For best results when printing this announcement, please click on link below:
https://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20260210:nRSJ3995Sa&default-theme=true
RNS Number : 3995S Blencowe Resources PLC 10 February 2026
Date: 10 February 2026
Blencowe Resources Plc
("Blencowe" or the "Company"),
Orom-Cross Graphite Confirms High-Quality Feedstock for High Value Synthetic
Diamond Manufacture
Additional test work demonstrates strong conversion yields and economically
viable non-China production potential
Blencowe Resources Plc (LSE: BRES) is pleased to announce the results of
additional test work confirming that graphite concentrates from the Orom-Cross
Project are suitable for the manufacture of synthetic industrial diamonds,
further validating the quality, versatility and downstream optionality of the
Company's graphite feedstock.
The test work was undertaken by American Energy Technology Co. ("AETC") in
Chicago and forms part of Blencowe's value-addition programme focused on
demonstrating commercially viable, non-China downstream applications for
Orom-Cross graphite.
Crucially, the test work achieved a diamond conversion yield of 53.6wt%,
exceeding the typical industry benchmark of approximately 50%. AETC notes
that this threshold is widely regarded as critical in determining whether
synthetic diamond production can be undertaken economically outside China,
given the highly competitive cost structure of the industry. Conversion yields
below this level typically necessitate lower-cost Chinese processing to remain
viable.
Production of industrial diamonds provides Orom-Cross with another significant
value-adding enhancement opportunity beyond sale of graphite as concentrates
and Blencowe will be seeking offtake opportunities in this sector ahead as it
continues to drive towards first production.
Synthetic Diamond Test Work - Highlights
· Successful synthesis of robust industrial diamonds from
Orom-Cross graphite concentrate
· All diamonds produced were mono-crystalline, a higher-value
structure than polycrystalline alternatives
· Average particle size of 50-60 microns, with oversized diamonds
up to 350-500 microns
· Conversion yield of 53.6wt%, supporting cost-competitive
production outside China
AETC further observed that many natural graphites, including several deposits
across East Africa, are less suitable for synthetic diamond manufacture due to
thicker, less compressible flake structures, which inhibit efficient diamond
formation. In contrast, the fine, compressible flake characteristics of
Orom-Cross graphite proved highly conducive to diamond synthesis, representing
a distinctive quality signature of the deposit.
Strategic Context
Synthetic diamond manufacture is a specialised, high-value industrial market
where feedstock quality and conversion efficiency directly influence cost
competitiveness. These results confirm that Orom-Cross graphite meets the
technical thresholds required to support economically viable diamond
production outside China, opening additional downstream pathways alongside the
Company's core battery and energy transition strategy.
This optionality further differentiates Orom-Cross as a high-quality,
non-China graphite source, aligned with increasing Western focus on secure
supply chains, local processing and advanced manufacturing.
Importantly, the confirmation of multiple high-value end markets strengthens
the overall Orom-Cross development case and supports Blencowe's ongoing
funding and offtake processes. In parallel, the Company continues to progress
drilling and resource definition across the project, with remaining assay
results from the Iyan and Beehive programmes expected to be reported
progressively, building toward sequential JORC resource updates.
Cameron Pearce, Blencowe's Executive Chairman commented:
"This work highlights a fundamental characteristic of Orom-Cross graphite: its
quality extends beyond battery applications into demanding industrial uses
where conversion efficiency and cost competitiveness are critical. Achieving
mono-crystalline diamond formation at conversion yields above industry
benchmarks reflects the compressibility and structural integrity of our
graphite, which continues to differentiate the project.
As further drill results and technical validation are delivered, Orom-Cross
continues to mature as a scalable, high-quality graphite development. This
progress strengthens the underlying project fundamentals and is directly
supporting funding and offtake discussions currently underway, as we advance
toward the next resource update."
**ENDS**
For further information please contact:
Blencowe Resources Plc www.blencoweresourcesplc.com (http://www.blencoweresourcesplc.com/)
Sam Quinn (Director) Tel: +44 (0)1624 681 250
info@blencoweresourcesplc.com (mailto:info@blencoweresourcesplc.com)
Sasha Sethi (Investor Relations) Tel: +44 (0) 7891 677 441
sasha.sethi@blencoweresourcesplc.com
(mailto:sasha.sethi@blencoweresourcesplc.com)
Tavira Financial (Joint Broker)
Jonathan Evans Tel: +44 (0)20 3192 1733
jonathan.evans@tavira.group (mailto:jonathan.evans@tavira.group)
Oak Securities (Joint Broker)
Calvin Man /Mungo Sheehan / Jerry Keen Tel: +44 (0)20 3973 3678
Twitter https://twitter.com/BlencoweRes (https://twitter.com/BlencoweRes)
LinkedIn https://www.linkedin.com/company/72382491/admin/
(https://www.linkedin.com/company/72382491/admin/)
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
or visit
www.rns.com (http://www.rns.com/)
.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
. END MSCGPUBPPUPQUQU
Copyright 2019 Regulatory News Service, all rights reserved