RNS Number : 5111G  Beowulf Mining PLC  16 November 2022

 

 

The information contained within this announcement is deemed to constitute
inside information as stipulated under the Market Abuse Regulation ("MAR")
(EU) No. 596/2014, as incorporated into UK law by the European Union
(Withdrawal) Act 2018. Upon the publication of this announcement, this inside
information is now considered to be in the public domain.

 

16 November 2022

Beowulf Mining plc

("Beowulf" or "the Company")

Jokkmokk Iron - Progress Update Regarding the Kallak Iron Ore Project

Beowulf (AIM: BEM; Spotlight: BEO), provides a progress update for the Kallak
Iron Ore Project ("Kallak") being developed by the Company's 100 per cent
owned subsidiary Jokkmokk Iron Mines AB ("Jokkmokk Iron").

Highlights:

·   Kallak North Scoping Study is on schedule to be completed this
quarter, Q4 2022.  The Scoping Study includes analysis of options and
trade-offs for different aspects of the project, for delivering on 'Net Zero'
ambitions and developing a sustainable mine.

·    In support of the Scoping Study, the Company has engaged Vulcan
Technologies Pty Ltd ("Vulcan Tech"), an Australian company, to complete a
Marketing Study to consider traditional and non-traditional market
opportunities that might be served by Kallak concentrates. Vulcan Tech
specialises in modelling of iron and steel making processes.

·  Workstreams associated with the Environmental Permit application are
progressing, including updating investigations regarding nature values, water
management and options for transporting Kallak products from mine to market.

·    Consultations regarding reindeer herding have started and broader
information meetings with the public are being planned.

 

Progress Update:

Ulla Sandborgh became CEO of Jokkmokk Iron in June 2022 and, since starting,
she has accelerated the pace of development of the Company's application for
an Environmental Permit for Kallak North, which is on schedule to be submitted
in Q4 2023.

Expert consultants have been contracted to support the Environmental Permit
application, including extensive investigations over the Kallak area, surveys,
sampling and analysis, and the development of a robust understanding of the
nature values and inventory. The Company is focused on meeting, in full, the
requirements of the permit application process, to support an expedited review
and decision, while honouring its commitment to the provisions attached to the
Exploitation Concession, awarded in March 2022, for Kallak North.

The Scoping Study, due to be completed this quarter, will establish the
foundation for moving to pre-feasibility, and thereafter a feasibility study,
in line with Jokkmokk Iron's strategic plan to have a mine in production in
2026; well timed to serve fossil-free steelmakers in the Nordic region.

In recent months, Jokkmokk Iron has participated in several important meetings
with authorities and strategic partners, to ensure a good dialogue and
establish the conditions for collaborations that are critical to delivering
primary raw materials, high-grade iron concentrate, critical to downstream
processes and essential to enabling a Green Transition.

 

Timeline to Production from Kallak:

 

 

Ulla Sandborgh, CEO of Jokkmokk Iron, commented:

 

"There are very many exciting activities taking place at Jokkmokk Iron right
now, with the delivery of the Environmental Permit application our major
focus.

"We see that, thanks to the extensive and detailed application process for the
Exploitation Concession, we have a lot of material that can be used in the
Environmental Permit application, which we are supplementing with further
studies and analyses in the area, being undertaken by consultants who, as
individuals, have worked on the Kallak project over many years and have
significant knowledge and experience. We see that there is a solid foundation
for us to create a plan for sustainable mining, encompassing the mining
lifecycle, from start to finish, to conclusion, restored and rehabilitated.

"In parallel with the Environmental Permit Application and the Scoping Study,
we have been meeting with key stakeholders to discuss areas such as
infrastructure and the possibilities for innovation projects. We see that
innovation is necessary to ensure sustainable mining and we will be evaluating
opportunities to realise our ambitions.

"Additionally, we are making plans for how the Company will honour its
commitment and fully implement the provisions attached to the Exploitation
Concession.  Jokkmokk Iron seeks to become a trusted local partner, and we
believe that by working in partnership with the community in Jokkmokk, the
Kallak project will make a real and positive transformation to the town.

"The real opportunity for Jokkmokk is much greater than simply the investment
and jobs that Kallak brings, it's the opportunity to have a thriving,
diversified and sustainable economy and town, where people can live and work;
a strong and vibrant local community."

 

About Jokkmokk Iron and Kallak

The Kallak deposit is located west of Jokkmokk in the County of Norrbotten.
Kallak was discovered by The Swedish Geological Survey ("SGU") in the 1940s.
The first exploration licence for Kallak was awarded by the Mining
Inspectorate of Sweden in 2006. Drilling was conducted at Kallak North and
South between 2010-2014, a total of 131 holes and 27,895 metres ("m"). An
Exploitation Concession for Kallak North was awarded in March 2022.

At Kallak, the iron mineralisation in the ground, that is to be mined,
contains approximately 28 per cent iron content ("Fe") which, through
enrichment, can be upgraded to a 'market leading' concentrate containing 71.5
per cent Fe. The high-grade concentrate makes Kallak production attractive to
downstream markets, such as fossil-free steelmakers.

It is the Company's ambition for the operation at Kallak to be Sweden's most
sustainable mining operation, where the start of fossil-free steel production
begins with primary raw material from Kallak. Kallak is excellently positioned
as a potential secure and sustainable supplier of high-quality iron
concentrate to Sweden's growing fossil-free steel making sector.

In the Kallak area, 389 million tonnes of iron mineralisation have been
estimated and when it comes to sustainable mining in the north of Sweden,
mines can be powered by renewable electricity, with the goal of being 'Net
Zero' mining operations. Kallak magnetite concentrate would reduce the carbon
footprint of traditional steel manufacturing, improve energy efficiency in any
downstream process and reduce waste; magnetite's inherent energy content,
ultimately results in lower energy demand for steel manufacturing when
compared to current common practice.

The development of Kallak will also bring opportunities for the local
community in Jokkmokk. Investment and the creation of much needed jobs at
Jokkmokk Iron will indirectly create further jobs locally, encouraging the
establishment of new companies and a reversal of the depopulation that has
afflicted Jokkmokk over recent years. This will contribute to a strong and
vibrant Jokkmokk community.

The Kallak deposit is being developed by Jokkmokk Iron, a 100 per cent owned
subsidiary of Beowulf Mining plc. The Jokkmokk Iron CEO is Ulla Sandborgh, who
is a civil engineer and has held senior positions in the private sector as
well as in public administration, in the infrastructure, electricity and water
sectors. Ulla has extensive experience from managing application procedures
and, as part of this, experience in collaborating with various stakeholders
and ensuring that mutual interests and benefits are shared and secured.

 

 

Enquiries:

 Beowulf Mining plc
 Kurt Budge, Chief Executive Officer        Tel: +44 (0) 20 7583 8304
 SP Angel

 (Nominated Adviser & Broker)
 Ewan Leggat / Stuart Gledhill / Adam Cowl  Tel: +44 (0) 20 3470 0470
 BlytheRay
 Tim Blythe / Megan Ray                     Tel: +44 (0) 20 7138 3204

 

Cautionary Statement

Statements and assumptions made in this document with respect to the Company's
current plans, estimates, strategies and beliefs, and other statements that
are not historical facts, are forward-looking statements about the future
performance of Beowulf. Forward-looking statements include, but are not
limited to, those using words such as "may", "might", "seeks", "expects",
"anticipates", "estimates", "believes", "projects", "plans", strategy",
"forecast" and similar expressions. These statements reflect management's
expectations and assumptions in light of currently available information. They
are subject to a number of risks and uncertainties, including, but not limited
to , (i) changes in the economic, regulatory and political environments in the
countries where Beowulf operates; (ii) changes relating to the geological
information available in respect of the various projects undertaken; (iii)
Beowulf's continued ability to secure enough financing to carry on its
operations as a going concern; (iv) the success of its potential joint
ventures and alliances, if any; (v) metal prices, particularly as regards iron
ore. In the light of the many risks and uncertainties surrounding any mineral
project at an early stage of its development, the actual results could differ
materially from those presented and forecast in this document. Beowulf assumes
no unconditional obligation to immediately update any such statements and/or
forecasts.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
 or visit
www.rns.com (http://www.rns.com/)
.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
.   END  UPDFLFSRLTLELIF

Recent news on Beowulf Mining

See all news