For best results when printing this announcement, please click on link below:
https://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20251023:nRSW4408Ea&default-theme=true
RNS Number : 4408E Ariana Resources PLC 23 October 2025
23 October 2025
AIM: AAU
ASX: AA2
Significant Dokwe Exploration Update
Ariana Resources plc (AIM: AAU, ASX: AA2, "Ariana" or the "Company"), the
mineral exploration, development and production company with gold project
interests in Africa and Europe, is pleased to announce an exploration update
for the 100% owned Dokwe Gold Project ("Dokwe" or "the Project") in Zimbabwe.
Highlights:
o Exploration drilling commencing imminently at the Dokwe North and Dokwe
Central areas and their extensions; regional exploration across the project
area has outlined several additional targets.
o 10,086 soil samples collected for multi-element portable XRF ("pXRF") and
detectORE(TM) gold analysis on a 50m by 100m grid across the entire project
area totalling 44km(2).
o Drilling planned for follow-up of historical intercept of 7.3m @ 6.63g/t
Au from 32.2m at the Sinkwe prospect.
o Drilling planned for follow-up of the historical intercept of 0.5m @
81.09g/t Au from 243m at the Siduli Pan prospect.
o Gold mineralisation at Dokwe North, Central and Siduli Pan are hosted by
shear zones which juxtapose distinct litho-structural domains, separating
volcanic and sedimentary units.
o Prospective shear zones have a combined strike length of at least 12km
within the project area and remain largely untested.
Dr. Kerim Sener, Managing Director of Ariana Resources, commented:
"Over the course of several months, the Dokwe site team have completed an
extensive new soil geochemical programme over the entire project area,
covering 44km(2) and undertaken on a tight grid. This work, in addition to an
extensive assessment and re-processing of previous geological, geophysical and
geochemical data, has resulted in a much-improved understanding of why the
gold deposits at Dokwe North and Central are located where they are.
"Major shear zones, which separate broadly ENE-WSW trending litho-structural
domains comprising an alternating sequence of volcanic and sedimentary units,
host the known mineralisation at Dokwe North and Central. Our mission is to
commence drill testing at certain locations along over 12km of strike of these
shear zones in the broader project area. Given that there is over 1Moz of gold
contained within only about 10% of this strike length, with the rest remaining
essentially untested by drilling, suggests there may be considerable upside
and discovery potential elsewhere in the project area.
"We have already identified a number of target areas along these shear zones
or their related structural splays, including the newly named Sinkwe, Wabayi
and Mpunzi prospects, which have yielded anomalous gold grades in prior
exploration. Some of these targets, along with the Siduli Pan prospect, are
due to be tested in upcoming exploration drilling."
Background
The Dokwe Gold Project in Zimbabwe hosts the million-ounce Dokwe gold
deposits, which are being progressed to a Feasibility Study ("FS"). Recent
work on the Dokwe Project has resulted in significant developments in our
understanding of the geological controls on the Dokwe North and Central
deposits, implying that both zones of mineralisation extend beyond their
currently defined limits (Figure 1). The potential for extending Dokwe North
has been further enhanced by the discovery of a soil anomaly to the northeast
of the deposit, utilising pXRF and detectORE(TM) analysis (RNS: 2 July 2025
(https://www.londonstockexchange.com/news-article/AAU/new-gold-anomaly-identified-next-to-dokwe-north/17114288)
).
Figure 1: Areas of interest discovered to date within the Dokwe project area,
highlighting the RC holes that are planned for the upcoming drilling programme
In conjunction with this, the Ariana team continues to evaluate the
prospectivity of the wider project area. A regional soil sampling programme
has been completed, with 10,086 samples collected on a 50m by 100m grid across
the entire project area, covering a total of 44km(2) (Figure 2).
These samples have all been analysed by multi-element portable XRF ("pXRF")
and some with detectORE(TM) analysis for gold. This has led to several new
target areas being defined or known target areas further refined. A Reverse
Circulation ("RC") drilling programme has been planned to test some of the
highest priority targets.
Figure 2: Left: Interpreted litho-structural domains and domain-bounding shear
zones within the Dokwe project area. Note how the main gold occurrences (A, B,
and D) are associated with the shear zones. Right: Geochemical heat map
(arsenic), from the recently completed soil sampling programme. Note the major
silver anomaly contoured at the southern end of the project area. The drill
collars (white dots) highlight that a relatively short strike length of the
shear zones has been drill tested
Near-Mine Exploration Targets
Dokwe Northeast Extension Target
The Dokwe North deposit represents the majority of the current resources
within the project area. The soil sampling programme identified an arsenic
anomaly to the north east of the Dokwe deposit, which led to the discovery of
a gold in soils anomaly using detectORE(TM). Ten holes have been planned to
test this initial target (Figures 1 & 3).
Figure 3: Dokwe Northeast Extension soil anomaly (left) and planned RC drill
holes (right)
Dokwe Central Western Extension Target
At Dokwe Central, the geology appears to be offset at the western end of the
deposit (Figure 4). The reinterpretation of historical drilling indicates that
the Central Shear Zone and the mineralisation appear to have been faulted
southwards at the western end of the resource (Figures 4 & 5).
There is no drilling in this area, and this presents an excellent opportunity
to extend mineralisation westwards along the Central Shear Zone, and is a
high-priority target that will be drilled in the upcoming programme.
Furthermore, anomalous drilling results at several locations away from these
deposits have not been adequately tested.
Figure 4: Central Shear Zone showing structural offsets, and the targets to
the west of the Dokwe Central deposit. The drilling planned at the Sinkwe
Prospect is also shown to the east
Figure 5: Dokwe Central deposit, plan view (A), and cross section X-Y (B).
Note how the western cross-fault appears to have displaced the geology
southwards along the western margin of the deposit. There are currently no
drill holes to test whether the mineralisation has also been offset
Regional Exploration Targets
Further afield from the two main deposits, several indications of gold
mineralisation have either not been adequately followed up or not followed up
at all.
Sinkwe Prospect
Approximately 750m eastwards from Dokwe Central along the Central Shear Zone,
a historical drill hole, DPD4, intercepted 7.3m @ 6.63g/t Au from 32.2m depth
(Figure 6). The drill core at this shallow depth is heavily weathered;
however, chips of rock can be observed, which show a strong similarity to the
mineralised breccia at Dokwe Central. The mineralised zone is also enriched in
zinc, akin to Dokwe Central. This is a priority target, and a pattern of RC
drill holes are planned (Figures 4 & 6) to test the strike and depth
extents of the target.
Figure 6: Cross-section through the Sinkwe Prospect, showing historical
drilling and planned holes
Siduli Pan Prospect
The Siduli Pan prospect is located ~2.5km southeast of Dokwe Central and was
the target of a historical geophysics and drilling programme undertaken by
Pexmin from 2017 to 2019. Ariana has re-evaluated the historical drill core
(SD1-SD5, DSD01 & DSD02), using the results of pXRF geochemistry and
geophysics.
This work highlights the presence of magnesium-chrome-nickel-rich ultrabasic
intrusive units, which are the only known occurrence of such rocks in the
project area, suggesting a different geological domain, juxtaposed by the
Siduli Shear Zone.
The Siduli Shear Zone represents a subvertical structure, with intensely
sheared shales, chlorite schists and mylonites over a width of at least 300m,
which can be traced along strike for more than 30km, using aeromagnetic data.
DSD02 intercepted 0.5m @ 81.09g/t Au from 243m down hole depth, within the
mylonitic ultrabasic unit and close to the contact with an adjacent chlorite
schist. The intercept is isolated and has not been followed up, making Siduli
Pan a high-priority target for mineralisation at shallower depths up dip and
along strike of this intercept (Figures 7 & 8).
Figure 7: Aeromagnetic image of the Siduli Pan prospect, where anomalous soil
samples appear to be spatially related to the Siduli shear zone. A historical
hole, DSD02, intercepted 0.5m @ 81.09g/t Au from 243m. The planned holes will
test the up-dip continuation of this intercept between 50m and 100m depth. The
cluster of anomalous soils in the northeast is outside of the licence
previously held by Pexmin and remains untested
Figure 8: Cross section along X-Y in Figure 7, showing the Siduli Pan target
up-dip from the high-grade intercept in DSD02
Wabayi Prospect
The Wabayi prospect is ~2km WSW of Dokwe Central (F in Figures 1 and 2). The
volcanic geology comprises andesite, with sections showing pillow textures
indicative of a submarine depositional environment. Metre-scale layers of
phyllite are interbedded within the volcanic rocks. The rocks have undergone
significant strain and greenschist facies metamorphism. Three very widely
spaced holes were drilled within the project area, NK17, 19, and 20 (Figure
5). An intercept grading 1.1m @ 0.32g/t Au from 211.6m in NK20 relates to a
quartz vein with pyrite. It is an isolated drill hole, and mineralisation such
as this is of considerable interest and warrants further investigation.
Mpunzi Prospect
A single drill hole, DPD20, was drilled approximately 1.5km ESE of Dokwe
Central (H in Figures 1 and 2). DPD20 was drilled vertically to a depth of 562
metres. The metamorphic basement rocks comprise chlorite schist and biotite
schist to a depth of 380m. The foliation and schistosity are sub-parallel to
the core axis, indicating they are sub-vertical. At 380 metres, the schists
are intruded by ~200m of medium to coarse-grained post-Archaean dolerite.
Sporadic 20 to 30cm samples were taken, with several samples returning
indications of subtle mineralisation, including 0.46g/t Au from 26.3m, and
0.37g/t Au from 36.3m.
Dokwe South
At the southern end of the claims area, the cover thins and outcrop begins to
emerge, revealing portions of a sheared granite greenstone contact. At the
Maboe prospect (G in Figures 1 and 2), just north of the contact, a
sub-cropping quartz-vein breccia forming an east-west ridge with an
intermittent strike of approximately 600 metres was discovered (Figure 9).
A rock-chipping programme returned several anomalous silver assays. Work is
ongoing to reconcile the silver in the breccia with a highly significant
silver-in-soils anomaly that appears to transect the southern end of the
claims area (Figure 2), and what that means for the prospectivity of the
southern shear zone.
Summary
Expanding the soil geochemistry and combining it with the geophysics and
drilling is already advancing our understanding of the geology and
prospectivity within the project area, and defining several distinct
litho-structural domains juxtaposed by major shear zones. Three of these shear
zones, totalling some 12km strike, host gold mineralisation, yet they remain
unexplored beyond the main deposits at Dokwe North and Central.
The majority of historical drilling in the project area has been focused on
the Dokwe North and Central deposits. Both Dokwe North and Central show
indications that they can be further extended into areas that have not been
drill-tested previously. A few relatively shallow drill holes are currently
considered sufficient to confirm this understanding.
It is encouraging that of the few holes drilled beyond the known prospects,
two have intercepted high-grade gold (DPD4 and DSD02), whilst two others have
intercepted subtle mineralisation (NK20 and DPD20). These exciting,
high-priority targets have either been inadequately followed up, or not
followed up at all.
Dokwe Mineral Resource Estimate
Table 1: In-pit Mineral Resource Estimate for the Dokwe Gold Project.
PROJECT CLASSIFICATION TONNAGE GRADE CONTAINED GOLD (oz)
(t)
(g/t Au)
(REPORTING CUT-OFF GRADE 0.3g/t Au)
Dokwe North Measured 17,309,000 1.06 592,000
Indicated 18,562,000 0.90 537,000
Inferred 7,095,000 0.82 187,000
Total 42,966,000 0.95 1,316,000
Dokwe Central Indicated 1,811,000 1.60 93,000
Inferred 120,000 1.69 7,000
Total 1,931,000 1.61 100,000
Total Measured 17,309,000 1.06 592,000
Indicated 20,373,000 0.96 631,000
Inferred 7,214,000 0.83 193,000
TOTAL 44,896,000 0.98 1,416,000
PROJECT CLASSIFICATION TONNAGE GRADE CONTAINED GOLD (oz)
(t)
(g/t Au)
(REPORTING CUT-OFF GRADE 0.6g/t Au)
Dokwe North Measured 10,220,000 1.50 493,000
Indicated 8,260,000 1.50 399,000
Inferred 3,123,000 1.33 134,000
Total 21,604,000 1.48 1,025,000
Dokwe Central Indicated 1,207,000 2.19 85,000
Inferred 98,000 1.98 6,000
Total 1,306,000 2.18 91,000
Total Measured 10,220,000 1.50 493,000
Indicated 9,468,000 1.59 484,000
Inferred 3,222,000 1.35 140,000
TOTAL 22,909,000 1.52 1,116,000
Notes:
1. The Dokwe Mineral Resource Estimate is reported in accordance with the
JORC Code. Reported using cut-offs grades of 0.3g/t Au and 0.6g/t Au As at 4
March 2025.
2. Refer to sections 4.8.5 and 4.8.6 of the IGR for further information
regarding the Dokwe Mineral Resource Estimate including information required
by ASX Listing Rule 5.8.
3. The Dokwe Mineral Resource Estimate is inclusive of Reserves.
Compliance Statements
The information in this announcement relating to Mineral Resources and Ore
Reserves has been reported by the Company in accordance with the 2012 Edition
of the 'Australasian Code for Reporting of Exploration results, Mineral
Resources and Ore Reserves' (JORC Code) previously (refer to the Company's
replacement prospectus, which was released to the ASX market platform on 8
September 2025 (Prospectus) and is available on the Company website
(https://www.arianaresources.com/) (Previous Market Announcement). The Company
confirms that it is not aware of any new information or data that materially
affects the information included in the Previous Market Announcement and, in
the case of estimates of Mineral Resources and Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the
Previous Market Announcement continue to apply and have not materially
changed.
The information in this announcement that relates to the Dokwe PFS production
target, or the forecast financial information derived from that production
target was first reported on the ASX in the Previous Market Announcement. The
Company confirms that all the material assumptions underpinning the production
target, and the forecast financial information derived from the production
target, in the Previous Market Announcement continue to apply and have not
materially changed.
Competent Persons Statement
The information in the Investment Overview Section of the prospectus (included
at Section 3), the Company and Projects Overview (included at Section 5), and
the Independent Geologist's Report (included at Annexure A of the prospectus),
which relate to exploration targets, exploration results, mineral resources,
Ore Reserves and forward looking financial information is based on, and fairly
represents, information and supporting documentation prepared by Alfred
Gillman, Ruth Woodcock, Izak van Coller, Hovhannes Hovhannisyan (together, the
JORC Competent People), and Richard John Siddle, Andrew Bamber and Daniel Van
Heerdan (together, the Qualified People). Refer to the Independent Geologist's
Report for further information in relation to the information compiled by each
of the JORC Competent People and the Qualified People, their professional
memberships, their relevant qualifications and experience and their
relationship with the Company.
The Company confirms that the form and context in which the Competent Persons'
findings are presented have not been materially modified from the Previous
Market Announcement.
Forward-looking statements and disclaimer
This announcement contains certain "forward-looking statements".
Forward-looking statements can generally be identified by the use of forward
looking words such as "forecast", "likely", "believe", "future", "project",
"opinion", "guidance", "should", "could", "target", "propose", "to be",
"foresee", "aim", "may", "will", "expect", "intend", "plan", "estimate",
"anticipate", "continue", "indicative" and "guidance", and other similar words
and expressions, which may include, without limitation, statements regarding
plans, strategies and objectives of management, anticipated production dates,
expected costs or production outputs for the Company, based on (among other
things) its estimates of future production of the Projects.
To the extent that this document contains forward-looking information
(including forward-looking statements, opinions or estimates), the
forward-looking information is subject to a number of risk factors, including
those generally associated with the gold exploration, mining and production
businesses. Any such forward-looking statement also inherently involves known
and unknown risks, uncertainties and other factors that may cause actual
results, performance and achievements to be materially greater or less than
estimated. These factors may include, but are not limited to, changes in
commodity prices, foreign exchange fluctuations, general economic and share
market conditions, increased costs and demand for production inputs, the
speculative nature of exploration and project development (including the risks
of obtaining necessary licenses and permits and diminishing quantities or
grades of reserves), changes to the regulatory framework within which the
Company operates or may in the future operate, environmental conditions
including extreme weather conditions, geological and geotechnical events, and
environmental issues, and the recruitment and retention of key personnel.
The Board of Ariana has approved this announcement and authorised its release.
The information contained within this announcement is deemed by the Company to
constitute inside information as stipulated under the Market Abuse Regulations
(EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the
European Union (Withdrawal) Act 2018 ("UK MAR").
Contacts:
Ariana Resources plc Tel: +44 (0) 20 3476 2080
Michael de Villiers, Chairman
Dr. Kerim Sener, Managing Director
Beaumont Cornish Limited Tel: +44 (0) 20 7628 3396
(Nominated Adviser)
Roland Cornish / Felicity Geidt
Zeus Capital (Joint Broker) Tel: +44 (0) 203 829 5000
Harry Ansell / Katy Mitchell
Fortified Securities (Joint Broker) Tel: +44 (0) 203 411 7773
Guy Wheatley
Yellow Jersey PR Limited (Financial PR) Tel: +44 (0) 7983 521 488
Dom Barretto / Shivantha Thambirajah / arianaresources@yellowjerseypr.com
Bessie Elliot
Shaw and Partners Limited Tel: +61 (0)2 9238 1268
(Lead Manager - ASX)
Damien Gullone
Beaumont Cornish Limited ("Beaumont Cornish") is the Company's Nominated
Adviser and is authorised and regulated by the FCA. Beaumont Cornish's
responsibilities as the Company's Nominated Adviser, including a
responsibility to advise and guide the Company on its responsibilities under
the AIM Rules for Companies and AIM Rules for Nominated Advisers, are owed
solely to the London Stock Exchange. Beaumont Cornish is not acting for and
will not be responsible to any other persons for providing protections
afforded to customers of Beaumont Cornish nor for advising them in relation to
the proposed arrangements described in this announcement or any matter
referred to in it.
About Ariana Resources plc:
Ariana is a mineral exploration, development and production company dual
listed on AIM (AIM: AAU) and ASX (ASX: AA2), with an exceptional track
record of creating value for its shareholders through its interests in active
mining projects and investments in exploration companies. Its current
interests include a major gold development project in Zimbabwe, gold-silver
production in Türkiye and copper-gold-silver exploration and development
projects in Kosovo and Cyprus.
For further information on the vested interests Ariana has, please visit the
Company's website at www.arianaresources.com (http://www.arianaresources.com)
.
Zeus Capital Limited, Fortified Securities and Shaw and Partners Limited are
the brokers to the Company and Beaumont Cornish Limited is the Company's
Nominated Adviser.
Ends.
JORC Table 1 - Dokwe
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling techniques · Nature and quality of sampling (eg cut channels, random chips, or · Soil samples were collected from 15cm deep pits, screened to
specific specialised industry standard measurement tools appropriate to the -1mm, on lines 400m apart with 50m samples composited over 400m. The samples
minerals under investigation, such as down hole gamma sondes, or handheld XRF were analysed by Intertek Genalysis in Perth Australia using their partial
instruments, etc). These examples should not be taken as limiting the broad extraction method (TL1) to determine Au, Ag, As, Co, Cu, Sb by ICP-MS.
meaning of sampling.
Sampling was carried in the Regional, Intermediate, follow-up and Detailed
· Include reference to measures taken to ensure sample representivity phases. For regional samples +-2kg samples were collected and sent to Peacock
and the appropriate calibration of any measurement tools or systems used. & Simpson & Associates laboratory in Harare for heavy mineral
concentration, and the concentrate sent to Intertek Genalysis laboratory in
· Aspects of the determination of mineralisation that are Material to Perth. Intermediate, follow-up, and detailed samples were passed through a
the Public Report. -1mm sieve, and +-100g of the fine sample was sent to Intertek Genalysis.
There was no QA/QC on the soil analyses apart from internal lab checks.
· In cases where 'industry standard' work has been done this would be
relatively simple (eg 'reverse circulation drilling was used to obtain 1 m · Portable XRF analysis for approximately 40,000 readings was taken
samples from which 3 kg was pulverised to produce a 30 g charge for fire across 138 archived diamond drill holes. Readings were taken at 1m intervals
assay'). In other cases more explanation may be required, such as where there directly onto cleaned core surfaces. The results obtained were used to
is coarse gold that has inherent sampling problems. Unusual commodities or identify relative geochemical characteristics of the Dokwe geology. The pXRF
mineralisation types (eg submarine nodules) may warrant disclosure of detailed unit used was an Olympus Vanta. QA/QC samples were utilised at the start of
information. each session and then at approximately every 100 readings.
· Portable XRF analysis for a total of 10,086 soil samples were
collected across the tenement area. Samples were collected on a grid of 50 m
by 200 m, reducing spacing to 50 m by 100 m in areas of priority interest.
Once the soil sample is dry, a pXRF reading is taken from the soil sample to
obtain multi-element geochemistry. The pXRF unit used was an Olympus Vanta.
QA/QC samples were utilised at the start of each session and then at
approximately every 100 readings.
· Next, a 250g sub-sample is weighed and placed into a plastic
pouch with 500ml of reagent added and a collector device (CD) attached to the
inside of the cap of the pouch. The pouches are placed in a barrel and tumbled
for 12 hours. After this, the pouches are removed from the drum and CDs are
removed from the pouches, rinsed gently in water and dried in a dehydrator
oven for three hours. This detectORE(TM) technology has been used to analyse
811 of the pXRF soil samples from priority areas.
Drilling techniques · Drill type (eg core, reverse circulation, open-hole hammer, rotary · Diamond drillholes were collared with HQ core size (63.5mm
air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or diameter) to a more competent ground and then continued with NQ core size
standard tube, depth of diamond tails, face-sampling bit or other type, (47.6mm diameter) to the end of drillhole. Some drillholes drilled between
whether core is oriented and if so, by what method, etc). 2003 and 2007 were drilled with narrower BQ core size (36.4mm diameter). The
diameter of the percussion drillholes was 152mm. Diamond drillholes drilled in
2020 for metallurgical purposes were collared with PQ core size (85mm) to more
competent ground and then continued with HQ core to the end of hole and the
diameter of sterilisation percussion drillholes was 133mm. Diamond drillholes
drilled in 2023-2024 for due diligence purposes were predominantly drilled
using standard HQ drill rods. However, some holes were collared with PQ-sized
rods to approximately 100m. Deeper holes (>250 metres), were drilled to
final depth using NQ rods after HQ (DPD132).
· The drill core since 2019 was oriented using the Boart Longyear
TruCore(TM) UPIX core orientation system. The NQ core was oriented but highly
weathered and broken HQ core was not oriented. The whole of the geotechnical
drillhole core was oriented. The due diligence drillholes (DPD129 - DPD132)
core were oriented.
Drill sample recovery · Method of recording and assessing core and chip sample recoveries and · Drillhole recoveries were measured during each diamond drilling
results assessed. campaign and a total average recovery of 94% was achieved for the diamond
drillholes to 2020, whereas 73% was achieved for the 2021 sterilisation
· Measures taken to maximise sample recovery and ensure representative percussion drillholes. However, recovery data pertaining to the percussion
nature of the samples. drillholes (32 drillholes) and five additional diamond drillholes drilled
between 2003 and 2004 were not available at the time of reporting. Recovery
· Whether a relationship exists between sample recovery and grade and for the 2023-2024 programme was 98.62%.
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material. · The sample recoveries were maximised through drilling techniques
and consistent monitoring.
· Sample recoveries versus grade relationships were not assessed.
It is the CP's opinion that there is no bias with respect to drilling
technique and sampling methodology utilised.
Logging · Whether core and chip samples have been geologically and · All drillholes drilled on Dokwe Project were logged geologically
geotechnically logged to a level of detail to support appropriate Mineral and the logging included "from" and "to" depth, lithology, colour, grain size,
Resource estimation, mining studies and metallurgical studies. weathering, oxidation, and mineralisation.
· Whether logging is qualitative or quantitative in nature. Core (or · All drillholes have been geologically logged to a level of detail
costean, channel, etc) photography. to support Mineral Resource estimation.
· The total length and percentage of the relevant intersections logged. · Drillhole logging is qualitative in nature. During the 2019
drilling, the diamond drill core was also photographed both wet and dry at the
drill site and photos.
· All diamond core and percussion chips were completely logged from
the top to the bottom of drillhole including all intersections.
Sub-sampling techniques and sample preparation · If core, whether cut or sawn and whether quarter, half or all core · During sampling, samples were marked at 1m intervals apart from
taken. where the sampling crossed lithological boundaries where each side of the
lithological contact was sampled separately.
· If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry. · After logging and marking of samples, the diamond drill core was
then split in half by a diamond saw with one half stored for future reference
· For all sample types, the nature, quality and appropriateness of the and the other half core was sent to the laboratory for analyses.
sample preparation technique.
· Diamond drill core was logged from the top to the bottom of the
· Quality control procedures adopted for all sub-sampling stages to drillhole including all the intersections, after logging, the drill core was
maximise representivity of samples. marked for sampling by a senior geologist. The core was sampled nominally in
1m length apart from where sampling crossed lithological boundaries where each
· Measures taken to ensure that the sampling is representative of the side of the boundary was sampled separately. Drill core was split in half with
in situ material collected, including for instance results for field a diamond saw with one half core sample bagged in a plastic bag and then sent
duplicate/second-half sampling. to the laboratory and the other half was retained in the core trays. In most
drillholes, the entire core was sampled apart for the younger sedimentary
· Whether sample sizes are appropriate to the grain size of the cover. In later drillholes, only the mineralised portions of the drill core
material being sampled. were sampled.
· During percussion drilling, samples were collected every 1m into
a large plastic bag and then split using a riffle splitter to desired amount
for the laboratory analysis.
· Sample representativity was tested by taking field duplicates and
internal laboratory duplicates.
· Sample size is in line with international practice and is
appropriate to the grain size of the material being sampled.
Quality of assay data and laboratory tests · The nature, quality and appropriateness of the assaying and · Sample analyses were carried out at Antech, SGS Lakefield
laboratory procedures used and whether the technique is considered partial or Research Africa, Intertek Genalysis Laboratories and ALS Global in South
total. Africa.
· For geophysical tools, spectrometers, handheld XRF instruments, etc, · Sample preparation at Antech laboratories involved drying the
the parameters used in determining the analysis including instrument make and sample, crushing, pulverising, riffle splitting, and packaging. A small
model, reading times, calibrations factors applied and their derivation, etc. portion of the pulverised material, 50g, was analysed for gold by fire assay
with atomic absorption ("AA") finish.
· Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of · At Intertek Genalysis South Africa, the sample preparation
accuracy (ie lack of bias) and precision have been established. involved drying the sample, crushing, pulverising, riffle splitting, and
packaging. After going through the sample preparation stages, the final sample
for analysis weighed approximately 50g and was shipped to Australia for
analysis. All samples were assayed for gold by 50g fire assay with optical
emission spectrometers ("OES") finish.
· Details pertaining to the analytical procedure at SGS Lakefield
Research Africa was not available at the time of reporting.
· Analytical techniques utilised at the laboratories are considered
total.
· No assay methods other than those conducted at the accredited
laboratory (Antech, Intertek Genalysis, SGS Lakefield Research Africa
Laboratory), were utilised in the generation of the Dokwe sampling database.
Note that the details pertaining to the accreditation status for SGS Lakefield
Research Africa Laboratory was not available, however, this data was not used
in the MRE work outlined here.
· Between 2003 and 2007, blanks and duplicates were inserted into
the sampling sequence. Between 2008 and 2011, CRMs, blanks and duplicates were
inserted into the sampling sequence.
· During 2019 and 2020 sampling campaigns, the QA/QC protocol for
insertion of QA/QC samples was that one in every 10th sample sent to the
laboratory will either be a blank or one of the four CRM.
· During the 2023 sampling, every batch of 34 samples sent to
Antech included 1 CRM, 1 blank, 1 field duplicate and 1 pulp duplicate.
· An adequate number of control samples were utilised during core
sampling.
· During Ariana's 2023 due diligence review of the Dokwe Project
approximately 10% of samples extracted from DPD129 (Dokwe North) and DPD131
(Dokwe Central) were duplicated as quarter core and sent to ALS Global in
South Africa for check analysis against the Antech laboratory in Zimbabwe.
Results are satisfactory.
· pXRF readings are taken on diamond drill core using a 3-beam
Vanta M Series (VMR) with test timings set to Beam 1: 30s - Beam 2: 20s - Beam
3: 20s. Soil samples for pXRF are collected and air dried prior to analysis.
Test timings for soils are set to Beam 1: 40s - Beam 2: 30s - Beam 3: 30s. For
all pXRF analyses the unit is calibrated (cal check) at the start of the
session. Following this, other QA/QC samples (blank, CRM, calibration disc)
were utilised at the start and end of each session and at approximately every
100 readings.
· For detectORE(TM) analyses, each batch of 90 samples contains two
reference materials supplied by Portable PPB which are processed and analysed
in the same way as the other samples. The reference materials are not
certified but have known concentrations of gold. They are used to check that
the leach and collection process has worked as intended for that batch. In
addition, two blanks and two field duplicates were included in every 90
samples. The pXRF detectORE(TM) mode is firmware installed on portable XRF
devices to allow detection of gold values from the CD's, controlled via API
coupled to pLIMS™ software that also manages the QA/QC. The pXRF
detectORE(TM) mode is calibrated using five Calibrated Collector Devices of
varying concentrations of gold from 0 to 1,000 ppb equivalent. Once dried, the
CDs are analysed for gold using Evident's detectORE(TM) mode on a Vanta M
Series (VMR) pXRF.
Verification of sampling and assaying · The verification of significant intersections by either independent · Dokwe North is an advanced exploration property that has a
or alternative company personnel. database with 101 diamond drillholes, 15 percussion drillholes and 25
sterilisation RC drillholes.
· The use of twinned holes.
· Less than 2km SE, Dokwe Central has 19 diamond drill holes and 5
· Documentation of primary data, data entry procedures, data percussion holes and has been audited by Digital Mining Services (DMS) in the
verification, data storage (physical and electronic) protocols. past. Individual significant intersections were, therefore, not verified
separately. In addition to the Dokwe North and Central holes 40 holes were
· Discuss any adjustment to assay data. drilled in prospects in the vicinity of Dokwe.
· As part of verification, the QA/QC for the various drilling
campaigns were reviewed and the drilling database was verified.
· The original Dokwe drilling database was in the form of Microsoft
Access database. The Dokwe drillhole database included 2003- 2004, 2007, 2008,
2009, 2010, 2019 and 2020 drilling campaigns. The database was checked for
duplicates, overlapping, and missing intervals, whilst all fields were checked
for spurious or out-of-range values.
· The database has been uploaded to MXDeposit as part of the Due
Diligence study.
· The Due Diligence drilling included a twin hole (DPD129), which
correlated very well with its twin DPD49.
· For detectORE(TM) analyses all samples and sample information are
tracked using the bar codes on the pouches and the CD's. The sample numbers
are entered into proprietary pLIMS(TM) software, Portable PPB's software
interface for sample management and results. The barcodes prevent manual
errors in data entry.
· For detectORE(TM) analyses the gold concentration is calculated
based on the weight of the original sample and moisture content, and the
amount of gold on the CD (i.e., gold leached into solution). The gold
concentration is given as dU (detectORE(TM) units), where a dU represents the
leached and collected gold in micrograms of gold. This is a partial
extraction, not a total gold result. The laboratory results from the trial
batches are compared to the detectORE(TM) results, and a correlation
coefficient is established. This equation is used to predict the ppm (g/t)
values the dU correlates with, and thus help define samples to be analysed at
a laboratory using conventional assay. The detectORE™ results when compared
to fire assays also provide detailed geometallurgical insights and leach
characteristics, further adding value to this process.
· During pXRF analyses, samples are analysed in numerical order,
and a sheet is completed to note the inserted QA/QC samples. These are
digitised and combined with the data export from the pXRF on a daily basis. No
adjustment is made to pXRF data for soils or core in the raw data set.
Location of data points · Accuracy and quality of surveys used to locate drill holes (collar · The coordinate utilised for Dokwe is WGS84 Universal Transverse
and down-hole surveys), trenches, mine workings and other locations used in Mercator ("UTM") Zone 35 South.
Mineral Resource estimation.
· All drillhole collars up to 2019 have been surveyed by qualified
· Specification of the grid system used. professional surveyors Drysdale and Associates using RTK GPS (3 - 5mm
accuracy) which is linked to the national grid. The coordinates were provided
· Quality and adequacy of topographic control. in Universal Transverse Mercator ("UTM") on Cape Datum. The geotech,
metallurgical and due diligence holes were located using hand-held GPS.
· During 2019 and 2020 drilling programme, all drillholes were
downhole surveyed at 6m intervals using Boart Longyear - TruShotTM digital
survey tools. In order to obtain the complete survey of the holes, the surveys
were done separately for the HQ and NQ diameter of the holes. Earlier
drillholes (DPD001 - 010) were downhole surveyed at 50m intervals using Reflex
EZ- Shot™ equipment. Subsequently drillholes were downhole surveyed with
Reflex EZ-Shot (Reflex single shot) and DeviFlexi tools and were surveyed at
25m and from DPD060 to DPD084 the interval decreased to 4m to 6m. No downhole
survey was carried out on the percussion drillholes and six diamond drillholes
drilled between 2003 and 2004 as well as the sterilisation drillholes drilled
in 2021. Downhole surveys were carried out for the 2023-24 drilling.
· In 2016, Southern Mapping Company (Pty) Ltd, was contracted by
Canister to carry out a LiDAR survey of the topography. This was tied into
WGS84 with better than 10cm accuracy, non-ground points were filtered out and
an orthophoto and topographical contours were generated at 0.5m contour
intervals.
· In 2023, a drone survey over the Dokwe North area captured 2,600
detailed 12-megapixel aerial images to produce a high- resolution (4cm/pixel)
photogrammetry map. This was used to validate and locate all historic collars
within the immediate Dokwe North area to within 1m accuracy.
Data spacing and distribution · Data spacing for reporting of Exploration Results. · Data spacing and distribution are sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral Resource
· Whether the data spacing and distribution is sufficient to establish estimation and classification.
the degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications applied. · A 1m compositing interval was selected and applied to the de-
surveyed drillholes. Composites were selected from all drill holes except
· Whether sample compositing has been applied. sterilisation RC holes.
DOKWE NORTH
· A total of 141 drillholes (including percussion and geotechnical
drillholes) have been drilled at Dokwe North. At Dokwe North, drillholes were
systematically laid out on 15 section lines (approximately 320º azimuth)
spaced 50m apart and the collars were also spaced at 50m along the section
lines.
· Of these 141 holes, a total of 25 sterilisation percussion
drillholes were drilled on a square grid of 350m over the proposed waste dump,
plant, heap leach, tailings dam, and solar farm sites to the southeast of
Dokwe North.
· The total metres drilled within the resource area (i.e. excluding
sterilisation holes) is 32,727m (116 holes).
DOKWE CENTRAL
· A total of 24 drillholes (including percussion drillholes) have
been drilled at Dokwe Central. At Dokwe Central, most drillholes were
systematically laid out on 3 section lines (E-W azimuth) spaced 50m apart and
the collars were also spaced at 25m along the section lines, resulting in an
average of 30m between holes.
· In the resource area there are 5,166m (24 holes).
Orientation of data in relation to geological structure · Whether the orientation of sampling achieves unbiased sampling of · Dokwe North drillholes were systematically laid out on a section
possible structures and the extent to which this is known, considering the line (approximately 320º azimuth) generally perpendicular to the strike and
deposit type. most of the drillholes were drilled towards the northwest to intersect the
mineralised orebodies very close to normal relative to the reef plane.
· If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have introduced a · At Dokwe Central, drillholes were systematically laid out on
sampling bias, this should be assessed and reported if material. section lines (E-W azimuth) generally perpendicular to the strike and most of
the drillholes were drilled towards the north to intersect the mineralised
orebodies very close to normal relative to the reef plane.
· Available information indicates that the drilling orientation
would provide unbiased sampling of the mineralisation zones.
· Due diligence drilling in 2023 drilled from various orientations
to better test the mineralisation and confirm that the drilling has provided
unbiased sampling.
· The geotechnical drilling was also completed in various
orientations.
Sample security · The measures taken to ensure sample security. · The core was then transported to the core yard for geological
logging and sampling. After logging and marking of samples, the diamond drill
core was then cut in half by a diamond saw with one half stored for future
reference and the other half core was sent to the laboratory for analyses.
· During percussion drilling, samples were collected in large bags
and then split using a sample riffle splitter. After splitting, samples were
bagged in plastic bags, the remaining bulk sample was transported to the main
office about 125km from site and stored at a shed in the early years, but
stored on site in the recent sterilization program.
· All samples were transported by company personnel to the
laboratory. They were signed off for dispatch from the core yard and on
receipt to the laboratory.
· All drill core is stored at the Dokwe Camp.
Audits or reviews · The results of any audits or reviews of sampling techniques and data. · In 2008 Digital Mining Services completed a data review and
verification of the drilling results to date.
· The sampling for the Due Diligence study has been supervised by
the CP of this MRE.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral tenement and land tenure status · Type, reference name/number, location and ownership including · Ariana owns 100% of the Dokwe Project following the all-share
agreements or material issues with third parties such as joint ventures, merger with Rockover Holdings Limited in June 2024.
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings. · Dokwe is held through 81 blocks of gold claims and 22 copper base
metal claims totalling 4,040ha which are protected up until at least April
· The security of the tenure held at the time of reporting along with 2026. The claims can be extended through annual inspection. Canister made
any known impediments to obtaining a licence to operate in the area. application to the Ministry of Mines and Mining Development in March 2021
under Part VIII of the Mines and Minerals Act (MMA) to convert the claims into
a Mining Lease with the aim is to facilitate the development of a significant
new gold mine at Dokwe. The Mining Lease application is for gold and base
metals, and the area applied for is 6,622ha. The Ministry requested additional
information in support of the application which has been submitted.
· The Project is currently not subjected to payment of royalties or
other payments. Government royalties will be payable once mining operations
are developed. A private royalty of 0.5% will also be payable once production
starts.
· As far as the CP is aware, no statutory instrument has been
gazetted implementing an environmental fund as yet, so no fees are due or
anticipated. In addition, the CP is not aware of any requests being made to
Rockover by the Minister to implement an environmental fund. As such, no
environmental rehabilitation trusts and guarantees have been established for
Dokwe.
Exploration done by other parties · Acknowledgment and appraisal of exploration by other parties. · Acknowledgement is hereby made for the historical exploration
conducted by Reunion Mining in 1993. Reunion Mining undertook a detailed
airborne magnetic survey over an area of approximately 1,000km(2). The
detailed airborne magnetic survey indicated the presence of an east-northeast
trending linear magnetic feature buried beneath the younger sedimentary cover.
Geology · Deposit type, geological setting and style of mineralisation. GENERAL DOKWE AREA
· The Dokwe gold deposits are situated in Archaean basement rocks
buried by up to 40 metres of Karoo and Kalahari sedimentary cover.
· The Dokwe area can be subdivided into a number of
litho-structural domains which are juxtaposed against each other by a series
of shear zones. The three known gold occurrences within the Claims Area are
within shear zones, which have a combined strike length of approximately 12km.
DOKWE NORTH
· The geology of Dokwe North primarily consists of a sequence of
Late Archean-aged greenstone volcaniclastics. These include dacite-to-andesite
flows featuring amygdaloidal rich horizons, interbedded felsic tuffs,
agglomerates, and irregular rhyolite flows.
· The sequence is intruded by earlier quartz-feldspar porphyries
and later altered dolerite. Brittle deformation, characterised by fracturing,
is common in felsic tuff whilst more ductile deformation characterises dacite
and andesite.
· A major brittle fault, the "Western" fault is post-mineralised
structure dissecting offsetting mineralisation.
· The main Dokwe North orebody occurs within a NE-SW trending shear
zone that displays a central core with intense foliation and mylonitisation of
the host rocks.
· Primary gold mineralisation at Dokwe is preserved as free gold
and occasionally as inclusions in quartz veins, micro-fractures in pyrite, and
other open-space micro-features.
· The mineralisation is primarily structurally controlled and
associated with the intensity of shearing and with lithological contacts.
Visible gold has been documented multiple times and is often associated within
the foliation planes formed by shearing.
· Overlying all the basement stratigraphy is a sequence of barren
sedimentary rocks.
DOKWE CENTRAL
· Dokwe Central is higher-grade pipe-like deposit containing
abundant quartz veins and several steeply plunging high-grade zones.
Mineralisation is contained within a series of strongly sheared intermediate
chlorite schists and biotite-chlorite schists in a covered Archean Greenstone
Belt, extending from the border with Botswana (Maitengwe Greenstone Belt) and
linking up with the Bulawayo-Bubi Greenstone Belt to the east. The Archaean
greenstone units are overlain by Karoo and Kalahari sedimentary units of up to
25-40m in thickness.
· Mineralisation appears to be dominantly constrained within
intensely sheared and brecciated zones, and in association with disseminated
sulphides (dominantly pyrite).
· The defined mineralisation extent is abruptly terminated against
a package of sedimentary rocks to the north, marking a major east-west
trending fault.
Drill hole Information · A summary of all information material to the understanding of the DOKWE NORTH
exploration results including a tabulation of the following information for
all Material drill holes: · Drillhole database consists of a total of 141 drillholes
totalling 34,477m. The database is split with:
o easting and northing of the drill hole collar
o 101 diamond drillholes (incl. 5 geotechnical holes) totalling 31,286m.
o elevation or RL (Reduced Level - elevation above sea level in metres) of
the drill hole collar o 15 percussion drillholes totalling 1,441m.
o dip and azimuth of the hole o 25 RC sterilisation holes totalling 1,750m.
o down hole length and interception depth DOKWE CENTRAL
o hole length. · Drillhole database consisted of a total of 24 drillholes,
totalling 5,166m. The database is split with:
· If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not detract from the o 19 diamond drillholes totalling 4,816m.
understanding of the report, the Competent Person should clearly explain why
this is the case. o 5 percussion drillholes totalling 350m.
· All information is included in the Collar Table of this
announcement.
Data aggregation methods · In reporting Exploration Results, weighting averaging techniques, · The sample intervals from the raw de-surveyed drillhole dataset
maximum and/or minimum grade truncations (eg cutting of high grades) and were analysed for the most appropriate composite length to be applied for
cut-off grades are usually Material and should be stated. geostatistical analysis. The mean of the population is 1.13m, with
approximately 75% of the population being exactly 1m in length. Given the
· Where aggregate intercepts incorporate short lengths of high grade data, a 1m compositing interval was selected and applied to the de-surveyed
results and longer lengths of low grade results, the procedure used for such drillholes. Composites were selected from all drill holes, except RC
aggregation should be stated and some typical examples of such aggregations sterilisation drilling data.
should be shown in detail.
· No metal equivalents were calculated.
· The assumptions used for any reporting of metal equivalent values
should be clearly stated.
Relationship between mineralisation widths and intercept lengths · These relationships are particularly important in the reporting of · At Dokwe North, drillholes were systematically laid out on
Exploration Results. section lines (approximately 320º azimuth) generally perpendicular to the
strike, and most of the drillholes were drilled towards the northwest to
· If the geometry of the mineralisation with respect to the drill hole intersect the mineralised orebodies very close to normal relative to the
angle is known, its nature should be reported. structural plane.
· If it is not known and only the down hole lengths are reported, there · At Dokwe Central, drillholes were systematically laid out on
should be a clear statement to this effect (eg 'down hole length, true width section lines (E-W azimuth) generally perpendicular to the strike and most of
not known'). the drillholes were drilled towards the north to intersect the mineralised
orebodies very close to normal relative to the reef plane.
· Downhole true widths are not calculated. All significant grades
presented represent the value attributable to the real sample length and not
corrected true width.
Diagrams · Appropriate maps and sections (with scales) and tabulations of · All relevant diagrams pertaining to sampling type and its
intercepts should be included for any significant discovery being reported. distribution, as well as geological and block models are presented in their
These should include, but not be limited to a plan view of drill hole collar respective sections and have been generated in accordance with the guidelines
locations and appropriate sectional views. described in the JORC Code.
Balanced reporting · Where comprehensive reporting of all Exploration Results is not · The Mineral Resource Estimate is based on the information resulting
practicable, representative reporting of both low and high grades and/or from sampling and drilling campaigns. This Mineral Resource estimation summary
widths should be practiced to avoid misleading reporting of Exploration contains information for all sampling and drilling campaigns within the
Results. Project Area to date.
· All material intercepts are included in the Intercepts Table in
this announcement.
Other substantive exploration data · Other exploration data, if meaningful and material, should be · Exploration works other than drilling conducted by or on behalf
reported including (but not limited to): geological observations; geophysical of the issuer includes soil geochemistry, geophysical survey (induced
survey results; geochemical survey results; bulk samples - size and method of polarisation survey, real section induced polarisation, magnetic survey), and
treatment; metallurgical test results; bulk density, groundwater, geotechnical lidar survey. Some of this data has been incorporated into the Mineral
and rock characteristics; potential deleterious or contaminating substances. Resource Estimation work completed here.
· Soil geochemistry surveys have been completed in the periphery of
Dokwe North and at the Dokwe Central prospect. A total of 10,086 samples have
been collected to date. detectORE(TM) technology has been used to analyse 811
of these samples in the first instance.
· pXRF soil sampling grid.
· detectORE(TM) soil sampling grid.
Further work · The nature and scale of planned further work (eg tests for lateral · Further exploration will be carried out in the region,
extensions or depth extensions or large-scale step-out drilling). particularly exploring the downdip of Dokwe North. Additional target areas
defined previously will also be followed up.
· Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas, · pXRF work is ongoing across all Dokwe North drillholes, and is
provided this information is not commercially sensitive. being used in the geological modelling. Approximately 40,000 readings have
been taken to date.
· Follow up of significant grades intercepted in DPD004
approximately 800m east of Dokwe Central.
· Exploration drilling at Dokwe North and Dokwe Central extensions.
NOTE: Sections 3 and 4 aren't provided here as no mineral resources or ore
reserves are being reported. Section 5 is not relevant to this work as there
is no estimation or reporting of diamonds or other gemstones in this project.
Drill hole intercepts referred to in text and maps
Hole ID From (m) To (m) Length (m) Gold g/t Prospect
DPD4 32.20 39.50 7.30 6.63 Sinkwe
DSD2 243.00 243.50 0.50 81.09 Siduli Pan
DPD73 411.70 428.70 17.00 5.91 Dokwe Central
DPD67 83.30 91.30 8.00 16.34 Dokwe Central
DPD67 106.40 123.40 17.00 3.21 Dokwe Central
DPD106 121.50 122.50 1.00 2.42 Sinkwe
NK20 211.60 212.70 1.10 0.32 Wabayi
DPD20 26.20 26.41 0.21 0.46 Mpunzi
DPD20 36.34 36.78 0.44 0.37 Mpunzi
Collars Table for Dokwe Area
Hole ID East North Elevation (m) Depth (m) Dip Azimuth Area Type
DPD1 574245 7790048 1,149 450.00 -45 320 Dokwe North DDH
DPD2 574306 7789972 1,150 295.40 -50 320 Dokwe North DDH
DPD3 575265 7788185 1,150 366.63 -45 0 Dokwe Exploration DDH
DPD4 575766 7788064 1,156 312.73 -45 0 Dokwe Exploration DDH
DPD5 575765 7788325 1,156 320.00 -45 180 Dokwe Exploration DDH
DPD6 574663 7788091 1,152 450.00 -45 360 Dokwe Exploration DDH
DPD7 574310 7789968 1,149 500.65 -50 0 Dokwe North DDH
DPD8 574299 7789826 1,150 473.51 -60 320 Dokwe North DDH
DPD9 574350 7789922 1,150 500.94 -50 320 Dokwe North DDH
DPD10 574323 7790105 1,149 307.76 -70 320 Dokwe North DDH
DPD11 574445 7790117 1,150 255.74 -70 320 Dokwe North DDH
DPD12 574361 7790206 1,149 400.94 -70 260 Dokwe North DDH
DPD13 574357 7790303 1,149 400.00 -70 260 Dokwe North DDH
DPD14 574185 7789972 1,149 250.48 -70 300 Dokwe North DDH
DPD15 574377 7790039 1,150 250.09 -70 325 Dokwe North DDH
DPD16 574258 7790105 1,149 200.00 -70 325 Dokwe North DDH
DPD17 574282 7790158 1,149 160.00 -70 325 Dokwe North DDH
DPD18 574211 7790245 1,149 120.00 -90 0 Dokwe North DDH
DPD19 574118 7790025 1,149 170.00 -70 310 Dokwe North DDH
DPD20 576365 7787752 1,150 561.66 -90 0 Dokwe North DDH
DPD21 574219 7790154 1,149 180.00 -90 0 Dokwe North DDH
DPD22 574187 7790191 1,149 179.31 -90 0 Dokwe North DDH
DPD23 574154 7790229 1,149 250.13 -90 0 Dokwe North DDH
DPD24 574252 7790116 1,149 248.00 -90 0 Dokwe North DDH
DPD25 574285 7790078 1,149 253.00 -90 0 Dokwe North DDH
DPD26 574120 7790268 1,148 125.68 -90 320 Dokwe North DDH
DPD27 574383 7789964 1,150 361.73 -70 320 Dokwe North DDH
DPD28 574418 7789923 1,150 413.20 -70 320 Dokwe North DDH
DPD29 574350 7790002 1,150 356.98 -70 320 Dokwe North DDH
DPD30 574451 7789884 1,150 304.44 -70 320 Dokwe North DDH
DPD31 574087 7790306 1,148 392.16 -90 260 Dokwe North DDH
DPD32 574323 7790105 1,149 260.14 -90 260 Dokwe North DDH
DPD33 574290 7790143 1,149 236.16 -90 260 Dokwe North DDH
DPD34 574259 7790181 1,149 215.16 -90 260 Dokwe North DDH
DPD35 574327 7790029 1,149 292.73 -60 320 Dokwe North DDH
DPD36 574292 7790074 1,149 214.90 -90 320 Dokwe North DDH
DPD37 574225 7790221 1,149 250.11 -90 320 Dokwe North DDH
DPD38 574193 7790258 1,149 208.19 -90 260 Dokwe North DDH
DPD39 574257 7790112 1,149 259.68 -50 320 Dokwe North DDH
DPD40 574225 7790149 1,149 236.43 -60 320 Dokwe North DDH
DPD41 574193 7790258 1,149 232.76 -70 320 Dokwe North DDH
DPD42 574409 7790003 1,150 311.49 -70 320 Dokwe North DDH
DPD43 574350 7790073 1,149 273.67 -70 320 Dokwe North DDH
DPD44 574295 7790221 1,149 293.08 -70 320 Dokwe North DDH
DPD45 574328 7790181 1,149 203.16 -70 320 Dokwe North DDH
DPD46 574265 7790258 1,149 203.10 -70 320 Dokwe North DDH
DPD47 574233 7790296 1,149 193.84 -60 320 Dokwe North DDH
DPD48 574200 7790334 1,149 264.00 -60 320 Dokwe North DDH
DPD49 574129 7789950 1,149 300.63 -60 320 Dokwe North DDH
DPD50 574098 7789987 1,149 254.16 -70 320 Dokwe North DDH
DPD51 574163 7789911 1,149 262.82 -70 320 Dokwe North DDH
DPD52 574066 7790025 1,149 260.16 -70 320 Dokwe North DDH
DPD53 574361 7790142 1,149 232.20 -70 320 Dokwe North DDH
DPD54 574334 7790251 1,149 302.16 -70 320 Dokwe North DDH
DPD55 574303 7790288 1,149 213.84 -70 320 Dokwe North DDH
DPD56 574235 7790368 1,149 119.00 -70 320 Dokwe North DDH
DPD57 574269 7790327 1,149 205.40 -70 320 Dokwe North DDH
DPD58 574093 7789915 1,149 278.16 -70 320 Dokwe North DDH
DPD59 574196 7789872 1,150 313.79 -70 320 Dokwe North DDH
DPD60 574113 7789814 1,149 468.52 -70 320 Dokwe North DDH
DPD61 574071 7789783 1,149 473.05 -70 320 Dokwe North DDH
DPD62 574962 7788028 1,154 145.30 -50 0 Dokwe Central DDH
DPD63 574964 7787977 1,154 211.87 -50 0 Dokwe Central DDH
DPD64 574965 7787926 1,154 292.22 -50 0 Dokwe Central DDH
DPD65 574915 7788026 1,154 151.37 -50 0 Dokwe Central DDH
DPD66 574916 7787926 1,153 283.46 -50 0 Dokwe Central DDH
DPD67 574940 7787977 1,154 293.72 -50 0 Dokwe Central DDH
DPD68 574989 7787979 1,154 243.25 -50 0 Dokwe Central DDH
DPD69 575016 7787979 1,154 234.12 -50 0 Dokwe Central DDH
DPD70 575015 7788027 1,154 157.32 -50 0 Dokwe Central DDH
DPD71 574988 7788027 1,154 157.29 -50 0 Dokwe Central DDH
DPD72 574941 7787927 1,154 243.06 -50 0 Dokwe Central DDH
DPD73 574966 7787848 1,154 433.28 -50 0 Dokwe Central DDH
DPD74 574207 7790017 1,149 283.38 -70 320 Dokwe North DDH
DPD75 574185 7790043 1,149 229.51 -70 320 Dokwe North DDH
DPD76 574122 7789875 1,149 309.10 -70 320 Dokwe North DDH
DPD77 574238 7789982 1,149 272.15 -70 320 Dokwe North DDH
DPD78 574229 7789834 1,150 401.59 -70 320 Dokwe North DDH
DPD79 574057 7789881 1,149 273.10 -70 320 Dokwe North DDH
DPD80 574157 7789840 1,150 402.08 -70 320 Dokwe North DDH
DPD81 574236 7789903 1,150 361.52 -70 320 Dokwe North DDH
DPD82 574039 7789760 1,149 294.96 -70 320 Dokwe North DDH
DPD83 574159 7790003 1,149 292.20 -70 320 Dokwe North DDH
DPD84 574939 7788028 1,154 86.50 -50 0 Dokwe Central DDH
DPD85 574189 7789802 1,150 450.33 -70 320 Dokwe North DDH
DPD86 574061 7789953 1,149 302.63 -70 320 Dokwe North DDH
DPD87 574087 7789844 1,149 313.63 -70 320 Dokwe North DDH
DPD88 574144 7789777 1,150 302.65 -70 320 Dokwe North DDH
DPD89 574025 7789919 1,149 302.63 -70 320 Dokwe North DDH
DPD90 574104 7789746 1,150 402.43 -70 320 Dokwe North DDH
DPD91 574039 7789821 1,149 354.76 -70 320 Dokwe North DDH
DPD92 574072 7789722 1,150 351.84 -70 320 Dokwe North DDH
DPD93 574006 7789798 1,149 304.15 -70 320 Dokwe North DDH
DPD94 574035 7789692 1,149 453.00 -70 320 Dokwe North DDH
DPD95 573970 7789768 1,149 302.79 -70 320 Dokwe North DDH
DPD96 574002 7789730 1,149 351.79 -70 320 Dokwe North DDH
DPD97 574077 7788351 1,151 470.55 -70 320 Dokwe Exploration DDH
DPD98 574004 7788439 1,151 450.76 -70 325 Dokwe Exploration DDH
DPD99 573911 7788551 1,150 467.96 -70 325 Dokwe Exploration DDH
DPD100 574058 7788221 1,151 600.48 -70 320 Dokwe Exploration DDH
DPD101 575054 7788077 1,154 251.98 -60 320 Dokwe Central DDH
DPD102 575120 7787999 1,154 341.73 -60 320 Dokwe Central DDH
DPD103 574868 7788267 1,153 452.66 -60 140 Dokwe Central DDH
DPD104 575154 7788038 1,154 332.81 -60 320 Dokwe Central DDH
DPD105 575439 7788318 1,155 455.38 -60 320 Dokwe Exploration DDH
DPD106 575778 7787919 1,157 500.19 -60 320 Dokwe Exploration DDH
DPD107 575917 7788220 1,157 375.30 -60 320 Dokwe Exploration DDH
DPD108 574260 7789797 1,150 509.30 -70 320 Dokwe North DDH
DPD109 573991 7789662 1,149 452.40 -70 320 Dokwe North DDH
DPD110 574272 7789943 1,150 400.00 -60 320 Dokwe North DDH
DPD111 574347 7789769 1,150 500.20 -60 320 Dokwe North DDH
DPD112 574066 7789655 1,149 350.48 -70 320 Dokwe North DDH
DPD113 573958 7789700 1,149 368.73 -70 320 Dokwe North DDH
DPD114 574103 7789687 1,149 371.33 -70 320 Dokwe North DDH
DPD115 574223 7789762 1,150 401.50 -70 320 Dokwe North DDH
DPD116 574135 7789711 1,149 399.80 -70 320 Dokwe North DDH
DPD117 574177 7789738 1,150 400.28 -70 320 Dokwe North DDH
DPD118 574103 7789903 1,149 170.94 -90 200 Dokwe North DDH
DPD119 574043 7789784 1,150 300.10 -70 320 Dokwe North DDH
DPD120 574103 7789858 1,150 300.00 -70 320 Dokwe North DDH
DPD121 574136 7789981 1,150 300.00 -70 320 Dokwe North DDH
DPD122 574214 7790040 1,150 300.13 -70 320 Dokwe North DDH
DPD123 574302 7790089 1,150 300.04 -70 320 Dokwe North DDH
DPD124 574053 7790285 1,148 360.70 -50 140 Dokwe North DDH
DPD125 573852 7789949 1,149 360.00 -50 100 Dokwe North DDH
DPD126 574374 7789847 1,150 400.00 -50 310 Dokwe North DDH
DPD127 574327 7790290 1,149 360.00 -50 200 Dokwe North DDH
DPD128 574480 7790117 1,150 360.00 -50 260 Dokwe North DDH
DPD129 574134 7789955 1,149 225.10 -70 310 Dokwe North DDH
DPD130 574168 7790235 1,149 386.90 -60 140 Dokwe North DDH
DPD131 574981 7788144 1,156 220.00 -60 190.5 Dokwe Central DDH
DPD132 574965 7787886 1,156 390.00 -50 10.5 Dokwe Central DDH
DPP1 574237 7790055 1,149 100.00 -70 320 Dokwe North PDH
DPP2 574222 7790073 1,147 104.00 -70 320 Dokwe North PDH
DPP3 574203 7790095 1,149 93.00 -70 320 Dokwe North PDH
DPP4 574196 7790104 1,149 102.00 -70 320 Dokwe North PDH
DPP5 574189 7790112 1,149 78.00 -70 320 Dokwe North PDH
DPP6 574215 7790003 1,149 96.00 -70 320 Dokwe North PDH
DPP7 574199 7790022 1,149 78.00 -70 320 Dokwe North PDH
DPP8 574181 7790042 1,147 102.00 -70 320 Dokwe North PDH
DPP9 574166 7790060 1,149 90.00 -70 320 Dokwe North PDH
DPP10 574185 7790117 1,149 105.00 -70 320 Dokwe North PDH
DPP11 574166 7789984 1,147 123.00 -70 320 Dokwe North PDH
DPP12 574150 7790004 1,147 90.00 -70 320 Dokwe North PDH
DPP13 574133 7790023 1,147 96.00 -70 320 Dokwe North PDH
DPP14 574118 7790042 1,147 98.00 -70 320 Dokwe North PDH
DPP15 575445 7788102 1,147 70.00 -90 0 Dokwe Exploration PDH
DPP16 575445 7788127 1,147 70.00 -90 0 Dokwe Exploration PDH
DPP17 575445 7788152 1,147 70.00 -90 0 Dokwe Exploration PDH
DPP18 575445 7788177 1,147 70.00 -90 0 Dokwe Exploration PDH
DPP19 575445 7788202 1,147 70.00 -90 0 Dokwe Exploration PDH
DPP20 575443 7788222 1,155 70.00 -90 0 Dokwe Exploration PDH
DPP21 575445 7788252 1,147 70.00 -90 0 Dokwe Exploration PDH
DPP31 574965 7788002 1,145 70.00 -90 0 Dokwe Central PDH
DPP32 574965 7788027 1,145 70.00 -90 0 Dokwe Central PDH
DPP33 574965 7788052 1,145 70.00 -90 0 Dokwe Central PDH
DPP34 574966 7788094 1,154 70.00 -90 0 Dokwe Central PDH
DPP35 574963 7788100 1,154 70.00 -90 0 Dokwe Central PDH
DPP37 574152 7790156 1,147 86.00 -90 320 Dokwe North PDH
DSD1 577026 7786652 1,150 150.80 -45 180 Dokwe South (Siduli DDH
DSD2 577026 7786352 1,150 251.65 -45 180 Dokwe South (Siduli DDH
NK12 570865 7787452 1,151 200.26 -60 270 Dokwe Exploration DDH
NK13 570765 7787102 1,151 285.71 -45 350 Dokwe Exploration DDH
NK17 573965 7787692 1,150 246.39 -50 180 Dokwe Exploration DDH
NK18 571965 7783826 1,150 160.00 -55 320 Dokwe Exploration PDH
NK19 573965 7786952 1,151 230.03 -55 0 Dokwe Exploration DDH
NK20 572965 7786829 1,152 250.58 -55 0 Dokwe Exploration DDH
NKP16 570935 7787652 1,149 87.00 -90 0 Dokwe Exploration PDH
NKP22 570995 7789367 1,143 165.00 -90 0 Dokwe Exploration PDH
NKP24 572413 7789171 1,146 116.00 -90 0 Dokwe Exploration PDH
NKP25 573173 7788870 1,148 107.00 -90 0 Dokwe Exploration PDH
S1 574221 7783064 1,150 85.35 -70 340 Dokwe Exploration Shava DDH
S2 573975 7783042 1,150 40.10 -50 340 Dokwe Exploration Shava DDH
S3 573666 7782986 1,150 51.75 -70 340 Dokwe Exploration Shava DDH
S4 573850 7783050 1,150 68.90 -70 340 Dokwe Exploration Shava DDH
S5 574030 7783111 1,150 79.30 -60 340 Dokwe Exploration Shava DDH
SD1 576556 7786275 1,150 92.48 -50 160 Dokwe South (Siduli) DDH
SD2 576797 7786334 1,150 105.78 -50 160 Dokwe South (Siduli) DDH
SD3 576691 7786337 1,150 84.98 -50 160 Dokwe South (Siduli) DDH
SD4 576885 7786381 1,150 87.58 -50 340 Dokwe South (Siduli) DDH
SD5 576417 7786218 1,150 54.73 -50 160 Dokwe South (Siduli) DDH
ST01 575715 7788952 1,155 70.00 -90 0 Dokwe Exploration RC
ST02 573965 7789202 1,152 70.00 -90 0 Dokwe Exploration RC
ST03 574465 7789202 1,153 70.00 -90 0 Dokwe Exploration RC
ST04 574965 7789202 1,155 70.00 -90 0 Dokwe Exploration RC
ST05 575465 7789202 1,155 70.00 -90 0 Dokwe Exploration RC
ST06 575965 7789202 1,155 70.00 -90 0 Dokwe Exploration RC
ST07 574215 7789452 1,152 70.00 -90 0 Dokwe Exploration RC
ST08 574715 7789452 1,155 70.00 -90 0 Dokwe Exploration RC
ST09 575215 7789452 1,155 70.00 -90 0 Dokwe Exploration RC
ST10 575715 7789452 1,155 70.00 -90 0 Dokwe Exploration RC
ST11 574465 7789702 1,155 70.00 -90 0 Dokwe Exploration RC
ST12 574965 7789702 1,155 70.00 -90 0 Dokwe Exploration RC
ST13 575465 7789702 1,155 70.00 -90 0 Dokwe Exploration RC
ST14 575965 7789702 1,155 70.00 -90 0 Dokwe Exploration RC
ST15 574715 7789952 1,155 70.00 -90 0 Dokwe Exploration RC
ST16 575215 7789952 1,155 70.00 -90 0 Dokwe Exploration RC
ST17 575715 7789952 1,155 70.00 -90 0 Dokwe Exploration RC
ST18 574965 7790202 1,155 70.00 -90 0 Dokwe Exploration RC
ST19 575465 7790202 1,155 70.00 -90 0 Dokwe Exploration RC
ST20 575965 7790202 1,155 70.00 -90 0 Dokwe Exploration RC
ST21 575215 7790452 1,155 70.00 -90 0 Dokwe Exploration RC
ST22 575715 7790452 1,155 70.00 -90 0 Dokwe Exploration RC
ST23 574965 7790702 1,150 70.00 -90 0 Dokwe Exploration RC
ST24 575465 7790702 1,155 70.00 -90 0 Dokwe Exploration RC
ST25 575965 7790702 1,155 70.00 -90 0 Dokwe Exploration RC
Intercepts Table for Dokwe Area
Intercepts calculated with 0.5g/t Au cut-off grade and minimum 1m composite
length, allowing for up to 1m internal dilution (down hole widths).
Hole ID From (m) To (m) Length (m) Gold (g/t)
DPD1 64.72 67.72 3.00 0.53
DPD1 86.00 88.46 2.46 0.97
DPD1 98.48 103.94 5.46 2.78
DPD1 147.10 151.33 4.23 0.52
DPD1 183.29 185.25 1.96 1.12
DPD1 186.12 187.22 1.10 0.55
DPD1 190.54 191.95 1.41 1.18
DPD1 294.66 295.66 1.00 0.60
DPD1 298.66 299.66 1.00 1.20
DPD1 364.50 365.50 1.00 0.71
DPD10 70.36 72.36 2.00 1.14
DPD10 84.36 86.36 2.00 2.32
DPD10 88.36 90.36 2.00 0.89
DPD10 98.36 104.36 6.00 1.58
DPD10 108.36 118.36 10.00 21.10
DPD10 128.36 136.36 8.00 1.10
DPD10 140.36 144.36 4.00 1.44
DPD10 156.36 158.36 2.00 3.68
DPD10 160.36 162.36 2.00 0.90
DPD10 164.36 168.36 4.00 3.32
DPD10 170.36 172.36 2.00 13.69
DPD10 174.36 176.36 2.00 0.63
DPD10 178.36 180.36 2.00 0.86
DPD10 184.36 186.36 2.00 0.83
DPD10 192.36 194.36 2.00 14.97
DPD102 189.61 190.61 1.00 13.65
DPD102 208.62 209.62 1.00 0.58
DPD102 238.72 239.72 1.00 0.77
DPD102 245.26 246.26 1.00 0.57
DPD103 377.31 378.31 1.00 1.50
DPD106 121.50 122.50 1.00 2.42
DPD108 56.19 57.19 1.00 0.55
DPD108 88.19 90.97 2.78 0.92
DPD108 97.34 98.34 1.00 1.69
DPD108 109.14 111.57 2.43 2.01
DPD108 396.16 397.16 1.00 0.63
DPD108 476.81 477.81 1.00 0.53
DPD108 482.13 484.13 2.00 0.96
DPD109 157.96 161.77 3.81 1.43
DPD11 82.90 84.90 2.00 0.82
DPD11 111.90 113.90 2.00 0.51
DPD11 114.27 117.95 3.68 0.85
DPD110 93.80 94.80 1.00 0.73
DPD110 116.80 117.80 1.00 0.79
DPD110 125.80 126.80 1.00 1.14
DPD110 139.38 141.21 1.83 0.59
DPD110 151.21 152.21 1.00 1.05
DPD110 197.97 198.97 1.00 0.99
DPD110 200.97 201.97 1.00 1.15
DPD110 202.97 203.97 1.00 0.85
DPD110 206.97 208.97 2.00 2.75
DPD110 214.10 217.10 3.00 3.51
DPD110 231.50 232.50 1.00 0.74
DPD110 233.50 235.50 2.00 0.63
DPD110 238.78 242.78 4.00 5.40
DPD110 247.78 250.78 3.00 0.88
DPD110 252.78 253.78 1.00 0.60
DPD110 256.78 257.78 1.00 0.66
DPD110 264.78 270.78 6.00 1.84
DPD110 272.78 274.78 2.00 1.40
DPD110 278.78 287.78 9.00 0.66
DPD110 301.58 303.58 2.00 0.61
DPD110 305.30 306.30 1.00 0.71
DPD110 309.26 310.26 1.00 0.74
DPD110 332.89 337.89 5.00 3.37
DPD110 341.89 342.89 1.00 0.64
DPD111 147.57 150.57 3.00 1.20
DPD111 231.30 232.30 1.00 0.55
DPD111 326.60 327.60 1.00 0.92
DPD111 470.51 471.51 1.00 0.69
DPD112 175.82 177.25 1.43 16.10
DPD112 205.39 206.39 1.00 0.58
DPD112 227.39 228.39 1.00 0.50
DPD113 140.80 141.80 1.00 0.65
DPD114 145.00 148.68 3.68 0.74
DPD114 151.68 152.68 1.00 0.84
DPD114 189.83 192.30 2.47 4.03
DPD115 114.57 115.57 1.00 0.55
DPD115 117.57 120.57 3.00 1.08
DPD115 266.17 268.17 2.00 1.55
DPD115 270.96 272.96 2.00 3.16
DPD115 281.41 282.41 1.00 0.63
DPD115 284.41 289.06 4.65 0.66
DPD116 130.66 133.00 2.34 2.49
DPD117 123.86 130.90 7.04 0.93
DPD117 266.53 267.53 1.00 0.52
DPD117 272.53 273.53 1.00 0.61
DPD117 276.62 284.62 8.00 1.39
DPD117 298.59 303.36 4.77 4.46
DPD119 92.23 94.20 1.97 3.51
DPD119 96.20 100.50 4.30 1.00
DPD119 115.24 116.24 1.00 0.88
DPD119 147.50 148.50 1.00 0.57
DPD119 193.00 194.27 1.27 0.50
DPD119 195.30 196.30 1.00 0.52
DPD119 198.29 213.27 14.98 1.91
DPD119 224.27 229.27 5.00 1.07
DPD12 92.92 94.89 1.97 2.36
DPD12 112.50 117.12 4.62 5.35
DPD12 130.89 138.89 8.00 1.74
DPD12 142.89 146.89 4.00 0.65
DPD12 152.89 156.89 4.00 0.71
DPD120 90.50 92.50 2.00 3.25
DPD120 106.50 107.50 1.00 0.87
DPD120 181.00 188.00 7.00 2.62
DPD120 192.55 193.55 1.00 0.54
DPD120 197.00 203.00 6.00 1.00
DPD121 88.40 89.40 1.00 0.65
DPD121 91.50 92.50 1.00 4.61
DPD121 100.30 109.00 8.70 1.22
DPD121 125.04 126.30 1.26 0.99
DPD121 136.20 141.20 5.00 0.77
DPD121 145.95 150.50 4.55 1.42
DPD121 152.24 155.40 3.16 1.01
DPD121 171.30 172.39 1.09 0.63
DPD121 174.24 180.24 6.00 0.61
DPD121 182.24 211.11 28.87 1.42
DPD121 215.24 218.00 2.76 0.80
DPD121 219.00 220.00 1.00 0.57
DPD122 78.00 79.00 1.00 0.90
DPD122 81.00 82.00 1.00 0.85
DPD122 88.00 90.00 2.00 2.05
DPD122 114.85 116.00 1.15 0.83
DPD122 142.00 147.00 5.00 12.45
DPD122 152.00 153.00 1.00 0.61
DPD122 155.00 159.00 4.00 7.73
DPD122 166.00 174.00 8.00 1.16
DPD122 177.00 183.00 6.00 1.96
DPD122 191.00 196.00 5.00 3.03
DPD122 197.00 198.00 1.00 0.54
DPD122 217.00 218.00 1.00 1.02
DPD122 226.00 227.00 1.00 0.50
DPD122 239.72 241.00 1.28 0.91
DPD122 254.40 255.40 1.00 30.00
DPD122 285.00 286.00 1.00 0.94
DPD123 79.00 80.00 1.00 0.97
DPD123 83.00 84.00 1.00 0.57
DPD123 116.00 117.00 1.00 0.71
DPD123 118.00 119.00 1.00 0.98
DPD123 125.00 131.18 6.18 1.57
DPD123 133.00 135.00 2.00 4.31
DPD123 147.00 149.16 2.16 0.70
DPD123 151.28 152.28 1.00 0.59
DPD123 153.28 158.68 5.40 1.38
DPD123 176.00 180.94 4.94 2.96
DPD123 183.29 185.00 1.71 3.45
DPD123 187.78 189.78 2.00 1.49
DPD123 207.00 209.00 2.00 0.87
DPD123 229.00 237.00 8.00 197.22
DPD124 247.00 249.00 2.00 1.74
DPD124 251.00 252.00 1.00 0.96
DPD124 335.00 337.00 2.00 0.64
DPD124 346.00 349.00 3.00 0.81
DPD124 359.00 360.27 1.27 3.92
DPD125 274.00 276.00 2.00 1.02
DPD125 295.00 296.00 1.00 1.10
DPD125 319.00 320.00 1.00 0.52
DPD125 338.00 339.00 1.00 0.93
DPD125 350.00 351.00 1.00 0.73
DPD126 139.00 140.00 1.00 0.59
DPD126 147.00 148.00 1.00 4.82
DPD126 163.00 164.00 1.00 2.04
DPD126 166.00 168.00 2.00 3.30
DPD126 170.00 172.00 2.00 1.29
DPD126 176.00 179.00 3.00 11.68
DPD126 183.00 184.00 1.00 1.95
DPD126 196.00 197.00 1.00 0.75
DPD126 206.00 207.00 1.00 0.59
DPD126 227.00 235.00 8.00 0.74
DPD126 246.00 247.00 1.00 0.52
DPD126 250.00 251.00 1.00 0.50
DPD126 256.00 257.00 1.00 0.87
DPD126 260.00 261.00 1.00 0.57
DPD126 263.00 266.00 3.00 1.02
DPD126 273.00 275.00 2.00 3.88
DPD126 277.00 287.00 10.00 1.46
DPD126 289.00 290.00 1.00 0.55
DPD126 292.00 294.00 2.00 1.17
DPD126 302.00 304.00 2.00 1.20
DPD126 306.00 312.00 6.00 0.78
DPD126 314.00 316.00 2.00 0.55
DPD126 317.00 333.00 16.00 0.83
DPD126 335.00 339.00 4.00 1.41
DPD126 341.00 342.00 1.00 0.51
DPD126 346.00 350.00 4.00 0.94
DPD126 354.00 356.00 2.00 17.24
DPD126 364.00 365.00 1.00 0.96
DPD126 367.00 371.00 4.00 1.10
DPD126 374.00 375.00 1.00 0.55
DPD126 376.00 377.00 1.00 0.53
DPD126 392.00 393.00 1.00 2.02
DPD126 395.00 399.00 4.00 0.74
DPD127 101.00 102.00 1.00 0.67
DPD127 103.00 104.00 1.00 3.00
DPD127 108.00 111.00 3.00 0.94
DPD127 117.00 119.00 2.00 15.97
DPD127 121.00 122.00 1.00 0.70
DPD127 123.00 124.00 1.00 1.14
DPD127 135.00 137.00 2.00 0.99
DPD127 142.00 146.00 4.00 6.36
DPD127 153.00 154.00 1.00 1.46
DPD127 161.00 169.00 8.00 1.96
DPD127 176.00 184.00 8.00 2.11
DPD127 203.00 204.00 1.00 0.92
DPD127 208.00 209.00 1.00 1.51
DPD127 213.00 218.00 5.00 4.30
DPD127 261.00 267.00 6.00 6.85
DPD127 271.00 280.00 9.00 3.39
DPD127 281.00 282.00 1.00 0.61
DPD127 288.00 289.00 1.00 0.51
DPD127 290.00 291.00 1.00 0.68
DPD127 293.00 295.00 2.00 4.21
DPD127 303.00 304.00 1.00 0.69
DPD127 311.00 314.00 3.00 1.19
DPD127 324.00 325.00 1.00 0.57
DPD127 354.00 355.00 1.00 0.79
DPD128 134.00 135.00 1.00 0.54
DPD128 182.00 183.00 1.00 0.56
DPD128 200.00 201.00 1.00 0.71
DPD128 222.00 223.00 1.00 0.66
DPD128 227.00 228.00 1.00 6.40
DPD128 232.00 233.00 1.00 3.59
DPD128 237.00 241.00 4.00 1.56
DPD128 242.00 243.00 1.00 0.60
DPD128 245.00 246.00 1.00 1.26
DPD128 257.40 264.00 6.60 1.39
DPD128 267.00 268.00 1.00 5.67
DPD128 271.00 275.00 4.00 1.04
DPD128 281.00 282.00 1.00 0.79
DPD128 286.00 288.00 2.00 1.13
DPD128 290.00 294.00 4.00 0.90
DPD128 298.00 299.00 1.00 6.00
DPD128 302.00 309.00 7.00 0.99
DPD128 323.00 325.00 2.00 0.94
DPD128 326.00 327.00 1.00 0.50
DPD128 343.00 348.00 5.00 0.89
DPD128 350.00 352.00 2.00 0.73
DPD128 354.00 355.00 1.00 2.22
DPD14 131.30 133.30 2.00 1.14
DPD14 135.30 145.30 10.00 3.12
DPD14 157.30 163.30 6.00 1.11
DPD14 171.36 173.36 2.00 0.50
DPD14 175.36 183.36 8.00 6.88
DPD14 189.36 191.36 2.00 0.67
DPD14 197.36 201.36 4.00 0.79
DPD14 211.36 227.36 16.00 1.67
DPD14 229.36 237.36 8.00 0.71
DPD14 241.36 245.36 4.00 1.07
DPD15 152.09 156.09 4.00 2.13
DPD15 184.09 190.09 6.00 1.07
DPD15 196.09 198.09 2.00 0.64
DPD15 210.09 212.09 2.00 1.09
DPD15 218.09 220.09 2.00 0.87
DPD16 44.38 46.38 2.00 0.60
DPD16 74.38 77.38 3.00 0.80
DPD16 100.96 103.96 3.00 4.33
DPD16 106.96 109.96 3.00 1.18
DPD16 120.92 126.92 6.00 1.63
DPD16 136.92 138.92 2.00 1.15
DPD16 152.92 154.92 2.00 2.66
DPD16 156.92 166.92 10.00 0.95
DPD16 174.92 176.92 2.00 0.57
DPD16 178.92 180.92 2.00 0.88
DPD16 184.92 190.92 6.00 0.76
DPD17 77.23 80.38 3.15 4.35
DPD17 95.38 97.38 2.00 0.58
DPD17 119.09 124.09 5.00 2.19
DPD17 138.09 140.09 2.00 1.45
DPD17 142.09 144.09 2.00 5.00
DPD17 158.09 160.00 1.91 0.56
DPD18 107.22 118.86 11.64 2.40
DPD19 46.89 49.15 2.26 0.53
DPD19 52.89 54.15 1.26 0.63
DPD19 78.89 80.89 2.00 6.80
DPD19 96.89 98.89 2.00 0.50
DPD19 100.89 102.83 1.94 0.76
DPD19 103.89 110.45 6.56 1.14
DPD19 112.89 115.79 2.90 0.88
DPD19 128.40 134.05 5.65 2.22
DPD2 161.51 163.51 2.00 0.78
DPD2 197.51 199.51 2.00 1.24
DPD2 205.51 207.51 2.00 0.65
DPD2 209.51 221.54 12.03 1.63
DPD2 223.54 229.54 6.00 0.77
DPD2 231.54 233.54 2.00 0.85
DPD2 237.54 245.54 8.00 2.41
DPD2 249.62 253.62 4.00 0.93
DPD2 257.62 259.62 2.00 0.80
DPD2 261.66 271.62 9.96 1.50
DPD2 273.62 279.62 6.00 2.03
DPD2 282.62 284.62 2.00 0.87
DPD2 287.62 288.62 1.00 1.38
DPD21 47.39 48.39 1.00 3.60
DPD21 58.39 59.39 1.00 0.52
DPD21 109.03 111.03 2.00 0.80
DPD21 121.03 123.03 2.00 0.53
DPD21 124.03 125.03 1.00 1.05
DPD21 139.03 145.03 6.00 2.95
DPD21 146.08 150.50 4.42 4.73
DPD22 54.30 57.29 2.99 1.32
DPD22 59.77 60.77 1.00 0.95
DPD22 66.28 67.60 1.32 2.58
DPD22 71.94 75.34 3.40 1.28
DPD22 78.17 80.82 2.65 1.65
DPD22 117.28 119.28 2.00 0.71
DPD22 131.28 132.28 1.00 0.98
DPD22 149.28 150.29 1.01 0.65
DPD22 151.29 157.33 6.04 2.89
DPD23 63.01 64.01 1.00 1.04
DPD23 75.01 76.01 1.00 2.31
DPD23 240.10 241.10 1.00 0.53
DPD24 47.20 54.20 7.00 2.98
DPD24 68.20 70.20 2.00 1.14
DPD24 75.20 76.20 1.00 0.83
DPD24 79.20 83.20 4.00 5.62
DPD24 92.20 95.20 3.00 10.40
DPD24 102.20 107.20 5.00 1.20
DPD24 112.20 113.20 1.00 0.81
DPD24 117.20 119.20 2.00 0.58
DPD24 122.20 124.20 2.00 0.84
DPD24 125.20 126.20 1.00 0.58
DPD24 127.20 141.20 14.00 1.41
DPD24 143.20 148.20 5.00 1.09
DPD24 152.89 153.89 1.00 0.51
DPD24 157.89 159.89 2.00 2.48
DPD24 164.89 167.89 3.00 0.69
DPD24 168.85 170.89 2.04 0.56
DPD24 171.89 173.89 2.00 0.69
DPD24 174.89 175.89 1.00 0.52
DPD25 96.70 98.70 2.00 1.18
DPD25 104.70 105.70 1.00 0.55
DPD25 118.70 119.70 1.00 0.55
DPD25 121.70 123.70 2.00 0.53
DPD25 124.70 125.70 1.00 0.53
DPD25 126.70 127.70 1.00 1.14
DPD25 130.70 132.70 2.00 0.91
DPD25 135.70 136.70 1.00 0.83
DPD25 138.70 139.70 1.00 0.50
DPD25 145.70 146.70 1.00 4.67
DPD25 150.70 151.70 1.00 0.94
DPD25 163.70 168.70 5.00 2.38
DPD25 171.70 172.70 1.00 0.63
DPD25 175.70 183.70 8.00 0.78
DPD25 184.70 185.70 1.00 0.75
DPD25 187.70 196.70 9.00 4.44
DPD25 209.70 210.70 1.00 0.54
DPD25 212.70 217.70 5.00 16.37
DPD25 224.70 226.70 2.00 3.43
DPD25 228.70 233.70 5.00 4.33
DPD25 240.90 241.90 1.00 3.40
DPD25 242.90 243.90 1.00 0.53
DPD26 95.08 96.58 1.50 1.13
DPD27 110.49 112.49 2.00 3.28
DPD27 126.84 127.84 1.00 1.05
DPD27 148.19 152.24 4.05 0.56
DPD27 163.44 164.44 1.00 0.54
DPD27 301.18 302.18 1.00 0.57
DPD27 332.18 333.18 1.00 0.66
DPD28 119.16 122.70 3.54 1.56
DPD28 130.70 132.06 1.36 0.71
DPD28 133.06 136.06 3.00 3.21
DPD28 141.16 148.66 7.50 1.43
DPD28 156.16 157.16 1.00 0.89
DPD28 175.16 176.16 1.00 1.44
DPD28 178.16 179.16 1.00 1.87
DPD28 181.16 182.16 1.00 0.69
DPD28 189.16 193.16 4.00 0.84
DPD28 208.16 210.16 2.00 4.60
DPD28 239.16 241.16 2.00 0.65
DPD28 256.16 257.16 1.00 0.75
DPD28 272.16 273.16 1.00 0.62
DPD29 117.50 132.50 15.00 4.57
DPD29 133.50 138.50 5.00 1.44
DPD29 143.50 157.50 14.00 3.61
DPD29 160.30 161.30 1.00 2.38
DPD29 175.30 181.60 6.30 1.47
DPD29 183.60 186.60 3.00 0.91
DPD29 188.60 190.60 2.00 0.81
DPD29 192.60 195.60 3.00 2.04
DPD29 203.00 210.00 7.00 4.37
DPD29 212.00 218.00 6.00 1.16
DPD29 223.00 229.00 6.00 1.77
DPD29 232.00 236.00 4.00 1.29
DPD29 239.00 240.00 1.00 0.54
DPD29 242.00 244.00 2.00 0.58
DPD29 251.00 252.00 1.00 0.70
DPD29 260.00 261.00 1.00 0.50
DPD29 268.00 270.00 2.00 0.76
DPD29 279.00 280.00 1.00 0.74
DPD29 303.00 304.00 1.00 0.52
DPD29 314.00 315.00 1.00 57.11
DPD29 319.00 325.00 6.00 1.17
DPD29 343.00 345.00 2.00 2.28
DPD31 83.62 84.62 1.00 2.65
DPD31 97.59 98.59 1.00 0.54
DPD32 49.84 50.84 1.00 0.87
DPD32 55.84 65.84 10.00 2.84
DPD32 67.84 72.84 5.00 2.36
DPD32 76.84 79.84 3.00 0.99
DPD32 80.84 81.84 1.00 0.54
DPD32 82.84 83.84 1.00 1.55
DPD32 84.94 91.94 7.00 2.39
DPD32 98.94 105.94 7.00 1.04
DPD32 107.94 108.94 1.00 1.79
DPD32 117.94 120.94 3.00 0.84
DPD32 123.94 124.94 1.00 1.27
DPD32 130.94 131.94 1.00 0.68
DPD32 134.94 148.94 14.00 2.26
DPD32 156.94 158.94 2.00 0.72
DPD32 180.94 187.94 7.00 0.94
DPD32 192.94 195.94 3.00 0.67
DPD32 199.94 200.94 1.00 8.53
DPD32 202.94 213.94 11.00 68.83
DPD32 218.94 221.94 3.00 0.87
DPD32 223.94 230.94 7.00 6.78
DPD32 236.94 237.94 1.00 0.81
DPD32 243.94 252.94 9.00 1.09
DPD32 253.94 256.94 3.00 0.59
DPD33 47.16 48.16 1.00 0.64
DPD33 49.16 51.16 2.00 1.74
DPD33 86.16 91.16 5.00 1.63
DPD33 96.16 101.16 5.00 3.86
DPD33 106.16 107.16 1.00 0.68
DPD33 114.16 115.16 1.00 0.60
DPD33 118.16 121.16 3.00 3.31
DPD33 128.16 129.16 1.00 0.51
DPD33 134.16 142.16 8.00 13.69
DPD33 144.16 145.16 1.00 6.28
DPD33 160.16 161.16 1.00 0.91
DPD33 164.16 165.16 1.00 1.18
DPD33 173.16 174.16 1.00 0.53
DPD33 175.16 181.16 6.00 1.70
DPD33 190.16 191.16 1.00 0.56
DPD33 207.16 209.16 2.00 4.96
DPD33 229.16 230.16 1.00 1.73
DPD33 232.16 233.16 1.00 2.14
DPD34 47.16 48.16 1.00 1.92
DPD34 52.16 53.16 1.00 0.65
DPD34 64.16 66.16 2.00 1.58
DPD34 79.16 80.16 1.00 2.05
DPD34 111.16 113.16 2.00 0.62
DPD34 115.16 116.16 1.00 0.77
DPD34 117.16 118.16 1.00 1.42
DPD34 123.16 128.16 5.00 3.99
DPD34 138.16 139.16 1.00 0.65
DPD34 197.16 201.16 4.00 1.19
DPD35 48.58 49.58 1.00 0.51
DPD35 75.58 76.58 1.00 0.52
DPD35 115.40 116.40 1.00 0.52
DPD35 121.40 126.40 5.00 3.44
DPD35 137.40 138.40 1.00 0.81
DPD35 142.40 143.40 1.00 6.35
DPD35 144.40 145.40 1.00 0.50
DPD35 146.40 147.40 1.00 1.16
DPD35 149.40 153.40 4.00 1.95
DPD35 157.40 159.40 2.00 12.39
DPD35 162.40 175.40 13.00 1.48
DPD35 176.40 194.40 18.00 2.10
DPD35 215.40 217.40 2.00 0.72
DPD35 236.40 239.40 3.00 1.60
DPD35 251.40 252.40 1.00 0.54
DPD35 254.40 259.40 5.00 0.72
DPD36 79.84 82.84 3.00 0.59
DPD36 126.62 138.64 12.02 0.68
DPD36 141.64 147.64 6.00 6.10
DPD36 150.64 151.64 1.00 0.93
DPD36 152.64 153.64 1.00 0.63
DPD36 159.64 161.64 2.00 0.57
DPD36 171.64 172.64 1.00 0.51
DPD36 173.64 176.64 3.00 2.09
DPD36 178.64 184.64 6.00 0.71
DPD36 186.64 195.15 8.51 1.59
DPD37 81.83 83.83 2.00 1.34
DPD37 84.83 85.83 1.00 0.51
DPD37 86.83 90.83 4.00 1.85
DPD37 106.93 107.93 1.00 1.23
DPD37 109.93 113.93 4.00 3.72
DPD37 116.93 122.93 6.00 4.03
DPD37 125.93 126.93 1.00 0.72
DPD37 133.93 134.93 1.00 0.86
DPD37 154.93 156.93 2.00 1.30
DPD37 189.86 190.86 1.00 0.55
DPD37 194.86 195.86 1.00 1.33
DPD37 197.86 198.86 1.00 0.80
DPD38 48.16 49.16 1.00 0.81
DPD38 53.16 54.16 1.00 5.21
DPD38 95.16 96.41 1.25 0.55
DPD38 98.16 101.16 3.00 0.80
DPD38 107.16 112.55 5.39 1.42
DPD38 127.55 128.55 1.00 0.68
DPD38 141.55 142.55 1.00 0.64
DPD38 149.55 151.55 2.00 0.67
DPD38 166.55 167.55 1.00 0.66
DPD38 187.55 192.55 5.00 0.57
DPD38 193.55 197.55 4.00 0.72
DPD38 199.55 200.55 1.00 0.60
DPD39 51.36 52.36 1.00 4.20
DPD39 63.07 65.07 2.00 1.48
DPD39 82.24 83.24 1.00 0.58
DPD39 89.28 91.18 1.90 4.26
DPD39 101.46 103.18 1.72 0.78
DPD39 109.18 112.18 3.00 0.93
DPD39 120.13 121.13 1.00 1.08
DPD39 125.13 126.13 1.00 1.38
DPD39 138.33 139.33 1.00 1.10
DPD39 141.33 142.33 1.00 0.51
DPD39 153.33 160.18 6.85 1.05
DPD39 175.00 176.00 1.00 3.89
DPD39 179.00 180.00 1.00 1.87
DPD39 183.00 184.00 1.00 1.01
DPD39 198.00 199.00 1.00 1.83
DPD39 203.00 205.00 2.00 0.55
DPD39 215.00 217.00 2.00 0.70
DPD39 219.00 220.00 1.00 1.10
DPD39 229.00 231.00 2.00 1.69
DPD4 32.20 43.73 11.53 4.48
including 32.20 39.50 7.30 6.63
DPD40 58.58 59.58 1.00 0.99
DPD40 86.58 87.58 1.00 0.53
DPD40 143.83 144.83 1.00 0.55
DPD40 180.38 181.38 1.00 0.79
DPD41 100.16 102.16 2.00 3.50
DPD41 133.16 134.16 1.00 0.51
DPD41 137.16 138.16 1.00 0.51
DPD41 140.16 141.16 1.00 0.74
DPD41 142.16 143.16 1.00 0.67
DPD41 199.16 200.16 1.00 2.39
DPD41 215.16 217.16 2.00 0.56
DPD41 218.16 219.16 1.00 0.61
DPD42 96.98 97.98 1.00 0.55
DPD42 99.98 105.59 5.61 5.10
DPD42 107.59 108.59 1.00 0.52
DPD42 113.59 114.59 1.00 3.38
DPD42 121.79 122.79 1.00 1.03
DPD42 134.79 140.79 6.00 0.72
DPD42 142.79 143.79 1.00 0.70
DPD42 175.29 176.29 1.00 1.32
DPD42 202.29 214.34 12.05 1.45
DPD42 218.44 220.44 2.00 1.25
DPD42 231.44 232.44 1.00 0.62
DPD42 237.44 242.44 5.00 1.26
DPD42 249.44 253.44 4.00 7.62
DPD42 254.44 255.44 1.00 0.51
DPD42 256.44 257.44 1.00 0.50
DPD42 260.44 273.44 13.00 4.68
DPD42 281.14 293.64 12.50 2.10
DPD42 302.37 303.37 1.00 1.61
DPD42 307.37 308.37 1.00 0.67
DPD42 309.37 310.37 1.00 0.50
DPD43 70.18 71.18 1.00 0.76
DPD43 77.18 78.18 1.00 0.66
DPD43 102.00 104.00 2.00 15.05
DPD43 113.00 114.00 1.00 0.50
DPD43 120.00 121.00 1.00 1.35
DPD43 126.00 128.00 2.00 1.23
DPD43 131.00 134.00 3.00 1.20
DPD43 136.00 141.00 5.00 1.09
DPD43 143.00 144.00 1.00 0.73
DPD43 145.00 152.00 7.00 2.44
DPD43 153.00 154.00 1.00 0.50
DPD43 158.00 159.00 1.00 0.75
DPD43 171.00 173.00 2.00 1.21
DPD43 181.00 183.00 2.00 0.98
DPD43 185.00 187.00 2.00 4.80
DPD43 190.00 191.00 1.00 4.27
DPD43 199.00 201.00 2.00 9.54
DPD43 203.00 204.00 1.00 1.81
DPD43 208.00 210.00 2.00 0.68
DPD43 211.00 212.00 1.00 0.63
DPD43 226.00 227.00 1.00 52.92
DPD43 228.00 229.00 1.00 0.79
DPD43 230.00 232.00 2.00 1.12
DPD43 234.00 235.00 1.00 0.91
DPD43 237.00 238.00 1.00 0.60
DPD44 44.16 45.16 1.00 0.60
DPD44 46.16 47.16 1.00 1.57
DPD44 50.16 52.16 2.00 5.93
DPD44 58.16 59.16 1.00 0.55
DPD44 71.16 72.16 1.00 1.76
DPD44 87.16 91.16 4.00 11.70
DPD44 93.16 98.16 5.00 1.62
DPD44 106.38 110.16 3.78 0.87
DPD44 112.16 114.16 2.00 2.17
DPD44 117.16 118.16 1.00 14.91
DPD44 121.16 122.16 1.00 9.70
DPD44 142.16 146.16 4.00 1.13
DPD44 148.16 149.16 1.00 0.85
DPD44 161.16 162.16 1.00 0.67
DPD44 166.16 167.16 1.00 0.84
DPD44 174.16 177.16 3.00 0.62
DPD44 180.16 181.16 1.00 0.54
DPD44 246.16 247.16 1.00 0.55
DPD45 73.26 74.26 1.00 8.86
DPD45 93.26 96.26 3.00 3.40
DPD45 99.26 100.26 1.00 2.59
DPD45 108.46 110.46 2.00 1.83
DPD45 116.16 117.16 1.00 1.43
DPD45 153.16 154.16 1.00 0.63
DPD45 173.16 175.16 2.00 0.74
DPD45 194.68 197.68 3.00 1.78
DPD45 201.67 202.67 1.00 1.13
DPD46 58.10 59.10 1.00 11.36
DPD46 70.04 71.10 1.06 9.86
DPD46 110.26 111.26 1.00 1.98
DPD46 115.40 117.00 1.60 0.58
DPD46 125.99 126.99 1.00 3.92
DPD47 62.35 63.35 1.00 0.85
DPD47 88.18 90.23 2.05 0.55
DPD47 156.74 157.74 1.00 0.51
DPD47 175.54 176.54 1.00 0.90
DPD47 181.54 182.54 1.00 0.67
DPD48 131.61 132.61 1.00 5.51
DPD49 84.47 85.50 1.03 29.33
DPD49 88.50 102.10 13.60 3.31
DPD49 104.10 105.35 1.25 0.59
DPD49 107.35 112.35 5.00 1.21
DPD49 117.35 118.35 1.00 0.55
DPD49 121.35 122.35 1.00 0.75
DPD49 124.58 127.58 3.00 0.60
DPD49 133.60 136.60 3.00 1.62
DPD49 139.80 140.80 1.00 0.72
DPD49 143.80 148.15 4.35 1.07
DPD49 150.15 152.15 2.00 1.41
DPD49 155.15 157.15 2.00 0.78
DPD49 165.15 167.15 2.00 0.79
DPD49 172.15 181.15 9.00 1.49
DPD49 186.15 187.15 1.00 0.57
DPD49 189.15 190.15 1.00 0.75
DPD49 242.15 243.15 1.00 0.87
DPD50 107.60 108.60 1.00 0.54
DPD50 109.60 110.60 1.00 0.58
DPD50 111.60 112.60 1.00 0.74
DPD50 114.60 117.60 3.00 1.58
DPD50 132.60 134.60 2.00 0.61
DPD50 141.60 142.60 1.00 0.72
DPD50 196.60 197.60 1.00 1.74
DPD51 86.06 89.06 3.00 0.51
DPD51 93.00 94.00 1.00 0.67
DPD51 110.53 112.53 2.00 2.75
DPD51 138.03 147.15 9.12 4.27
DPD51 148.15 149.15 1.00 0.50
DPD51 154.15 155.15 1.00 0.66
DPD51 160.15 161.15 1.00 1.60
DPD51 172.15 174.15 2.00 0.89
DPD51 178.15 189.15 11.00 1.01
DPD51 198.02 199.50 1.48 0.61
DPD51 209.62 220.15 10.53 3.30
DPD51 223.15 231.15 8.00 1.40
DPD51 233.15 236.15 3.00 2.02
DPD51 237.15 238.15 1.00 0.50
DPD51 245.15 246.15 1.00 1.25
DPD53 64.18 65.18 1.00 0.66
DPD53 82.39 84.44 2.05 0.75
DPD53 87.49 90.54 3.05 2.07
DPD53 97.64 98.64 1.00 1.26
DPD53 104.74 106.79 2.05 1.98
DPD53 114.89 117.99 3.10 3.68
DPD53 119.19 121.04 1.85 2.01
DPD53 122.99 123.99 1.00 0.65
DPD53 124.99 125.99 1.00 1.24
DPD53 128.14 131.14 3.00 0.69
DPD53 142.14 144.14 2.00 5.60
DPD53 150.14 151.14 1.00 1.02
DPD53 178.14 179.14 1.00 0.87
DPD53 185.14 193.14 8.00 1.10
DPD53 210.29 211.29 1.00 0.50
DPD53 213.29 214.29 1.00 1.36
DPD54 52.16 53.16 1.00 1.31
DPD54 63.16 65.16 2.00 0.70
DPD54 79.16 80.16 1.00 1.35
DPD55 146.03 147.03 1.00 0.80
DPD55 156.03 157.03 1.00 0.76
DPD56 44.90 45.90 1.00 0.87
DPD56 111.95 112.95 1.00 0.69
DPD57 76.16 77.16 1.00 11.71
DPD57 117.16 118.16 1.00 12.67
DPD57 126.16 128.16 2.00 3.38
DPD57 136.16 137.16 1.00 0.64
DPD57 140.16 148.16 8.00 0.65
DPD57 151.16 152.16 1.00 0.74
DPD57 188.16 190.16 2.00 0.62
DPD57 201.16 202.16 1.00 0.86
DPD58 83.16 86.16 3.00 2.91
DPD58 91.16 94.16 3.00 1.98
DPD58 96.16 99.16 3.00 2.29
DPD58 109.16 110.16 1.00 1.28
DPD58 112.16 113.16 1.00 0.83
DPD58 115.16 116.16 1.00 0.52
DPD58 121.16 122.16 1.00 0.50
DPD58 130.16 131.16 1.00 0.53
DPD58 132.16 134.16 2.00 0.55
DPD58 135.16 139.16 4.00 1.06
DPD58 142.16 146.16 4.00 1.06
DPD58 163.16 164.16 1.00 0.63
DPD58 171.16 172.16 1.00 0.63
DPD58 186.16 188.16 2.00 0.64
DPD58 221.16 230.16 9.00 1.83
DPD58 232.16 233.16 1.00 1.63
DPD58 235.16 239.16 4.00 1.14
DPD59 60.16 61.16 1.00 0.78
DPD59 181.16 182.16 1.00 0.54
DPD59 204.16 205.16 1.00 0.56
DPD59 208.16 215.16 7.00 5.52
DPD59 218.16 224.16 6.00 5.21
DPD59 226.16 227.16 1.00 0.59
DPD59 229.16 233.16 4.00 1.45
DPD59 235.16 246.16 11.00 1.94
DPD59 249.16 250.16 1.00 8.45
DPD59 255.16 257.16 2.00 1.60
DPD59 270.16 281.16 11.00 2.62
DPD59 283.16 289.16 6.00 27.24
DPD59 299.16 300.16 1.00 0.53
DPD59 307.79 308.79 1.00 0.57
DPD60 90.63 95.63 5.00 1.84
DPD60 101.63 102.63 1.00 0.52
DPD60 104.63 106.63 2.00 15.98
DPD60 108.63 109.63 1.00 0.59
DPD60 111.63 112.63 1.00 0.94
DPD60 146.63 147.63 1.00 0.59
DPD60 148.63 149.63 1.00 1.26
DPD60 151.63 153.63 2.00 0.58
DPD60 194.63 197.63 3.00 0.54
DPD60 208.63 210.63 2.00 1.13
DPD60 212.63 216.63 4.00 0.91
DPD60 219.63 220.63 1.00 0.58
DPD61 44.90 45.90 1.00 1.37
DPD61 96.66 99.66 3.00 15.49
DPD61 104.66 105.66 1.00 1.73
DPD61 133.66 134.66 1.00 0.67
DPD61 146.66 149.66 3.00 2.30
DPD61 156.66 157.66 1.00 1.57
DPD61 207.66 221.66 14.00 2.81
DPD61 240.66 241.66 1.00 0.59
DPD62 34.59 38.59 4.00 1.54
DPD62 56.59 58.59 2.00 0.84
DPD62 68.79 72.79 4.00 1.33
DPD62 74.79 75.79 1.00 0.75
DPD62 78.80 93.90 15.10 3.57
DPD62 96.90 101.30 4.40 3.03
DPD62 105.30 107.30 2.00 1.30
DPD62 109.30 125.30 16.00 4.17
DPD63 79.32 81.32 2.00 1.59
DPD63 83.32 84.32 1.00 0.63
DPD63 86.32 88.55 2.23 0.88
DPD63 97.32 99.32 2.00 1.63
DPD63 101.32 104.32 3.00 1.49
DPD63 109.32 113.32 4.00 1.70
DPD63 118.32 120.32 2.00 0.87
DPD63 122.32 126.32 4.00 1.91
DPD63 134.32 147.32 13.00 0.85
DPD63 152.32 153.32 1.00 0.73
DPD63 154.32 155.32 1.00 0.51
DPD63 159.32 161.32 2.00 0.54
DPD63 166.32 167.32 1.00 0.83
DPD63 172.32 174.32 2.00 0.72
DPD63 176.32 178.32 2.00 0.80
DPD63 179.32 180.32 1.00 0.53
DPD63 183.32 184.32 1.00 3.36
DPD63 186.32 187.32 1.00 1.14
DPD63 190.32 191.32 1.00 0.61
DPD63 193.32 209.05 15.73 2.06
DPD64 50.22 55.22 5.00 2.87
DPD64 157.22 158.22 1.00 2.09
DPD64 164.22 168.22 4.00 2.42
DPD64 170.22 172.22 2.00 2.68
DPD64 176.22 177.22 1.00 0.65
DPD64 184.22 186.22 2.00 3.73
DPD64 189.22 190.22 1.00 1.37
DPD64 196.22 200.22 4.00 2.34
DPD64 202.22 203.22 1.00 0.65
DPD64 216.22 218.22 2.00 0.77
DPD64 221.22 222.22 1.00 0.59
DPD64 228.22 234.22 6.00 6.89
DPD64 236.22 242.22 6.00 4.54
DPD64 246.22 255.22 9.00 2.58
DPD64 256.22 257.22 1.00 0.72
DPD64 269.40 270.40 1.00 0.70
DPD64 271.40 272.40 1.00 0.74
DPD64 274.40 277.40 3.00 0.61
DPD66 112.46 113.46 1.00 1.62
DPD67 65.40 70.37 4.97 4.18
DPD67 74.37 77.37 3.00 0.95
DPD67 79.37 82.37 3.00 0.57
DPD67 83.30 94.37 11.07 13.54
including 83.30 91.30 8.00 16.34
DPD67 98.37 123.40 25.03 2.48
including 106.40 123.40 17.00 3.21
DPD68 63.12 64.27 1.15 0.55
DPD68 65.27 66.75 1.48 0.65
DPD68 112.27 113.27 1.00 1.62
DPD68 115.27 117.27 2.00 6.49
DPD68 120.27 121.27 1.00 0.62
DPD68 134.27 136.27 2.00 1.20
DPD68 143.27 149.27 6.00 5.19
DPD68 160.27 161.27 1.00 0.87
DPD68 168.27 169.27 1.00 1.85
DPD68 170.27 171.27 1.00 0.57
DPD68 176.27 180.27 4.00 1.62
DPD68 182.27 184.27 2.00 0.56
DPD68 191.27 192.27 1.00 0.50
DPD68 210.27 211.27 1.00 0.67
DPD69 103.37 108.37 5.00 0.95
DPD69 126.37 129.37 3.00 4.83
DPD69 136.37 138.37 2.00 0.88
DPD69 149.37 152.37 3.00 1.45
DPD69 219.37 220.37 1.00 0.72
DPD7 98.69 100.79 2.10 4.57
DPD7 122.56 124.56 2.00 0.65
DPD7 148.43 150.43 2.00 0.56
DPD7 152.43 154.43 2.00 0.54
DPD7 174.43 176.43 2.00 1.52
DPD7 182.43 186.43 4.00 4.11
DPD7 190.00 195.93 5.93 2.47
DPD7 199.93 205.93 6.00 1.59
DPD7 207.93 211.93 4.00 3.23
DPD7 213.93 225.93 12.00 1.11
DPD7 235.93 246.41 10.48 6.93
DPD7 250.41 258.41 8.00 3.29
DPD7 260.41 266.23 5.82 0.66
DPD7 268.23 280.26 12.03 0.81
DPD7 282.26 286.26 4.00 0.96
DPD7 290.26 318.26 28.00 2.39
DPD7 320.26 322.26 2.00 2.46
DPD7 330.26 332.26 2.00 0.55
DPD7 348.26 350.26 2.00 1.48
DPD7 356.26 358.26 2.00 0.75
DPD7 474.26 476.26 2.00 0.58
DPD7 482.26 484.26 2.00 0.60
DPD7 488.26 494.26 6.00 1.98
DPD70 36.42 37.42 1.00 3.12
DPD70 40.42 41.42 1.00 1.27
DPD70 80.32 81.32 1.00 0.82
DPD71 52.39 55.39 3.00 1.76
DPD71 60.39 73.29 12.90 1.45
DPD71 74.29 75.29 1.00 0.60
DPD71 117.29 120.29 3.00 5.01
DPD71 122.29 133.29 11.00 2.11
DPD72 125.10 126.10 1.00 0.94
DPD72 141.10 168.10 27.00 4.65
DPD72 169.10 178.10 9.00 1.59
DPD72 181.10 183.10 2.00 0.61
DPD72 194.10 196.10 2.00 0.69
DPD73 128.28 129.28 1.00 0.92
DPD73 297.28 298.28 1.00 1.08
DPD73 323.28 324.28 1.00 0.79
DPD73 327.28 328.28 1.00 2.19
DPD73 366.28 368.28 2.00 0.66
DPD73 376.28 377.28 1.00 1.17
DPD73 380.28 381.28 1.00 0.55
DPD73 382.28 428.70 46.42 3.19
including 411.70 428.70 17.00 5.91
DPD74 62.73 64.73 2.00 15.10
DPD74 81.73 83.73 2.00 25.00
DPD74 105.62 106.62 1.00 4.55
DPD74 108.62 109.62 1.00 1.22
DPD74 111.62 112.62 1.00 8.30
DPD74 119.62 122.62 3.00 0.97
DPD74 132.62 133.62 1.00 0.69
DPD74 170.55 171.55 1.00 4.60
DPD74 174.55 176.55 2.00 1.16
DPD74 179.55 180.55 1.00 0.71
DPD74 186.55 192.55 6.00 0.92
DPD74 195.55 198.55 3.00 0.66
DPD74 232.55 236.55 4.00 0.80
DPD74 245.55 246.55 1.00 0.50
DPD74 262.55 267.55 5.00 7.12
DPD74 272.55 273.55 1.00 0.79
DPD75 66.05 68.05 2.00 2.83
DPD75 104.00 106.00 2.00 0.89
DPD75 108.00 111.90 3.90 1.47
DPD75 118.90 120.90 2.00 0.73
DPD75 124.51 128.51 4.00 1.29
DPD75 130.51 131.51 1.00 1.00
DPD75 135.51 136.51 1.00 1.23
DPD75 141.51 144.51 3.00 1.27
DPD75 147.51 148.51 1.00 0.69
DPD75 149.51 150.51 1.00 0.79
DPD75 158.51 161.51 3.00 2.63
DPD75 164.51 165.51 1.00 0.58
DPD75 179.51 180.51 1.00 0.52
DPD75 185.51 186.51 1.00 0.61
DPD75 188.51 189.51 1.00 0.70
DPD75 190.51 195.51 5.00 1.34
DPD75 207.51 208.51 1.00 0.57
DPD75 218.51 219.51 1.00 0.57
DPD76 114.60 115.60 1.00 1.86
DPD76 121.60 122.60 1.00 0.51
DPD76 127.60 129.60 2.00 1.90
DPD76 131.60 132.64 1.04 1.66
DPD76 173.60 174.60 1.00 1.37
DPD76 176.60 183.60 7.00 1.56
DPD76 190.60 199.60 9.00 0.96
DPD76 212.60 214.60 2.00 0.94
DPD76 226.60 227.60 1.00 0.51
DPD76 258.60 262.60 4.00 1.04
DPD76 270.60 272.60 2.00 0.74
DPD76 274.60 275.60 1.00 3.80
DPD76 296.60 297.60 1.00 0.68
DPD77 54.72 56.72 2.00 2.55
DPD77 62.72 64.72 2.00 1.53
DPD77 74.72 76.72 2.00 0.99
DPD77 78.72 82.72 4.00 0.83
DPD77 97.72 99.72 2.00 3.42
DPD77 158.62 159.62 1.00 0.52
DPD77 167.62 170.68 3.06 1.07
DPD77 174.62 193.62 19.00 12.50
DPD77 194.62 195.62 1.00 0.52
DPD77 197.62 204.62 7.00 0.93
DPD77 206.62 207.62 1.00 0.67
DPD77 208.62 235.62 27.00 5.62
DPD77 238.62 239.62 1.00 1.85
DPD77 241.62 244.62 3.00 1.03
DPD77 247.62 259.62 12.00 3.25
DPD77 263.62 265.62 2.00 20.56
DPD78 47.30 48.30 1.00 0.55
DPD78 112.00 113.00 1.00 1.10
DPD78 127.58 129.58 2.00 1.36
DPD78 250.65 254.65 4.00 0.89
DPD78 257.65 261.65 4.00 1.74
DPD78 263.65 265.65 2.00 0.64
DPD78 277.58 280.58 3.00 2.45
DPD78 289.58 295.58 6.00 1.30
DPD78 323.58 324.58 1.00 1.10
DPD78 348.58 349.58 1.00 1.46
DPD78 372.58 373.58 1.00 1.00
DPD79 40.70 42.70 2.00 18.06
DPD79 44.70 48.70 4.00 1.22
DPD79 76.70 79.70 3.00 0.55
DPD79 115.00 116.00 1.00 0.65
DPD79 125.00 131.00 6.00 1.52
DPD79 134.00 137.00 3.00 0.71
DPD79 148.00 151.00 3.00 1.58
DPD79 155.00 156.00 1.00 1.92
DPD79 182.00 185.00 3.00 3.33
DPD8 79.62 81.62 2.00 5.03
DPD8 229.63 231.63 2.00 0.58
DPD8 233.63 235.63 2.00 1.23
DPD8 252.43 254.43 2.00 0.55
DPD8 256.43 266.43 10.00 0.61
DPD8 282.43 284.43 2.00 0.70
DPD8 290.43 292.43 2.00 0.55
DPD8 294.43 296.43 2.00 6.17
DPD8 298.43 304.43 6.00 2.32
DPD8 308.43 310.43 2.00 0.95
DPD8 316.43 328.43 12.00 1.01
DPD8 330.43 334.43 4.00 0.53
DPD8 372.43 374.43 2.00 0.63
DPD8 380.43 382.43 2.00 1.28
DPD8 388.43 390.43 2.00 0.68
DPD80 83.95 87.95 4.00 1.06
DPD80 91.95 93.95 2.00 0.59
DPD80 118.03 119.03 1.00 2.16
DPD80 121.03 122.03 1.00 1.00
DPD80 131.03 132.03 1.00 0.53
DPD80 232.58 238.58 6.00 7.09
DPD80 242.58 243.58 1.00 0.89
DPD80 253.58 259.58 6.00 2.03
DPD80 261.58 268.58 7.00 1.26
DPD80 273.58 274.58 1.00 0.82
DPD80 276.58 280.58 4.00 0.70
DPD80 294.58 295.58 1.00 0.64
DPD80 329.58 330.58 1.00 0.55
DPD80 335.58 336.58 1.00 0.65
DPD80 372.58 373.58 1.00 1.81
DPD80 379.58 380.58 1.00 1.85
DPD80 385.58 386.58 1.00 0.72
DPD81 44.30 45.30 1.00 0.79
DPD81 51.30 52.30 1.00 1.14
DPD81 76.62 78.62 2.00 0.72
DPD81 132.00 135.00 3.00 1.64
DPD81 137.00 138.00 1.00 2.36
DPD81 141.00 142.00 1.00 0.97
DPD81 148.00 149.00 1.00 0.53
DPD81 156.40 160.40 4.00 0.99
DPD81 198.52 201.10 2.58 1.03
DPD81 204.10 207.10 3.00 2.69
DPD81 220.80 222.80 2.00 0.61
DPD81 232.80 234.80 2.00 0.66
DPD81 246.80 254.40 7.60 1.02
DPD81 258.40 262.40 4.00 5.87
DPD81 266.52 267.52 1.00 4.82
DPD81 269.52 277.52 8.00 1.63
DPD81 291.52 302.52 11.00 1.16
DPD81 312.52 319.52 7.00 2.38
DPD81 321.52 323.52 2.00 1.80
DPD81 330.52 345.52 15.00 1.37
DPD81 349.52 351.52 2.00 0.82
DPD81 359.52 361.52 2.00 1.27
DPD82 100.00 101.00 1.00 0.54
DPD82 105.00 106.00 1.00 0.68
DPD82 108.00 119.00 11.00 5.99
DPD82 133.00 143.78 10.78 3.01
DPD82 159.78 161.78 2.00 0.60
DPD82 199.78 212.78 13.00 9.40
DPD82 218.78 219.78 1.00 0.66
DPD82 224.78 225.78 1.00 0.64
DPD82 227.78 228.78 1.00 0.58
DPD82 229.78 230.78 1.00 0.96
DPD82 247.78 248.78 1.00 1.45
DPD82 269.78 270.78 1.00 1.81
DPD82 273.78 274.78 1.00 2.16
DPD82 290.78 292.13 1.35 0.50
DPD83 44.73 46.73 2.00 7.56
DPD83 50.73 52.73 2.00 1.39
DPD83 77.73 78.73 1.00 0.66
DPD83 102.00 103.00 1.00 5.29
DPD83 109.00 111.00 2.00 1.72
DPD83 112.00 113.00 1.00 0.77
DPD83 119.00 120.00 1.00 0.58
DPD83 124.00 125.00 1.00 0.56
DPD83 126.00 144.00 18.00 0.97
DPD83 146.00 154.00 8.00 1.31
DPD83 156.00 165.00 9.00 1.37
DPD83 209.00 212.00 3.00 0.84
DPD83 231.00 238.00 7.00 0.92
DPD83 253.00 254.00 1.00 1.39
DPD84 36.90 37.90 1.00 0.52
DPD85 62.19 65.00 2.81 0.82
DPD85 67.00 68.00 1.00 1.77
DPD85 71.00 72.00 1.00 0.51
DPD85 73.00 76.00 3.00 8.92
DPD85 98.73 99.73 1.00 1.01
DPD85 129.94 130.94 1.00 0.74
DPD85 251.33 253.33 2.00 10.21
DPD85 254.95 255.95 1.00 0.50
DPD85 259.95 273.95 14.00 2.07
DPD85 281.95 283.95 2.00 0.89
DPD85 286.95 296.95 10.00 1.99
DPD85 298.95 300.95 2.00 0.58
DPD85 301.95 312.95 11.00 2.03
DPD85 320.95 321.95 1.00 1.90
DPD86 50.84 52.84 2.00 0.62
DPD86 84.00 86.00 2.00 1.11
DPD86 121.13 122.13 1.00 0.62
DPD86 168.00 169.00 1.00 1.90
DPD86 171.00 172.00 1.00 0.59
DPD86 176.00 177.00 1.00 0.80
DPD87 91.39 95.39 4.00 1.00
DPD87 122.31 123.31 1.00 2.99
DPD87 132.31 133.31 1.00 0.51
DPD87 179.75 181.97 2.22 1.20
DPD87 184.66 186.35 1.69 0.54
DPD87 257.93 262.91 4.98 0.67
DPD87 266.09 267.09 1.00 0.52
DPD87 287.84 290.61 2.77 6.28
DPD88 89.80 91.80 2.00 1.52
DPD88 141.23 142.23 1.00 0.53
DPD88 226.30 228.30 2.00 0.94
DPD88 230.30 232.30 2.00 0.58
DPD88 259.30 260.30 1.00 0.56
DPD88 269.30 270.30 1.00 0.61
DPD88 280.30 295.46 15.16 2.97
DPD89 66.43 68.43 2.00 1.37
DPD89 94.13 95.13 1.00 0.54
DPD89 101.13 102.13 1.00 1.70
DPD9 102.56 104.56 2.00 0.69
DPD9 164.56 166.56 2.00 0.52
DPD9 202.56 206.56 4.00 0.57
DPD9 214.56 218.56 4.00 0.66
DPD9 230.56 238.56 8.00 2.36
DPD9 252.56 254.56 2.00 0.61
DPD9 256.56 258.56 2.00 1.00
DPD9 284.56 290.56 6.00 0.93
DPD9 292.56 298.56 6.00 0.84
DPD9 314.56 316.56 2.00 0.66
DPD9 332.56 334.56 2.00 1.05
DPD9 342.56 346.56 4.00 1.48
DPD9 352.56 354.56 2.00 2.51
DPD9 360.56 362.56 2.00 1.71
DPD9 374.56 388.56 14.00 1.65
DPD9 410.56 412.56 2.00 1.60
DPD90 103.95 104.95 1.00 1.96
DPD90 107.95 109.95 2.00 1.87
DPD90 112.95 116.86 3.91 0.63
DPD90 121.52 123.52 2.00 0.59
DPD90 125.52 128.52 3.00 1.29
DPD90 135.58 136.58 1.00 0.51
DPD90 143.54 148.54 5.00 18.62
DPD90 150.54 151.54 1.00 2.57
DPD90 163.00 166.00 3.00 0.85
DPD90 216.75 218.75 2.00 0.66
DPD90 221.75 222.75 1.00 0.55
DPD90 223.75 228.75 5.00 1.29
DPD90 232.75 236.75 4.00 6.21
DPD90 238.75 239.75 1.00 0.58
DPD90 240.75 243.75 3.00 15.29
DPD90 245.75 247.75 2.00 8.23
DPD90 251.47 262.82 11.35 1.22
DPD90 283.04 284.04 1.00 0.81
DPD90 286.04 288.92 2.88 1.95
DPD90 291.55 292.55 1.00 0.89
DPD90 390.86 391.86 1.00 0.59
DPD91 104.13 105.13 1.00 3.91
DPD91 117.00 118.00 1.00 0.96
DPD91 168.26 176.00 7.74 2.10
DPD91 177.45 180.45 3.00 1.08
DPD91 181.45 182.45 1.00 0.53
DPD91 212.50 218.24 5.74 1.49
DPD92 127.53 129.53 2.00 0.80
DPD92 157.53 158.53 1.00 0.55
DPD92 163.53 164.53 1.00 0.62
DPD92 189.53 191.53 2.00 4.45
DPD92 196.53 210.53 14.00 0.89
DPD92 213.53 214.53 1.00 0.71
DPD92 218.12 220.12 2.00 0.58
DPD92 230.86 235.10 4.24 0.97
DPD93 91.10 92.10 1.00 0.56
DPD93 94.84 96.45 1.61 1.39
DPD93 97.75 98.75 1.00 0.57
DPD93 111.75 113.75 2.00 3.49
DPD93 120.39 123.39 3.00 0.88
DPD93 124.65 125.65 1.00 0.79
DPD93 127.65 128.65 1.00 0.50
DPD93 131.65 132.65 1.00 0.55
DPD93 161.84 162.84 1.00 0.68
DPD93 169.84 175.24 5.40 1.51
DPD94 148.16 155.79 7.63 1.59
DPD94 171.42 173.42 2.00 5.19
DPD94 180.42 181.42 1.00 0.55
DPD94 196.42 197.42 1.00 1.48
DPD95 93.45 95.71 2.26 1.67
DPD95 96.15 97.15 1.00 0.57
DPD95 107.13 108.13 1.00 1.73
DPD95 115.39 117.46 2.07 1.40
DPD95 149.27 154.80 5.53 0.85
DPD95 157.84 161.93 4.09 1.41
DPD96 117.86 120.06 2.20 0.71
DPD96 163.00 165.00 2.00 14.71
DPD96 203.51 208.96 5.45 1.98
DPD96 209.96 210.96 1.00 0.51
DPD96 211.96 212.96 1.00 0.54
DPD96 213.63 214.63 1.00 0.58
DPD96 215.63 220.19 4.56 35.71
DPD96 224.34 226.62 2.28 0.60
DPD96 228.62 229.62 1.00 0.52
DPD96 269.47 270.47 1.00 1.72
DPD96 285.82 286.82 1.00 1.46
DPP10 60.00 64.00 4.00 1.19
DPP10 68.00 70.00 2.00 0.63
DPP10 84.00 88.00 4.00 3.14
DPP11 114.00 116.00 2.00 0.60
DPP11 122.00 123.00 1.00 1.41
DPP12 64.00 66.00 2.00 0.51
DPP13 46.00 48.00 2.00 5.19
DPP13 68.00 70.00 2.00 0.76
DPP14 48.00 50.00 2.00 5.59
DPP14 62.00 66.00 4.00 3.22
DPP14 72.00 80.00 8.00 5.60
DPP14 82.00 86.00 4.00 0.78
DPP14 92.00 96.00 4.00 0.86
DPP2 48.00 50.00 2.00 0.63
DPP2 62.00 64.00 2.00 0.64
DPP2 74.00 76.00 2.00 0.86
DPP2 80.00 82.00 2.00 2.31
DPP3 64.00 68.00 4.00 8.54
DPP3 76.00 80.00 4.00 6.30
DPP3 86.00 88.00 2.00 0.65
DPP31 30.00 34.00 4.00 6.72
DPP32 32.00 34.00 2.00 1.77
DPP33 48.00 50.00 2.00 0.75
DPP33 60.00 62.00 2.00 0.56
DPP33 68.00 70.00 2.00 0.54
DPP34 29.00 31.00 2.00 0.55
DPP34 33.00 39.00 6.00 1.14
DPP34 51.00 55.00 4.00 1.83
DPP35 43.00 45.00 2.00 0.57
DPP35 47.00 70.00 23.00 7.61
DPP37 56.00 58.00 2.00 0.77
DPP37 60.00 64.00 4.00 24.82
DPP37 66.00 70.00 4.00 0.65
DPP4 57.00 59.00 2.00 0.59
DPP5 66.00 68.00 2.00 0.50
DPP6 41.00 43.00 2.00 0.62
DPP6 53.00 55.00 2.00 1.27
DPP6 59.00 65.00 6.00 18.30
DPP8 58.00 60.00 2.00 0.73
DPP8 64.00 66.00 2.00 2.52
DPP8 86.00 88.00 2.00 1.14
DPP9 63.00 65.00 2.00 0.58
DPP9 77.00 81.00 4.00 1.01
ST01 60.00 62.00 2.00 0.80
ST07 42.00 44.00 2.00 0.51
ST11 48.00 50.00 2.00 0.72
ST15 44.00 46.00 2.00 7.04
ST19 44.00 46.00 2.00 0.65
ST21 38.00 40.00 2.00 0.63
DPD130 57.00 58.00 1.00 3.00
DPD130 60.00 63.00 3.00 5.15
DPD130 86.00 87.00 1.00 1.95
DPD130 116.00 117.00 1.00 17.72
DPD130 118.00 119.00 1.00 0.65
DPD130 121.00 122.00 1.00 5.28
DPD130 124.00 125.00 1.00 3.93
DPD130 127.00 129.00 2.00 0.62
DPD130 135.00 136.00 1.00 0.57
DPD130 144.00 145.00 1.00 1.14
DPD130 148.00 149.00 1.00 2.18
DPD130 155.00 156.00 1.00 0.53
DPD130 158.00 159.00 1.00 0.75
DPD130 161.00 166.70 5.70 0.99
DPD130 177.00 178.00 1.00 0.83
DPD130 192.00 194.00 2.00 0.78
DPD130 203.00 205.00 2.00 1.18
DPD130 208.00 210.00 2.00 1.27
DPD130 239.00 242.70 3.70 1.98
DPD130 247.00 252.00 5.00 7.74
DPD130 254.00 255.00 1.00 4.62
DPD130 259.00 260.00 1.00 16.48
DPD130 266.00 267.00 1.00 2.11
DPD130 273.00 278.00 5.00 1.39
DPD130 289.00 293.00 4.00 2.76
DPD130 300.00 303.00 3.00 0.79
DPD130 307.00 309.00 2.00 0.82
DPD130 311.00 324.00 13.00 0.90
DPD130 326.00 329.00 3.00 0.72
DPD130 350.00 351.00 1.00 0.50
DPD129 63.00 64.00 1.00 1.30
DPD129 89.00 99.00 10.00 6.61
DPD129 104.86 115.00 10.14 4.87
DPD129 116.00 117.00 1.00 0.75
DPD129 121.00 122.00 1.00 0.66
DPD129 124.00 129.00 5.00 0.78
DPD129 136.00 150.00 14.00 2.28
DPD129 155.00 156.00 1.00 0.58
DPD129 171.00 179.20 8.20 0.70
DPD129 189.00 190.00 1.00 0.53
DPD129 222.00 225.10 3.10 0.93
DPD131 76.00 85.00 9.00 2.74
DPD131 100.00 102.00 2.00 1.18
DPD131 107.00 108.00 1.00 1.10
DPD131 111.00 112.00 1.00 17.88
DPD131 121.00 122.00 1.00 0.75
DPD131 127.00 128.00 1.00 4.48
DPD131 131.00 133.00 2.00 0.81
DPD131 138.00 139.00 1.00 1.63
DPD131 144.00 145.00 1.00 0.79
DPD131 155.00 156.00 1.00 0.55
DPD131 158.00 159.00 1.00 1.15
DPD131 161.00 164.00 3.00 1.41
DPD131 177.00 178.00 1.00 0.86
DPD131 184.00 186.00 2.00 1.99
DPD131 191.00 192.00 1.00 0.56
DPD132 156.00 157.00 1.00 0.69
DPD132 165.00 166.00 1.00 0.62
DPD132 170.00 171.00 1.00 0.66
DPD132 186.00 188.00 2.00 0.81
DPD132 226.00 229.00 3.00 1.01
DPD132 256.00 258.00 2.00 1.57
DPD132 287.00 289.00 2.00 1.69
DPD132 291.00 305.00 14.00 1.15
DPD132 306.00 307.00 1.00 0.63
DPD132 311.00 312.00 1.00 16.95
DPD132 315.00 320.00 5.00 1.76
DPD132 323.00 326.00 3.00 0.65
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
or visit
www.rns.com (http://www.rns.com/)
.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
. END DRLBSBDGDGDDGUD