For best results when printing this announcement, please click on link below:
http://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20220407:nRSG5366Ha&default-theme=true
RNS Number : 5366H Central Asia Metals PLC 07 April 2022
7 April 2022
CENTRAL ASIA METALS PLC
('CAML' or the 'Company')
Q1 2022 Operations Update
Central Asia Metals plc (AIM: CAML) today provides a Q1 2022 operations update
for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW')
copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in
North Macedonia ('Sasa').
Summary
- Zero lost time injuries ('LTI') at Kounrad
- One LTI at Sasa
- Kounrad copper production, 3,024 tonnes
- Sasa zinc in concentrate production, 5,240 tonnes
- Sasa lead in concentrate production, 6,736 tonnes
Outlook
- Full year 2022 guidance
o Copper, 12,500 to 13,500 tonnes
o Zinc in concentrate, 20,000 to 22,000 tonnes
o Lead in concentrate, 27,000 to 29,000 tonnes
CAML production summary
Metal production (tonnes) Q1 2022 Q1 2021
Copper 3,024 2,880
Zinc 5,240 5,742
Lead 6,736 7,016
Nigel Robinson, Chief Executive Officer, commented:
"We have had a strong Q1 2022 and we are on track to meet our full year
production guidance at both Kounrad and Sasa."
Health and Safety
In Q1 2022, there were no LTIs at Kounrad and one LTI at Sasa.
Kounrad
Kounrad Q1 2022 copper production was 3,024 tonnes and copper sales during Q1
2022 were 2,906 tonnes.
Sasa
In Q1 2022, mined and processed ore were 197,501 tonnes and 197,986 tonnes
respectively. The average head grades for the period were 3.14% zinc and 3.65%
lead. Q1 2022 metallurgical recoveries were 84.3% for zinc and 93.3% for
lead.
Sasa produces a zinc concentrate and a separate lead concentrate. In Q1 2022,
10,519 tonnes of concentrate containing 49.81% zinc and 9,488 tonnes of
concentrate containing 70.99% lead were produced.
Sasa typically receives from smelters approximately 84% of the value of its
zinc in concentrate and approximately 95% of the value of its lead in
concentrate. Accordingly, Q1 2022 payable production was 4,398 tonnes of zinc
and 6,399 tonnes of lead. Given that deliveries from Sasa to the smelters
occur on a regular basis, payable base metal in concentrate sales for the
quarter were similar at 4,409 tonnes of zinc and 6,314 tonnes of lead.
During Q1 2022, Sasa sold 74,795 ounces of payable silver to Osisko Gold
Royalties, in accordance with its streaming agreement.
Units Q1 2022 Q1 2021
Ore mined t 197,501 207,704
Plant feed t 197,986 210,413
Zinc grade % 3.14 3.23
Zinc recovery % 84.3 84.5
Lead grade % 3.65 3.57
Lead recovery % 93.3 93.5
Zinc concentrate t (dry) 10,519 11,521
- Grade % 49.8 49.8
- Contained zinc t 5,240 5,742
Lead concentrate t (dry) 9,488 9,730
- Grade % 71.0 72.1
- Contained lead t 6,736 7,016
For further information contact:
Central Asia Metals Tel: +44 (0) 20 7898 9001
Nigel Robinson, CEO
Gavin Ferrar, CFO
Louise Wrathall, Director of Corporate Relations louise.wrathall@centralasiametals.com
Peel Hunt (Nominated Advisor and Joint Broker) Tel: +44 (0) 20 7418 8900
Ross Allister
David McKeown
BMO Capital Markets (Joint Broker) Tel: +44 (0) 20 7236 1010
Thomas Rider
Pascal Lussier Duquette
BlytheRay (PR Advisors) Tel: +44 (0) 20 7138 3204
Tim Blythe
Megan Ray
Rachael Brooks
Note to editors:
Central Asia Metals, an AIM-listed UK company based in London, owns 100% of
the Kounrad SX-EW copper project in central Kazakhstan and 100% of the Sasa
zinc-lead mine in North Macedonia.
For further information, please visit www.centralasiametals.com
(http://www.centralasiametals.com/) and follow CAML on Twitter at
@CamlMetals and on LinkedIn at Central Asia Metals Plc
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
or visit
www.rns.com (http://www.rns.com/)
.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
. END UPDFLFEESTIRIIF