Jan 15 (Reuters) - Total Sa TOTF.PA /Petrobras:
* Petrobras and Total finalize decisive milestone in the
realization of their Strategic Alliance, signed in March 2017
* Transfer from Petrobras to Total of 35% of the rights, as
well as the operatorship, of the Lapa field in Block BM-S-9A in
the Santos Basin pre-salt, alongside Shell (30%), Repsol-Sinopec
(25%) and Petrobras (10%). The Lapa field was put in production
in December 2016, via the 100,000 barrel per day capacity Cidade
de Caraguatatuba FPSO.
* Transfer from Petrobras to Total of 22.5% of the rights of
the Iara area, which comprises the Sururu, Berbigão and Oeste de
Atapu fields in Block BM-S-11A in the Santos Basin pre-salt,
operated by Petrobras (42.5%) alongside Shell (25%) and Petrogal
(10%).
* Production in Iara expected to start in 2018 through the
150,000 barrel per day capacity P-68 FPSO in Berbigão-Sururu
fields, which will be followed by a second FPSO in 2019 in the
Atapu field.
* The consideration for the above transactions amounts to
US$1.95 billion, including closing adjustments. This amount does
not include US$ 400 million that can be triggered by Petrobras
to carry a part of its investment share in the Iara development
fields and contingent payments
* Transactions give shape to the Strategic Alliance between
Petrobras and Total, allowing them to combine their
deep-offshore expertise
((sudip.kargupta@thomsonreuters.com;))