REG - First Tin PLC - Tellerhäuser Drilling and DFS Update

For best results when printing this announcement, please click on link below:
http://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20230313:nRSM6571Sa&default-theme=true

RNS Number : 6571S  First Tin PLC  13 March 2023

13 March 2023

First Tin Plc

("First Tin" or "the Company")

Tellerhäuser Drilling and DFS Update

 

First Tin Plc ("First Tin"), a tin development company with advanced, low
capex projects in Germany and Australia, is pleased to provide an update on
its drilling programme and Definitive Feasibility Study ("DFS") currently
being undertaken at its Tellerhäuser Tin Project in Germany. Additionally,
the Company announces that a considerable amount of additional historic
drilling data has recently been located which could potentially add resources
at a significant cost saving to drilling its own holes. The project is owned
by First Tin's 100% owned German subsidiary, Saxore Bergbau GmbH ("Saxore").

 

Drill Results

First Tin has received positive results from the second two deep drillholes
undertaken as part of the drill programme into the deep Dreiberg
mineralisation. This programme is designed to add Indicated Resources to its
Tellerhäuser Project in Germany by confirming the continuity of
mineralisation previously identified by Wismut during 1970s and early 1980s.
Wismut previously intersected high grade tin mineralisation at depth, along
strike from the known Indicated Resources at the Dreiberg seam (Figure 1).

 

The two areas tested are at depths of between 800m and 900m below surface and
between 3,000m and 4,000m along strike from the Hämmerlein Indicated Resource
area and 1,000m to 1,500m along strike from the Dreiberg Indicated Resource
area. Both drillholes intersected the targeted skarn horizon and returned the
following significant downhole intercepts:

 

·      Drillhole SAXDRE24:

o  5.90m skarn from 810.3m downhole grading 0.40% Sn, 0.74% Zn, 43.0ppm In,
5.9g/t Ag

§ Including (0.5% Sn lower cut-off): 1.35m @ 1.26% Sn, 2.16% Zn, 130.3ppm In,
20.0g/t Ag from 811.6m downhole

·      Drillhole SAXDRE31:

o  2.90m skarn from 877.2m downhole grading 0.71% Sn, 0.48% Zn, 56.4ppm In,
6.5g/t Ag

§ Including (0.5% Sn lower cut-off): 0.95m @ 2.02% Sn, 1.39% Zn, 163.0ppm In,
18.7g/t Ag from 877.7m downhole

As reported in December 2022, First Tin's previous two holes also intersected
the targeted skarn zone.  Together, they have successfully shown the skarn
horizon is present, continuous, and tin mineralised as suggested by the
previous Wismut drilling. This suggests that the skarn horizon is continuous
for at least 1.5km southeast of the Indicated Resources at Dreiberg and is
open to the southeast.

 

Importantly, the tin assays were as expected from the location of the
intercepts. The other metals, in particular zinc, indium and silver were all
as good as, or better than, expected.

 

 

 Drillhole Number  From (m)  To      Interval (m)  Sn    Zn    In (ppm)  Ag      Notes

                             (m)                   (%)   (%)             (g/t)
 SAXDRE25          794.65    795.30  0.65          0.34  0.74  34.9      11.3    Upper Skarn
 and               805.70    807.20  1.50          0.75  1.00  33.2      5.6     Lower Skarn
 incl.             806.00    806.60  0.60          1.43  1.99  61.5      10.9    0.5% Sn cut-off
 SAXDRE24          810.30    816.20  5.90          0.40  0.74  43.0      5.9     Skarn
 incl.             811.60    813.00  1.40          1.26  2.16  130.3     20.0    0.5% Sn cut-off
 SAXDRE34          886.60    890.45  3.85          0.63  1.29  58.4      4.5     Skarn/schist
 incl.             887.75    889.10  1.35          1.49  0.78  122.1     7.1     0.5% Sn cut-off
 SAXDRE31          877.2     880.1   2.90          0.71  0.48  56.4      6.5     Skarn/marble
 incl.             877.65    878.60  0.95          2.02  1.39  163.0     18.7    0.5% Sn cut-off

 

 

The "20" series holes are located approximately 500m southeast of, and roughly
along strike from, the Indicated Resources at Dreiberg (Figure 1). They
targeted mineralisation identified by three previous drillholes completed by
the SDAG Wismut joint venture (between the Russian and East German
governments) in the early 1980s.  These returned intercepts of:

 

·      7.4m @ 1.72% Sn

·      3.2m @ 2.01% Sn and 2.0m @ 1.21% Sn

·      1.9m @ 1.57% Sn

Both drillholes intersected the skarn horizon and returned intercepts of:

 

·      5.9m @ 0.40% Sn (incl. 1.4m @ 1.26% Sn)

·      0.65m @ 0.34% Sn and 1.5m @ 0.75% Sn (incl. 0.6m @ 1.43% Sn)

These holes have successfully confirmed both the location and thickness of the
skarn and the tenor of tin and associated metals mineralisation.

 

The "30" series holes are located approximately 1,500m southeast of the
Indicated Resources at Dreiberg and approximately 850m south of the "20"
series holes. They were designed to target mineralisation outlined by two
previous Wismut drillholes that had returned intercepts of:

 

·      7.2m @ 2.15% Sn

·      3.8m @ 0.58% Sn (incl. 1.6m @ 1.00% Sn)

Due to difficulties encountered during drilling, both of the planned
drillholes hit the skarn horizon off-target (65m to 70m away from target
locations, see Figure 1) and hence did not accurately test the historical high
grade intercepts. However, the drillholes still intersected the targeted skarn
horizon and returned significant tin intercepts including:

 

·      2.90m @ 0.71% Sn (incl. 0.95m @ 2.02% Sn)

·      3.85m @ 0.63% Sn (incl. 1.35m @ 1.49% Sn)

 

Figure 1: Dreiberg Deep Drilling Summary Plan

 

DFS Update

 

Due to the slow operational performance of the Company's original drilling
contractor, and their inability to intersect the target zones in a controlled
manner at predefined positions, the current contract has been terminated.

 

First Tin is in the process of identifying a new contractor to take over the
Dreiberg drill programme, with the current intention that the new contractor
will drill the holes using RC to depths of between 300m and 500m and then to
convert to diamond drilling to test the target horizon. The next Dreiberg hole
(the fifth drilled by First Tin) is scheduled to commence in Q2 2023 and,
should this prove successful, the programme may be expanded to define
additional Indicated Resources in the Dreiberg area.

 

This drilling delay has put the proposed drilling programme behind schedule by
around six months, which has in turn put the revised resource estimate back by
around the same time. As such, it is now not anticipated that the DFS at First
Tin's Tellerhäuser asset will be completed by the end of 2023 as previously
expected. Depending on how the new contractor performs, the DFS is now
targeted to be completed in 2024.

 

However, the Board is pleased to highlight that the drilling to date has
obtained enough drill core to undertake mineral processing test work from
Dreiberg with half of the core from the drillholes being sent to ALS in
Burnie, Australia. This will be the first mineral processing testwork
conducted on Dreiberg mineralisation in over 40 years and will be useful as
variability testwork for the project as a whole.

 

Additional Historic Drilling Data

 

A further positive outcome is that a considerable amount of additional
historic drilling data has recently been located for the Tellerhäuser project
area. This new data came from previously unseen old Wismut uranium exploration
drillholes as well as some assay data that had not previously been able to be
located from three different archives in Freiberg. Following granting of the
Mining Licence in 2021, Saxore was able to request additional data, in
particular drillholes targeting uranium mineralisation, that were also assayed
for tin and other metals.

 

All of this data is currently being added to the main database and should
result in a more robust resource model and may lead to additional resource
tonnes being added very cost effectively. The additional identified data
represents an equivalent of around 3,500m of core drilling from surface,
4,500m of core drilling from underground and a number of other channel
samples.   Based on the new data from the Tellerhäuser drilling programme,
plus the additional historical data recently received, the Company expects to
publish an updated JORC compliant Resource Statement for Tellerhäuser in
June/July 2023.

 

While waiting for additional drilling results to be returned and while the new
historical drilling data is being analysed, the DFS will continue to progress
and will focus on the areas of mineral processing as well as investigating
optimal mining methods, mine access and environmental studies. All these
activities are well financed until end of 2023. A potential adjusted and
extended drilling programme for Tellerhäuser based on the results of the
updated Resource Statement may require further funding beyond the existing
budget.

 

 

First Tin CEO Thomas Buenger said, "It is highly encouraging that the results
from these four drillholes confirm continuity of higher grade mineralisation
previously identified by Wismut over 40 years ago.

The holes all intersected significant skarn mineralisation and suggest the
skarn is continuous and mineralisation is consistent.

 

"It is unfortunate that the drilling contractor was unable to achieve the
desired accuracy, however we are hopeful that this can be achieved by the new
contractor and look forward to reporting additional results as they become
available.

 

"The identification of significant additional data not previously available to
us is an excellent outcome and could potentially add resources at a
significant cost saving to drilling our own holes.  These new developments,
however, mean that we are now behind the previous schedule for our DFS and it
is considered unlikely that we will be able to complete the study in 2023 as
we previously expected.  We are still progressing those parts of the study
that are not dependent on the new drill data being added to the database, so
that we can finalise the DFS as soon as we can - most probably now in 2024
rather than in 2023. However, with the forthcoming tin deficit expected to be
of a long term nature, our project is still well aligned to provide critical
supply to meet demand."

 

 

 

Enquiries:

 

 First Tin                                                                      Via SEC Newgate below
 Thomas Buenger - Chief Executive Officer

 Arlington Group Asset Management Limited (Financial Advisor and Joint Broker)
 Simon Catt                                                                     020 7389 5016

 WH Ireland Limited (Joint Broker)
 Harry Ansell                                                                   020 7220 1670

 SEC Newgate (Financial Communications)
 Elisabeth Cowell / Axaule Shukanayeva /                                        07900 248 213

 Molly Gretton

 

Notes to Editors

First Tin is an ethical, reliable, and sustainable tin production company led
by a team of renowned tin specialists. The Company is focused on becoming a
tin supplier in conflict-free, low political risk jurisdictions through the
rapid development of high value, low capex tin assets in Germany and
Australia.

Tin is a critical metal, vital in any plan to decarbonise and electrify the
world, yet Europe has very little supply. Rising demand, together with
shortages, is expected to lead tin to experience sustained deficit markets for
the foreseeable future. Its assets have been de-risked significantly, with
extensive work undertaken to date.

First Tin's goal is to use best-in-class environmental standards to bring two
tin mines into production in three years, providing provenance of supply to
support the current global clean energy and technological revolutions.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
 or visit
www.rns.com (http://www.rns.com/)
.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
.   END  DRLEASDFFEADEFA

Recent news on First Tin

See all news