RNS Number : 2309W  Condor Gold PLC  17 August 2022

     Condor Gold plc

     7/8 Innovation Place

     Douglas Drive

     Godalming

     Surrey

     GU7 1JX

 

17 August 2022

Condor Gold Plc

("Condor", "Condor Gold" or the "Company")

Mineral Resource Update for La India Project of 9.7 Mt at 3.5 g/t gold for
1,088,000 oz gold in the Indicated Category and 8.8 Mt at 4.3 g/t gold for
1,190,000 oz gold in the Inferred Category.

 

Condor Gold (AIM: CNR; TSX: COG) is pleased to announce the results of an
updated Mineral Resource Estimate (the "MRE") on its 100% owned La India
Project in Nicaragua. The updated MRE is 9,672 kt at 3.5g/t gold for 1,087,000
oz gold in the indicated mineral resource category and 8,642 kt at 4.3 g/t
gold for 1,189,000 oz gold in the inferred mineral resource category.

 

The MRE was prepared by SRK Consulting (US) Inc. ("SRK") and uses the
terminology, definitions and guidelines given in the Canadian Institute of
Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and
Mineral Reserves (May 2014) and The CIM Estimation of Mineral Resources and
Mineral Reserves Best Practice Guidelines (MRMR Best Practice Guidelines,
November 2019).

 

Highlights of Mineral Resource Estimate

·    Updated Mineral Resource Estimate of 9,672 kt at 3.5g/t gold for
1,088,000 oz gold in the indicated mineral resource category and 8,642 kt at
4.3 g/t gold for 1,190,000 oz gold in the inferred mineral resource category.

·    The open pit Mineral Resource Estimate is 8,693 kt at 3.2 g/t gold
for 893,000 oz gold in the indicated mineral resource category and 3,026 kt at
3.0 g/t gold for 291,000 oz gold in the inferred mineral resource category.

·    Total underground Mineral Resource Estimate is 979 kt at 6.2 g/t gold
for 194,000 oz gold in the indicated mineral resource category and 5,615 kt at
5.0 g/t gold for 898,000 oz gold in the inferred mineral resource category.

·    A Feasibility Study is being conducted on La India vein set Open Pit
("La India Open Pit"), which has a Mineral Resource Estimate of 8,487 kt at
3.0g/t gold in for 827,000 oz gold in the indicated mineral resource category
and 893 Kt at 2.4 g/t gold for 69,000 oz gold in the inferred mineral resource
category. There is a small silver content of 1,803,000 oz

·    The Cacao Mineral Resource has increased 69% to 1,164 kt at 2.5g/t
gold for 101,000 oz gold in the inferred mineral resource category. The
deposit remains 'open' on strike and at depth.

·    Updated geological interpretations and integrated litho-structural,
weathering and mineralisation models are integrated in the MRE and reflect the
higher degree of detail that is warranted for a Feasibility level of study on
La India Open Pit. This is supported by closer-spaced diamond drilling within
the upper portion of the main La India pit, along with additional detailed
deposit-scale surface mapping.

 

Mark Child, Chairman and CEO commented:

"Condor has produced a much more robust and conversative Mineral Resource
Estimate for the entire La India Project, which comprises 6 separate deposits
all of which have potential to be expanded. The focus has been of
strengthening the confidence of the geological model ahead of a forthcoming
Feasibility Study on La India Open Pit. The update on La India Open Pit
includes assay results from infill drilling, a new lithological, structural
and weathering model, a new depletion model for historic and artisanal mining
and an increase in the cut-off grade to 0.65 g/t gold from 0.50 g/t gold. The
updated Mineral Resource includes the latest operating costs and bulk density
measurements. I am pleased the drilling on the Cacao deposit increased the
Mineral Resource Estimate in the inferred mineral resource category by 69% to
101,000 oz gold at 2.5 g/t gold, the interpretation is that drilling has
clipped the top of a fully preserved epithermal vein system with a strike
length of at least 1km.

 

The updated Mineral Resource Estimate is 9,672 kt at 3.5g/t gold for 1,088,000
oz gold in the indicated mineral resource category and 8,642 kt at 4.3g/t gold
for 1,190,000 oz gold in the inferred mineral resource category. A Feasibility
Study is being conducted on La India Open Pit which has a Mineral Resource
Estimate of 8,487 kt at 3.0g/t gold in for 827,000 oz gold in the indicated
mineral resource category and 893 Kt at 2.4 g/t gold for 69,000 oz gold in the
inferred mineral resource category. There is an additional 289,000 oz gold
classified as open pit material outside the main La India Open Pit, some in
permitted pits, which will be targeted for additional early mill feed (see
details in table below). The plan is to add the substantial underground
mineral resource, currently in excess of 1 Moz gold, to the mine plan once in
production."

 

 

Introduction & Background to Update Mineral Resource Estimate ("MRE")

Between December 2020 and June 2021 Condor completed a drilling programme
totalling 59 new diamond drillholes for 3,413 m of drilling within the La
India Open Pit Area. The focus of the drilling was twofold: (1) to infill near
surface areas of the Mineral Resource, which includes a historical
Pre-Feasibility Level Mineral Reserve, that would likely be mined in the
initial years of the Life of Mine, and (2) to replace reverse circulation
("RC") drill holes with diamond core drilling. In addition, Condor completed a
drilling programme totalling 15 new diamond drillholes for 3,504 m of
drilling on the Cacao vein ("Cacao") which is located approximately 6 km to
the east of the La India Vein Set. The aim of the drilling at Cacao was to
test the geological concept that the near surface gold mineralisation at Cacao
marks the top of an epithermal gold system, and to test for a strike extension
beyond the 450 m long outcrop where previous drilling has been focused.

 

The updated MRE was prepared by SRK and reported using the terminology,
definitions and guidelines given in the CIM Code, was produced using industry
standard practices, is consistent with SRK's approach for the Mineral Resource
Estimates previously completed and is effective as of 28(th) February 2022.

 

The infill drilling and replacement of the RC drilling at La India, along with
additional detailed deposit-scale surface mapping has resulted in increased
confidence in the geological interpretations which is reflected in the new
lithological-structural, mineralisation and weathering models. Additional
benefits include validating and updating the depletion model associated with
historic and artisanal mining activities and obtaining additional density
measurements to supplement the existing database. Density values have been
assigned to estimation domains and oxidation zones.

 

The additional drilling at Cacao and updated MRE has been successful in
demonstrating the potential growth of the underground Mineral Resource on the
Cacao vein. Drilling completed during 2021 confirmed the presence of the vein
hidden below surface along strike to the east, extending the current known
strike to 950 m. Drilling at depth has also returned wider intersections and
higher grades than noted near surface: the best drilling intercept was
returned from the current deepest drill hole some 260 m below surface. The
vein remains open along strike in both directions and at depth. Further
exploration is required to further test the potential of the vein.

 

Sampling, QAQC & Mineral Resource estimation methodology

Drill core samples were prepared in the Bureau Veritas Inspectorate Laboratory
in Managua, Nicaragua which is independent from Condor Gold. Pulp samples were
then sent to Bureau Veritas analytical Laboratory in Vancouver, British
Columbia, Canada. The core samples were analysed for gold (0.005 ppm detection
limit) by fire assay using AAS finish, and silver at a 2 ppm detection limit
using four acid digest and AAS finish. Sample results higher than 10 g/t gold
were systematically re-assayed using a gravimetric finish.

 

Condor has routine quality control procedures in place which ensure that every
batch of samples includes sample repeats, commercial standards and blanks. SRK
has reviewed the QA/QC for the 2021 drilling, which included a site visit to
La India and did not identify any biases within the assay data. In addition,
SRK reviewed the data relating to the RC replacement drilling and confirmed
the re-assayed samples agreed within acceptable levels with the original RC
assays.

 

SRK has prepared the MRE for the La India vein set utilising samples coded
according to the geological model, with samples composited and capped per
domain.  SRK has reviewed and updated the statistical analysis, variography,
grade interpolation and resource classification, for each domain, as well as
an updated assessment of the reasonable prospects for eventual economic
extraction.

 

In order to standardize the reporting approach SRK has reviewed the historical
estimates for the Teresa, Arizona, Agua Caliente, Guapinol, San Lucas and
Cristalito-Tatescame veins. These are still early-stage Mineral Resources and
it was not considered appropriate to run open pit design algorithms, so the
higher underground mining costs were applied as a default. This differs from
the approach taken in the previous Mineral Resources estimated by SRK (22(nd)
December 2011) in which costs intermediate between open pit and underground
mining were applied. These Mineral Resources have been updated to reflect
current price and cost assumptions for underground mining, represented by a
2.0 g/t cut-off grade over a minimum width of 1.0 m, as well as additional
depletion to account for mining under a crown pillar.

 

Mineral Resources

The total MRE on La India Project does not reflect a material change in the
number of ounces of gold reported, being 1,087 Koz in the Indicated Mineral
Resource category and 1,189 Koz in the Inferred Mineral Resource category,
where this represents only a slight reduction of 4.7% in the Indicated and
0.9% in the Inferred Mineral Resources compared to the previous MRE. The
reduction in the ounces is due to a combination of factors including:

1.    refinements in the geological interpretation including steepening of
the veins near surface on La India deposit.

2.    slightly lower density values in some zones of La India deposit based
on additional data and refined domaining.

3.    an updated depletion model to reflect artisanal mining at La India
Open Pit; and

4.    an increase in the reporting cut-off from 0.5 g/t Au to 0.65 g/t Au
for the open pit resources, and from 1.5 g/t Au to 2.0g/t Au along with the
application of crown pillars (as depletion) to reflect assumed underground
mining on several historical estimates.

 

The updated geological interpretations informing the MRE reflect a higher
degree of detail which is warranted for a Feasibility level of study and is
supported by closer-spaced infill and RC-replacement diamond drilling within
the upper portion of the main La India pit, as well as additional detailed
deposit-scale surface mapping. This information has been integrated with the
previous data to inform a more robust litho-structural and weathering
interpretation and an updated model of the historic and artisanal mine
depletion.

 

The MRE continues to demonstrate the open pit and underground mining potential
of the La India Project. In addition to the main La India Open Pit there are
four satellite pits that have the potential to provide additional mineralized
material to the fully permitted La India processing plant. At Cacao the
updated MRE substantially increased the Mineral Resources potentially
extractable by underground methods by 40 koz to 86 koz, and also marginally
increased the potential open pit Mineral Resource by 1 koz to 15 koz, for a
combined open pit and underground Mineral Resource of 101 koz gold.

 

The Mineral Resources for three of the satellite pits: La Mestiza vein set,
America vein and Central Breccia, have not been updated as no new work has
been completed since the previous January 2019 estimate. These three deposits
represent an aggregate 206 Kt at 9.9 g/t Au for 66,000 oz in the indicated
mineral resource category and 1,939 Kt at 3.3 g/t gold for 207,000 oz in the
inferred mineral resource category. A drilling programme of 8,004m has been
completed on the Mestiza Vein Set to infill the current Mineral Resources (RNS
dated 10(th) March 2021). However, assay results were received after the
cut-off date for inclusion in the MRE update. Therefore, at this stage these
Mineral Resources for La Mestiza have not been updated but will be included in
future estimates.

 

Table 1 presents the Mineral Resource Statement for the La India Project
(inclusive of the La India, America, La Mestiza, Cacao, Central Breccia, San
Lucas and Cristalito-Tatescame deposits).  Only the Mineral Resource
estimates for the La India vein set and Cacao veins have been updated since
the previous January 2019 MRE. The reporting criteria for the Teresa, Arizona,
Agua Caliente, Guapinol, San Lucas and Cristalito-Tatescame veins has been
updated to reflect a 2.0 g/t cut-off grade over a minimum width of 1.0 m and
introduction of a crown pillar depletion. In completing the MREs, SRK has
reviewed and completed the necessary validation via visual checks, statistical
analysis and swath analysis sufficient to satisfy the requirement for
reporting Mineral Resources in the appropriate categories. Table 2 presents
the Mineral Resource Statement for the combined vein sets, effective 28
February 2022. Mineral Resources are reported inclusive of Mineral Reserves.

 

 

 

Table 1: SRK CIM Compliant Mineral Resource Statement effective 28 February
2022 for La India Project

 MINERAL RESOURCE STATEMENT SPLIT PER VEIN as of February 28, 2022
 ((7),(8),(9),(10),(11))
 Category   Area Name                  Vein Name                     Cut-Off         gold                                  silver

            Tonnes (kt)                                              Au Grade (g/t)  Au (Koz)   Ag Grade (g/t)  Ag (Koz)
 Indicated  La India Vein Set          La India/ California((1)(6))  0.65 g/t (OP)   8,487      3.0             827        6.1        1,669
            La India/ California((2))                                2.0 g/t (UG)    391        5.0             63         10.6       134
            America Vein Set           America Mine((3))             0.5 g/t (OP)    114        8.1             30         4.9        18
            America Mine((4))          2.0 g/t (UG)                  470             7.3        110             4.7        71
            Mestiza Vein Set           Tatiana ((3))                 0.5 g/t (OP)    92         12.1            36         19.5       57
            Tatiana ((4))              2.0 g/t (UG)                  118             5.5        21              11.3       43
 Inferred   La India Vein Set          La India/ California((1)(6))  0.65 g/t (OP)   893        2.4             69         4.7        134
            Teresa((1))                                              0.65 g/t (OP)   5          6.4             1
            La India/ California((2))                                2.0 g/t (UG)    1,142      5.6             206        12.2       446
            Teresa((2))                                              2.0 g/t (UG)    85         10.9            30
            Arizona((5))                                             2.0 g/t (UG)    399        4.3             56
            Agua Caliente((5))                                       2.0 g/t (UG)    43         9.0             13
            America Vein Set           America Mine((3))             0.5 g/t (OP)    677        3.1             67         5.5        120
            America Mine((4))          2.0 g/t (UG)                  1,008           4.8        156             6.8        221
            Guapinol((5))              2.0 g/t (UG)                  497             5.9        94
            Mestiza Vein Set ((9))     Tatiana((3))                  0.5 g/t (OP)    220        6.6             47         13.6       97
            Tatiana((4))               2.0 g/t (UG)                  615             3.9        77              8.8        174
            Buenos Aires((3))          0.5 g/t (OP)                  120             9.8        38
            Buenos Aires((4))          2.0 g/t (UG)                  188             7.1        43
            Espenito((4))              2.0 g/t (UG)                  181             8.4        49
            Central Breccia            Central Breccia((3))          0.5 g/t (OP)    922        1.9             56
            San Lucas                  San Lucas((5))                2.0 g/t (UG)    298        5.9             56
            Cristalito-Tatescame       Cristalito-Tatescame((5))     2.0 g/t (UG)    185        5.5             33
            Cacao                      Cacao((1))                    0.65 g/t (OP)   190        2.4             15
            Cacao((2))                 2.0 g/t (UG)                  975             2.8        86

 (1) The La India and Cacao pits are amenable to open pit mining and the
 Mineral Resource Estimates are constrained within Whittle optimised pits,
 which SRK based on the following parameters: A Gold price of USD1,800 per
 ounce of gold with no adjustments. Prices are based on experience gained from
 other SRK Projects.  Slope angles defined by the Company Geotechnical study
 which range from angle 42 - 48°. Metallurgical recovery assumptions are set
 at 90.2% for gold, based on testwork conducted to date. Marginal costs of
 USD24.32/t for processing, USD7.50/t G&A and USD2.33/t for mining, with
 consideration for mining royalties, but without considering revenues from
 other metals.
 (2) Underground Mineral Resources beneath the open pit are reported at a
 cut-off grade of 2.0 g/t Au over a minimum width of 1.0 m. Cut-off grades
 are based on a price of USD1,800 per ounce of gold and gold recoveries of
 90.2%, costs of USD24.32/t for processing, USD7.5/t G&A and USD51.0/t for
 mining, with consideration for mining royalties, but without considering
 revenues from other metals.
 (3) The America, Central Breccia, La Mestiza pits are amenable to open pit
 mining and the Mineral Resource Estimates are constrained within Whittle
 optimised pits. No new work has been completed on the Mineral Resources
 estimates for these projects since the previous estimates (2019) which SRK
 based on the following parameters: A Gold price of USD1,500 per ounce of gold
 with no adjustments. Prices are based on experience gained from other SRK
 Projects. Slope angles defined by the Company Geotechnical study which range
 from angle 40 - 48°. Metallurgical recovery assumptions are between 91-96%
 for gold, based on testwork conducted to date. Marginal costs of USD19.36/t
 for processing, USD5.69/t G&A and USD2.35/t for mining, a haul cost of
 USD1.25/t was added to the Mestiza ore tonnes to consider transportation to
 the processing plant, with consideration for mining royalties, but without
 considering revenues from other metals.
 (4) Underground Mineral Resources beneath the America, Central Breccia, La
 Mestiza open pits are reported at a cut-off grade of 2.0 g/t Au over a
 minimum width of 1.0 m. Cut-off grades are based on a price of USD1,500 per
 ounce of gold and gold recoveries of 91% for resources, costs of USD19.36/t
 for processing, USD4.55/t G&A and USD50.0/t for mining, without
 considering revenues from other metals.
 (5) Mineral Resources as previously estimated by SRK (22 December 2011),
 cut-off grade updated to reflect current price and cost assumptions and using
 a 2.0 g/t Au  over a minimum width of 1.0 m. Cut-off grades are based on a
 price of USD1,800 per ounce of gold and gold recoveries of 90.2% for
 resources, costs of USD24.32/t for processing, USD7.5/t G&A and USD51.0/t
 for mining, with consideration for mining royalties, but without considering
 revenues from other metals.
 (6) The La India deposit Mineral Resource as reported considers the current
 maximum limits for potential extraction. The current operating permits
 consider a limitation from the current village boundaries, which have been
 applied to the Mineral ReservesN. It is the QP's opinion there remains a
 reasonable prospect that this may be revisited at a future date once mining
 commences, and relocation of the La India village may be required. Further
 work will be required on the costs associated to such relocation efforts,
 along with the potential timelines to achieve the relocation. In order to
 achieve this outcome Condor will need to submit an updated EIA and receive
 environmental approval, where this will need to take account stakeholder
 interests and concerns,and complete a resettlement process.  Such exercises
 require careful stakeholder engagement.
 (7) Back calculated Inferred silver grade based on a total tonnage of 4,569 Kt
 as no silver estimates for Teresa, Central Breccia, Arizona, Agua Caliente,
 Guapinol, San Lucas, Cristalito-Tatescame or Cacao inherently involve a degree
 of rounding and consequently introduce a margin of error. Where these occur,
 SRK does not consider them to be material. All composites have been capped
 where appropriate. The Concessions are wholly owned by and exploration is
 operated by Condor Gold plc
 (8) Mineral Resources that are not Mineral Reserves do not have demonstrated
 economic viability. All figures are rounded to reflect the relative accuracy
 of the estimate and have been used to derive sub-totals, totals and weighted
 averages.  Such calculations inherently involve a degree of rounding and
 consequently introduce a margin of error. Where these occur, SRK does not
 consider them to be material. All composites have been capped where
 appropriate. The Concessions are wholly owned by and exploration is operated
 by Condor Gold plc.
 (9) Mineral Resources presented do not include any updated Mineral Resource
 Estimates on the 2021 Mestiza drilling program completed and reported on March
 10, 2022, as it post-dates the effective date for the current study. Updated
 Mineral Resources will be disclosed in future updates.
 (10) The reporting standard adopted for the reporting of the MRE uses the
 terminology, definitions and guidelines given in the Canadian Institute of
 Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and
 Mineral Reserves (May 2014) as required by NI 43-101.
 (11) SRK has completed a site inspection to the deposit by Mr Benjamin
 Parsons, MSc (MAusIMM(CP), Membership Number 222568, an appropriate
 "independent qualified person" as this term is defined in National Instrument
 43-101.

 

 

Table 2: SRK CIM Compliant Mineral Resource Statement effective 28th February
2022 for the La India Project

 

 SRK MINERAL RESOURCE STATEMENT as of 28 February 2022 ((7),)((8),(9),(10),
 (11))
 Category   Area Name    Vein Name   Cut-Off                 gold                                     silver

            Tonnes (kt)              Au Grade (g/t)          Au (koz)   Ag Grade (g/t)  Ag (koz) (7)
 Indicated  Grand total  All veins   0.5g/t (OP) ((3))       206        9.9             66            11.4       75
                                     0.65 g/t (OP) ((1,6))   8,487      3               827           6.1        1,669
                                     2.0 g/t (UG) ((2,4,5))  979        6.2             194           7.9        248
                         Subtotal Indicated                  9,672      3.5             1,088         6.4        1,992
 Inferred   Grand total  All veins   0.5g/t (OP) ((3))       1,939      3.3             208           3.5        217
                                     0.65 g/t (OP) ((1,6))   1,087      2.4             84            4.7        134
                                     2.0 g/t (UG) ((2,4,5))  5,616      5               898           9.5        841
                         Subtotal Inferred                   8,642      4.3             1,190         8.1((7))   1,193

 (1) The La India and Cacao pits are amenable to open pit mining and the
 Mineral Resource Estimates are constrained within Whittle optimised pits,
 which SRK based on the following parameters: A Gold price of USD1,800 per
 ounce of gold with no adjustments. Prices are based on experience gained from
 other SRK Projects.  Slope angles defined by the Company Geotechnical study
 which range from angle 42 - 48°. Metallurgical recovery assumptions are set
 at 90.2% for gold, based on testwork conducted to date. Marginal costs of
 USD24.32/t for processing, USD7.50/t G&A and USD2.33/t for mining, with
 consideration for mining royalties, but without considering revenues from
 other metals.
 (2) Underground Mineral Resources beneath the open pit are reported at a
 cut-off grade of 2.0 g/t Au over a minimum width of 1.0 m. Cut-off grades
 are based on a price of USD1,800 per ounce of gold and gold recoveries of
 90.2%, costs of USD24.32/t for processing, USD7.5/t G&A and USD51.0/t for
 mining, with consideration for mining royalties, but without considering
 revenues from other metals.
 (3) The America, Central Breccia, La Mestiza pits are amenable to open pit
 mining and the Mineral Resource Estimates are constrained within Whittle
 optimised pits. No new work has been completed on the Mineral Resources
 estimates for these projects since the previous estimates (2019) which SRK
 based on the following parameters: A Gold price of USD1,500 per ounce of gold
 with no adjustments. Prices are based on experience gained from other SRK
 Projects. Slope angles defined by the Company Geotechnical study which range
 from angle 40 - 48°. Metallurgical recovery assumptions are between 91-96%
 for gold, based on testwork conducted to date. Marginal costs of USD19.36/t
 for processing, USD5.69/t G&A and USD2.35/t for mining, a haul cost of
 USD1.25/t was added to the Mestiza ore tonnes to consider transportation to
 the processing plant, with consideration for mining royalties, but without
 considering revenues from other metals.
 (4) Underground Mineral Resources beneath the America, Central Breccia, La
 Mestiza open pits are reported at a cut-off grade of 2.0 g/t Au over a
 minimum width of 1.0 m. Cut-off grades are based on a price of USD1,500 per
 ounce of gold and gold recoveries of 91% for resources, costs of USD19.36/t
 for processing, USD4.55/t G&A and USD50.0/t for mining, without
 considering revenues from other metals.
 (5) Mineral Resources as previously estimated by SRK (22 December 2011),
 cut-off grade updated to reflect current price and cost assumptions and using
 a 2.0 g/t Au over a minimum width of 1.0 m. Cut-off grades are based on a
 price of USD1,800 per ounce of gold and gold recoveries of 90.2% for
 resources, costs of USD24.32/t for processing, USD7.5/t G&A and USD51.0/t
 for mining, with consideration for mining royalties, but without considering
 revenues from other metals.
 (6) The La India deposit Mineral Resource as reported considers the current
 maximum limits for potential extraction. The current operating permits
 consider a limitation from the current village boundaries, which have been
 applied to the Mineral Reserves. It is the QP's opinion there remains a
 reasonable prospect that this may be revisited at a future date once mining
 commences, and relocation of the La India village may be required. Further
 work will be required on the costs associated to such relocation efforts,
 along with the potential timelines to achieve the relocation. In order to
 achieve this outcome Condor will need to submit an updated EIA and receive
 environmental approval, where this will need to take account stakeholder
 interests and concerns, and complete a resettlement process.  Such exercises
 require careful stakeholder engagement.
 (7) Back calculated Inferred silver grade based on a total tonnage of 4,555 Kt
 as no silver estimates for Teresa, Central Breccia, Arizona, Agua Caliente,
 Guapinol, San Lucas, Cristalito-Tatescame or Cacao. inherently involve a
 degree of rounding and consequently introduce a margin of error. Where these
 occur, SRK does not consider them to be material. All composites have been
 capped where appropriate. The Concessions are wholly owned by and exploration
 is operated by Condor Gold plc
 (8) Mineral Resources that are not Mineral Reserves do not have demonstrated
 economic viability. All figures are rounded to reflect the relative accuracy
 of the estimate and have been used to derive sub-totals, totals and weighted
 averages.  Such calculations inherently involve a degree of rounding and
 consequently introduce a margin of error. Where these occur, SRK does not
 consider them to be material. All composites have been capped where
 appropriate. The Concessions are wholly owned by and exploration is operated
 by Condor Gold plc.
 (9) Mineral Resources presented do not include any updated Mineral Resource
 estimates on the 2022 Mestiza drilling program completed and reported on March
 10, 2022, as it post-dates the effective date for the current study. Updated
 Mineral Resources will be disclosed in future updates.
 (10) The reporting standard adopted for the reporting of the MRE uses the
 terminology, definitions and guidelines given in the Canadian Institute of
 Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and
 Mineral Reserves (May 2014) as required by NI 43-101.
 (11) SRK has completed a site inspection to the deposit by Mr Benjamin
 Parsons, MSc (MAusIMM(CP), Membership Number 222568, an appropriate
 "independent qualified person" as this term is defined in National Instrument
 43-101.

 

 

 

Figure 1: Location of the Mineral Resource Estimates on La India Project
showing known mineralised veins and the area fully permitted for open pit
mining.

 

Background and Reporting Standards

 

The reporting standard adopted for the reporting of the Mineral Resource
Estimate and Mineral Reserve Estimate is the Canadian Institute of Mining,
Metallurgy and Petroleum ("CIM") Standards on Mineral Resources and Mineral
Reserves (May 2014) (the "CIM Code") as required by National Instrument 43-101
- Standards of Disclosure for Mineral Projects adopted by the Canadian
Securities Administrators ("NI 43-101"). The CIM Code is an internationally
recognised reporting code which is aligned with the Combined Reserves
International Reporting Standards Committee ("CRIRSCO").

 

The Mineral Resource Estimate has been completed by Ben Parsons, a Principal
Consultant (Resource Geology) with SRK Consulting (U.S.), Inc, who is a Member
of the Australian Institute of Mining and Metallurgy, MAusIMM(CP). Ben Parsons
has some twenty plus years' experience in the exploration, definition and
mining of precious and base metal Mineral Resources. Ben Parsons is a
full-time employee of SRK Consulting (U.S.), Inc, an independent Consultancy,
and has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration, and to the type of activity which he
is undertaking to qualify as a "qualified person" as defined by NI 43-101 and
as required by the June 2009 Edition of the AIM Note for Mining and Oil &
Gas Companies. Ben Parsons consents to the inclusion in the announcement of
the matters based on their information in the form and context in which it
appears and confirms that this information is accurate and not false or
misleading.

 

The technical and scientific information in this press release has been
reviewed, verified and approved by Andrew Cheatle, P.Geo., who is a "qualified
person" as defined by NI 43-101.

 

Given the changes to Mineral Resources reported for the La India Project
herein are not considered material, the Preliminary Economic Assessment
presented in the PEA Technical Report filed on SEDAR on the 25 October 2021 is
considered to remain valid, and therefore an updated Technical Report is not
deemed to be required at this stage. Condor are in the process on preparing a
Feasibility Study focusing on the open pit portion of the La India Vein Set
which will be reflected in an updated Technical Report on completion.

 

 

 

 

- Ends -

For further information please visit www.condorgold.com or contact:

 Condor Gold plc                 Mark Child, Chairman and CEO

                                 +44 (0) 20 7493 2784
 Beaumont Cornish Limited         Roland Cornish and James Biddle

                                 +44 (0) 20 7628 3396
 SP Angel Corporate Finance LLP  Ewan Leggat

+44 (0) 20 3470 0470
 H&P Advisory Limited            Andrew Chubb and Nilesh Patel

                                 +44 207 907 8500
 BlytheRay                       Tim Blythe and Megan Ray

                                 +44 (0) 20 7138 3204

 

About Condor Gold plc:

Condor Gold plc was admitted to AIM in May 2006 and dual listed on the TSX in
January 2018. The Company is a gold exploration and development company with a
focus on Nicaragua.

 

On 25 October 2021 Condor announced the filing of a Preliminary Economic
Assessment Technical Report ("PEA") for its La India Project, Nicaragua on
SEDAR https://www.sedar.com (https://www.sedar.com) . The highlight of the
technical study is a post-tax, post upfront capital expenditure NPV of US$418
million, with an IRR of 54% and 12 month pay-back period, assuming a US$1,700
per oz gold price, with average annual production of 150,000 oz gold per annum
for the initial 9 years of gold production. The open pit mine schedules have
been optimised from designed pits, bringing higher grade gold forward
resulting in average annual production of 157,000 oz gold in the first 2 years
from open pit material and underground mining funded out of cashflow.

In August 2018, the Company announced that the Ministry of the Environment in
Nicaragua had granted the Environmental Permit ("EP") for the development,
construction and operation of a processing plant with capacity to process up
to 2,800 tonnes per day at its wholly-owned La India Gold Project ("La India
Project"). The EP is considered the master permit for mining operations in
Nicaragua. Condor has purchased a new SAG Mill, which has mainly arrived in
Nicaragua. Site clearance and preparation is at an advanced stage.

 

Environmental Permits were granted in April and May 2020 for the La Mestiza
and America open pits respectively, both located close to La India. The La
Mestiza open pit hosts 92 Kt at a grade of 12.1 g/t gold (36,000 oz contained
gold) in the Indicated Mineral Resource category and 341 Kt at a grade of 7.7
g/t gold (85,000 oz contained gold) in the Inferred Mineral Resource category.
The America open pit hosts 114 Kt at a grade of 8.1 g/t gold (30,000 oz) in
the Indicated Mineral Resource category and 677 Kt at a grade of 3.1 g/t gold
(67,000 oz) in the Inferred Mineral Resource category. Following the
permitting of the La Mestiza and America open pits, together with the La India
Open Pit Condor has 1.12 M oz gold open pit Mineral Resources permitted for
extraction.

 

Disclaimer

Neither the contents of the Company's website nor the contents of any website
accessible from hyperlinks on the Company's website (or any other website) is
incorporated into, or forms part of, this announcement.

 

Qualified Persons

 

The Mineral Resource Estimate has been completed by Ben Parsons, a Principal
Consultant (Resource Geology) with SRK Consulting (U.S.), Inc, who is a Member
of the Australian Institute of Mining and Metallurgy, MAusIMM(CP). Ben Parsons
has some twenty years' experience in the exploration, definition and mining of
precious and base metal Mineral Resources. Ben Parsons is a full-time employee
of SRK Consulting (U.S.), Inc, an independent Consultancy, and has sufficient
experience which is relevant to the

style of mineralisation and type of deposit under consideration, and to the
type of activity which he is undertaking to qualify as a "qualified person" as
defined by NI 43-101 and as required by the June 2009 Edition of the AIM Note
for Mining and Oil & Gas Companies.

 

Ben Parsons consents to the inclusion in the announcement of the matters based
on their information in the form and context in which it appears and confirms
that this information is accurate and not false or misleading.

 

The technical and scientific information in this press release has been
reviewed, verified and approved by Andrew Cheatle, P.Geo., a director of
Condor Gold plc, Luc English, C.Geol., the Resident Geologist of Condor Gold
plc, and Gerald D. Crawford, P.E., the Chief Technical Officer of Condor Gold
plc, each of whom is a "qualified person" as defined by NI 43-101.

 

Technical Information

 

Certain disclosure contained in this news release of a scientific or technical
nature has been summarised or extracted from the technical report entitled
"Technical Report on the La India Gold Project, Nicaragua, October 2021",
dated October 22, 2021 with an effective date of September 9, 2021 (the
"Technical Report"), prepared in accordance with NI 43-101. The Qualified
Persons responsible for the Technical Report are Dr Tim Lucks of SRK
Consulting (UK) Limited, and Mr Fernando Rodrigues, Mr Stephen Taylor and Mr
Ben Parsons of SRK Consulting (U.S.) Inc. Mr Parsons assumes responsibility
for the Mineral Resource Estimate, Mr Rodrigues the open pit mining aspects,
Mr Taylor the underground mining aspects and Dr Lucks for the oversight of the
remaining technical disciplines and compilation of the report.

 

Forward Looking Statements

 

All statements in this press release, other than statements of historical
fact, are 'forward-looking information' with respect to the Company within the
meaning of applicable securities laws, including statements with respect to:
future development and production plans, projected capital and operating
costs, mine life and production rates, metal or mineral recovery estimates and
Mineral Resource and Mineral Reserve estimates at the La India Project.
Forward-looking information is often, but not always, identified by the use of
words such as: "seek", "anticipate", "plan", "continue", "strategies",
"estimate", "expect", "project", "predict", "potential", "targeting",
"intends", "believe", "potential", "could", "might", "will" and similar
expressions. Forward-looking information is not a guarantee of future
performance and is based upon a number of estimates and assumptions of
management at the date the statements are made including, among others,
assumptions regarding: future commodity prices and royalty regimes;
availability of skilled labour; timing and amount of capital expenditures;
future currency exchange and interest rates; the impact of increasing
competition; general conditions in economic and financial markets;
availability of drilling and related equipment; effects of regulation by
governmental agencies; the receipt of required permits; royalty rates; future
tax rates; future operating costs; availability of future sources of funding;
ability to obtain financing and assumptions underlying estimates related to
adjusted funds from operations. Many assumptions are based on factors and
events that are not within the control of the Company and there is no
assurance they will prove to be correct.

 

Such forward-looking information involves known and unknown risks, which may
cause the actual results to be materially different from any future results
expressed or implied by such forward-looking information, including, risks
related to: mineral exploration, development and operating risks; estimation
of mineralisation and resources; environmental, health and safety regulations
of the resource industry; competitive conditions; operational risks; liquidity
and financing risks; funding risk; exploration costs; uninsurable risks;
conflicts of interest; risks of operating in Nicaragua; government policy
changes; ownership risks; permitting and licencing risks; artisanal miners and
community relations; difficulty in enforcement of judgments; market
conditions; stress in the global economy; current global financial condition;
exchange rate and currency risks; commodity prices; reliance on key personnel;
dilution risk; payment of dividends; as well as those factors discussed under
the heading "Risk Factors" in the Company's annual information form for the
fiscal year ended December 31, 2021 dated March 29, 2022 and available under
the Company's SEDAR profile at www.sedar.com (http://www.sedar.com) .

 

Although the Company has attempted to identify important factors that could
cause actual actions, events or results to differ materially from those
described in forward-looking information, there may be other factors that
cause actions, events or results not to be as anticipated, estimated or
intended. There can be no assurance that such information will prove to be
accurate as actual results and future events could differ materially from
those anticipated in such statements. The Company disclaims any intention or
obligation to update or revise any forward-looking information, whether as a
result of new information, future events or otherwise unless required by law.

 

Technical Glossary

 Au                          Gold
 Breccia                     A rock made up of angular rock fragments cemented together by a finer grained
                             matrix
 Diamond core drilling       A drilling method in which penetration is achieved through abrasive cutting by
                             rotation of a diamond encrusted drill bit. This drilling method enables
                             collection of tubes of intact rock (core) and when successful gives the best
                             possible quality samples for description, sampling and analysis of an ore body
                             or mineralised structure.
 Fault                       The plane along which two rock masses have moved or slide against each other
                             in opposing directions
 Grade                       The proportion of a mineral within a rock or other material. For gold
                             mineralisation this is usually reported as grams of gold per tonne of rock
                             (g/t)
 g/t                         grams per tonne
 Indicated Mineral Resource  That part of a Mineral Resource for which tonnage, densities, shape, physical
                             characteristics, grade and mineral content can be estimated with a reasonable
                             level of confidence. It is based on exploration, sampling and testing
                             information gathered through appropriate techniques from locations such as
                             outcrops, trenches, pits, workings and drill holes. The locations are too
                             widely or inappropriately spaced to confirm geological and/or grade continuity
                             but are spaced closely enough for continuity to be assumed.
 Inferred Mineral Resource   That part of a Mineral Resource for which tonnage, grade and mineral content
                             can be estimated with a low level of confidence. It is inferred from
                             geological evidence and assumed but not verified geological and/or grade
                             continuity. It is based on information gathered through appropriate techniques
                             from locations such as outcrops, trenches, pits, workings and drill holes that
                             may be limited, or of uncertain quality and reliability,
 IRR                         The Internal Rate of Return (IRR) is the discount rate that makes the net
                             present value (NPV) of a project zero. In other words, it is the expected
                             compound annual rate of return that will be earned on a project or investment
 Kt                          Thousand tonnes
 Mineral Resource Estimate   A concentration or occurrence of material of economic interest in or on the

                           Earth's crust in such a form, quality, and quantity that there are reasonable
                             and realistic prospects for eventual economic extraction. The location,

                           quantity, grade, continuity and other geological characteristics of a Mineral
                             Resource are known, estimated from specific geological knowledge, or

                           interpreted from a well constrained and portrayed geological model.

 Mineral Reserve             A 'Mineral Reserve' is the economically mineable part of a Measured and/or
                             Indicated Mineral Resource. It includes diluting materials and allowances for
                             losses, which may occur when the material is mined. Appropriate assessments
                             and studies have been carried out and include consideration of and
                             modification by realistically assumed mining, metallurgical, economic,
                             marketing, legal, environmental, social and governmental factors. These
                             assessments demonstrate at the time of reporting that extraction could
                             reasonably be justified. Ore Reserves are sub-divided in order of increasing
                             confidence into Probable Ore Reserves and Proved Ore Reserves.
 NI 43-101                   Canadian National Instrument 43-101 a common standard for reporting of
                             identified mineral resources and mineral reserves
 NPV                         Net Present Value (NPV) is the value of all future cash flows
                             (https://corporatefinanceinstitute.com/resources/knowledge/accounting/statement-of-cash-flows/)
                              (positive and negative) over the entire life of an investment discounted to
                             the present. NPV analysis is a form of intrinsic valuation and is used
                             extensively across finance
                             (https://corporatefinanceinstitute.com/resources/knowledge/finance/corporate-finance-industry/)
                              and accounting for determining the value of a business, investment security,
                             capital project, new venture, cost reduction program, and anything that
                             involves cash flow. It is after deducting the upfront capital cost
 Open pit mining             A method of extracting minerals from the earth by excavating downwards from
                             the surface such that the ore is extracted in the open air (as opposed to
                             underground mining).
 Strike length               The longest horizontal dimension of an ore body or zone of mineralisation.
 Vein                        A sheet-like body of crystallised minerals within a rock, generally forming in
                             a discontinuity or crack between two rock masses. Economic concentrations of
                             gold are often contained within vein minerals.

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
 or visit
www.rns.com (http://www.rns.com/)
.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
.   END  MSCPFMFTMTTBBAT

Recent news on Condor Gold

See all news