1,200/oz, Ag = US$16/oz.  Revised
    estimate was not performed due to lack of material changes.
12. Initial estimate prepared  by Polymetal as  at 01.01.2017. Au  = US$1,200/oz, Ag  = US$16/oz, Cu  =
    US$4,500/t and Zn = US$1,900/t. Revised estimate was not performed due to lack of material changes.
13. Estimate prepared by Polymetal as at 01.01.2019. Revised estimate was not performed due to lack  of
    material changes. 
14. Estimate prepared by Polymetal as at 01.01.2019. Revised estimate was not performed due to lack  of
    material changes. 
15. Estimate prepared by SRK Consulting (Russia) Limited as  at 01.08.2018. Price: Ag = US$16/oz, Pb  =
    US$2,200/t. Revised estimate was not performed due to lack of material changes. Recalculation  into
    gold equivalent  was  made by  Polymetal  based on  Au=  US$1,200/oz, Ag  =  US$15/oz.             
                 

 

 

 

PGM Mineral Resources as at 1 January 2020 (1)

 
                         Tonnage                   Grade                             Content
 
                                                         Cu,               Pd, Pt, Au,   Cu,
                           Mt    Pd, g/t Pt, g/t Au, g/t      PdEq(2), g/t                    PdEq, Moz
                                                          %                Moz Moz Moz   Kt
Measured                                                                                           
Viksha project             6.9     0.8     0.3     0.1   0.09     1.1      0.2 0.1 0.03  6.5     0.2
Total Measured             6.9     0.8     0.3     0.1   0.09     1.1      0.2 0.1 0.03  6.5     0.2
                                                                                                   
Indicated                                                                                          
Viksha project            100.5    0.7     0.3     0.1   0.10     1.1      2.4 0.8 0.5  96.2     3.5
Total Indicated           100.5    0.7     0.3     0.1   0.10     1.1      2.4 0.8 0.5  96.2     3.5
                                                                                                   
Measured + Indicated                                                                               
Viksha project            107.4    0.7     0.3     0.1   0.10     1.1      2.6 0.9 0.5  102.7    3.7
Total Measured +          107.4    0.7     0.3     0.1   0.10     1.1      2.6 0.9 0.5  102.7    3.7
Indicated
                                                                                                   
Inferred                                                                                           
Viksha project            57.4     0.7     0.3     0.1   0.10     1.1      1.4 0.5 0.3  58.4     2.0
Total Inferred            57.4     0.7     0.3     0.1   0.10     1.1      1.4 0.5 0.3  58.4     2.0
                                                                                                   
Measured + Indicated + Inferred                                                                    
Viksha project            164.8    0.7     0.3     0.1   0.10     1.1      3.9 1.4 0.8  161.0    5.7
Total Measured +          164.8    0.7     0.3     0.1   0.10     1.1      3.9 1.4 0.8  161.0    5.7
Indicated + Inferred

 1. Mineral Resources  are reported  in accordance  with the  JORC Code  (2012). Estimate  prepared  by
    Polymetal as at 05.09.2019. Price for Pd = US$1,500/oz,  Pt = US$800/oz, Au = US$1,200/oz and Cu  =
    US$ 6,000/t. Revised estimate was not performed  due to lack of material changes. Discrepancies  in
    calculations are due to rounding.
 2. PdEq is calculated using the following formula: PdEq =  Pd (g/t) + Pt (g/t)/2.35 + Au (g/t)/1.46  +
    Cu (%)/0.76.

This estimate  was  prepared  by employees  of  JSC  Polymetal Management  Company  and  JSC  Polymetal
Engineering, led by Mr Valery Tsyplakov, who  assumes overall responsibility for the Mineral  Resources
and Ore Reserves Report.

Mr Tsyplakov is the employed  full-time as the Managing Director  of JSC Polymetal Engineering and  has
more than 19 years' experience in gold, silver and polymetallic mining. He is a Fellow of the Institute
of Materials, Minerals & Mining (FIMMM), London, and a Competent Person under the JORC Code.

Listed below are  other Competent Persons  employed by the  Company that are  responsible for  relevant
research on which the Mineral Resources and Ore Reserves estimate is based:

* Geology and  Mineral  Resources  -  Roman  Govorukha,  Head  of  Geologic  Modelling  and  Monitoring
Department, JSC Polymetal Management Company, MIMMM, with 19 years' relevant experience;

* Mining and  Ore  Reserves  -  Igor  Epshteyn,  Head  of  Mining  Process  Department,  JSC  Polymetal
Engineering, FIMMM, with 38 years' relevant experience;

* Concentration and Metals  - Igor Agapov,  Deputy Director  of Science and  Technology, JSC  Polymetal
Engineering, MIMMM, with 22 years' relevant experience.

All the above mentioned Competent Persons have sufficient  experience that is relevant to the style  of
mineralisation and  types of  deposits under  consideration and  to the  activity being  undertaken  to
qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves' (JORC Code).

All Competent Persons have given their consent to the  inclusion in the report of the matters based  on
their information in the form and context in which it appears.

 

Metals prices used in estimating Mineral Resources and Ore Reserves are listed below (unless  otherwise
indicated in the footnotes of the above tables):

Au = US$ 1,200/oz

Ag = US$ 15.0/oz

Cu = US$ 5,500/t

Zn = US$ 2,200/t

Pb = US$ 2,000/t.

Gold equivalent data is based on "Metal equivalent conversion ratios" provided in the Appendix below.

About Polymetal 

Polymetal  International  plc  (LSE,  MOEX:  POLY,  ADR:  AUCOY)  (together  with  its  subsidiaries  -
"Polymetal", the "Company", or the "Group") is a top-20 global gold producer and a top-5 global  silver
producer with  assets in  Russia and  Kazakhstan.  The Company  combines strong  growth with  a  robust
dividend yield.

Enquiries

    Media                            Investor Relations
                                 Polymetal           3 ir@polymetalinternational.com
FTI Consulting
                                 Evgeny Monakhov    +44 20 7887 1475 (UK)
Leonid Fink     +44 20 3727 1000
                                 Timofey Kulakov     
Viktor Pomichal
                                 Kirill Kuznetsov   +7 812 334 3666 (Russia)
    Joint Corporate Brokers           
Morgan Stanley  +44 20 7425 8000

Andrew Foster                    RBC Europe Limited

Richard Brown                    Marcus Jackson     +44 20 7653 4000

Panmure Gordon                   Jamil Miah

James Stearns   +44 20 7886 2500

 

Forward-looking statements

This release may include  statements that are,  or may be deemed  to be, "forward-looking  statements".
These forward-looking statements  speak only  as at  the date  of this  release. These  forward-looking
statements can be identified by the use of forward-looking terminology, including the words  "targets",
"believes", "expects", "aims", "intends", "will", "may", "anticipates", "would", "could" or "should" or
similar expressions or, in each case their negative or other variations or by discussion of strategies,
plans, objectives, goals,  future events or  intentions. These forward-looking  statements all  include
matters that are not historical facts. By  their nature, such forward-looking statements involve  known
and unknown risks, uncertainties and  other important factors beyond  the company's control that  could
cause the actual results, performance  or achievements of the company  to be materially different  from
future results, performance or  achievements expressed or implied  by such forward-looking  statements.
Such forward-looking statements are based on  numerous assumptions regarding the company's present  and
future business  strategies and  the environment  in  which the  company will  operate in  the  future.
Forward-looking statements are not guarantees of future performance. There are many factors that  could
cause the  company's  actual results,  performance  or achievements  to  differ materially  from  those
expressed in  such  forward-looking statements.  The  company  expressly disclaims  any  obligation  or
undertaking to disseminate any updates or revisions to any forward-looking statements contained  herein
to reflect any  change in  the company's  expectations with  regard thereto  or any  change in  events,
conditions or circumstances on which any such statements are based.

 

Appendix

Reporting of Metal Equivalents

Gold equivalent conversion ratio

GE=Me/k

Where Me is the evaluated metal content (silver g/t, copper %, zinc %, lead %)

Where k is the metal to gold equivalent  conversion rate that is calculated considering the  difference
in metals value issuing the following formula:

For silver:  k= ((Au  price/31.1035 -  (Au price  /31.1035 -  Treatment charge  Au)*(Royalty Au)/100  -
(Treatment charge  Au))*(Recovery Au))  / ((Ag  price/31.1035 -  (Ag price/31.1035  - Treatment  charge
Ag)*(Royalty Ag)/100 - (Treatment charge Ag))*(Recovery Ag)),

for copper  or zinc  or  lead: k  = 100*((Au  price/31.1035)  - (Au  price/31.1035 -  Treatment  charge
Au)*(Royalty Au)/100 -  (Treatment change Au))*(Recovery  Au)) / ((Me  price) - (Me  price -  Treatment
charge Me)*(Royalty Me)/100 - (Treatment charge Me))*Recovery Me)),

where Royalty is the mineral  extraction tax at applicable rate,  recovery - the life-of-mine  expected
recovery of the respective metal in the processing technology applied.

Metal equivalent conversion ratios:

Deposit                   Ore processing technology                                         k
                                                                                  Ag   Cu   Zn  Pt  Pb
Dukat                     Conventional flotation                                  83                 
Lunnoye (Ore Zone 5)      Cyanidation+Merrill Crowe process                       94                 
Lunnoye (Ore Zones 6,7,9) Cyanidation+Merrill Crowe process                       82                 
Arylakh                   Cyanidation+Merrill Crowe process                       80                 
Goltsovoye                Conventional flotation                                  80                 
Perevalnoye               Conventional flotation                                  80       3.01    5.73
Primorskoye               Concentrate sales                                       91                 
                          Cyanidation+Merrill Crowe process (run-of-mine ore)     141                
Varvara                   Primary ore with high copper content: Conventional          0.51           
                          flotation
Birkachan                 Cyanidation carbon-in-pulp                              101                
                          Heap leaching + сarbon-in-column                        80                 
Olcha                     Cyanidation+Merrill Crowe process                       100                
Tsokol Kubaka             Cyanidation carbon-in-pulp                              100                
Burgali                   Cyanidation+Merrill Crowe process                       105                
Irbychan                  Cyanidation+Merrill Crowe process                       89                 
Yolochka                  Cyanidation carbon-in-pulp                              89                 
Nevenrekan                Cyanidation+Merrill Crowe process                       89                 
Voro North                Cyanidation carbon-in-pulp                              132                
Voro West (oxide ore)     Heap leaching + Merrill Crowe process                   155                
                          Cyanidation carbon-in-pulp                              138                
North Kaluga              Conventional flotation                                  91  0.68 7.76      
Tamunier                  Conventional flotation                                  199                
                          Oxide ore:  Cyanidation carbon-in-pulp                  111                
Saum                      Cu-Zn primary ore: Conventional flotation               113 0.54 1.91      
                          Cu-Zn loose ore: Conventional flotation                 63  0.38 1.38      
                          Zn - Conventional flotation                             168      0.62      
Prognoz                   Conventional flotation (open-pit)                       75               3.32
                          Conventional flotation (underground)                    75               1.91

 

 

═══════════════════════════════════════════════════════════════════════════════════════════════════════

 4  1 ) Hereinafter Ore Reserves and Mineral Resources are reported as from continuing operations.
Lichkvaz, Oroch, Sopka Kvartsevaya, Dalneye and Irbychan mines were classified as discontinued
operations as at 01.01.2020 and are not included in this estimate.

 5  2  Ore Reserves are reported here on the 100% ownership basis. Ore Reserves in accordance with
Polymetal 74.3% ownership equal to 2 Moz.

═══════════════════════════════════════════════════════════════════════════════════════════════════════

   ISIN:          JE00B6T5S470
   Category Code: MSCH
   TIDM:          POLY
   Sequence No.:  48963
   EQS News ID:   983983


    
   End of Announcement EQS News Service

   ══════════════════════════════════════════════════════════════════════════

    6 fncls.ssp?fn=show_t_gif&application_id=983983&application_name=news&site_id=refinitiv

References

   Visible links
   1. file:///data/ucdp/tmp/xhtmlconvert_parsn_eqs_46DLdfvz.html#_ftn1
   2. file:///data/ucdp/tmp/xhtmlconvert_parsn_eqs_46DLdfvz.html#_ftn2
   3. mailto:ir@polymetalinternational.com
   4. file:///data/ucdp/tmp/xhtmlconvert_parsn_eqs_46DLdfvz.html#_ftnref1
   5. file:///data/ucdp/tmp/xhtmlconvert_parsn_eqs_46DLdfvz.html#_ftnref2


============

Recent news on Polymetal International PK

See all news