Picture of Berkeley Energia logo

BKY — Berkeley Energia News Story

0.000.00%
gb flag iconLast trade - 00:00
Basic MaterialsHighly SpeculativeSmall CapMomentum Trap

Berkeley Energia - Quarterly Report June 2022

For best results when printing this announcement, please click on link below:
http://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20220729:nRSc1822Ua&default-theme=true

RNS Number : 1822U  Berkeley Energia Limited  29 July 2022

BERKELEY ENERGIA LIMITED

 

NEWS RELEASE | 29 July 2022

 

Quarterly Report June 2022

 

Highlights:

 

·     Appointment of Spanish Based Director

The Company strengthened the Board's technical capacity and Spanish operating
experience with the appointment of Mr Francisco Bellón as an Executive
Director.

Mr Bellón is a Mining Engineer with more than 25 years of experience in the
resources sector, including specialisation in mineral processing. During his
career, Mr Bellón has participated in the construction, commissioning and
operation of four mines in Spain, two in South America and two in West Africa,
working at an executive level for Toronto, New York or Madrid Stock Exchange
listed companies, such as Rio Narcea Gold Mines, Lundin Mining, ENDESA and
Duro Felguera.

Mr Bellón who is based in Salamanca, joined Berkeley in 2011 as General
Manager of Operations, and was subsequently promoted to Chief Operating
Officer in 2017. During this period, Mr Bellón has been responsible for the
Company's day-to-day operations in Spain, and has overseen the development of
the Salamanca Project from the Scoping Study stage through to the completion
of the Definitive Feasibility Study and Front End Engineering Design.

Mr Bellón has a Masters Degrees in Mining Engineering and Occupational Health
and Safety, Investor Relations Certification from the Madrid Stock Exchange,
and is Member of the Australasian Institute of Mining and Metallurgy.

·     European Nuclear Power and Global Uranium Market:

The outlook for nuclear power and the uranium market strengthened further
during the quarter, with a number of important recent developments, including:

·      The European Parliament voted to reject objections to the
inclusion of natural gas and nuclear power in its taxonomy plan which had been
subjected to extensive debate since late 2021. A majority of ministers voted
against the effort to block the inclusion of the two fuels/generating
technologies. Reportedly, "the result means the European Commission's
proposals to include certain nuclear and gas activities within the list of
investments that meet the taxonomy requirements, is now due to come into force
from the start of 2023, given that the European Council is not expected to
object to it".

Further, the European Commission released its proposed "REPowerEU Plan" in
response to the Russian invasion of Ukraine. The Plan looks to
reduce/eliminate the European Union's dependency on fossil fuel imports from
Russia.

·      At the Group of Seven ("G7") meeting held in Germany, the
broad-ranging G7 Leader's Communique specifically addressed the Russian
aggression in Ukraine and its effects on global energy. Regarding commercial
nuclear power, the world leaders stated; "Those countries that opt to use it
reaffirm the role of nuclear energy in their energy mix. Those countries
recognise its potential to provide affordable low-carbon energy and contribute
to the security of energy supply as a source of baseload energy and grid
flexibility."

Recognising the global role of Russian-sourced nuclear fuel, the communique
clearly stated; "We will further reduce reliance on civil nuclear and related
goods from Russia, including working to assist countries seeking to diversify
their supplies. We task our relevant Ministers to evaluate the feasibility and
efficiency of these measures urgently."

·      The International Energy Agency ("IEA") released a new report
Nuclear Power and Secure Energy Transitions: From Today's Challenges to
Tomorrow's Clean Energy Systems that highlights nuclear has an essential part
to play in delivering a clean, affordable and secure energy future. According
to the IEA's report, a low-carbon, sustainable, affordable and secure energy
future needs nuclear.

·      Spain's main opposition party, Partido Popular ("PP"), outlined
its economic proposals to deal with the economic and energy crises that the
country is currently experiencing. The actions include the resurrection of
nuclear power in Spain and "extending the useful life of the reactors" in line
with what other European countries are doing. The PP believes that this
technology must play a key role in the ecological transition as a support for
renewable energies, since the opposite would imply greater gas consumption and
therefore greater dependence on countries such as Russia.

Security of supply concerns continued to be raised in Spain given that the
country's existing nuclear power and fuel fabrication facilities import
approximately 39% (2020) of their required uranium from Russia.

·      President Macron cancelled the plan to close 12 reactors by 2035
and requested the state-owned nuclear operator, EDF, to study the feasibility
of prolonging reactor lifespans beyond the statutory 50 years. In addition,
his government supports the construction of six European Pressurised Reactors
by 2050.

·      Belgium's Nuclear Research Centre announced that it will soon
begin working with international partners to evaluate the use case for
advanced reactors in Belgium. The agency said it is now operating with a
Belgian federal government issued €100 million budget, and allocated €25
million per year for four years, to conduct in-depth research into new nuclear
units.

·      A new survey carried out in Finland showed that support for
nuclear power is at record highs across the country. The survey noted that
nuclear power favourability has been measured continually since 1983, and the
latest results have beat all-time highs, as more than 60% of the survey's
respondents have a positive attitude towards nuclear power. 11% of Finns have
a negative stance toward nuclear energy, with 62% of respondents noting that
nuclear power is an important tool for combating climate change.

Finland's Green Party, part of the government coalition, also voted to adopt a
fully pro-nuclear stance. The party manifesto now states that nuclear is
"sustainable energy" and demands the reform of current energy legislation to
streamline the approval process for small modular reactors. It also supports
licence extensions for existing nuclear reactors. Finland's is the first Green
Party to adopt such a position.

·      Swedish MP, Mats Nordberg, emphasized that in order to help
counter the Russian aggression in Ukraine there is a need for "mutual
assistance and unity" and called for the restart of nuclear reactors and
planning for new reactors. Nordberg observed that "The existing reactors,
where possible, should continue to work. We must also continue to plan the
launch of new nuclear reactors to make the European Union more self-sufficient
in the field of energy resources."

·      Germany disclosed that it is reviewing all options at its
disposal to ensure the country's energy supply remains robust amid uncertainty
over Russian gas supply. The Economy Ministry stated in July that Germany may
extend the life of its three remaining nuclear power plants, as public support
increases in the face of growing energy shortages. The three plants - Isar 2,
Emsland and Neckarwestheim 2 - which made up 6% of Germany's power production
in the first quarter of 2022, are scheduled to close at the end of the year.

·      The UK government released its national energy strategy policy
paper outlining that nation's plans for enhanced energy security. Under the
energy policy, nuclear would provide up to 25% of the country's electricity by
2050 from up to 24 GWe of nuclear generating capacity. In order to support its
ambitious commercial nuclear power goals, the UK will establish the Great
British Nuclear Vehicle designed to provide support to nuclear projects
"through every stage of the development process.

·      China announced plans to construct a further six nuclear reactors
as the country pursues its Net Zero goals, with approval given for Sanmen
units 3 and 4, Haiyang 3 and 4, and Lufeng 5 and 6.

·      Japan will have as many as nine nuclear power reactors in
operation this winter, stated Prime Minister Fumio Kishida. With five reactors
currently online, the move will boost combined capacity from nuclear to around
10% of the country's electricity needs. "We want to have ample capacity to
ensure a stable supply of electricity during peak times," Kishida said. "The
national government will take the lead" on restarting these reactors, "making
tenacious efforts to secure the understanding and cooperation of local
governments and other stakeholders."

·      South Korea released its revised energy policy which sets the
goal of maintaining nuclear power's share of total electricity generation at a
minimum of 30% by 2030.

Newly-elected President, Yoon Suk-yeol announced the construction of two
reactors would resume immediately. The Ministry of Trade, Industry and Energy
also commented that in response to the global goals of carbon neutrality and
the Russia-Ukraine conflict which threatens global energy security supply
chains, "it is imperative that new energy policy goals and directions are set
to better accomplish carbon neutral government projects and the expansion of
nuclear power." Included in the energy policy are the goals of exporting 10
nuclear power plants by 2030 as well as the development of a Korean small
modular reactor design.

The Uranium spot price closed at US$49.00 per pound at the end of June 2022,
with the spot market volume increasing to 3.3 million pounds, more than 40% up
from the May total volumes.

Longer-term uranium price indicators continued to rise steadily with a 23.5%
increased year to date.  At the end of June, prices closed at US$50.00 per
pound (Long-Term); US$54.50 per pound (3-year forward price); and US$57.25 per
pound (5-year forward price).

·     Balance Sheet

The Company is in a strong financial position with A$80 million in cash
reserves and no debt.

 

For further information please contact:

 

Robert
Behets
Franciso Bellón

Acting Managing Director
Executive Director

+61 8 9322
6322
+34 923 193 903

info@berkeleyenergia.com (mailto:info@berkeleyenergia.com)

 

Salamanca Project Summary

The Salamanca Project ("Salamanca" or "Project") is being developed in an
historic uranium mining area in Western Spain about three hours west of
Madrid.

The Project hosts a Mineral Resource of 89.3Mlb uranium, with more than two
thirds in the Measured and Indicated category. In 2016, Berkeley published the
results of a robust Definitive Feasibility Study ("DFS") for Salamanca
confirming that the Project will be one of the world's lowest cost producers,
capable of generating strong after-tax cash flows. The DFS was based solely on
Measured and Indicated Resources, with the following key study outputs and
economics:

·      Producing 4.4 million pounds of uranium per annum (steady state
operation)

·      Initial mine life of 14 years

·      Uranium prices based on UxC annual mid-long term base price
projection (US$39.06 per pound (2017) - US$67.69 per pound (2030))

·      Initial capital cost of US$95.7 million

·      Operating costs of US$15.39 per pound

·      Post-tax NPV(8) of US$531.9 million

·      Post-tax IRR of 60%

In 2021, the Company received formal notification from Ministry for Ecological
Transition and the Demographic Challenge ("MITECO") that it had rejected the
Authorisation for Construction for the uranium plant as a radioactive facility
("NSC II") application at Salamanca. This decision followed the unfavourable
NSC II report issued by the Nuclear Safety Council ("NSC") in July 2021.

The Company continues to strongly defend its position in relation to the
adverse resolution by MITECO and has submitted an administrative appeal
against the decision under Spanish law.

In Berkeley's strong opinion, MITECO has rejected the Company's NSC II
application without following a legally established procedure and the Company
believes that MITECO has infringed regulations on administrative procedures in
Spain, as well as Berkeley's right of defence, which would imply that the
decision on the rejection of the Company's NSC II application is not legal.

NSC II is the only key approval required to commence full construction of the
Salamanca mine.

The Salamanca mine is being developed to the highest international standards
and the Company's commitment to health, safety and the environment is a
priority. Berkeley holds certificates in Sustainable Mining (UNE 22470-80) and
Environmental Management (ISO 14001) which were awarded by AENOR, an
independent Spanish government agency.

These management systems ensure that Company procedures are compliant with
current regulations, ensure that the environment is protected, the project is
sustainable, and that all activities are carried out with respect for and in
collaboration with the local communities.

Berkeley's efforts in the key area of Sustainable Mining have been
independently recognised with it being selected as the winner of the
Outstanding Contribution to Sustainable Mining - Europe category in the 2020
Capital Finance International Sustainability Awards.

The Company is in a strong financial position with A$80 million in cash
reserves and no debt.

Project Update:

The Company continued with its commitment to health, safety and the
environment as a priority.

During the June 2022 quarter, the Company measured and reported its
performance against its planned 2021 objectives in the areas of health,
safety, environment and sustainability.

The Sustainability Performance Report is a voluntary transparency initiative
through which the Company openly communicates information regarding its
management systems in the areas of health, safety, environmental protection
and social responsibility, as well as its performance in sustainability, to
all stakeholders.

The Sustainability Performance Report, which provides a detailed overview of
environmental, social and governance ("ESG") activities over the 12-month
period to 31 December 2021, has been distributed to key stakeholders.

A copy of the Sustainable Performance Report can be found on the Company's
website at:  www.berkeleyenergia.com/sustainable-mining/
(http://www.berkeleyenergia.com/sustainable-mining/) .

Berkeley is committed to sustainable development, and accordingly has
implemented Environmental and Sustainable Management Systems to ensure
compliance with performance standards. The UNE 22470-80 standard for
Sustainable Mining Management has established 55 indicators that are certified
annually. Of these 55 indicators, 36 are currently applicable to Berkeley's
Salamanca Project. These are divided into: economic (5), social (19) and
environmental (12) categories.

Highlights from the 2021 performance include:

·      R&D investment by the Company increased by 5%.

·      74% of consumables acquired by the Company were sourced locally
i.e. promoting the socioeconomic development of the province.

·      Investment in environmental protection increased by 55% compared
to previous year

Also noteworthy is the 29% reduction achieved in energy consumption, derived
from fuel and electricity consumption. These energy savings minimise resource
depletion and contribute to a decrease in CO(2) emissions into the atmosphere.
During 2021, The Company reduced CO(2) emissions by ~28% or the equivalent of
eight tonnes of CO(2) emissions to the atmosphere.

The Company continued its strong engagement with key stakeholders at a local,
regional and federal level in Spain during the quarter.

Exploration:

The Company continued with its exploration program focusing on battery and
critical metals in Spain.

The exploration program is targeting lithium, cobalt, tin, tungsten and rare
earths, within the Company's existing tenement package in western Spain.
Further analysis of the mineral and metal endowment across the entire mineral
rich province and other prospective regions in Spain is also being undertaken,
with a view to identifying additional targets and regional consolidation
opportunities.

Whilst Berkeley remains focused on defending its position in relation to the
adverse resolution by MITECO and ultimately advancing the Salamanca project
towards production, the planned battery and critical metals exploration
initiative also facilitates the Company's participation in these important,
rapidly evolving, growth sectors which are integral to the global clean energy
transition.

Investigation Permit Conchas

The Investigation Permit ("I.P.") Conchas is located ~10km south of Berkeley's
Alameda deposit, in the very western part of Salamanca province, close to the
Portuguese border.

The tenement covers an area of ~31km(2) in the western part of the Ciudad
Rodrigo Basin and is largely covered by Cenozoic aged sediments. Only the
north-western part of the tenement is uncovered and dominated by the Guarda
Batholith (Vilar Formoso-Fuentes de Oñoro sector) intrusion. The tenement
hosts a number of sites where small-scale historical tin and tungsten mining
was undertaken. In addition, several mineral occurrences (tin, tungsten,
titanium, lithium) have been identified during historical mapping or stream
sediment sampling programs.

The Company completed initial soil sampling programs in northern and central
portions of the tenement during 2021. The sampling, which was undertaken on a
200m by 200m grid, defined a tin-lithium anomaly covering approximately 1.1km
by 0.7km which correlated with a mapped aplo-pegmatitic leucogranite.

During the quarter, an infill and extension soil sampling program was
undertaken to follow-up the 2021 results. A total of 116 samples was collected
to close the grid down to a 100m by 100m spacing over the previous defined
anomaly, and extend the coverage to the east on a 200m by 200m grid. The
samples were subsequently prepared and sent to ALS Seville for analysis.

The results of the infill soil sampling program have confirmed the spatial
location, scale and tenor of the tin-lithium anomaly defined in 2021 but
failed to extend the anomalism to the east (Figure 2).

The Company has also recently obtained a report summarising exploration work
undertaken by Billiton PLC on the I.P. Conchas between 1981 and 1983.
Billiton's exploration was focused on tin and tantalum and comprised regional
and detailed geological mapping, geochemistry, trenching and limited drilling.

The results of Berkeley's recent soil sampling program are encouraging and the
Company is currently verifying, evaluating and incorporating the additional
historical information contained in the Billiton report, with a view to
planning the next phase of exploration activity to assess the tin-lithium
anomaly.

Corporate

Settlement of OIA Claim:

During the quarter, Berkeley announced that the OIA Claim brought against the
Company in relation to the investment agreement and convertible note had been
settled with the parties agreeing to discontinue legal proceedings in the
Supreme Court of Western Australia.

Appointment of Spanish Based Director:

During the quarter, the Company announced the appointment of Mr Francisco
Bellón as an Executive Director of the Company effective 1 July 2022.

Mr Bellón who is based in Salamanca, joined Berkeley in 2011 as General
Manager of Operations, and was subsequently promoted to Chief Operating
Officer in 2017. During this period, Mr Bellón has been responsible for the
Company's day-to-day operations in Spain, and has overseen the development of
the Salamanca Project from the Scoping Study stage through to the completion
of the Definitive Feasibility Study and Front End Engineering Design. He has
also been a Director of the Company's Spanish subsidiaries since 2011.

The appointment of Mr Bellón will substantially strengthen the Board's
technical capacity and Spanish operating experience as the Company continues
to focus on resolving the current permitting situation, and ultimately
advancing the Salamanca project towards production.

Additional Information on the European Nuclear Power and Global Uranium
Market:

The outlook for nuclear power and the uranium market strengthened further
during the quarter, with a number of important recent developments, including:

·      The European Parliament voted to reject objections to the
inclusion of natural gas and nuclear power in its taxonomy plan which had been
subjected to extensive debate since late 2021. A majority (353) of MEPs voted
against the effort to block the inclusion of the two fuels/generating
technologies while 278 MEPs voted in favour of the measure. Reportedly, "the
result means the European Commission's proposals to include certain nuclear
and gas activities within the list of investments that meet the taxonomy
requirements, is now due to come into force from the start of 2023, given that
the European Council is not expected to object to it".

Further, in May 2022, the European Commission released its proposed "REPowerEU
Plan" in response to the Russian invasion of Ukraine. The Plan looks to
reduce/eliminate the European Union's dependency on fossil fuel imports from
Russia.

·      At the conclusion of the G7 meeting held in Germany during the
quarter, the broad-ranging G7 Leader's Communique specifically addressed the
Russian aggression in Ukraine and its effects on global energy. The communique
stated; "We reaffirm our commitment to phase out our dependency on Russian
energy" and furthermore, "we will explore further measures to prevent Russia
from profiting from its war of aggression." Regarding commercial nuclear
power, the world leaders stated; "Those countries that opt to use it reaffirm
the role of nuclear energy in their energy mix. Those countries recognise its
potential to provide affordable low-carbon energy and contribute to the
security of energy supply as a source of baseload energy and grid
flexibility."

Recognising the global role of Russian-sourced nuclear fuel, the communique
clearly stated; "We will further reduce reliance on civil nuclear and related
goods from Russia, including working to assist countries seeking to diversify
their supplies. We task our relevant Ministers to evaluate the feasibility and
efficiency of these measures urgently."

·      The International Energy Agency ("IEA") released a new report
Nuclear Power and Secure Energy Transitions: From Today's Challenges to
Tomorrow's Clean Energy Systems that looks at how nuclear energy could help
address two major crises - energy and climate - facing the world today. The
report highlights that nuclear has an essential part to play in delivering a
clean, affordable and secure energy future. According to the IEA's report, a
low-carbon, sustainable, affordable and secure energy future needs nuclear.

·      Spain's main opposition party, Partido Popular ("PP"), outlined
its economic proposals to deal with the economic and energy crises that the
country is currently experiencing. The actions include the resurrection of
nuclear power in Spain and "extending the useful life of the reactors" in line
with what other European countries are doing. The PP believes that this
technology must play a key role in the ecological transition as a support for
renewable energies, since the opposite would imply greater gas consumption and
therefore greater dependence on countries such as Russia.

Security of supply concerns continued to be raised in Spain given that the
country's existing nuclear power and fuel fabrication facilities import
approximately 39% (2020) of their required uranium from Russia.

·      After winning a second term in office during national elections,
President Macron cancelled the plan to close 12 reactors by 2035 and requested
the state-owned nuclear operator, EDF, to study the feasibility of prolonging
reactor lifespans beyond the statutory 50 years. In addition, his government
supports the construction of six European Pressurized Reactors by 2050.

·      Belgium's Nuclear Research Centre (SCK CEN) announced in May that
it will soon begin working with international partners to evaluate the use
case for advanced reactors in Belgium. The agency said it is now operating
with a Belgian federal government issued €100 million budget, and allocated
€25 million per year for four years, to conduct in-depth research into new
nuclear units.

·      A new survey carried out in Finland during the quarter shows that
support for nuclear power is at record highs across the country. The survey
noted that nuclear power favourability has been measured continually since
1983, and the latest results have beat all-time highs, as more than 60% of the
survey's respondents have a positive attitude towards nuclear power. 11% of
Finns have a negative stance toward nuclear energy, with 62% of respondents
noting that nuclear power is an important tool for combating climate change.

Finland's Green Party, part of the government coalition, voted to adopt a
fully pro-nuclear stance at its annual conference in May. The party manifesto
now states that nuclear is "sustainable energy" and demands the reform of
current energy legislation to streamline the approval process for small
modular reactors. It also supports licence extensions for existing nuclear
reactors. Finland's is the first Green Party to adopt such a position.

·      In his comments before a conference held in the Guildhall-London
in June, Swedish MP, Mats Nordberg, emphasized that in order to help counter
the Russian aggression in Ukraine there is a need for "mutual assistance and
unity" and called for the restart of nuclear reactors and planning for new
reactors.

Nordberg observed that "The existing reactors, where possible, should continue
to work. We must also continue to plan the launch of new nuclear reactors to
make the European Union more self-sufficient in the field of energy
resources."

·      Germany disclosed that it is reviewing all options at its
disposal to ensure the country's energy supply remains robust amid uncertainty
over Russian gas supply. The Economy Ministry stated in July that Germany may
extend the life of its three remaining nuclear power plants, as public support
increases in the face of growing energy shortages. The three plants - Isar 2,
Emsland and Neckarwestheim 2 - which made up 6% of Germany's power production
in the first quarter of 2022, are scheduled to close at the end of the year.

·      The UK government released its national energy strategy policy
paper during the quarter outlining that nation's plans for enhanced energy
security. Under the energy policy, nuclear would provide up to 25% of the
country's electricity by 2050 from up to 24 GWe of nuclear generating
capacity. In order to support its ambitious commercial nuclear power goals,
the UK will establish the Great British Nuclear Vehicle designed to provide
support to nuclear projects "through every stage of the development process.

·      China announced plans to construct a further six nuclear reactors
as the country pursues its Net Zero goals. During an executive meeting of the
State Council, approval was given for Sanmen units 3 and 4, Haiyang 3 and 4,
and Lufeng 5 and 6.

·      Japan will have as many as nine nuclear power reactors in
operation this winter, stated Prime Minister Fumio Kishida. With five reactors
currently online, the move will boost combined capacity from nuclear to around
10% of the country's electricity needs. "We want to have ample capacity to
ensure a stable supply of electricity during peak times," Kishida said. "The
national government will take the lead" on restarting these reactors, "making
tenacious efforts to secure the understanding and cooperation of local
governments and other stakeholders."

·      South Korea released its revised energy policy which sets the
goal of maintaining nuclear power's share of total electricity generation at a
minimum of 30% by 2030

Newly-elected President, Yoon Suk-yeol announced the construction of two
reactors would resume immediately. In its statement before the 30th State
Council meeting, the Ministry of Trade, Industry and Energy commented that in
response to the global goals of carbon neutrality and the Russia-Ukraine
conflict which threatens global energy security supply chains, "it is
imperative that new energy policy goals and directions are set to better
accomplish carbon neutral government projects and the expansion of nuclear
power."

Included in the energy policy are the goals of exporting 10 nuclear power
plants by 2030 as well as the development of a Korean small modular reactor
design.

Forward Looking Statements

Statements regarding plans with respect to Berkeley's mineral properties are
forward-looking statements. There can be no assurance that Berkeley's plans
for development of its mineral properties will proceed as currently expected.
There can also be no assurance that Berkeley will be able to confirm the
presence of additional mineral deposits, that any mineralisation will prove to
be economic or that a mine will successfully be developed on any of Berkeley
mineral properties. These forward-looking statements are based on Berkeley's
expectations and beliefs concerning future events.  Forward looking
statements are necessarily subject to risks, uncertainties and other factors,
many of which are outside the control of Berkeley, which could cause actual
results to differ materially from such statements. Berkeley makes no
undertaking to subsequently update or revise the forward-looking statements
made in this announcement, to reflect the circumstances or events after the
date of that announcement.

Competent Persons Statement

The information in this report that relates to Exploration Results is based
on, and fairly represents, information compiled by Mr Enrique Martínez, a
Competent Person who is a Member of the Australasian Institute of Mining and
Metallurgy. Mr Martínez is Berkeley's Geology Manager and a holder of shares
and options in Berkeley. Mr Martínez has sufficient experience which is
relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the 'Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr
Martínez consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears

The information in this report that relates to the DFS, Mineral Resources, Ore
Reserve Estimates, Mining, Uranium Preparation, Infrastructure, Production
Targets and Cost Estimation is extracted from the announcement entitled 'Study
confirms the Salamanca project as one of the world's lowest cost uranium
producers' dated 14 July 2016, which is available to view on Berkeley's
website at www.berkeleyenergia.com.

Berkeley confirms that: a) it is not aware of any new information or data that
materially affects the information included in the original announcement; b)
all material assumptions and technical parameters underpinning the Mineral
Resources, Ore Reserve Estimate, Production Target, and related forecast
financial information derived from the Production Target included in the
original announcement continue to apply and have not materially changed; and
c) the form and context in which the relevant Competent Persons' findings are
presented in this announcement have not been materially modified from the
original announcements.

To view this announcement in full, including all figures and illustrations,
please refer to www.berkeleyenergia.com (http://www.berkeleyenergia.com) .

Appendix 1: Mineral Resource at Salamanca

 Deposit                      Resource Category  Tonnes  U(3)O(8)  U(3)O(8)

 Name                                            (Mt)    (ppm)     (Mlbs)
 Retortillo                   Measured           4.1     498       4.5
                              Indicated          11.3    395       9.8
                              Inferred           0.2     368       0.2
                              Total              15.6    422       14.5
 Zona 7                       Measured           5.2     674       7.8

                              Indicated          10.5    761       17.6
                              Inferred           6.0     364       4.8
                              Total              21.7    631       30.2
 Alameda                      Indicated          20.0    455       20.1
                              Inferred           0.7     657       1.0
                              Total              20.7    462       21.1
 Las Carbas                   Inferred           0.6     443       0.6
 Cristina                     Inferred           0.8     460       0.8
 Caridad                      Inferred           0.4     382       0.4
 Villares                     Inferred           0.7     672       1.1
 Villares North               Inferred           0.3     388       0.2
 Total Retortillo Satellites  Total              2.8     492       3.0
 Villar                       Inferred           5.0     446       4.9
 Alameda Nth Zone 2           Inferred           1.2     472       1.3
 Alameda Nth Zone 19          Inferred           1.1     492       1.2
 Alameda Nth Zone 21          Inferred           1.8     531       2.1
 Total Alameda Satellites     Total              9.1     472       9.5
 Gambuta                      Inferred           12.7    394       11.1
 Salamanca Project Total      Measured           9.3     597       12.3
                              Indicated          41.8    516       47.5
                              Inferred           31.5    395       29.6
                              Total (*)          82.6    514       89.3

 

Appendix 2: Summary of Mining Tenements

As at 30 June 2022, the Company had an interest in the following tenements:

 

 Location   Tenement Name                 Percentage Interest  Status
 Spain
 Salamanca  D.S.R Salamanca 28 (Alameda)  100%                 Granted
            D.S.R Salamanca 29 (Villar)   100%                 Granted
            E.C. Retortillo-Santidad      100%                 Granted
            E.C. Lucero                   100%                 Pending
            I.P. Abedules                 100%                 Granted
            I.P. Abetos                   100%                 Granted
            I.P. Alcornoques              100%                 Granted
            I.P. Alisos                   100%                 Granted
            I.P. Bardal                   100%                 Granted
            I.P. Barquilla                100%                 Granted
            I.P. Berzosa                  100%                 Granted
            I.P. Campillo                 100%                 Granted
            I.P. Castaños 2               100%                 Granted
            I.P. Ciervo                   100%                 Granted
            I.P. Conchas                  100%                 Granted
            I.P. Dehesa                   100%                 Granted
            I.P. El Águila                100%                 Granted
            I.P. El Vaqueril              100%                 Granted
            I.P. Espinera                 100%                 Granted
            I.P. Horcajada                100%                 Granted
            I.P. Lis                      100%                 Granted
            I.P. Mailleras                100%                 Granted
            I.P. Mimbre                   100%                 Granted
            I.P. Pedreras                 100%                 Granted
            E.P. Herradura*               100%                 Granted
 Cáceres    I.P. Almendro                 100%                 Granted
            I.P. Ibor                     100%                 Granted
            I.P. Olmos                    100%                 Granted

*An application for a 1-year extension at E.P. Herradura was previously
rejected however this decision has been appealed and the Company awaits the
decision regarding its appeal.

 

Appendix 3: Related Party Payments

During the quarter ended 30 June 2022, the Company made payments of $130,000
to related parties and their associates. These payments relate to existing
remuneration arrangements (director and consulting fees plus statutory
superannuation).

Appendix 4: Exploration and Mining Expenditure

 

During the quarter ended 30 June 2022, the Company made the following payments
in relation to exploration and development activities:

 

 Activity                                                   $000
 Radiological protection and monitoring                     (9)
 Permitting related expenditure (including legal expenses)  (266)
 Consultants and other expenditure                          (196)
 Return of VAT in Spain                                     32
 Total as reported in the Appendix 5B                       (439)

 

There were no mining or production activities and expenses incurred during the
quarter ended 30 June 2022.

 

Appendix 5: Summary of Soil Sampling Results - I.P. Conchas

 

 Sample ID  Easting (m)  Northing (m)  Li (ppm)  Sn (ppm)  Nb (ppm)  Ta (ppm)
 49277      683,494      4,494,099     38        90        9.9       1.8
 49278      683,704      4,494,104     32        14        6.7       1.3
 49279      683,904      4,494,102     60        35        9.3       1.8
 49280      684,116      4,494,094     82        14        8.7       1.4
 49281      684,302      4,494,099     77        60        13.0      1.8
 49282      684,499      4,494,099     49        300       15.2      4.3
 49283      684,701      4,494,099     95        125       17.3      7.0
 49284      685,098      4,494,093     95        29        12.3      1.9
 49285      683,504      4,493,899     86        23        14.0      2.3
 49286      683,504      4,493,899     89        20        14.6      2.2
 49287      683,730      4,493,925     91        34        14.4      2.3
 49288      683,902      4,493,897     73        71        13.6      2.6
 49289      684,102      4,493,897     86        50        14.4      1.8
 49290      684,298      4,493,899     57        29        14.6      2.2
 49291      684,501      4,493,899     105       151       21.3      8.7
 49292      684,706      4,493,901     78        27        12.6      2.3
 49293      684,900      4,493,901     119       32        15.0      3.1
 49294      685,097      4,493,900     98        42        13.2      2.9
 49295      683,498      4,493,698     41        31        9.8       1.8
 49296      683,697      4,493,705     40        23        13.4      2.2
 49297      683,898      4,493,701     77        17        16.0      2.3
 49298      684,098      4,493,701     58        21        10.2      1.5
 49299      684,297      4,493,704     119       45        15.4      2.2
 49300      684,297      4,493,704     125       46        15.5      2.2
 49301      684,502      4,493,697     88        79        13.9      2.2
 49302      684,700      4,493,704     76        80        11.4      2.0
 49303      684,898      4,493,703     69        37        9.9       1.6
 49304      684,898      4,493,703     81        75        13.2      2.2
 49305      685,097      4,493,700     70        35        12.7      2.2
 49306      683,496      4,493,498     52        35        10.8      1.9
 49307      683,496      4,493,498     53        45        12.4      2.2
 49308      683,704      4,493,499     43        28        10.9      1.8
 49309      683,898      4,493,499     83        245       15.5      4.2
 49310      684,099      4,493,499     59        29        9.2       1.4
 49311      684,299      4,493,499     58        34        9.0       4.7
 49312      684,499      4,493,499     45        24        10.1      4.3
 49313      684,701      4,493,499     55        34        14.0      6.2
 49314      683,701      4,493,297     37        22        10.2      5.9
 49315      683,898      4,493,299     40        23        12.1      9.8
 49316      684,089      4,493,302     42        65        10.1      5.2
 49317      684,299      4,493,300     38        43        10.2      5.0
 49318      684,507      4,493,302     55        217       17.6      8.8
 Sample ID  Easting (m)  Northing (m)  Li (ppm)  Sn (ppm)  Nb (ppm)  Ta (ppm)
 49319      684,705      4,493,304     37        70        4.7       1.5
 49320      684,901      4,493,303     53        208       12.4      3.8
 49321      685,099      4,493,297     108       28        11.7      1.6
 49322      683,899      4,493,098     47        64        17.6      10.5
 49323      684,099      4,493,104     44        43        9.2       6.3
 49324      684,295      4,493,099     49        21        9.8       7.5
 49325      684,504      4,493,100     48        91        13.0      8.5
 49326      684,700      4,493,101     240       729       25.5      21.1
 49327      684,897      4,493,095     70        428       19.6      13.1
 49328      685,101      4,493,099     81        93        18.0      10.2
 49329      683,898      4,492,901     43        37        12.2      2.2
 49330      684,101      4,492,901     630       622       49.6      41.7
 49331      684,304      4,492,904     580       353       36.9      23.5
 49332      684,500      4,492,902     400       473       40.3      25.5
 49333      684,702      4,492,902     219       128       39.5      25.8
 49334      684,901      4,492,900     108       49        14.7      2.8
 49335      685,094      4,492,898     45        111       10.5      2.9
 49336      683,901      4,492,702     41        40        10.6      1.9
 49337      684,099      4,492,700     39        24        7.7       1.6
 49338      684,296      4,492,700     53        58        12.2      2.9
 49339      684,296      4,492,700     54        63        11.6      2.8
 49340      684,501      4,492,700     96        155       13.9      9.0
 49341      684,701      4,492,700     121       177       23.0      11.3
 49342      684,901      4,492,703     110       104       14.6      3.6
 49343      685,097      4,492,700     34        56        13.5      2.9
 49344      684,101      4,492,497     35        72        10.2      2.2
 49345      684,301      4,492,501     450       251       28.6      18.0
 49346      684,497      4,492,496     171       198       21.2      10.5
 49347      684,696      4,492,501     72        261       17.4      7.7
 49348      684,902      4,492,504     98        81        18.4      5.8
 49349      685,097      4,492,502     35        102       13.5      2.6
 49350      684,112      4,492,296     65        128       12.7      3.5
 49351      684,304      4,492,300     76        76        10.7      4.2
 49352      684,304      4,492,300     86        68        11.2      4.2
 49353      684,494      4,492,298     128       196       18.2      9.7
 49354      684,494      4,492,298     151       256       22.5      13.3
 49355      684,700      4,492,298     139       209       24.6      7.5
 49356      684,903      4,492,301     26        85        11.6      2.7
 49357      685,101      4,492,297     34        54        16.0      3.5
 49358      684,301      4,492,100     980       1200      92.6      83.3
 49359      684,501      4,492,106     270       219       24.3      10.6
 49360      684,701      4,492,097     52        76        12.3      4.0
 49361      684,891      4,492,102     30        56        11.8      3.2
 Sample ID  Easting (m)  Northing (m)  Li (ppm)  Sn (ppm)  Nb (ppm)  Ta (ppm)
 49362      685,101      4,492,104     21        42        13.0      2.5
 49363      684,714      4,491,904     53        18        12.3      1.7
 49364      684,899      4,491,905     17        20        11.2      2.0
 49365      685,100      4,491,898     48        231       27.7      43.0
 49366      685,201      4,493,389     95        37        14.8      2.3
 49367      685,199      4,493,203     116       48        17.4      2.5
 49368      685,396      4,493,199     52        50        12.7      2.4
 49369      685,598      4,493,199     41        170       17.4      4.3
 49370      685,202      4,493,003     48        84        8.3       2.1
 49371      685,399      4,493,001     42        65        13.3      2.3
 49372      685,595      4,492,998     47        95        16.2      3.6
 49373      685,205      4,492,798     41        34        12.8      2.1
 49374      685,205      4,492,798     44        105       14.3      3.3
 49375      685,397      4,492,800     42        70        14.3      3.1
 49376      685,600      4,492,797     42        107       15.2      3.2
 49377      685,203      4,492,604     34        32        12.2      2.3
 49378      685,402      4,492,601     38        42        14.2      2.4
 49379      685,602      4,492,599     37        66        14.0      3.4
 49380      685,199      4,492,403     33        72        14.0      3.1
 49381      685,402      4,492,399     34        96        16.0      4.5
 49382      685,601      4,492,404     42        162       16.6      3.3
 49383      685,201      4,492,200     25        29        10.8      2.7
 49384      685,400      4,492,202     51        554       27.6      11.0
 49385      685,595      4,492,198     32        106       14.5      5.2
 49386      685,197      4,491,996     45        146       17.9      4.8
 49387      685,368      4,491,956     37        87        13.8      3.1
 49388      685,596      4,491,997     33        85        15.4      3.7
 49389      685,596      4,491,997     33        108       12.7      2.8
 49390      685,196      4,491,798     36        54        17.6      3.6
 49391      685,398      4,491,798     33        85        16.2      3.5
 49392      685,597      4,491,799     25        50        11.2      2.6

 

Appendix 6:  JORC Code, 2012 Edition - Table 1 Report

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

 Criteria                                                 JORC Code explanation                                                            Commentary
 Sampling techniques                                      Nature and quality of sampling (eg cut channels, random chips, or specific       The I.P. Conchas sampling includes 116 soil and QA/QC samples. Soil samples
                                                          specialised industry standard measurement tools appropriate to the minerals      are collected over igneous rocks of the Guarda Batholith (Vilar
                                                          under investigation, such as down hole gamma sondes, or handheld XRF             Formoso-Fuentes de Oñoro sector) at the grass root zone, between 15cm and
                                                          instruments, etc). These examples should not be taken as limiting the broad      20cm depth. One sample is collected at each location.
                                                          meaning of sampling.
                                                          Include reference to measures taken to ensure sample representivity and the      Field duplicate samples are inserted to assess the variability of the
                                                          appropriate calibration of any measurement tools or systems used.                mineralisation. Approximately 10% of all samples relate to quality control. In
                                                                                                                                           addition, the laboratories undertake their own duplicate sampling as part of
                                                                                                                                           their internal QA/QC processes. Examination of the QA/QC sample data indicates
                                                                                                                                           satisfactory performance of field sampling protocols and assay laboratories
                                                                                                                                           providing acceptable levels of precision and accuracy.

                                                          Aspects of the determination of mineralisation that are Material to the Public   Soil samples are collected between 15cm and 20cm depth using a small shovel.
                                                          Report. In cases where 'industry standard' work has been done this would be      The average weight per sample is approximately 0.5kg. One sample is collected
                                                          relatively simple (eg 'reverse circulation drilling was used to obtain 1 m       at each location.
                                                          samples from which 3 kg was pulverised to produce a 30 g charge for fire
                                                          assay'). In other cases more explanation may be required, such as where there
                                                          is coarse gold that has inherent sampling problems. Unusual commodities or
                                                          mineralisation types (eg submarine nodules) may warrant disclosure of detailed
                                                          information.
 Drilling techniques                                      Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,    No drilling completed.
                                                          auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
                                                          tube, depth of diamond tails, face-sampling bit or other type, whether core is
                                                          oriented and if so, by what method, etc).
 Drill sample recovery                                    Method of recording and assessing core and chip sample recoveries and results    No drilling completed.
                                                          assessed.

                                                          Measures taken to maximise sample recovery and ensure representative nature of   No drilling completed.
                                                          the samples.
                                                          Whether a relationship exists between sample recovery and grade and whether      No drilling completed.
                                                          sample bias may have occurred due to preferential loss/gain of fine/coarse
                                                          material.
 Logging                                                  Whether core and chip samples have been geologically and geotechnically logged   No drilling completed.
                                                          to a level of detail to support appropriate Mineral Resource estimation,
                                                          mining studies and metallurgical studies.
                                                          Whether logging is qualitative or quantitative in nature. Core (or costean,      A short field description of each soil sample was collected, including colour
                                                          channel, etc) photography.                                                       and regolith.
                                                          The total length and percentage of the relevant intersections logged.            No drilling completed.
 Sub-sampling techniques                                  If core, whether cut or sawn and whether quarter, half or all core taken.        No drilling completed.

 and sample preparation                                   If non-core, whether riffled, tube sampled, rotary split, etc and whether        Soil samples sieved and collected dry to slightly moist. Samples are allowed
                                                          sampled wet or dry.                                                              to air dry before being sent to the laboratory.
                                                          For all sample types, the nature, quality and appropriateness of the sample      Samples are sent to ALS laboratory for preparation. Samples are pulverised
                                                          preparation technique.                                                           with at least 85% of the sample passing 75µm. 0.2g of sample is used for
                                                                                                                                           analysis by ICP method. This is considered appropriate for this style of
                                                                                                                                           mineralisation.
                                                          Quality control procedures adopted for all sub-sampling stages to maximise       The laboratory reports results for internal standards, duplicates, prep
                                                          representivity of samples.                                                       duplicates and blanks.
                                                          Measures taken to ensure that the sampling is representative of the in situ      Field duplicates are inserted into sample batches at a frequency of
                                                          material collected, including for instance results for field                     approximately 10%.
                                                          duplicate/second-half sampling.
                                                          Whether sample sizes are appropriate to the grain size of the material being     The sample weights average 0.4kg, this is considered appropriate for the
                                                          sampled.                                                                         material being sampled.
 Quality of assay data and laboratory tests               The nature, quality and appropriateness of the assaying and laboratory           Analysis is by ALS Method ME-MS89LTM, which uses a sodium peroxide fusion with
                                                          procedures used and whether the technique is considered partial or total.        ICP finish. The method is considered a total technique with 53 elements
                                                                                                                                           reported.
                                                          For geophysical tools, spectrometers, handheld XRF instruments, etc, the         No geophysical surveys conducted.
                                                          parameters used in determining the analysis including instrument make and
                                                          model, reading times, calibrations factors applied and their derivation, etc.
                                                          Nature of quality control procedures adopted (eg standards, blanks,              Field duplicates are regularly inserted into the sample stream with
                                                          duplicates, external laboratory checks) and whether acceptable levels of         approximately 10% of all samples related to quality control. The external
                                                          accuracy (ie lack of bias) and precision have been established.                  laboratories used also maintain their own process of QA/QC utilising
                                                                                                                                           standards, pulp repeats, sample duplicates and blanks.

                                                                                                                                           Review of Berkeley's quality control samples, as well as the external
                                                                                                                                           laboratory quality QA/QC reports, has shown no sample preparation issues,
                                                                                                                                           acceptable levels of accuracy and precision and no bias in the analytical
                                                                                                                                           datasets.
 Verification of sampling and assaying                    The verification of significant intersections by either independent or           No drilling completed.
                                                          alternative company personnel.

                                                          The use of twinned holes.                                                        No drilling completed.
                                                          Documentation of primary data, data entry procedures, data verification, data    All primary data is recorded in templates designed by Berkeley. Assay data
                                                          storage (physical and electronic) protocols.                                     from the external laboratory is received in spreadsheets and downloaded
                                                                                                                                           directly into the spreadsheet. Data is entered into controlled excel templates
                                                                                                                                           for validation.

                                                                                                                                           GPS locations are downloaded directly to a GIS platform and then copy and
                                                                                                                                           paste in the master spreadsheet.
                                                          Discuss any adjustment to assay data.                                            None applied.
 Location of data points                                  Accuracy and quality of surveys used to locate drill holes (collar and           Soil sample locations were collected using a handheld GPS unit which has an
                                                          down-hole surveys), trenches, mine workings and other locations used in          accuracy of approximately +/- 5m.
                                                          Mineral Resource estimation.
                                                          Specification of the grid system used.                                           The grid system is ETRS 1989 UTM Zone 29N.
                                                          Quality and adequacy of topographic control.                                     Topographic control is based on a digital terrain model with sub metric
                                                                                                                                           accuracy sourced from the Spanish Geographical Institute (Instituto
                                                                                                                                           Geográfico Nacional).
 Data spacing and distribution                            Data spacing for reporting of Exploration Results.                               I.P. Conchas soil samples collected on approximately 200 x 200m grid.

                                                          Whether the data spacing and distribution is sufficient to establish the         Existing data not applicable to estimate mineral resources.
                                                          degree of geological and grade continuity appropriate for the Mineral Resource
                                                          and Ore Reserve estimation procedure(s) and classifications applied.
                                                          Whether sample compositing has been applied.                                     No compositing applied.
 Orientation of data in relation to geological structure  Whether the orientation of sampling achieves unbiased sampling of possible       Shallow parts of the deposit show that the mineralised zone is rounded without
                                                          structures and the extent to which this is known, considering the deposit        preferred direction. Grid sampling is oriented NS-EW.
                                                          type.
                                                          If the relationship between the drilling orientation and the orientation of      No drilling completed.
                                                          key mineralised structures is considered to have introduced a sampling bias,
                                                          this should be assessed and reported if material.
 Sample security                                          The measures taken to ensure sample security.                                    Chain of custody is managed by Berkeley. Samples are transported from the
                                                                                                                                           sample site by Company vehicle to a sample preparation shed where samples are
                                                                                                                                           prepared for dispatch. Samples are sent directly from the sample preparation
                                                                                                                                           shed to the laboratory using a certified courier. Sample submission forms are
                                                                                                                                           sent in paper form with the samples as well as electronically to the
                                                                                                                                           laboratory. Reconciliation of samples occurs prior to commencement of sample
                                                                                                                                           preparation for assaying.
 Audits or reviews                                        The results of any audits or reviews of sampling techniques and data.            None completed.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

 Criteria                           JORC Code explanation                                                                                               Commentary
 Mineral tenement and land tenure status                               Type, reference name/number, location and ownership including agreements or      The Conchas Prospect lies on the Investigation Permit Conchas, PI 6,930, which
                                                                       material issues with third parties such as joint ventures, partnerships,         is 100% owned by Berkeley Minera España S.L., a wholly owned subsidiary of
                                                                       overriding royalties, native title interests, historical sites, wilderness or    Berkeley Energia Limited.
                                                                       national park and environmental settings.

                                                                                                                                                        The I.P. Conchas is currently in the second year of its third three-year term,
                                                                                                                                                        and will expire on 22 October 2023.

                                                                                                                                                        No historical sites, wilderness or national parks are located within the
                                                                                                                                                        Permit. The Conchas Prospect is located adjacent to the Spain-Portugal
                                                                                                                                                        boundary and to the village of Fuentes de Oñoro.
                                                                       The security of the tenure held at the time of reporting along with any known    Tenure in the form of an Investigation Permit has been granted and is
                                                                       impediments to obtaining a licence to operate in the area.                       considered secure. There are no known impediments to obtaining a licence to
                                                                                                                                                        operate in this area.
 Exploration done by other parties                                     Acknowledgment and appraisal of exploration by other parties.                    Previous exploration at Conchas was completed initially by Billiton PLC, for
                                                                                                                                                        tin and tantalum, between 1981 to 1983. Work completed by Billiton included
                                                                                                                                                        mapping, pit sampling, trenching and drilling.

 Geology                                                               Deposit type, geological setting and style of mineralisation.                    The lithium, tin and tantalum mineralisation is hosted in a muscovitic
                                                                                                                                                        leucogranite (aplopegmatite), quite differentiated, belonging to the Guarda
                                                                                                                                                        Batholith (Vilar Formoso-Fuentes de Oñoro sector). The regional rock is some
                                                                                                                                                        monzonitic and granodiorite granites, of calc-alkaline character and
                                                                                                                                                        considered as late. These are two mica granites, although biotite
                                                                                                                                                        predominates. Locally they can present andalusite as an accessory mineral, and
                                                                                                                                                        also apatite, zircon (included in biotite), cordierite (totally pinitized,
                                                                                                                                                        altered to muscovite), sphene and rutile (in needles in biotite).

                                                                                                                                                        The mineralisation occupies a surface area of about 0.77km(2), that is,
                                                                                                                                                        approximately 1.1km long by 0.7km wide. It presents a millimetric
                                                                                                                                                        mineralization of cassiterite and columbo-tantalite distributed homogeneously
                                                                                                                                                        throughout its surface. Lithium mineralisation is not yet known to which
                                                                                                                                                        mineral it is associated.
 Drill hole Information                                                A summary of all information material to the understanding of the exploration    No drilling completed.
                                                                       results including a tabulation of the following information for all Material

                                                                       drill holes:

                                                                       o easting and northing of the drill hole collar

                                                                       o elevation or RL (Reduced Level - elevation above sea level in metres) of the
                                                                       drill hole collar

                                                                       o dip and azimuth of the hole

                                                                       o down hole length and interception depth

                                                                       o hole length.
                                                                       If the exclusion of this information is justified on the basis that the          No drilling completed.
                                                                       information is not Material and this exclusion does not detract from the

                                                                       understanding of the report, the Competent Person should clearly explain why
                                                                       this is the case.
 Data aggregation methods                                              In reporting Exploration Results, weighting averaging techniques, maximum        Not applicable.
                                                                       and/or minimum grade truncations (eg cutting of high grades) and cut-off

                                                                       grades are usually Material and should be stated.
                                                                       Where aggregate intercepts incorporate short lengths of high grade results and   Not applicable.
                                                                       longer lengths of low grade results, the procedure used for such aggregation
                                                                       should be stated and some typical examples of such aggregations should be
                                                                       shown in detail.
                                                                       The assumptions used for any reporting of metal equivalent values should be      Not applicable.
                                                                       clearly stated.
 Relationship between mineralisation widths and intercept lengths      These relationships are particularly important in the reporting of Exploration   Not applicable.
                                                                       Results. If the geometry of the mineralisation with respect to the drill hole
                                                                       angle is known, its nature should be reported.
                                                                       If it is not known and only the down hole lengths are reported, there should     Not applicable.
                                                                       be a clear statement to this effect (eg 'down hole length, true width not
                                                                       known').
 Diagrams                                                              Appropriate maps and sections (with scales) and tabulations of intercepts        Appropriate diagrams are included in the main body of this report.
                                                                       should be included for any significant discovery being reported These should
                                                                       include, but not be limited to a plan view of drill hole collar locations and
                                                                       appropriate sectional views.
 Balanced reporting                                                    Where comprehensive reporting of all Exploration Results is not practicable,     All results are reported in Appendix 5 of this report.
                                                                       representative reporting of both low and high grades and/or widths should be
                                                                       practiced to avoid misleading reporting of Exploration Results.
 Other substantive exploration data                                    Other exploration data, if meaningful and material, should be reported           All meaningful and material data reported.
                                                                       including (but not limited to): geological observations; geophysical survey
                                                                       results; geochemical survey results; bulk samples - size and method of
                                                                       treatment; metallurgical test results; bulk density, groundwater, geotechnical
                                                                       and rock characteristics; potential deleterious or contaminating substances.
 Further work                                                          The nature and scale of planned further work (eg tests for lateral extensions    Further work planned for the Conchas Prospect will include drilling focused on
                                                                       or depth extensions or large-scale step-out drilling).                           testing the soil sampling anomalies.

                                                                       Diagrams clearly highlighting the areas of possible extensions, including the    These are shown in the main body of this report.
                                                                       main geological interpretations and future drilling areas, provided this
                                                                       information is not commercially sensitive.

 

 

Appendix 5B

Mining exploration entity or oil and gas exploration entity

quarterly cash flow report

 Name of entity
 Berkeley Energia Limited
 ABN               Quarter ended ("current quarter")
 40 052 468 569    30 June 2022

 

 Consolidated statement of cash flows                                                               Current quarter  Year to date

$A'000
(12 months)

$A'000
 1.                   Cash flows from operating activities                                          -                -
 1.1                  Receipts from customers
 1.2                  Payments for                                                                  (439)            (2,812)
                      (a)   exploration & evaluation
                      (b)   development                                                             -                -
                      (c)   production                                                              -                -
                      (d)   staff costs                                                             (550)            (1,375)
                      (e)   administration and corporate costs                                      (220)            (1,017)
 1.3                  Dividends received (see note 3)                                               -                -
 1.4                  Interest received                                                             4                20
 1.5                  Interest and other costs of finance paid                                      -                -
 1.6                  Income taxes paid                                                             -                -
 1.7                  Government grants and tax incentives                                          -                -
 1.8                  Other (provide details if material)                                           (17)             (29)

(50)
(196)
                      (a) Business Development

                      (b) Litigation
 1.9                  Net cash from / (used in) operating activities                                (1,272)          (5,409)

 2.                   Cash flows from investing activities                                          -                -
 2.1                  Payments to acquire or for:
                      (a)   entities
                      (b)   tenements                                                               -                -
                      (c)   property, plant and equipment                                           -                -
                      (d)   exploration & evaluation                                                -                -
                      (e)   investments                                                             -                -
                      (f)    other non-current assets                                               -                -
 2.2                  Proceeds from the disposal of:                                                -                -
                      (a)   entities
                      (b)   tenements                                                               -                -
                      (c)   property, plant and equipment                                           -                -
                      (d)   investments                                                             -                -
                      (e)   other non-current assets                                                -                -
 2.3                  Cash flows from loans to other entities                                       -                -
 2.4                  Dividends received (see note 3)                                               -                -
 2.5                  Other (provide details if material)                                           -                -
 2.6                  Net cash from / (used in) investing activities                                -                -

 3.                   Cash flows from financing activities                                          -                -
 3.1                  Proceeds from issues of equity securities (excluding convertible debt
                      securities)
 3.2                  Proceeds from issue of convertible debt securities                            -                -
 3.3                  Proceeds from exercise of options                                             -                -
 3.4                  Transaction costs related to issues of equity securities or convertible debt  -                (93)
                      securities
 3.5                  Proceeds from borrowings                                                      -                -
 3.6                  Repayment of borrowings                                                       -                -
 3.7                  Transaction costs related to loans and borrowings                             -                -
 3.8                  Dividends paid                                                                -                -
 3.9                  Other (provide details if material)                                           -                -
 3.10                 Net cash from / (used in) financing activities                                -                (93)

 4.                   Net increase / (decrease) in cash and cash equivalents for the period
 4.1                  Cash and cash equivalents at beginning of period                              75,151           79,064
 4.2                  Net cash from / (used in) operating activities (item 1.9 above)               (1,272)          (5,409)
 4.3                  Net cash from / (used in) investing activities (item 2.6 above)               -                -
 4.4                  Net cash from / (used in) financing activities (item 3.10 above)              -                (93)
 4.5                  Effect of movement in exchange rates on cash held                             6,063            6,380
 4.6                  Cash and cash equivalents at end of period                                    79,942           79,942

 

 5.   Reconciliation of cash and cash equivalents                                 Current quarter  Previous quarter
      at the end of the quarter (as shown in the consolidated statement of cash
$A'000
$A'000
      flows) to the related items in the accounts
 5.1  Bank balances                                                               79,892           75,101
 5.2  Call deposits                                                               50               50
 5.3  Bank overdrafts                                                             -                -
 5.4  Other (provide details)                                                     -                -
 5.5  Cash and cash equivalents at end of quarter (should equal item 4.6 above)   79,942           75,151

 

 6.   Payments to related parties of the entity and their associates                 Current quarter

$A'000
 6.1  Aggregate amount of payments to related parties and their associates included  (130)
      in item 1
 6.2  Aggregate amount of payments to related parties and their associates included  -
      in item 2
 Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity
 report must include a description of, and an explanation for, such payments.

 

 7.   Financing facilities                                                     Total facility amount at quarter end  Amount drawn at quarter end
      Note: the term "facility' includes all forms of financing arrangements
$A'000
$A'000
      available to the entity.

      Add notes as necessary for an understanding of the sources of finance
      available to the entity.
 7.1  Loan facilities                                                          -                                     -
 7.2  Credit standby arrangements                                              -                                     -
 7.3  Other (please specify)                                                   -                                     -
 7.4  Total financing facilities                                               -                                     -

 7.5  Unused financing facilities available at quarter end                                                           -
 7.6  Include in the box below a description of each facility above, including the
      lender, interest rate, maturity date and whether it is secured or unsecured.
      If any additional financing facilities have been entered into or are proposed
      to be entered into after quarter end, include a note providing details of
      those facilities as well.
                                                                                                                     Not
                                                                                                                     app
                                                                                                                     lic
                                                                                                                     abl
                                                                                                                     e

 

 8.   Estimated cash available for future operating activities                        $A'000
 8.1  Net cash from / (used in) operating activities (item 1.9)                       (1,272)
 8.2  (Payments for exploration & evaluation classified as investing activities)      -
      (item 2.1(d))
 8.3  Total relevant outgoings (item 8.1 + item 8.2)                                  (1,272)
 8.4  Cash and cash equivalents at quarter end (item 4.6)                             79,942
 8.5  Unused finance facilities available at quarter end (item 7.5)                   -
 8.6  Total available funding (item 8.4 + item 8.5)                                   79,942

 8.7  Estimated quarters of funding available (item 8.6 divided by item 8.3)          >10
                                                                                      No
                                                                                      te
                                                                                      :
                                                                                      if
                                                                                      th
                                                                                      e
                                                                                      en
                                                                                      ti
                                                                                      ty
                                                                                      ha
                                                                                      s
                                                                                      re
                                                                                      po
                                                                                      rt
                                                                                      ed
                                                                                      po
                                                                                      si
                                                                                      ti
                                                                                      ve
                                                                                      re
                                                                                      le
                                                                                      va
                                                                                      nt
                                                                                      ou
                                                                                      tg
                                                                                      oi
                                                                                      ng
                                                                                      s
                                                                                      (i
                                                                                      e
                                                                                      a
                                                                                      ne
                                                                                      t
                                                                                      ca
                                                                                      sh
                                                                                      in
                                                                                      fl
                                                                                      ow
                                                                                      )
                                                                                      in
                                                                                      it
                                                                                      em
                                                                                       8
                                                                                      .3
                                                                                      ,
                                                                                      an
                                                                                      sw
                                                                                      er
                                                                                      it
                                                                                      em
                                                                                       8
                                                                                      .7
                                                                                      as
                                                                                      "N
                                                                                      /A
                                                                                      ".
                                                                                      Ot
                                                                                      he
                                                                                      rw
                                                                                      is
                                                                                      e,
                                                                                      a
                                                                                      fi
                                                                                      gu
                                                                                      re
                                                                                      fo
                                                                                      r
                                                                                      th
                                                                                      e
                                                                                      es
                                                                                      ti
                                                                                      ma
                                                                                      te
                                                                                      d
                                                                                      qu
                                                                                      ar
                                                                                      te
                                                                                      rs
                                                                                      of
                                                                                      fu
                                                                                      nd
                                                                                      in
                                                                                      g
                                                                                      av
                                                                                      ai
                                                                                      la
                                                                                      bl
                                                                                      e
                                                                                      mu
                                                                                      st
                                                                                      be
                                                                                      in
                                                                                      cl
                                                                                      ud
                                                                                      ed
                                                                                      in
                                                                                      it
                                                                                      em
                                                                                      8.
                                                                                      7.
 8.8  If item 8.7 is less than 2 quarters, please provide answers to the following
      questions:
      8.8.1     Does the entity expect that it will continue to have the current
      level of net operating cash flows for the time being and, if not, why not?
      Answer: Not applicable
      8.8.2     Has the entity taken any steps, or does it propose to take any
      steps, to raise further cash to fund its operations and, if so, what are those
      steps and how likely does it believe that they will be successful?
      Answer: Not applicable
      8.8.3     Does the entity expect to be able to continue its operations and
      to meet its business objectives and, if so, on what basis?
      Answer: Not applicable
      Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2
      and 8.8.3 above must be answered.

 

Compliance statement

1        This statement has been prepared in accordance with accounting
standards and policies which comply with Listing Rule 19.11A.

2        This statement gives a true and fair view of the matters
disclosed.

 

Date:                29 July 2022

Authorised by:  Company Secretary

(Name of body or officer authorising release - see note 4)

Notes

1.          This quarterly cash flow report and the accompanying
activity report provide a basis for informing the market about the entity's
activities for the past quarter, how they have been financed and the effect
this has had on its cash position. An entity that wishes to disclose
additional information over and above the minimum required under the Listing
Rules is encouraged to do so.

2.          If this quarterly cash flow report has been prepared in
accordance with Australian Accounting Standards, the definitions in, and
provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and
AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash
flow report has been prepared in accordance with other accounting standards
agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent
standards apply to this report.

3.          Dividends received may be classified either as cash flows
from operating activities or cash flows from investing activities, depending
on the accounting policy of the entity.

4.          If this report has been authorised for release to the
market by your board of directors, you can insert here: "By the board". If it
has been authorised for release to the market by a committee of your board of
directors, you can insert here: "By the [name of board committee - eg Audit
and Risk Committee]". If it has been authorised for release to the market by a
disclosure committee, you can insert here: "By the Disclosure Committee".

5.          If this report has been authorised for release to the
market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council's
Corporate Governance Principles and Recommendations, the board should have
received a declaration from its CEO and CFO that, in their opinion, the
financial records of the entity have been properly maintained, that this
report complies with the appropriate accounting standards and gives a true and
fair view of the cash flows of the entity, and that their opinion has been
formed on the basis of a sound system of risk management and internal control
which is operating effectively.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
 or visit
www.rns.com (http://www.rns.com/)
.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
.   END  UPDSEESEUEESEFW

Recent news on Berkeley Energia

See all news