Highlights
Underground development
During the year the first transport decline was taken from 250masl (metres above sea level) to 200masl. The decline will now stop at this level.
Second transport decline was taken from the 250masl and is currently being developed to 225masl.
Completion of works on the second decline from 250masl to the bottom of the open pit at 320masl.
Access portal, for the second transport decline was completed during H2 2016.
Ventilation shafts and ancillary services for the mine works were completed.
Tailings dam 4 was completed in January 2017. It covers an area of 190,000sqm and has the capacity to absorb 1m tonnes of tailings, and will have an operational capacity of 2-3 years on the basis of the planned production increases.
Capital investment of US$5.6m (2015: US$9.6m) which includes 30 tonne haulage trucks and new load-haul-dumper (LHD), used to fill the underground trucks with ore. The principal operational fleet is to be further enhanced with an additional 30 tonne haulage truck in 2017 and an additional LHD, to be purchased in 2017.
Financial Highlights
Debt raising of US$12m through the issue of convertible bonds, (2015: US$5.1m equity raising) and US$1.66m through unsecured loans.
Turnover decreased in the year to US$15.9m (2016: US$24.1m).
12,602oz of gold sold (2015: 20,890oz), a reduction of 8,288oz.
Average gold price achieved (including silver as a by-product), US$1,259oz, (2015: US$1,173oz).
Adjusted EBITDA (Earnings before interest, tax, depreciation and amortisation excluding impairment) of US$260,000 (2015: negative US$2.3m).
Operational Highlights
Gold poured 10,970oz, (2015: 15,534oz) a 29.4% decrease year-on-year, due to the continuing development of the second transport decline that resulted in a lower production in the year.
Underground gold grade 2.70g/t, (2015: 2.55g/t).
Operating cash cost US$846/oz, (2015: US$837/oz).
Gold recovery rate 80.20% (2015:76.04%) the improvement is in line with expectations as the higher grade ore is processed.
Neil Herbert, Director of Altyn Plc commented:
"The 2016 annual results are in line with expectations, production declined as resources were switched to develop the second decline and infrastructure in order to access the high grade underground ore. With the solid platform developed in 2016, we look forward to progressing the underground mine in 2017, with rising production and profitability."
For further information please contact:
Altyn Plc
Rajinder Basra, CFO +44 (0) 207 932 2456
VSA Capital (Corporate Broker)
Andrew Monk / Andrew Raca +44 (0) 203 005 5000
Blytheweigh (Financial PR)
Tim Blythe/Camilla Horsfall +44 (0) 207 138 3204
Information on the Company
Altyn is a gold mining, exploration and development group based in Kazakhstan. Whilst the Company was initially established to exclusively develop and operate the Sekisovskoye gold and silver mine in the East Kazakhstan Region, it is now actively targeting additional gold mining opportunities in Kazakhstan. This includes the adjacent prospective Karasuyskoye Ore Fields, on which Altyn was recently awarded the tender to perform further confirmatory testing in order to gain the sub-soil user licence.
The Company holds a 100 per cent shareholding in DTOO GRP Baurgold (Formerly DTOO Gornorudnoe Predpriatie Sekisovskoye ) which holds a subsoil use contract in relation to the Sekisovskoye deposit, covering a total area of 0.855km. The subsoil use contract for Sekisovskoye is valid until 2020 and the Company currently intends to seek to extend the contract in accordance with its terms. The Company also holds a 100 per cent shareholding in TOO GMK Altyn MM (formerly TOO Altai Ken-Bayitu), which owns and operates the processing plant at the Sekisovskoye deposit. The Sekisovskoye deposit is located at the village of Sekisovskoye, approximately 40km north of the town of Ust-Kamenogorsk, the capital city of the East Kazakhstan Region. The current operation is focused on mining the near-vertical deposits which extend to the surface below the open pits which have been previously mined.
The Company intends that the Sekisovskoye deposit shall become a selective-mining underground operation. As at 31 May 2014, the Company's proven and probable reserves consisted of 2.67moz of gold and 3.52moz of silver and the Company's measured, indicated, inferred resources consisted of 5.14moz of gold, and 3.52moz of silver, in each case as classified in accordance with JORC.
Chairman's Statement
Dear shareholders,
The focus in 2016 as in the prior year has been on moving the underground project forward as efficiently as possible but aiming to maintain our working capital requirements, and ensure our loan commitments are met.
In relation to the latter the Company currently has a bank loan with EBRD, the capital amount outstanding as at the date of this report is US$1.79m. During the year the Company raised US$12m through the issue of convertible bonds with a coupon rate of 10%. The proceeds include US$2m from institutional investors and US$10m from its major shareholder. Additionally, a total of US$1.7m was raised in the form of 13% unsecured loans from the major shareholder. The funds raised were used to finance working capital commitments, repay the loan commitments as noted above, in addition to acquiring the capital assets in the year.
In order to continue with the underground development plans and move towards the targeted production levels the Company needs to raise further funds for capital investment in the underground development. As part of the process of engaging with potential investors the Company has instructed brokers and external consultants to actively market the company. We will keep shareholders updated as the financing progresses.
The Company has made significant progress utilising the funding so far, and the transition to the underground mine is progressing well, albeit with a delay from the original anticipated schedule of approximately 9 months. The underground ore mined in H1 2016 was 28,824mt and in H2 71,939mt. The Company has now moved to a monthly run rate of 29,000t in 2017, with the anticipation to increasing this toward the target of 40-45,000t during 2017.
The gold price is still favourable and stable and has been trading in the range of US$1,200/oz -US$1,300oz. As interest rates rise it is expected that the current price may be put under downward pressure. However, based on the Company's revenue and cost assumptions the profits going forward are still very favourable.
In summary we have now developed the platform to move forward. The forthcoming years, will see the fortunes of the Company change as production increases and we move towards our target of 100,000oz of gold a year.
Finally, may I once again thank all our employees and our Management team for their hard work and also thank our shareholders for their continued support, as we look forward to a challenging and exciting year ahead for Altyn.
Kanat Assaubayev
Chairman
Chief Executive Officer's Report
Overview
The management team have had a successful year in advancing the development of the underground mine. The exercise was time consuming and technically difficult in a number of areas leading to a delay from the planned time table, essentially pushing the development back by approximately 9 months from that initially envisaged.
MAP OF UNDERGROUND MINE SOWING DECLINES
Current developments
To summarise the following progress was achieved in the development of the underground mine in the year, building a solid platform for production growth going forward:
Development of the first decline which was taken from the 250masl down to 200masl, this gave access to ore body 11. The first decline will now be terminated at this level and the second decline will be used in the future to access the ore bodies. Development of the second decline has significantly reduced the haulage distance to the underground tracks. The decline was taken from the 250masl up to the 320masl to give access to the bottom of the open pit, and a transport portal was constructed. It is also currently in the process of being further developed to 225masl giving access to a number of ore bodies at this level.
Ore bodies were prepared for production including ore body 10 and also ore body 5, the latter was originally expected to be producing ore in H2 2016, however the delay pushed this back to Q1 2017.
The current production in Q1 2017 is being taken from ore body 5 that typically has ore grades on average of 3.5g/t. Although the actual grade achieved in the Q1 was 2.56 g/t this is mainly a dilution issue that is expected to be settled in the 2nd half of the year achieving the targeted average gold grade for the year.
The extraction from the sides of the open pit has revealed veins of ore with very high grades of gold in excess of 6g/t, as well as free gold.
Completion of tailings dam 4 allows for approximately 1 million tonnes of tailings to be absorbed. Tailings dam 4 will have a life of approximately 2-3 years, taking into account our plan to raise production. It is expected that after this period the paste plant will be constructed, thereafter allowing the tailings to be backfilled into the underground mine.
Sourcing, purchasing and commissioning of plant and equipment during the year. Key items were the load-haul dumper CAT R1300 and the 3 Sandvik UG trucks TH430 which can carry 30 tonnes each. These are replacing the existing 15 tonne trucks which have been retained for possible deployment in Karasuyskoye. Another 30 tonne UG truck is to be ordered in the near term. Also in addition to the above a low haul dumper was delivered in late March 2017 and is now being used in the operations.
Looking forward
The second decline is to be developed to 225masl as noted above, and this is expected to be completed by June 2017, giving access to the ore bodies at this level which will then be prepared for production. Ore body 11 contains on average higher grade ore up to 4.5g/t, and will be mined in H2 2017.
Further drilling and preparatory works will be undertaken at ore bodies 2-10 at the 250masl in order to prepare them for ore production.
The extraction of the very high grade ore that is being mined from the sides of the open pit is being further refined by applying higher concentrations of cyanide, in three smaller intensive leaching tanks which have been set up. The recovery rates will be further enhanced in the future by the purchase of gravitational circuits, as cash flow permits.
Capital requirements
An update to the current projected development capital requirements is given in the table below.
| Total | 2017 | 2018 | 2019 | 2020 | |
| US$m | US$m | US$m | US$m | US$m | |
| Prospect drilling | 4.0 | 0.9 | 0.1 | 1.5 | 1.5 |
| Underground development | 3.5 | 1.4 | 0.4 | 0.8 | 0.9 |
| Infrastructure | 1.2 | 1.2 | - | - | - |
| Ore handling facilities | 16.8 | 10.2 | 4.6 | 2.0 | - |
| Process plant & paste plant | 12.0 | - | 12.0 | - | - |
| Contingency | 3.3 | 0.6 | 2.3 | 0.3 | 0.1 |
| Total | 40.8 | 14.3 | 19.4 | 4.6 | 2.5 |
| Mining - open pit | |||
| 2016 | 2015 | ||
| Ore mined | T | 107,586 | 339,111 |
| Gold grade | g/t | 0.91 | 1.06 |
| Silver grade | g/t | 1.60 | 2.03 |
| Contained gold | oz | 3,065 | 11,595 |
| Contained silver | oz | 5,361 | 22,139 |
| Mining - underground | |||
| 2016 | 2015 | ||
| Ore mined | T | 100,763 | 79,276 |
| Gold grade | g/t | 2.70 | 2.55 |
| Silver grade | g/t | 3.76 | 3.7 |
| Contained gold | oz | 8,757 | 6,492 |
| Contained silver | oz | 12,182 | 9,441 |
| Mining processing | |||
| 2016 | 2015 | ||
| Crushing | T | 258,206 | 570,949 |
| Milling | T | 262,546 | 566,664 |
| Gold grade | g/t | 1.66 | 1.12 |
| Silver grade | g/t | 2.88 | 2.25 |
| Gold recovery | % | 80.20 | 76.04 |
| Silver recovery | % | 73.45 | 64.91 |
| Contained gold | oz | 13,679 | 20,428 |
| Contained silver | oz | 22,491 | 40,994 |
| Gold poured | oz | 10,970 | 15,534 |
| Silver poured | oz | 16,519 | 26,608 |
| Notes | 2016 US$000 | 2015 US$000 | |
| Revenue Costs of sales | 3 | 15,867 (13,554) | 24,054 (19,763) |
| Gross profit Administrative expenses Impairment-other Impairment reversed | 2,313 (5,352) (1,107) - | 4,291 (9,762) - 674 | |
| Operation Loss Foreign exchange loss Finance expense | (4,146) 283 (2,215) | (4,797) (5,718) (1,235) | |
| Loss profit before taxation Taxation credit | (6,078) (278) | (11,750) 1,532 | |
| Loss attributable to equity holders of the parent | (6,356) | (10,218) | |
| Profit per ordinaryshare | |||
| Basic & Diluted | 4 | (0.3c) | (0.4c) |
| 2016 US$000 | 2015 US$000 | |
| Loss for the year | (6,356) | (10,218) |
| Currency translation differences arising on translations of foreign operations items that may be reclassified to profit orloss | 747 | (34,577) |
| Currency translation differences arising on translation of foreign operations relating totaxation | 866 | 4,574 |
| Total comprehensive loss attributable to equity holders of the parent | (4,743) | (40,221) |
| Company number 5048549 | Notes | 2016 US$000 | 2015 US$000 |
| Non-current assets Intangible assets Property, plant and equipment Inventory Trade and other receivables Deferred tax asset Restricted cash | 5 6 | 10,264 37,316 - 1,100 5,855 139 | 9,887 35,134 604 1,337 5,145 137 |
| 54,674 | 52,244 | ||
| Current assets Inventories Trade and other receivables Cash and cash equivalents | 1,366 3,096 2,236 | 3,223 2,649 1,084 | |
| 6,698 | 6,956 | ||
| Total assets | 61,372 | 59,200 | |
| Current Liabilities Trade and other payables Other financial liabilities Current tax payable Provisions Borrowings | (5,877) (461) (11) (190) (4,439) | (9,298) (297) (191) (247) (6,676) | |
| (10,978) | (16,709) | ||
| Net current assets/(liabilities) | (4,280) | (9,753) | |
| Non-current liabilities Other financial liabilities Other contract liabilities Provisions Convertible bonds Borrowings | (254) (190) (3,978) (11,281) (700) | (537) - (3,553) - - | |
| (16,403) | (4,090) | ||
| Total liabilities | (27,381) | (20,799) | |
| Net assets | 33,991 | 38,401 | |
| Equity Called-up share capital Share premium Merger reserve Other reserve Currency translation reserve Accumulated losses | 3,886 141,918 (282) 333 (45,804) (66,060) | 3,886 141,918 (282) - (47,417) (59,704) | |
| Total equity | 33,991 | 38,401 |
| Share Capital US$000 | Share Premium US$000 | Merger Reserve US$000 | Currency translation reserve US$000 | Other reserve US$000 | Accumulat- ed Losses US$000 | Total US$000 | |
| 1 January 2015 | 3,702 | 137,234 | (282) | (17,414) | - | (49,486) | 73,754 |
| Loss for the year Other comprehensive loss | - - | - - | - - | - (30,003) | - | (10,218) - | (10,218) (30,003) |
| Total comprehensive loss | - | - | - | (30,003) | - | (10,218) | (40,221) |
| Shares issued on conversion of loan notes Issue costs | 184 - | 4,968 (284) | - - | - - | - - | - - | 5,152 (284) |
| 31 December 2015 | 3,886 | 141,918 | (282) | (47,417) | - | (59,704) | 38,401 |
| Loss for the year Other comprehensive income | - - | - - | - - | - 1,613 | - - | (6,356) - | (6,356) 1,613 |
| Total comprehensive loss | - | - | - | 1,613 | - | (6,356) | (4,743) |
| Equity components of loans received | - | - | - | - | 333 | - | 333 |
| 31 December 2016 | 3,886 | 141,918 | (282) | (45,804) | 333 | (66,060) | 33,991 |
| 2016 US$000 | 2015 US$000 | |
| Net cash (outflow)/inflow from operating activities | (2,918) | 8,183 |
| Investing activities Purchase of property, plant and equipment Payment of costs associated with provisions | (4,898) (396) | (9,639) - |
| Net cash used in investing activities Financing activities Proceeds on issue of shares Issue costs Loans received Borrowings and Interest paid | (5,294) - - 13,661 (4,193) | (9,639) 5,152 (284) - (3,990) |
| Net cash inflow from financing activities | 9,468 | 878 |
| Increase/ (decrease) in cash and cash equivalents | 1,256 | (578) |
| Foreign currency translation | (104) | (22) |
| Cash and cash equivalents at beginning of the year | 1,084 | 1,684 |
| Cash and cash equivalents at the end of the year | 2,236 | 1,084 |
| 2016 $000 | 2015 $000 | |
| Sale of gold and silver | 15,867 | 24,054 |
| 2016 | 2015 | |
| Basic and diluted | 2,334,342,130 | 2,298,284,596 |
| Karasuyskoye geological data | Exploration and evaluation costs | US$000 | |
| Cost 1 January 2015 Translation difference | 20,736 (9,597) | - - | 20,736 (9,597) |
| 31 December 2015 & 1 January 2016 Additions Translation difference Amortisation capitalised | 11,139 - 206 - | - 396 - 322 | 11,139 396 206 322 |
| 31 December 2016 | 11,345 | 718 | 12,063 |
| Amortisation 1 January 2015 Charge for the year Translation difference | 1,296852(896) | - - - | 1,296 852 (896) |
| 31 December 2015 & 1 January 2016 | 1,252 | - | 1,252 |
| Charge for the year Translation difference | 553 (6) | - - | 553 (6) |
| 31 December 2016 | 1,799 | - | 1,799 |
| Net Book Value | |||
| 1 January 2015 | 19,440 | - | 19,440 |
| 31 December 2015 | 9,887 | - | 9,887 |
| 31 December 2016 | 9,546 | 718 | 10,264 |
| Mining properties and leases US$000 | Freehold, land and buildings US$000 | Equipment fixtures and fittings US$000 | Plant, machinery and vehicles US$000 | Assets under construction US$000 | Total US$000 | |
| Cost 1 January 2015 Additions Disposals Transfers Currency translation adjustment | 16,541 104 (863) - (7,392) | 15,434 1,210 - - (7,564) | 18,852 1,782 (288) - (9,245) | 8,041 92 (8) - (3,751) | 29,414 6,451 (21) - (16,425) | 88,282 9,639 (1,180) - (44,377) |
| 31 December 2015 & 1 January 2016 Additions Disposals Transfers Transfers to inventories Currency translation adjustment | 8,390 - - - 2,817 144 | 9,080 217 - 14,788 - 156 | 11,101 1,056 (663) 505 - 190 | 4,374 1,376 - - - 75 | 19,419 2,891 (1) (18,487) - 333 | 52,364 5,540 (664) (3,194) 2,817 898 |
| 31 December 2016 | 11,351 | 24,241 | 12,189 | 5,825 | 4,155 | 57,761 |
| Accumulated depreciation 1 January 2015 Charge for the year Disposals Currency translation adjustment | 3,432 -425 - (1,736) | 6,046 1,136 - (3,193) | 12,768 1,840 - (6,550) | 4,798 823 (81) (2,479) | - - - - | 27,044 4,224 (81) (13,958) |
| 31 December 2015 & 1 January 2016 Charge for the year Disposals Transfers Currency translation adjustment | 2,121 102 - - 39 | 3,989 1,016 - - 95 | 8,058 1,573 (216) - 169 | 3,061 376 - - 62 | - - - - | 17,229 3,067 (216) - 365 |
| 31 December 2016 | 2,262 | 5,100 | 9,584 | 3,499 | - | 20,445 |
| Net book value 1 January 2015 | 13,109 | 9,388 | 6,084 | 3,243 | 29,414 | 61,238 |
| 31 December 2015 | 6,269 | 5,091 | 3,043 | 1,312 | 19,419 | 35,134 |
| 31 December 2016 | 9,089 | 19,140 | 2,605 | 2,327 | 4,155 | 37,316 |
Recent news on Altyngold
See all newsKazakhstan-focused miner Altyngold's H1 profit jumps on higher gold prices
Brief: Altyngold H1 Pretax Profit USD 55.054 Million
AltynGold Plc Half-year Financial Report
Brief: Altyngold Remains On Track To Meet Market Guidance Of 52-55Koz For Full Year
AltynGold Plc Second Quarter - 30 June 2026 production results