Picture of Bluebird Mining Ventures logo

BMV Bluebird Mining Ventures News Story

0.000.00%
gb flag iconLast trade - 00:00
Basic MaterialsHighly SpeculativeMicro CapValue Trap

REG - Bluebird Merchant - Result of AGM

For best results when printing this announcement, please click on link below:
http://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20240806:nRSF2811Za&default-theme=true

RNS Number : 2811Z  Bluebird Merchant Ventures Limited  06 August 2024

Bluebird Merchant Ventures Ltd / EPIC: BMV.L / Market: FTSE / Sector: Mining

06 August 2024

Bluebird Merchant Ventures Ltd

('Bluebird' or 'the Company')

 

Result of AGM

 

Bluebird Merchant Ventures Ltd, a gold company primarily focused on bringing
historic mines back into production, is pleased to announce that at its Annual
General Meeting ("AGM") on 02 August 2024, all resolutions were duly passed.

 

**ENDS**

 

For further information please visit https://bluebirdmv.com or contact:

Jonathan Morley-Kirk      Bluebird Merchant Ventures Ltd
        Email: jmk@bluebirdmv.com (mailto:colin@bluebirdmv.com)

Nick Emerson                    SI Capital
 
                Tel: 01483413500

 

About Bluebird

London listed Bluebird Merchant Ventures Ltd is focused on developing high
grade, low capex gold projects. With a cumulative estimated 1.8M oz Au across
three projects, including two historic mines in South Korea and a development
project in the Philippines, the Company looks to JV its assets with local
partners to provide free carry structures to advance its assets to production.

 

Bluebird recognised the most effective strategy to develop projects in South
Korea and the Philippines involved adopting a Joint Venture model; by securing
local partners with in-country operational knowledge and investment capital at
the project level, assets can be advanced to production on a de-risked basis.

 

The Company has three JV's providing a cumulative c.US$9m investment: US$5m
for the development of the historic Gubong Gold Mine and US$2m for the Kochang
Gold and Silver Mine, in South Korea and c.US$2m (funding to a production
decision) for the Batangas Gold Project in the Philippines. With committed
development capital at the project level, the Company has free carries to
production/mine construction on all its projects, which reduces its reliance
on the international capital markets.

 

Bluebird continues to provide technical assistance to these projects,
utilising its internationally experienced mining team, which has a track
record of bringing gold projects into production across Southeast Asia.  Both
JV parties recognise each sides competencies and the mutual belief that
together they can bring the projects into production and generate significant
value for all stakeholders. Importantly the management team has personally
invested cUS$2 million into the Company, highlighting their belief in the
quality of the portfolio.

 

Gubong, which was historically the second largest gold mine in South Korea has
9 granted tenements covering c.25 sq km.  Gubong is moderately dipping with 9
veins extending 500m below surface and known to extend at least a further
250m. However, the production opportunity for Bluebird prior to looking at
deepening the mine is the 25 levels already developed with all the remnants
and unmined areas left by the original miners.  The 25 levels extend over
120km in total length which indicates the size of the opportunity. The Korea
Resources Corporation ('KORES') estimated 2.34M tonnes at some 7.3g/t Au
garnered from 57 drill holes over 17,715.3 metres.  With additional sampling,
mapping, pit modelling and grade analysis, plus the fact that Gubong is an
orogenic deposit, which typically have a depth of 2km compared to the current
depth of 500m, the Board believe it has a geological potential of 1 million +
oz Au in-situ, plus an estimated additional 300,000 oz Au from satellite ore
bodies.

 

Kochang is an epithermal vein deposit with parallel vertical ore bodies
covering 8.3 sq km that reportedly produced 110,000 oz of gold and 5.9 million
oz of silver between 1961 and 1975.  Consisting of a gold and silver mine,
there are currently four main veins and several parallel subsidiary veins vein
which have been identified, as well as a newly identified cross-cutting vein.
Historic drilling indicates the veins continue to depth below the current 150m
mine and mapping shows the veins on surface providing potential above and
below the old workings. The veins extend to the NE providing a strike length
of 2.5km with 600m between the two mines not exploited.  There is potential
to expand operations to the southwest/northeast and to depth, as well as
exploit the already mined areas. The total resource potential is between
550,000 and 700,000 tonnes, with a range of grades between 5.2 g/t to 6.6 g/t
gold, and 27.3 g/t to 34.8 g/t silver.  Following the granting of a Mountain
Use permit, there is an estimated 6-to-9-month development time to trial
mining.

 

Batangas is a 1,160-hectare licence with a 25-year Mineral Production Sharing
Agreement ('MPSA') granted. The Project has a current JORC compliant resource
of 440,000 ounces, including a maiden ore reserve of 128,000 ounces (including
silver credits) as well as multiple additional targets providing extensive
resource upside. Exploration expenditure to the tune of c.$20m has already
been invested.

 

Work is focused on completing Exploration and Environmental Work Programmes
initially targeting the high-grade 1,164-hectares Lobo licence.  This has an
initial Probable JORC Compliant Ore Reserves of 171,000 tons at 6.6 g/t for
36,000 ounces of gold excluding silver credits based primarily on the South
West Breccia ('SWB') area of the licence that can be mined in the first 18
months of any operation.  There is an Indicated resource of 82,000 oz Au that
is perceived as easily convertible.  Additionally, the area has multiple
epithermal and high-grade targets already identified for resource expansion
with 15km of identified mineralised structures with results across the nine
identified targets yielding excellent results.  These include 2.1m @14.4g/t
Au and 3m at 12.1g/t at West Drift, which already has an Indicated and
Inferred resource of 350,000t at 3 g/t Au, 8.35m at 18.3 g/t Au and 6.0m at
31.2 g/t Au located immediately west of the SWB Extension, 19m surface channel
sample with intersections of 19m grading 9.8 g/t Au at Ulupong and trenching
at Limestone Target yielded 3.5m at 25.9 g/t Au including 1.5m at 56.8 g/t Au.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
 or visit
www.rns.com (http://www.rns.com/)
.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
.   END  RAGPAMJTMTAMTRI

Recent news on Bluebird Mining Ventures

See all news