Picture of Condor Gold logo

CNR Condor Gold News Story

0.000.00%
gb flag iconLast trade - 00:00
Basic MaterialsSpeculativeSmall CapMomentum Trap

REG - Condor Gold PLC - Unaudited results ended September 30, 2018





 




RNS Number : 2449H
Condor Gold PLC
14 November 2018
 

 

 

 

 

 

Condor Gold plc

             7th Floor

39 St. James's Street

London

SW1A 1JD 

 

November 14, 2018                                                                                                                      

Condor Gold plc

("Condor", "Condor Gold" or the "Company")

Condor Gold plc announces its unaudited results for the three and nine months ended September 30, 2018

 

Condor Gold (AIM: CNR; OTCQX: CNFGF; TSX: COG) announces that it has today published its unaudited financial results for the three and nine month periods ending September 30, 2018 and the Management's Discussion and Analysis for the same period.

Both of the above have been posted on the Company's website www.condorgold.com and are also available on SEDAR at www.sedar.com .

 

Highlights for the third quarter of 2018

·  The Ministry of the Environment ("MARENA") completed a positive review of the Environmental and Social Impact Assessment ("ESIA") at the La India Project in Nicaragua (the "Project") and formally notified the Company to proceed to a Public Consultation (a public hearing) on July 13, 2018.

·     The turn out was high; a total of 499 people registered and attended the Public Consultation at which the technical, environmental and social aspects of a new mine were presented and discussed in a transparent manner. During presentations of the Project to community groups and house-to-house visits the Company received over 600 expressions of interest in/applications for new jobs.

·     On August 6, 2018, the Company announced that MARENA had granted the Company the key Environmental Permit for the Project for the development, construction and operation of a processing plant with capacity to process up to 2,800 tonnes per day ("tpd"). Gold production is expected to be between 80,000 and 100,000 ounces ("oz") per annum from a single open pit, representing a US$120 million investment and creating an estimated 1,000 new jobs.

·     Positive rock chip assay results and on-going detailed geological mapping progress the plan to define a major gold district around La India Project.

 

Post Period Highlights

·     SRK Consulting (U.K.) Ltd has been engaged to update the mineral resource for approximately 12,000m drilling since the previous mineral resource update from December 2014.

 

 

 

Mark Child, Chairman and Chief Executive of Condor Gold, commented:

 

"The construction and operation of a new mine at Mina La India is now materially de-risked. During the third quarter Condor received the key Environmental Permit to produce approximately 600,000 oz gold from a single open pit. Annual gold production is expected to be between 80,000 to 100,000 oz.  La India has an open pit gold mineral reserve in the Probable category of 6.9 million tonnes ("Mt") at 3.0 grams per tonne ("g/t") gold for 675,000 oz gold. The economics are attractive. All-in sustaining cash costs of US$700 per ounce gold compare favorably to the current gold price of US$1,220 per ounce.  

 

"To put the permitted open pit in context, it represents about 34% of the La India Project's total mineral resource; significantly more gold may be produced, subject to further drilling, technical studies and additional permits. The La India Project contains a mineral resource in the indicated category of 9.6 Mt at 3.5 g/t for 1.08 million oz gold and a total mineral resource in the inferred category of 8.5 Mt at 4.5 g/t for 1.23 million oz gold. The indicated mineral resource is inclusive of the mineral reserve.

 

"Condor has engaged SRK Consulting (U.K.) Ltd to update the mineral resource for approximately 12,000m drilling since the previous mineral resource update. Internal studies show a new high-grade feeder pit.  Our strategy is to demonstrate that high grade feeder pits can materially supplement production from the main La India open pit."

 

 

 

 

 

 

 

CONDOR GOLD PLC

 

CONDENSED CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME

FOR THE THREE AND NINE MONTHS TO 30 SEPTEMBER 2018

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nine

months

 to 30.09.18

unaudited

£

 

Nine

 months

 to 30.09.17

unaudited

£

 

Three

months

 to 30.09.18

unaudited

£

 

Three months

to 30.09.17

unaudited

£

Revenue

 

 

-

 

-

 

-

 

-

 

 

 

 

 

 

 

 

 

 

Share based payments

 

 

(501,530)

 

(1,849,568)

 

(35,225)

 

(194,171)

Administrative expenses

 

 

(1,112,147)

 

(2,034,384)

 

(289,963)

 

(344,302)

 

 

 

 

 

 

 

 

 

 

Operating loss

Note 3

 

(1,613,677)

 

(3,883,952)

 

(325,188)

 

(538,473)

 

 

 

 

 

 

 

 

 

 

Finance income

 

 

1,797

 

-

 

839

 

-

 

 

 

 

 

 

 

 

 

 

Loss before income tax

 

 

(1,611,880)

 

(3,883,952)

 

(324,349)

 

(538,473)

 

 

 

 

 

 

 

 

 

 

Income tax expense                

Note 4

 

-

 

-

 

-

 

-

 

 

 

 

 

 

 

 

 

 

Loss for the period

 

 

(1,611,880)

 

(3,883,952)

 

(324,349)

 

(538,473)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other comprehensive income/(loss):

 

 

 

 

 

 

 

 

 

Currency translation differences

 

 

182,041

 

735,189

 

(10,370)

 

(786,028)

Other comprehensive income/(loss) for the period

 

 

182,041

 

735,189

 

(10,370)

 

(786,028)

 

 

 

 

 

 

 

 

 

 

Total comprehensive loss for the period

 

 

(1,429,839)

 

(3,148,763)

 

(334,719)

 

(1,324,501)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Loss attributable to:

 

 

 

 

 

 

 

 

 

Non-controlling interest

 

 

-

 

-

 

-

 

-

Owners of the parent

 

 

(1,611,880)

 

(3,883,952)

 

(324,349)

 

(538,473)

 

 

 

(1,611,880)

 

(3,883,952)

 

(324,349)

 

(538,473)

 

 

 

 

 

 

 

 

 

 

Total comprehensive loss attributable to:

 

 

 

 

 

 

 

 

 

Non-controlling interest

 

 

-

 

(6,946)

 

-

 

(2,809)

Owners of the parent

 

 

(1,429,839)

 

(3,141,817)

 

(334,719)

 

(1,327,310)

 

 

 

(1,429,839)

 

(3,148,763)

 

(334,719)

 

(1,324,501)

 

 

 

 

 

 

 

 

 

 

Loss per share expressed in pence per share:

 

 

 

 

 

 

 

 

 

Basic and diluted (in pence)

Note 7

 

(2.46)

 

(6.52)

 

(0.48)

 

(0.88)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONDOR GOLD PLC

 

CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION

AS AT 30 SEPTEMBER 2018

 

 

 

 

 

 

 

 

 

30.09.18

unaudited

£

 

31.12.17

audited

£

 

30.09.17

unaudited

£

ASSETS:

 

 

 

 

 

NON-CURRENT ASSETS

 

 

 

 

 

Property, plant and equipment                                                       

191,881

 

271,319

 

275,766

Intangible assets

20,431,673

 

18,927,968

 

18,355,741

 

20,623,554

 

19,199,287

 

18,631,507

 

 

 

 

 

 

CURRENT ASSETS

 

 

 

 

 

Trade and other receivables

312,626

 

320,974

 

580,942

Cash and cash equivalents

878,272

 

946,261

 

2,020,493

 

1,190,898

 

1,267,235

 

2,601,435

 

 

 

 

 

 

TOTAL ASSETS

21,814,452

 

20,466,522

 

21,232,942

 

 

 

 

 

 

LIABILITIES:

 

 

 

 

 

CURRENT LIABILITIES

 

 

 

 

 

Trade and other payables

322,218

 

445,030

 

354,019

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL LIABILITIES

322,218

 

445,030

 

354,019

 

 

 

 

 

 

NET CURRENT ASSETS

868,680

 

822,205

 

2,247,416

 

 

 

 

 

 

 

NET ASSETS

21,492,234

 

20,021,492

 

20,878,923

 

 

 

 

 

 

 

 

 

 

 

 

SHAREHOLDERS' EQUITY ATTRIBUTABLE TO OWNERS OF THE PARENT

 

 

 

 

 

Called up share capital                                        Note 8

13,435,868

 

12,273,077

 

12,273,076

Share premium

33,662,309

 

32,426,049

 

32,426,047

Exchange difference reserve

763,616

 

581,575

 

1,374,661

Retained earnings

(26,369,559)

 

(25,174,153)

 

(25,109,211)

 

21,492,234

 

20,106,548

 

20,964,573

 

 

 

 

 

 

TOTAL EQUITY ATTRIBUTABLE TO:

 

 

 

 

 

Non-controlling interest

-

 

(85,056)

 

(85,650)

 

21,492,234

 

20,021,492

 

20,878,923

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONDOR GOLD PLC

 

CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY

AS AT 30 SEPTEMBER 2018

 

 

 

 

Share capital

Share premium

Exchange difference reserve

Retained earnings

Total

Non controlling interest

Total equity

 

£

£

£

£

£

£

£

At 1 January 2017

10,582,129

28,875,061

632,526

(23,075,118)

17,014,598

(78,704)

16,935,894

Comprehensive income:

 

 

 

 

 

 

 

Loss for the period

-

-

-

(3,883,952)

(3,883,952)

-

(3,883,952)

Other comprehensive income:

 

 

 

 

 

 

 

Currency translation differences

-

-

742,135

-

742,135

(6,946)

735,189

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total comprehensive income

-

-

742,135

(3,883,952)

(3,141,817)

(6,946)

(3,148,763)

 

 

 

 

 

 

 

 

New shares issued

1,690,947

3,550,986

-

-

5,241,933

-

5,241,933

Share based payment

-

-

-

1,849,859

1,849,859

-

1,849,859

 

 

 

 

 

 

 

 

At 30 September 2017

12,273,076

32,426,047

1,374,661

(25,109,211)

20,964,573

(85,650)

20,878,923

 

 

 

 

 

 

 

 

At 1 January 2018

12,273,077

32,426,049

581,575

(25,174,153)

20,106,548

(85,056)

20,021,492

Comprehensive income:

 

 

 

 

 

 

 

Loss for the period

-

-

-

(1,611,880)

(1,611,880)

-

(1,611,880)

Other comprehensive income:

 

 

 

 

 

 

 

Transactions with non-controlling interest

-

-

-

(85,056)

(85,056)

85,056

-

Currency translation differences

-

-

182,041

-

182,041

-

182,041

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total comprehensive income

 

 

182,041

(1,696,936)

(1,514,895)

85,056

(1,429,839)

 

 

 

 

 

 

 

 

New shares issued

1,162,791

1,337,210

-

-

2,500,001

-

2,500,001

Issue costs

-

(100,950)

-

-

(100,950)

-

(100,950)

Share based payment

-

-

-

501,530

501,530

-

501,530

 

 

 

 

 

 

 

 

At 30 September 2018

13,435,868

763,616

(26,369,559)

21,492,234

21,492,234

 

 

CONDOR GOLD PLC

 

CONDENSED CONSOLIDATED CASH FLOW STATEMENT

AS AT 30 SEPTEMBER 2018

 

 

 

 

 

 

 

 

 

 

 

 

Nine months

to 30.09.18

unaudited

£

 

Nine months

 to 30.09.17

unaudited

£

 

Cash flows from operating activities

 

 

 

 

 

Loss before tax

 

 

(1,611,880)

 

(3,883,952)

 

Share based payment

 

 

501,530

 

1,849,859

 

Depreciation charges

 

 

91,350

 

75,601

 

Impairment charge of intangible fixed assets

 

 

-

 

-

 

Finance income

 

 

(1,797)

 

-

 

 

 

 

(1,020,797)

 

(1,958,492)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Increase)/decrease in trade and other receivables

 

 

8,351

 

(35,691)

 

Increase/(decrease) in trade and other payables

 

 

(122,813)

 

2,468

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net cash absorbed in operating activities

 

 

(1,135,259)

 

(1,991,715)

 

 

 

 

 

 

 

 

Cash flows from investing activities

 

 

 

 

 

 

Purchase of intangible fixed assets

 

 

(1,314,117)

 

(2,506,191)

 

Purchase of tangible fixed assets

 

 

(13,571)

 

(118,216)

 

Interest received

 

 

1,797

 

-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net cash absorbed in investing activities

 

 

(1,325,891)

 

(2,624,407)

 

 

 

 

 

 

 

 

Cash flows from financing activities

 

 

 

 

 

 

Net proceeds from share issue

 

 

2,399,051

 

5,241,933

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net cash generated in financing activities

 

 

2,399,051

 

5,241,933

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Increase / (decrease) in cash and cash equivalents

 

 

(62,099)

 

625,811

 

Cash and cash equivalents at beginning of period

 

 

946,261

 

583,610

 

Exchange losses on cash and bank

 

 

(5,890)

 

811,072

 

 

 

 

 

 

 

 

Cash and cash equivalents at end of period

 

 

878,272

 

2,020,493

 

 

 

- Ends -

For further information please visit www.condorgold.com or contact:

Condor Gold plc

Mark Child, Chairman and CEO

+44 (0) 20 7493 2784

 

Beaumont Cornish Limited

 Roland Cornish and James Biddle

+44 (0) 20 7628 3396

 

Numis Securities Limited

John Prior and James Black

+44 (0) 20 7260 1000

 

Blytheweigh

Tim Blythe, Camilla Horsfall and Megan Ray

+44 (0) 20 7138 3204

 

 

 

About Condor Gold plc:

Condor Gold plc was admitted to AIM on 31 May 2006. The Company is a gold exploration and development company with a focus on Central America.

In August 2018, the Company announced that the Ministry of the Environment had granted the Company the Environmental Permit ("EP") for the development, construction and operation of a processing plant with capacity to process up to 2,800 tonnes per day, The EP is considered to be the master permit for mining operations in Nicaragua. Condor published a Pre-Feasibility Study ("PFS") on its wholly owned La India Project in Nicaragua in December 2014, as summarised in the Technical Report (as defined below). The PFS details an open pit gold mineral reserve in the Probable category of 6.9 million tonnes ("Mt") at 3.0 grams per tonne ("g/t") gold for 675,000 oz gold, producing 80,000 oz gold per annum for seven years. La India Project contains a mineral resource in the indicated category of 9.6 Mt at 3.5 g/t for 1.08 million oz gold and a total mineral resource in the inferred category of 8.5 Mt at 4.5 g/t for 1.23 million oz gold. The indicated mineral resource is inclusive of the mineral reserve.  

Disclaimer

Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) is incorporated into, or forms part of, this announcement.

Technical Information

Certain disclosure contained in this news release of a scientific or technical nature has been summarised or extracted from the technical report entitled "Technical Report on the La India Gold Project, Nicaragua, December 2014", dated November 13, 2017 with an effective date of December 21, 2014 (the "Technical Report"), prepared in accordance with NI 43-101. The Technical Report was prepared by or under the supervision of Tim Lucks, Principal Consultant (Geology & Project Management), Gabor Bacsfalusi, Principal Consultant (Mining), Benjamin Parsons, Principal Consultant (Resource Geology), each of SRK Consulting (UK) Limited, and Neil Lincoln of Lycopodium Minerals Canada Ltd., each of whom is an independent Qualified Person as such term is defined in NI 43-101.

David Crawford, Chief Technical Officer of the Company and a Qualified Person as defined by NI 43-101, has approved the written disclosure in this press release.

Forward Looking Statements

All statements in this press release, other than statements of historical fact, are 'forward-looking information' with respect to the Company within the meaning of applicable securities laws, including statements with respect to: the Company's plans, the increase in future gold production at La India, the mineral resources, mineral reserves and production rate and operational activities at the La India Project. Forward-looking information is often, but not always, identified by the use of words such as: "seek", "anticipate", "plan", "continue", "strategies", "estimate", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", "could", "might", "will" and similar expressions. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions regarding: future commodity prices and royalty regimes; availability of skilled labour; timing and amount of capital expenditures; future currency exchange and interest rates; the impact of increasing competition; general conditions in economic and financial markets; availability of drilling and related equipment; effects of regulation by governmental agencies; the receipt of required permits; royalty rates; future tax rates; future operating costs; availability of future sources of funding; ability to obtain financing and assumptions underlying estimates related to adjusted funds from operations. Many assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct.

 

Such forward-looking information involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to: mineral exploration, development and operating risks; estimation of mineralisation, resources and reserves; environmental, health and safety regulations of the resource industry; competitive conditions; operational risks; liquidity and financing risks; funding risk; exploration costs; uninsurable risks; conflicts of interest; risks of operating in Nicaragua; government policy changes; ownership risks; permitting and licencing risks; artisanal miners and community relations; difficulty in enforcement of judgments; market conditions; stress in the global economy; current global financial condition; exchange rate and currency risks; commodity prices; reliance on key personnel; dilution risk; payment of dividends; as well as those factors discussed under the heading "Risk Factors" in the Company's annual information form for the fiscal year ended December 31, 2017 dated March 29, 2018, available under the Company's SEDAR profile at www.sedar.com.

 

Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.


This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
QRTFMMMMVFRGRZM

Recent news on Condor Gold

See all news