REG - First Tin PLC - Updated Mineral Resource Estimate

For best results when printing this announcement, please click on link below:
https://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20260430:nRSd4704Ca&default-theme=true

RNS Number : 4704C  First Tin PLC  30 April 2026

30 April 2026

First Tin PLC

("First Tin" or "the Company")

 

Updated Mineral Resource Estimate

First Tin PLC (the "Company"), a tin development company with advanced
projects in Germany and Australia, is pleased to report it has received an
updated Mineral Resource estimate (MRE) for its 100% owned Taronga Tin
Project ("Taronga") in New South Wales, Australia, prepared by H&S
Consultants Pty Ltd.

The updated MRE indicates the successful conversion of a significant
proportion of Inferred Resources into the Measured and Indicated categories,
supporting an expected increase in mine life and enhanced project economics
for the forthcoming optimised Definitive Feasibility Study ("DFS").

Highlights:

·      Measured Resources increased by 7,000t tin (15.8%) to 39.2Mt @
0.13% Sn (51,200t tin)

·      Indicated Resources increased by 4,400t tin (10.5%) to 46.5Mt @
0.10% Sn (46,400t tin)

·      Combined Measured & Indicated Resources increased by 11,400t
tin (13.3%) to 85.7Mt @ 0.11% Sn (97,700t tin)

·      Total Measured, Indicated & Inferred Resources of 132Mt @
0.10% Sn (136,600t tin) with over 71% of contained tin now in the higher
confidence Measured & Indicated categories

·      Maiden Inferred Resource Estimate for copper and silver
by-product metals associated with the tin mineralisation:

o  132Mt @ 0.05% Cu (60,600t copper)

o  132Mt @ 2.8g/t Ag (12.0Moz silver)

The increase in the Measured and Indicated Resources reflects the
reclassification of previously reported Inferred material following infill
drilling and updated geological interpretation.

Resource Update:

The updated MRE follows completion of a recent drilling programme primarily
aimed at upgrading Inferred Resources to Measured and Indicated categories
(see RNS dated 18 December 2025).  The resulting data and assays were
independently reviewed by H&S Consultants Pty Ltd.  The updated MRE has
been prepared and reported in accordance with the 2012 Edition of the JORC
Code & Guidelines, using a 0.05% cut-off as for the previous estimate, and
is shown in Table 1:

Table 1: Mineral Resource Estimate as of 31(st) March 2026 for the Taronga Tin
Deposit using a 0.05% Sn cut-off

 Category     Mt     Sn %  Sn Kt  Density t/m3
 Measured     39.2   0.13  51.2   2.72
 Indicated    46.5   0.10  46.4   2.74
 Ms & Id      85.7   0.11  97.7   2.73
 Inferred     46.2   0.08  38.9   2.75
 Total        132.0  0.10  136.6  2.74

The updated combined Measured and Indicated Resource estimate is 85.7Mt @
0.11% Sn (97,700t tin), an increase of 11,400t tin (13.3%) from the previous
estimate.  This increase is supporting an expected increase in mine life and
underpinning ongoing economic evaluations.

The Inferred Resource has correspondingly reduced to 46.2Mt @ 0.08% Sn
(38,900t tin), a decrease of 13,000t tin, mainly due to this reclassification
of material to Measured and Indicated categories, rather than depletion or
material changes in geological interpretation.

Total contained tin remains broadly unchanged at 136,600t compared to the
previous estimate of 138,300t tin.  The slight reduction of 1,700t tin is
primarily attributable to better definition of the weathering profile,
resulting in locally lower rock density assumptions.

By-Product Mineralisation:

The recent drilling, metallurgical testwork and a review of historical data
indicated the presence of silver and copper mineralisation associated with,
and spatially proximal to, the tin mineralisation (see RNS dated 18(th)
February 2026).  These metals were not previously included in the Company's
published MRE.

For the first time, in addition to tin, the updated MRE now includes an
Inferred Resource for the copper and silver by-products as shown in Table 2:

Table 2: Maiden Mineral Resource Estimate for Copper and Silver at the Taronga
Tin Deposit

 Category  Mt     Cu %  Ag ppm  Cu Kt  Ag Mozs  Density t/m3
 Inferred  132.0  0.05  2.8     60.6   12.0     2.75
 Total     132.0  0.05  2.8     60.6   12.0     2.74

The 60,600t copper and 12Moz silver will not be included in the optimised DFS
economic assessment due to their Inferred classification, reflecting
historical Newmont drilling that only assayed selected intervals for these
metals.

However, metallurgical testwork indicates that the copper and silver report to
sulphide residues in the proposed processing route, being upgraded to levels
of 137g/t (4.4oz/t) silver and 1.74% Copper. TMPL is currently assessing
technical and economic options for eventual extraction of these valuable
metals.

First Tin CEO, Bill Scotting, commented: "This resource update demonstrates
the successful conversion of targeted Inferred mineralisation into Measured
and Indicated categories, enabling inclusion in ongoing financial
evaluations.  This is a significant step forward for Taronga.

"We look forward to incorporating updated pit designs and an extended life of
mine, based on the new MRE, in our forthcoming DFS update.

"The maiden Inferred Resources for copper and silver highlight additional
longer-term value potential, which will be considered post the current DFS
optimisation work."

 

Competent Person Statement

Information in this announcement that relates to exploration results, data
quality and geological interpretations is based on information compiled by Mr
Antony Truelove. Mr Truelove is a Member of the Australian Institute of
Geoscientists (AIG) and the Australasian Institute of Mining and Metallurgy
(AusIMM). Mr Truelove has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration, and to the activities
undertaken, to qualify as a Competent Person as defined in the 2012 Edition of
the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Mr Truelove is Chief
Operating Officer of First Tin Plc and consents to the inclusion in this
announcement of the matters based on this information in the form and context
in which it appears.

Information in this announcement that relates to Mineral Resource estimation
is based on information compiled by Mr Simon Tear. Mr Tear is a Fellow of the
Australasian Institute of Mining and Metallurgy (AusIMM). Mr Tear has
sufficient experience relevant to the style of mineralisation and type of
deposit under consideration, and to the activities undertaken, to qualify as a
Competent Person as defined in the 2012 Edition of the Joint Ore Reserves
Committee (JORC) Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Tear is a director of H&S
Consultants Pty Ltd and consents to the inclusion in this announcement of the
matters based on this information in the form and context in which it appears.

Enquiries:

 First Tin                                                                      Via SEC Newgate below
 Bill Scotting - Chief Executive Officer

 Arlington Group Asset Management Limited (Financial Advisor and Joint Broker)
 Simon Catt                                                                     +44 (0)20 7389 5016

 Tamesis Partners LLP (Joint Broker)                                            +44 (0) 20 3882 2868
 Richard Greenfield / Charlie Bendon

 Zeus Capital Limited (Joint Broker)                                            +44 (0)20 3829 5000
 Harry Ansell / Dan Bristowe / Katy Mitchell

 SEC Newgate (Financial Communications)
 Robin Tozer / George Esmond / Gwen Samuel                                      +44 (0)7540 106366

                                                                                firsttin@secnewgate.co.uk

 

Notes to Editors

First Tin PLC is an ethical, reliable, and sustainable tin production company
led by a team of renowned tin specialists. The Company is focused on becoming
a tin supplier in conflict-free, low political risk jurisdictions through the
rapid development of high value, low capex tin assets in Germany and
Australia, which have been de-risked significantly, with extensive work
undertaken to date.

Tin is a critical metal, vital in any plan to decarbonise and electrify the
world, yet Europe and North America have very little supply. Rising demand,
together with shortages, is expected to lead tin to experience sustained
deficit markets for the foreseeable future.

First Tin's goal is to use best-in-class environmental standards to bring two
tin mines into production in three years, providing provenance of supply to
support the current global clean energy and technological revolution.

 

 
JORC Code, 2012 Edition - Table 1 Taronga Tin Project (TMPL)
Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

 Criteria                                                 JORC Code explanation                                                            Commentary
 Sampling techniques                                      ·    Nature and quality of sampling (eg cut channels, random chips, or           ·     Sampling consisted of two surface drilling phases:  Newmont 1979
                                                          specific specialised industry standard measurement tools appropriate to the      to 1982 and Taronga Mines Pty Ltd (TMPL) 2022 to 2025.
                                                          minerals under investigation, such as down hole gamma sondes, or handheld XRF

                                                          instruments, etc). These examples should not be taken as limiting the broad      ·     Diamond drilling (DD) was used to obtain 1m samples of NQ3/HQ3 core
                                                          meaning of sampling.                                                             which was sawn in half longitudinally. The half core was bagged and sent to a

                                                                                commercial laboratory for sample prep and assay. This is industry standard
                                                          ·    Include reference to measures taken to ensure sample representivity         work.
                                                          and the appropriate calibration of any measurement tools or systems used.

                                                                                ·     The Newmont open hole percussion (OHP) and JACRO percussion
                                                          ·    Aspects of the determination of mineralisation that are Material to         drilling was used to obtain 1m samples. (a JACRO percussion rig was used to
                                                          the Public Report.                                                               sample shallow areas with shallow angled drillholes).

                                                          ·    In cases where 'industry standard' work has been done this would be         ·     The TMPL Reverse Circulation (RC) drilling was used to obtain 1m
                                                          relatively simple (eg 'reverse circulation drilling was used to obtain 1 m       samples from a 4.5 inch diameter drill hole. This is industry standard work.
                                                          samples from which 3 kg was pulverised to produce a 30 g charge for fire

                                                          assay'). In other cases more explanation may be required, such as where there    ·     To ensure sample representivity all diamond drilling was triple
                                                          is coarse gold that has inherent sampling problems. Unusual commodities or       tube.
                                                          mineralisation types (eg submarine nodules) may warrant disclosure of detailed

                                                          information.                                                                     ·     To ensure sample representivity for RC sampling appropriate
                                                                                                                                           compressors were used for the OHP/JACRO/RC drilling to lift all the sample and
                                                                                                                                           prevent water inflows.

                                                                                                                                           ·     Mineralisation is characterised as sheeted quartz veins with minor
                                                                                                                                           cassiterite, arsenopyrite and chalcopyrite in hornfelsed metasediments. Veins
                                                                                                                                           are often hairline fractures and there is no obviously visible pervasive
                                                                                                                                           alteration associated with the hornfelsing. No discrete boundaries to the
                                                                                                                                           mineralisation are known to exist. Virtually all drilling samples were
                                                                                                                                           analysed and hence no prior determination of mineralisation was made.

                                                                                                                                           ·     Laboratory sample prep involved industry standard drying, weighing
                                                                                                                                           and crushing followed by splitting (where sample size was too large) and
                                                                                                                                           pulverising. For Newmont this was completed on site with analysis at a
                                                                                                                                           commercial laboratory, whilst for TMPL the sample prep and analysis was
                                                                                                                                           completed at a commercial laboratory. The subsequent pulp sample was analysed
                                                                                                                                           by an appropriate industry standard method for the time.
 Drilling techniques                                      ·    Drill type (eg core, reverse circulation, open-hole hammer, rotary          ·    Details of drilling for the general area:
                                                          air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
Company   Type   No of Holes  Metres
                                                          standard tube, depth of diamond tails, face-sampling bit or other type,          Newmont   DD     178          24,187
                                                          whether core is oriented and if so, by what method, etc).                             OHP    72           5,202
                                                                                                                                                JACRO  107          3,961
                                                                                                                                                Total  357          33,350

                                                                                                                                           TMPL      Type   No of Holes  Metres
                                                                                                                                                DD     13           1,619
                                                                                                                                                RC     143          12,188
                                                                                                                                                Total  59           13,807

                                                                                                                                           Combined  Type   No of Holes  Metres
                                                                                                                                                DD     191          25,806
                                                                                                                                                OHP    72           5,202
                                                                                                                                                RC     143          12,188
                                                                                                                                                JACRO  107          3,961
                                                                                                                                                Total  416          47,157

 

                                                                                                                                           Newmont

                                                                                                                                           ·    DD were collared HQ or with OHP, reducing to NQ triple tube once
                                                                                                                                           solid ground was met. Triple tube drilling was employed to maximise core
                                                                                                                                           recovery and minimise the loss of cassiterite. Core was not oriented.

                                                                                                                                           ·    OHP drilling was originally undertaken using a high pressure Schramm
                                                                                                                                           rig. Later percussion drilling, including all drillholes in the PG 400 series,
                                                                                                                                           used a high pressure T-3 rig with a 140mm tungsten bit. The rig was equipped
                                                                                                                                           with a primary cyclone connected to a manifold at the collar for sample
                                                                                                                                           recovery.  A secondary Donaldson filter was attached to the outlet of the
                                                                                                                                           primary cyclone to collect minus 5 micrometre dust.

                                                                                                                                           ·    A modified JACRO percussion rig equipped with a vacuum sample
                                                                                                                                           recovery system was used exclusively for Newmont's shallow angle drilling.

                                                                                                                                           TMPL

                                                                                                                                           ·    Diamond drilling was undertaken using an HQ bit with a soft matrix.
                                                                                                                                           Triple tube drill rods were used to ensure good core recovery and avoid
                                                                                                                                           washing out of cassiterite. Core was not oriented.

                                                                                                                                           ·    Percussion drilling was undertaken using a face sampling 4.5 inch
                                                                                                                                           "Black Diamond" hammer, 137mm PED (polycarbonate diamond) bit and a 4.5 inch,
                                                                                                                                           6m stainless steel rod. A tight shroud (3mm gap) ensured the holes remained as
                                                                                                                                           straight as possible. A 350psi, 900cfm compressor was used to keep holes dry
                                                                                                                                           and ensure all heavy minerals such as cassiterite are recovered.
 Drill sample recovery                                    ·    Method of recording and assessing core and chip sample recoveries and       ·    All core intervals were measured and compared with the drillers marks
                                                          results assessed.                                                                to determine actual recovery. Recovery was generally 100% apart from isolated

                                                                                intervals with poor ground conditions, generally either near surface or in
                                                          ·    Measures taken to maximise sample recovery and ensure representative        fault zones. Average recovery for Newmont DD is 97.3% with average recovery
                                                          nature of the samples.                                                           for TMPL DD of 96.8%

                                                          ·    Whether a relationship exists between sample recovery and grade and         ·    Sample recovery for the TMPL RC drilling was based on visual
                                                          whether sample bias may have occurred due to preferential loss/gain of           volumetric observation of drill chips entering 50L containers off the cyclone
                                                          fine/coarse material.                                                            and was estimated to be very good in general (>90%).

                                                                                                                                           ·    No information on the JACRO holes' recovery was available.

                                                                                                                                           ·    All diamond drilling used triple tube rods to maximise sample
                                                                                                                                           recovery.

                                                                                                                                           ·    There is some speculation by TMPL that the drilling and core cutting
                                                                                                                                           processes may have resulted in small scale loss of tin through washout
                                                                                                                                           associated with the vein margins and very small vughs in the tin-bearing
                                                                                                                                           veins. Conclusive evidence for this is lacking.

                                                                                                                                           ·    For the percussion drilling a high pressure and volume compressor was
                                                                                                                                           used to ensure good sample return and to keep holes dry. No significant water
                                                                                                                                           was encountered meaning sample quality was good. The hole was cleaned out with
                                                                                                                                           compressed air after every rod change and no significant volume of material
                                                                                                                                           was returned via this process.

                                                                                                                                           ·    No relationship can be seen between recovery and tin grade. No sample
                                                                                                                                           bias is noted.

                                                                                                                                           ·    Previous work by Mining One suggested that there was downhole
                                                                                                                                           smearing of tin grade associated with the JACRO drilling based on
                                                                                                                                           geostatistical work, but a review of the Newmont JACRO/DD twin hole drilling
                                                                                                                                           indicated no bias; check modelling without the JACRO drilling indicated no
                                                                                                                                           difference in global block grades. Visual inspection might suggest possible
                                                                                                                                           smearing but it is difficult to be certain. The JACRO holes were included in
                                                                                                                                           the Mineral Resource estimate.
 Logging                                                  ·    Whether core and chip samples have been geologically and                    ·    All samples have been geologically logged to a level of detail to
                                                          geotechnically logged to a level of detail to support appropriate Mineral        support appropriate mineral estimation, mining, and metallurgical studies.
                                                          Resource estimation, mining studies and metallurgical studies.

                                                                                ·    The TMPL diamond holes have been geotechnically logged to a level of
                                                          ·    Whether logging is qualitative or quantitative in nature. Core (or          detail to support appropriate mineral estimation, mining, and metallurgical
                                                          costean, channel, etc) photography.                                              studies

                                                          ·    The total length and percentage of the relevant intersections logged.       ·    All drill core logging is both qualitative and quantitative in
                                                                                                                                           nature, with the TMPL logging following a strict set of guidelines. The entire
                                                                                                                                           length each hole has been logged.

                                                                                                                                           ·    The Newmont drilling was completed as hardcopy logsheets which were
                                                                                                                                           transcribed into a digital format in 2013 by AusTin Mining. All TMPL core was
                                                                                                                                           digitally logged and has been photographed.

                                                                                                                                           ·    All RC, OHP and JACRO logging is semi-quantitative in nature, with
                                                                                                                                           the TMPL RC drilling following a strict set of guidelines, with percentage
                                                                                                                                           estimates made. Representative sub-samples were collected, sieved and
                                                                                                                                           selectively panned to visually estimate heavy mineral content. A sub-set of
                                                                                                                                           rock chips for each RC sample are kept in chip-trays for reference and stored
                                                                                                                                           on site.
 Sub-sampling techniques and sample preparation           ·    If core, whether cut or sawn and whether quarter, half or all core          Newmont drilling sample prep:
                                                          taken.

                                                                                ·    NQ core was sawn in half longitudinally at 1m intervals with one half
                                                          ·    If non-core, whether riffled, tube sampled, rotary split, etc and           dispatched to Analabs Pty Limited ("Analabs") in Perth, Australia for assay.
                                                          whether sampled wet or dry.                                                      The half core selected for assay was crushed (size unknown) then ground to 500

                                                                                microns from which a 100g sample was split and pulverized to less than 75
                                                          ·    For all sample types, the nature, quality and appropriateness of the        microns. A lab duplicate of each tenth sample was split and pulverised to
                                                          sample preparation technique.                                                    check sample preparation and assaying reliability. These were appropriate,

                                                                                industry standard sampling and sample preparation techniques for the time.
                                                          ·    Quality control procedures adopted for all sub-sampling stages to

                                                          maximise representivity of samples.                                              ·    All 1m percussion drill samples were prepared for assay on site using

                                                                                four stages of size reduction comprising jaw crusher, rolls crusher, disc
                                                          ·    Measures taken to ensure that the sampling is representative of the         grinder and ring grinder (pulveriser), with sample splitting between stages in
                                                          in situ material collected, including for instance results for field             accord with Pierre Gy's "Particulate Sampling Procedures".  The pulverised
                                                          duplicate/second-half sampling.                                                  material was dispatched to Analabs in Perth for assay.

                                                          ·    Whether sample sizes are appropriate to the grain size of the               ·    A duplicate of each tenth sample was split and pulverised to check
                                                          material being sampled.                                                          sample preparation and assaying reliability. These were appropriate, industry
                                                                                                                                           standard sampling and sample preparation techniques at the time.

                                                                                                                                           ·    Duplicate samples showed that a majority of duplicate Sn assays
                                                                                                                                           deviated by less than 2.5% relative to a "perfect correlation".

                                                                                                                                           TMPL drilling sample prep:

                                                                                                                                           ·    HQ core was sawn in half longitudinally after fitting together of
                                                                                                                                           core across drillers breaks and a reference line marked on the core. A
                                                                                                                                           consistent side of the core is taken for sampling with the samples sent to the
                                                                                                                                           ALS laboratory in Brisbane, Australia for sample prep and analysis.

                                                                                                                                           ·    All RC cuttings, as 1m samples, were split using an in-built cone
                                                                                                                                           splitter on the cyclone set to deliver approximately 7% of the sample into a
                                                                                                                                           prenumbered calico bag. Remaining chips were dropped into a 50L container and
                                                                                                                                           volumetrically checked for good sample return. The sub-sample is sent to the
                                                                                                                                           ALS laboratory in Brisbane for sample prep and analysis.

                                                                                                                                           ·    Prior to dispatch of samples, the following QAQC samples were added:

                                                                                                                                           o    Field duplicates are added at the rate of 1 in 200 samples for RC.
                                                                                                                                           These are riffle split from the original sample on site.

                                                                                                                                           o    For diamond drilling, the half core is split into two quarter cores
                                                                                                                                           every 1 in 20 samples and these are sent as field duplicates.

                                                                                                                                           ·    Core and RC chip sample prep consists of crushing to 70% passing 6mm
                                                                                                                                           with splitting used if crushed sample is over 3kg. The entire sample or
                                                                                                                                           sub-sample is then pulverized in a mill to 85% finer than 75µm.

                                                                                                                                           ·    Laboratory duplicates numbered 446 samples with an insertion rate of
                                                                                                                                           1 in 35.  Despite some of the low data numbers (i.e. field duplicates = 27),
                                                                                                                                           there were no obvious issues noted with the results.

                                                                                                                                           ·    Sample sizes are considered appropriate for the material being
                                                                                                                                           sampled as the tin mineralisation occurs as cassiterite (SnO(2)) within
                                                                                                                                           sub-vertical veins that are between 0.05mm and 0.5cm wide (rarely to 5cm) and
                                                                                                                                           cassiterite crystals are smaller than the vein width. Vein density varies from
                                                                                                                                           about 5/m to greater than 20/m and hence several veins are sampled in each
                                                                                                                                           metre. This compares favourably with the sample size that is approximately
                                                                                                                                           10,000 cm(3) for RC and 3,200cm(3) for HQ core before sub-sampling.

                                                                                                                                           ·    No independent sizing checks were completed. The ALS Lab completed
                                                                                                                                           its own internal checks and reported the results.
 Quality of assay data and laboratory tests               ·    The nature, quality and appropriateness of the assaying and                 Newmont
                                                          laboratory procedures used and whether the technique is considered partial or

                                                          total.                                                                           ·    All Sn assays were performed by taking 10g samples from the 100g

                                                                                pulverised samples. The samples were analysed for Sn using pressed powder
                                                          ·    For geophysical tools, spectrometers, handheld XRF instruments, etc,        X-ray fluorescence at Analabs, Perth. Pressed powder X-ray fluorescence was
                                                          the parameters used in determining the analysis including instrument make and    the industry standard for Sn analysis at the time.
                                                          model, reading times, calibrations factors applied and their derivation, etc.

                                                                                ·    Comparison of Sn assays of samples from diamond drill and percussion
                                                          ·    Nature of quality control procedures adopted (eg standards, blanks,         holes was good and no bias between the two sets of analyses is evident.
                                                          duplicates, external laboratory checks) and whether acceptable levels of

                                                          accuracy (ie lack of bias) and precision have been established.                  ·    For every 30 samples, four standards were inserted on rotation. In
                                                                                                                                           addition, every tenth sample was an assayed lab duplicate.

                                                                                                                                           ·    Selected samples were check assayed at other laboratories and using
                                                                                                                                           other assay methods, including an XRF method developed by Cleveland Tin
                                                                                                                                           Limited in Tasmania which was a significant Australian tin producer at the
                                                                                                                                           time. The checks confirmed that Analab's procedures were satisfactory and that
                                                                                                                                           sample preparation and assay quality were consistently maintained by Analabs.

                                                                                                                                           TMPL

                                                                                                                                           ·    All Sn assays were performed on a 0.1g sub-sample of the pulverised
                                                                                                                                           and mixed material, which was taken and fused with lithium borate. The fused
                                                                                                                                           bead is then analysed by a mass spectrometer using method ME-MS85 which
                                                                                                                                           reports Sn, W, Ta and Nb. This returns a total tin content, including tin as
                                                                                                                                           cassiterite. Over limit assays of tin are re-analysed using method ME-XRF15b
                                                                                                                                           which involves fusion with lithium metaborate with a lithium tetraborate flux
                                                                                                                                           containing 20% NaNO(3) with an XRF finish.

                                                                                                                                           ·    Other elements are analysed by method ME-ICP61 using a 0.25g
                                                                                                                                           sub-sample. This involves a 4 acid digest with an ICP-AES finish. This is an
                                                                                                                                           industry standard technique for a suite of 34 elements, including tin, copper,
                                                                                                                                           arsenic, sulphur and silver. The tin assay is only acid soluble tin and thus
                                                                                                                                           can be subtracted from the fusion tin assays to obtain tin as cassiterite.
                                                                                                                                           Acid soluble tin is generally associated with stannite and in the lattice of
                                                                                                                                           silicates. The acid soluble tin is generally insignificant in relation to tin
                                                                                                                                           as cassiterite at Taronga.

                                                                                                                                           ·    Prior to dispatch of samples, the following QAQC samples were added:

                                                                                                                                           o    4 Certified Reference Materials (527 samples), representative of the
                                                                                                                                           expected grades were inserted into the sample suite at the rate of 1 in 35
                                                                                                                                           samples.

                                                                                                                                           o    Coarse Blanks (362 samples) were inserted at the rate of 1 in 35
                                                                                                                                           samples.

                                                                                                                                           ·    If results for the CRMs indicated a >5% assay error, the sample
                                                                                                                                           was compared with other CRMs in the same batch. If other CRMs indicated
                                                                                                                                           similar errors the lab was contacted to review.

                                                                                                                                           ·    All QAQC data is within acceptable limits.
 Verification of sampling and assaying                    ·    The verification of significant intersections by either independent         Newmont
                                                          or alternative company personnel.

                                                                                ·    There is no information on any verification of significant
                                                          ·    The use of twinned holes.                                                   intersections by either independent or alternative company personnel.

                                                          ·    Documentation of primary data, data entry procedures, data                  ·    Geological interpretations were made using cross-sections and level
                                                          verification, data storage (physical and electronic) protocols.                  plans. Mining One accepted the Northern Zone 101 and the Southern Zones of

                                                                                Payback, Payback Extended, Hillside and Hillside Extended were interpreted on
                                                          ·    Discuss any adjustment to assay data.                                       cross-sections as reported in a Pre-feasibility Study prepared by Newmont
                                                                                                                                           Holdings Pty Ltd in 1982.

                                                                                                                                           ·    A small number of twinned holes (10 pairs) were completed by Newmont
                                                                                                                                           and comparison of length weighted intercepts indicated no obvious bias.

                                                                                                                                           ·    There is no information available on documentation of primary data,
                                                                                                                                           data entry procedures, data verification, data storage. It is assumed all data
                                                                                                                                           was paper copies subsequently transcribed by AusTinMining using a data entry
                                                                                                                                           bureau service.

                                                                                                                                           ·    There are no reports of any adjustments made to the assay data,
                                                                                                                                           although it appears that some transcribed assay data was limited to 2 decimal
                                                                                                                                           places rendering very low grade data as zeroes.

                                                                                                                                           TMPL

                                                                                                                                           ·    Simon Tear, a director of independent consultants H&S Consultants
                                                                                                                                           Pty Ltd, has viewed and verified all core from 6 DD holes.

                                                                                                                                           ·    Twinning of previous Newmont drillholes has included:

                                                                                                                                           o  11 TMPL DD twins of Newmont DD Holes

                                                                                                                                           o  2 TMPL DD twins of Newmont OPH holes

                                                                                                                                           o  5 TMPL RC twins of Newmont OPH holes

                                                                                                                                           ·    Twin holes were selected to represent all zones of mineralisation and
                                                                                                                                           the length of the known deposit.

                                                                                                                                           ·    All results are within acceptable limits taking into account any
                                                                                                                                           possible nugget effect resulting from coarse cassiterite (noticed in three
                                                                                                                                           drill intersections). Due to the small number of high grade veins, top cutting
                                                                                                                                           of the high grade assays has a negligible effect on the overall grade.

                                                                                                                                           ·    All data is recorded on site in MSExcel spreadsheets and this is
                                                                                                                                           later transferred via cut and paste to an MSAccess database - the main data
                                                                                                                                           repository by the Senior Site Geologist. Detailed protocols for data
                                                                                                                                           recording, logging codes etc are used.  The assay data is received from the
                                                                                                                                           laboratory (ALS) via csv and pdf digital file format with attached
                                                                                                                                           certificates.

                                                                                                                                           ·    Assays below lower detection limits were substituted to half lower
                                                                                                                                           detection limit.
 Location of data points                                  ·    Accuracy and quality of surveys used to locate drill holes (collar          Newmont
                                                          and down-hole surveys), trenches, mine workings and other locations used in

                                                          Mineral Resource estimation.                                                     ·    Drill hole collars were located by theodolite traverses by qualified

                                                                                surveyors.
                                                          ·    Specification of the grid system used.

                                                                                ·    A local grid parallel to the strike of the mineralisation was used.
                                                          ·    Quality and adequacy of topographic control.                                Local grid north has a bearing of 055.103(O) true. A 3.5km baseline was
                                                                                                                                           surveyed with surveyed cross-lines at 100m intervals.

                                                                                                                                           ·    Holes were surveyed down-hole for azimuth and dip using down-hole
                                                                                                                                           cameras with a range of downhole depths from 15m to 50m. Given the generally
                                                                                                                                           non-magnetic nature of the mineralisation and the host rocks, this was a
                                                                                                                                           reasonable survey method.

                                                                                                                                           ·    Topographic maps at 1:1000 scale were prepared by Australian Aerial
                                                                                                                                           Mapping. The maps were related to the local grid.

                                                                                                                                           TMPL

                                                                                                                                           ·    All hole collars are accurately surveyed post drilling with an RTK
                                                                                                                                           GPS (+/-0.1m accuracy).

                                                                                                                                           ·    All DD are surveyed downhole at 30m intervals using Axis Champ
                                                                                                                                           Gyroscope.

                                                                                                                                           ·    All 2023 RC holes are surveyed downhole at 30m intervals using a
                                                                                                                                           single shot Trushot Digital survey tool including a surface collar dip and
                                                                                                                                           azimuth measurement.

                                                                                                                                           ·    All 2025 RC holes had a DeviAligner surveying tool to set azimuth and
                                                                                                                                           declination at the collar. Down hole surveys were then completed nominally at
                                                                                                                                           30m intervals with a Reflex OMNIx42 - Multishot surveying tool.

                                                                                                                                           ·    The grid system used is GDA94, zone 56.

                                                                                                                                           ·    Topography is obtained via a LiDAR survey flown in late 2022 and is
                                                                                                                                           to sub-10cm accuracy.

                                                                                                                                           ·    All data was converted to local grid by H&SC for resource
                                                                                                                                           estimation work.

                                                                                                                                           ·   H&SC undertook field measurement of 20 drill collars from both
                                                                                                                                           phases using a hand held GPS.  Average discrepancy was 0.5m in the easting
                                                                                                                                           and 0.5m in the northing.
 Data spacing and distribution                            ·    Data spacing for reporting of Exploration Results.                          ·    The Newmont drilling was nominally on a 50m by 50m pattern with 25m

                                                                                infill drilling in some areas.
                                                          ·    Whether the data spacing and distribution is sufficient to establish

                                                          the degree of geological and grade continuity appropriate for the Mineral        ·    The TMPL drilling completed in 2023/25 was nominally at the same 50m
                                                          Resource and Ore Reserve estimation procedure(s) and classifications applied.    by 50m spacing.

                                                          ·    Whether sample compositing has been applied.                                ·    Virtually all downhole sampling was 1m intervals from surface.

                                                                                                                                           ·    Data spacing is sufficient to establish the geological and grade
                                                                                                                                           continuity appropriate for the Mineral Resource estimation and classification
                                                                                                                                           procedures applied for this report.

                                                                                                                                           ·    Minor zones of unsampled material exist mainly from the South Pit
                                                                                                                                           area.

                                                                                                                                           ·    No sample compositing has been applied.
 Orientation of data in relation to geological structure  ·    Whether the orientation of sampling achieves unbiased sampling of           ·    The drilling is oriented at 90° to the strike of the sheeted vein
                                                          possible structures and the extent to which this is known, considering the       system.
                                                          deposit type.

                                                                                ·    The vein system is sub-vertical and the drilling is angled between
                                                          ·    If the relationship between the drilling orientation and the                -25° and -60° to be as close as possible to cutting across the veins at
                                                          orientation of key mineralised structures is considered to have introduced a     90°. Due to difficulties drilling at very shallow angles, especially with RC,
                                                          sampling bias, this should be assessed and reported if material.                 a default angle of -60° was adopted for the later TMPL drillholes.

                                                                                                                                           ·    As drilling was designed to cut the main sheeted vein system at as
                                                                                                                                           high an angle as possible, the potential for any introduced sampling bias is
                                                                                                                                           considered minor.
 Sample security                                          ·    The measures taken to ensure sample security.                               ·    Samples of Newmont drill core and percussion chips were bagged and
                                                                                                                                           tagged and shipped to the assay laboratory by independent third party
                                                                                                                                           transport. No further information is available.

                                                                                                                                           ·    A chain of custody was maintained for all TMPL drilling.

                                                                                                                                           ·    TMPL samples were placed in calico bags in groups of seven which were
                                                                                                                                           then wrapped in opaque polyweave bags, stacked on a palette and wrapped with
                                                                                                                                           pallet wrap and tape.

                                                                                                                                           ·    Samples sent to the lab via registered courier with tracking
                                                                                                                                           capabilities.

                                                                                                                                           ·    Samples arrive at the lab and were cross checked with a separate
                                                                                                                                           despatch form (electronically sent to ALS).
 Audits or reviews                                        ·    The results of any audits or reviews of sampling techniques and data.       ·    A review of the TMPL sampling procedures and protocols was completed
                                                                                                                                           by Simon Tear of independent consultants H&S Consultants Pty Ltd whilst
                                                                                                                                           drilling was in progress, with some recommendations.

 

Newmont

·    DD were collared HQ or with OHP, reducing to NQ triple tube once
solid ground was met. Triple tube drilling was employed to maximise core
recovery and minimise the loss of cassiterite. Core was not oriented.

·    OHP drilling was originally undertaken using a high pressure Schramm
rig. Later percussion drilling, including all drillholes in the PG 400 series,
used a high pressure T-3 rig with a 140mm tungsten bit. The rig was equipped
with a primary cyclone connected to a manifold at the collar for sample
recovery.  A secondary Donaldson filter was attached to the outlet of the
primary cyclone to collect minus 5 micrometre dust.

·    A modified JACRO percussion rig equipped with a vacuum sample
recovery system was used exclusively for Newmont's shallow angle drilling.

 

TMPL

·    Diamond drilling was undertaken using an HQ bit with a soft matrix.
Triple tube drill rods were used to ensure good core recovery and avoid
washing out of cassiterite. Core was not oriented.

·    Percussion drilling was undertaken using a face sampling 4.5 inch
"Black Diamond" hammer, 137mm PED (polycarbonate diamond) bit and a 4.5 inch,
6m stainless steel rod. A tight shroud (3mm gap) ensured the holes remained as
straight as possible. A 350psi, 900cfm compressor was used to keep holes dry
and ensure all heavy minerals such as cassiterite are recovered.

Drill sample recovery

·    Method of recording and assessing core and chip sample recoveries and
results assessed.

·    Measures taken to maximise sample recovery and ensure representative
nature of the samples.

·    Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.

·    All core intervals were measured and compared with the drillers marks
to determine actual recovery. Recovery was generally 100% apart from isolated
intervals with poor ground conditions, generally either near surface or in
fault zones. Average recovery for Newmont DD is 97.3% with average recovery
for TMPL DD of 96.8%

·    Sample recovery for the TMPL RC drilling was based on visual
volumetric observation of drill chips entering 50L containers off the cyclone
and was estimated to be very good in general (>90%).

·    No information on the JACRO holes' recovery was available.

·    All diamond drilling used triple tube rods to maximise sample
recovery.

·    There is some speculation by TMPL that the drilling and core cutting
processes may have resulted in small scale loss of tin through washout
associated with the vein margins and very small vughs in the tin-bearing
veins. Conclusive evidence for this is lacking.

·    For the percussion drilling a high pressure and volume compressor was
used to ensure good sample return and to keep holes dry. No significant water
was encountered meaning sample quality was good. The hole was cleaned out with
compressed air after every rod change and no significant volume of material
was returned via this process.

·    No relationship can be seen between recovery and tin grade. No sample
bias is noted.

·    Previous work by Mining One suggested that there was downhole
smearing of tin grade associated with the JACRO drilling based on
geostatistical work, but a review of the Newmont JACRO/DD twin hole drilling
indicated no bias; check modelling without the JACRO drilling indicated no
difference in global block grades. Visual inspection might suggest possible
smearing but it is difficult to be certain. The JACRO holes were included in
the Mineral Resource estimate.

Logging

·    Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.

·    Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.

·    The total length and percentage of the relevant intersections logged.

·    All samples have been geologically logged to a level of detail to
support appropriate mineral estimation, mining, and metallurgical studies.

·    The TMPL diamond holes have been geotechnically logged to a level of
detail to support appropriate mineral estimation, mining, and metallurgical
studies

·    All drill core logging is both qualitative and quantitative in
nature, with the TMPL logging following a strict set of guidelines. The entire
length each hole has been logged.

·    The Newmont drilling was completed as hardcopy logsheets which were
transcribed into a digital format in 2013 by AusTin Mining. All TMPL core was
digitally logged and has been photographed.

·    All RC, OHP and JACRO logging is semi-quantitative in nature, with
the TMPL RC drilling following a strict set of guidelines, with percentage
estimates made. Representative sub-samples were collected, sieved and
selectively panned to visually estimate heavy mineral content. A sub-set of
rock chips for each RC sample are kept in chip-trays for reference and stored
on site.

Sub-sampling techniques and sample preparation

·    If core, whether cut or sawn and whether quarter, half or all core
taken.

·    If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.

·    For all sample types, the nature, quality and appropriateness of the
sample preparation technique.

·    Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.

·    Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.

·    Whether sample sizes are appropriate to the grain size of the
material being sampled.

Newmont drilling sample prep:

·    NQ core was sawn in half longitudinally at 1m intervals with one half
dispatched to Analabs Pty Limited ("Analabs") in Perth, Australia for assay.
The half core selected for assay was crushed (size unknown) then ground to 500
microns from which a 100g sample was split and pulverized to less than 75
microns. A lab duplicate of each tenth sample was split and pulverised to
check sample preparation and assaying reliability. These were appropriate,
industry standard sampling and sample preparation techniques for the time.

·    All 1m percussion drill samples were prepared for assay on site using
four stages of size reduction comprising jaw crusher, rolls crusher, disc
grinder and ring grinder (pulveriser), with sample splitting between stages in
accord with Pierre Gy's "Particulate Sampling Procedures".  The pulverised
material was dispatched to Analabs in Perth for assay.

·    A duplicate of each tenth sample was split and pulverised to check
sample preparation and assaying reliability. These were appropriate, industry
standard sampling and sample preparation techniques at the time.

·    Duplicate samples showed that a majority of duplicate Sn assays
deviated by less than 2.5% relative to a "perfect correlation".

 

TMPL drilling sample prep:

·    HQ core was sawn in half longitudinally after fitting together of
core across drillers breaks and a reference line marked on the core. A
consistent side of the core is taken for sampling with the samples sent to the
ALS laboratory in Brisbane, Australia for sample prep and analysis.

·    All RC cuttings, as 1m samples, were split using an in-built cone
splitter on the cyclone set to deliver approximately 7% of the sample into a
prenumbered calico bag. Remaining chips were dropped into a 50L container and
volumetrically checked for good sample return. The sub-sample is sent to the
ALS laboratory in Brisbane for sample prep and analysis.

·    Prior to dispatch of samples, the following QAQC samples were added:

o    Field duplicates are added at the rate of 1 in 200 samples for RC.
These are riffle split from the original sample on site.

o    For diamond drilling, the half core is split into two quarter cores
every 1 in 20 samples and these are sent as field duplicates.

·    Core and RC chip sample prep consists of crushing to 70% passing 6mm
with splitting used if crushed sample is over 3kg. The entire sample or
sub-sample is then pulverized in a mill to 85% finer than 75µm.

·    Laboratory duplicates numbered 446 samples with an insertion rate of
1 in 35.  Despite some of the low data numbers (i.e. field duplicates = 27),
there were no obvious issues noted with the results.

·    Sample sizes are considered appropriate for the material being
sampled as the tin mineralisation occurs as cassiterite (SnO(2)) within
sub-vertical veins that are between 0.05mm and 0.5cm wide (rarely to 5cm) and
cassiterite crystals are smaller than the vein width. Vein density varies from
about 5/m to greater than 20/m and hence several veins are sampled in each
metre. This compares favourably with the sample size that is approximately
10,000 cm(3) for RC and 3,200cm(3) for HQ core before sub-sampling.

·    No independent sizing checks were completed. The ALS Lab completed
its own internal checks and reported the results.

Quality of assay data and laboratory tests

·    The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered partial or
total.

·    For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.

·    Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.

Newmont

·    All Sn assays were performed by taking 10g samples from the 100g
pulverised samples. The samples were analysed for Sn using pressed powder
X-ray fluorescence at Analabs, Perth. Pressed powder X-ray fluorescence was
the industry standard for Sn analysis at the time.

·    Comparison of Sn assays of samples from diamond drill and percussion
holes was good and no bias between the two sets of analyses is evident.

·    For every 30 samples, four standards were inserted on rotation. In
addition, every tenth sample was an assayed lab duplicate.

·    Selected samples were check assayed at other laboratories and using
other assay methods, including an XRF method developed by Cleveland Tin
Limited in Tasmania which was a significant Australian tin producer at the
time. The checks confirmed that Analab's procedures were satisfactory and that
sample preparation and assay quality were consistently maintained by Analabs.

 

TMPL

·    All Sn assays were performed on a 0.1g sub-sample of the pulverised
and mixed material, which was taken and fused with lithium borate. The fused
bead is then analysed by a mass spectrometer using method ME-MS85 which
reports Sn, W, Ta and Nb. This returns a total tin content, including tin as
cassiterite. Over limit assays of tin are re-analysed using method ME-XRF15b
which involves fusion with lithium metaborate with a lithium tetraborate flux
containing 20% NaNO(3) with an XRF finish.

·    Other elements are analysed by method ME-ICP61 using a 0.25g
sub-sample. This involves a 4 acid digest with an ICP-AES finish. This is an
industry standard technique for a suite of 34 elements, including tin, copper,
arsenic, sulphur and silver. The tin assay is only acid soluble tin and thus
can be subtracted from the fusion tin assays to obtain tin as cassiterite.
Acid soluble tin is generally associated with stannite and in the lattice of
silicates. The acid soluble tin is generally insignificant in relation to tin
as cassiterite at Taronga.

·    Prior to dispatch of samples, the following QAQC samples were added:

o    4 Certified Reference Materials (527 samples), representative of the
expected grades were inserted into the sample suite at the rate of 1 in 35
samples.

o    Coarse Blanks (362 samples) were inserted at the rate of 1 in 35
samples.

·    If results for the CRMs indicated a >5% assay error, the sample
was compared with other CRMs in the same batch. If other CRMs indicated
similar errors the lab was contacted to review.

·    All QAQC data is within acceptable limits.

Verification of sampling and assaying

·    The verification of significant intersections by either independent
or alternative company personnel.

·    The use of twinned holes.

·    Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.

·    Discuss any adjustment to assay data.

Newmont

·    There is no information on any verification of significant
intersections by either independent or alternative company personnel.

·    Geological interpretations were made using cross-sections and level
plans. Mining One accepted the Northern Zone 101 and the Southern Zones of
Payback, Payback Extended, Hillside and Hillside Extended were interpreted on
cross-sections as reported in a Pre-feasibility Study prepared by Newmont
Holdings Pty Ltd in 1982.

·    A small number of twinned holes (10 pairs) were completed by Newmont
and comparison of length weighted intercepts indicated no obvious bias.

·    There is no information available on documentation of primary data,
data entry procedures, data verification, data storage. It is assumed all data
was paper copies subsequently transcribed by AusTinMining using a data entry
bureau service.

·    There are no reports of any adjustments made to the assay data,
although it appears that some transcribed assay data was limited to 2 decimal
places rendering very low grade data as zeroes.

 

TMPL

·    Simon Tear, a director of independent consultants H&S Consultants
Pty Ltd, has viewed and verified all core from 6 DD holes.

·    Twinning of previous Newmont drillholes has included:

o  11 TMPL DD twins of Newmont DD Holes

o  2 TMPL DD twins of Newmont OPH holes

o  5 TMPL RC twins of Newmont OPH holes

·    Twin holes were selected to represent all zones of mineralisation and
the length of the known deposit.

·    All results are within acceptable limits taking into account any
possible nugget effect resulting from coarse cassiterite (noticed in three
drill intersections). Due to the small number of high grade veins, top cutting
of the high grade assays has a negligible effect on the overall grade.

·    All data is recorded on site in MSExcel spreadsheets and this is
later transferred via cut and paste to an MSAccess database - the main data
repository by the Senior Site Geologist. Detailed protocols for data
recording, logging codes etc are used.  The assay data is received from the
laboratory (ALS) via csv and pdf digital file format with attached
certificates.

·    Assays below lower detection limits were substituted to half lower
detection limit.

Location of data points

·    Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.

·    Specification of the grid system used.

·    Quality and adequacy of topographic control.

Newmont

·    Drill hole collars were located by theodolite traverses by qualified
surveyors.

·    A local grid parallel to the strike of the mineralisation was used.
Local grid north has a bearing of 055.103(O) true. A 3.5km baseline was
surveyed with surveyed cross-lines at 100m intervals.

·    Holes were surveyed down-hole for azimuth and dip using down-hole
cameras with a range of downhole depths from 15m to 50m. Given the generally
non-magnetic nature of the mineralisation and the host rocks, this was a
reasonable survey method.

·    Topographic maps at 1:1000 scale were prepared by Australian Aerial
Mapping. The maps were related to the local grid.

 

TMPL

·    All hole collars are accurately surveyed post drilling with an RTK
GPS (+/-0.1m accuracy).

·    All DD are surveyed downhole at 30m intervals using Axis Champ
Gyroscope.

·    All 2023 RC holes are surveyed downhole at 30m intervals using a
single shot Trushot Digital survey tool including a surface collar dip and
azimuth measurement.

·    All 2025 RC holes had a DeviAligner surveying tool to set azimuth and
declination at the collar. Down hole surveys were then completed nominally at
30m intervals with a Reflex OMNIx42 - Multishot surveying tool.

·    The grid system used is GDA94, zone 56.

·    Topography is obtained via a LiDAR survey flown in late 2022 and is
to sub-10cm accuracy.

·    All data was converted to local grid by H&SC for resource
estimation work.

·   H&SC undertook field measurement of 20 drill collars from both
phases using a hand held GPS.  Average discrepancy was 0.5m in the easting
and 0.5m in the northing.

Data spacing and distribution

·    Data spacing for reporting of Exploration Results.

·    Whether the data spacing and distribution is sufficient to establish
the degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications applied.

·    Whether sample compositing has been applied.

·    The Newmont drilling was nominally on a 50m by 50m pattern with 25m
infill drilling in some areas.

·    The TMPL drilling completed in 2023/25 was nominally at the same 50m
by 50m spacing.

·    Virtually all downhole sampling was 1m intervals from surface.

·    Data spacing is sufficient to establish the geological and grade
continuity appropriate for the Mineral Resource estimation and classification
procedures applied for this report.

·    Minor zones of unsampled material exist mainly from the South Pit
area.

·    No sample compositing has been applied.

Orientation of data in relation to geological structure

·    Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.

·    If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.

·    The drilling is oriented at 90° to the strike of the sheeted vein
system.

·    The vein system is sub-vertical and the drilling is angled between
-25° and -60° to be as close as possible to cutting across the veins at
90°. Due to difficulties drilling at very shallow angles, especially with RC,
a default angle of -60° was adopted for the later TMPL drillholes.

·    As drilling was designed to cut the main sheeted vein system at as
high an angle as possible, the potential for any introduced sampling bias is
considered minor.

Sample security

·    The measures taken to ensure sample security.

·    Samples of Newmont drill core and percussion chips were bagged and
tagged and shipped to the assay laboratory by independent third party
transport. No further information is available.

·    A chain of custody was maintained for all TMPL drilling.

·    TMPL samples were placed in calico bags in groups of seven which were
then wrapped in opaque polyweave bags, stacked on a palette and wrapped with
pallet wrap and tape.

·    Samples sent to the lab via registered courier with tracking
capabilities.

·    Samples arrive at the lab and were cross checked with a separate
despatch form (electronically sent to ALS).

Audits or reviews

·    The results of any audits or reviews of sampling techniques and data.

·    A review of the TMPL sampling procedures and protocols was completed
by Simon Tear of independent consultants H&S Consultants Pty Ltd whilst
drilling was in progress, with some recommendations.

 
Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

 Criteria                                                          JORC Code explanation                                                            Commentary
 Mineral tenement and land tenure status                           ·    Type, reference name/number, location and ownership including               ·    The project is secured by two granted tenements: EL8407 and ML 1774,
                                                                   agreements or material issues with third parties such as joint ventures,         both of which are currently in good standing. These are held 100% by TMPL.
                                                                   partnerships, overriding royalties, native title interests, historical sites,

                                                                   wilderness or national park and environmental settings.                          ·    No joint ventures or other encumbrances are known. The underlying

                                                                                properties are freehold land owned 100% by TMPL apart from a block of Crown
                                                                   ·    The security of the tenure held at the time of reporting along with         Land that covers part of the southern deposit area as defined by Newmont.
                                                                   any known impediments to obtaining a licence to operate in the area.

                                                                                                                                                    ·    The Crown Land is the only land subject to Native Title. No Native
                                                                                                                                                    Title claims existed at the time the tenements were granted.

                                                                                                                                                    ·    No national parks, historical sites or environmental constraints are
                                                                                                                                                    known. Recent surveys have identified the "vulnerable" flora species Velvet
                                                                                                                                                    Wattle. This is currently being avoided as much as possible and is not
                                                                                                                                                    considered to be a major constraint moving forward.

                                                                                                                                                    ·    The only royalty is the state of NSW royalty of 4% on tin mined.
 Exploration done by other parties                                 ·    Acknowledgment and appraisal of exploration by other parties.               ·    Detailed exploration and feasibility studies were undertaken by
                                                                                                                                                    Newmont between 1979 and 1984. These have been used where applicable.

                                                                                                                                                    ·    This work was undertaken to a high standard and all data is
                                                                                                                                                    considered to be usable.
 Geology                                                           ·    Deposit type, geological setting and style of mineralisation.               ·    The tin deposit is a sheeted vein style +/- copper-silver with
                                                                                                                                                    horizontally and vertically extensive veins of
                                                                                                                                                    quartz-mica-cassiterite-sulphide +/-fluorite-topaz occurring over a combined
                                                                                                                                                    area of up to 2,700m by 270m.

                                                                                                                                                    ·    The veins vary in thickness from less than 0.5mm to 100mm but are
                                                                                                                                                    generally between 1mm and 10mm thick. They average about 20 veins per metre in
                                                                                                                                                    the mineral zones.

                                                                                                                                                    ·    The host rock is hornfels derived by contact metamorphism of
                                                                                                                                                    Permian-aged metasediments by Triassic-aged granites.

                                                                                                                                                    ·    The source of mineralising fluids is interpreted to be an underlying
                                                                                                                                                    intrusion of the Triassic Mole Leucogranite, a reduced, highly fractionated, A
                                                                                                                                                    to I type granite. The metals of interest (Sn, Cu, Ag) are interpreted to have
                                                                                                                                                    been enriched in the late magmatic fluid of this granite via enrichment of
                                                                                                                                                    incompatible elements during fractional crystallisation. Breaching of the
                                                                                                                                                    magma chamber during brittle faulting in an ENE orientation, producing a
                                                                                                                                                    structural corridor, leading to a tapping of these enriched fluids which have
                                                                                                                                                    subsequently deposited the metals due to changing temperature and pressure
                                                                                                                                                    conditions and/or mixing with meteoric fluids.
 Drill hole Information                                            ·    A summary of all information material to the understanding of the           ·   No Exploration Results are being reported.
                                                                   exploration results including a tabulation of the following information for
                                                                   all Material drill holes:

                                                                   o easting and northing of the drill hole collar

                                                                   o elevation or RL (Reduced Level - elevation above sea level in metres) of the
                                                                   drill hole collar

                                                                   o dip and azimuth of the hole

                                                                   o down hole length and interception depth

                                                                   o hole length.

                                                                   ·    If the exclusion of this information is justified on the basis that
                                                                   the information is not Material and this exclusion does not detract from the
                                                                   understanding of the report, the Competent Person should clearly explain why
                                                                   this is the case.
 Data aggregation methods                                          ·    In reporting Exploration Results, weighting averaging techniques,           ·    No Exploration Results are being reported.
                                                                   maximum and/or minimum grade truncations (eg cutting of high grades) and
                                                                   cut-off grades are usually Material and should be stated.

                                                                   ·    Where aggregate intercepts incorporate short lengths of high grade
                                                                   results and longer lengths of low grade results, the procedure used for such
                                                                   aggregation should be stated and some typical examples of such aggregations
                                                                   should be shown in detail.

                                                                   ·    The assumptions used for any reporting of metal equivalent values
                                                                   should be clearly stated.
 Relationship between mineralisation widths and intercept lengths  ·    These relationships are particularly important in the reporting of          ·    As mineralisation is sub-vertical and while holes dip at between
                                                                   Exploration Results.                                                             -25° and -60°, actual true widths vary from 88% to 50% of interval widths.

                                                                   ·    If the geometry of the mineralisation with respect to the drill hole        ·    No Exploration Results are being reported.
                                                                   angle is known, its nature should be reported.

                                                                   ·    If it is not known and only the down hole lengths are reported, there
                                                                   should be a clear statement to this effect (eg 'down hole length, true width
                                                                   not known').
 Diagrams                                                          ·    Appropriate maps and sections (with scales) and tabulations of              ·    No Exploration Results are being reported.
                                                                   intercepts should be included for any significant discovery being reported
                                                                   These should include, but not be limited to a plan view of drill hole collar
                                                                   locations and appropriate sectional views.
 Balanced reporting                                                ·    Where comprehensive reporting of all Exploration Results is not             ·    No Exploration Results are being reported.
                                                                   practicable, representative reporting of both low and high grades and/or
                                                                   widths should be practiced to avoid misleading reporting of Exploration
                                                                   Results.
 Other substantive exploration data                                ·    Other exploration data, if meaningful and material, should be               ·    Bulk samples have been collected for metallurgical testwork with the
                                                                   reported including (but not limited to): geological observations; geophysical    testwork showing that a saleable concentrate can be produced at reasonable
                                                                   survey results; geochemical survey results; bulk samples - size and method of    recoveries using simple off the shelf gravity techniques.
                                                                   treatment; metallurgical test results; bulk density, groundwater, geotechnical

                                                                   and rock characteristics; potential deleterious or contaminating substances.     ·    Geotechnical, groundwater and rock characteristics, including waste
                                                                                                                                                    rock, studies are also in progress
 Further work                                                      ·    The nature and scale of planned further work (eg tests for lateral          ·    Completion of a Definitive Feasibility Study.
                                                                   extensions or depth extensions or large-scale step-out drilling).

                                                                                ·    No further drilling is planned at this stage
                                                                   ·    Diagrams clearly highlighting the areas of possible extensions,
                                                                   including the main geological interpretations and future drilling areas,
                                                                   provided this information is not commercially sensitive.

 
Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to
this section.)

 Criteria                                     JORC Code explanation                                                            Commentary
 Database integrity                           ·    Measures taken to ensure that data has not been corrupted by, for           ·      The Newmont drilling data was supplied by TMPL as an MSAccess
                                              example, transcription or keying errors, between its initial collection and      database which had been compiled by the previous holders of the property,
                                              its use for Mineral Resource estimation purposes.                                AusTinMining. This data was re-imported into an MSAccess database to allow for

                                                                                some error checking.
                                              ·    Data validation procedures used.

                                                                                                                               ·      The TMPL recent drilling data was supplied as a series of CSV
                                                                                                                               files which H&SC imported into its MSAccess database (as used for the
                                                                                                                               Newmont drilling).

                                                                                                                               ·      TMPL digital logging process involves android based Lenovo Tab
                                                                                                                               M10 HD tablets. The tablet has a rugged plastic and rubber waterproof case and
                                                                                                                               requires a pin code to unlock. The tablet has various templates stored on it
                                                                                                                               for recording different data sets (RC logging, DDH logging, RQD's etc). All
                                                                                                                               templates are MSExcel spreadsheets and operate via manually typing in the data
                                                                                                                               on the tablet or utilizing pre-filled drop-down boxes.

                                                                                                                               ·      Validation of the Newmont drilling by H&SC included original
                                                                                                                               assay and logging sheet checks against the supplied digital data for a set of
                                                                                                                               13 randomly selected drillholes. Minor typographic errors were noted and
                                                                                                                               fixed. Some of the methodology of transcribing the hard copy data could be
                                                                                                                               improved.

                                                                                                                               ·      H&SC completed some independent validation of the new data to
                                                                                                                               ensure the drill hole database is internally consistent. Validation included
                                                                                                                               checking that no assays or geological logs occur beyond the end of hole and
                                                                                                                               that all drilled intervals have been geologically logged. The minimum and
                                                                                                                               maximum values of assays and density measurements were checked to ensure
                                                                                                                               values are within expected ranges. Further checks include testing for
                                                                                                                               duplicate samples and overlapping sampling or logging intervals.

                                                                                                                               ·      H&SC takes responsibility for the accuracy and reliability of
                                                                                                                               the data used in the Mineral Resource estimates.

                                                                                                                               ·      H&SC used the historic local N-S orthogonal grid for all
                                                                                                                               interpretation and modelling work. For subsequent mine planning studies this
                                                                                                                               work was rotated and converted to MGA94 Zone 56 using the Surpac 2 point grid
                                                                                                                               transformation option.
 Site visits                                  ·    Comment on any site visits undertaken by the Competent Person and the       ·      Two site visits were completed by Simon Tear of H&SC, in
                                              outcome of those visits.                                                         October 2022 during the recent drilling campaign and again in June 2023 to

                                                                                review newly drilled diamond core and other aspects of the sample data
                                              ·    If no site visits have been undertaken indicate why this is the case.       collection phase.

                                                                                                                               ·      The October 2022 visit involved inspection of both ongoing
                                                                                                                               diamond and RC drilling operations. A check on collar coordinates for 20 holes
                                                                                                                               including both historic and recent holes was completed. A review of chip trays
                                                                                                                               for 2 RC drillholes was also undertaken. Inspection of the trial adit and its
                                                                                                                               recent TMPL sampling was also completed.

                                                                                                                               ·      The June 2023 visit involved inspection of 6 DD holes from the
                                                                                                                               recent hole twinning programme designed by TMPL to test previous results from
                                                                                                                               the Newmont drilling. The inspection confirmed the geology, mineralisation and
                                                                                                                               assay grades at Taronga as comprising thin, cassiterite-bearing veins, in a
                                                                                                                               sheeted vein system, hosted within hornfels rock.
 Geological interpretation                    ·    Confidence in (or conversely, the uncertainty of) the geological            ·      The mineralisation comprises North Pit and South Pit zones with a
                                              interpretation of the mineral deposit.                                           relatively lower grade zone in between. This lower grade zone is partly the

                                                                                result of a lack of drilling and a change in the host lithology with possibly
                                              ·    Nature of the data used and of any assumptions made.                        a change in the rheological properties of the host.

                                              ·    The effect, if any, of alternative interpretations on Mineral               ·      The North Pit comprises two higher grade elongate tin zones with
                                              Resource estimation.                                                             an enveloping zone of lower grade tin mineralisation forming a single mass.

                                                                                Whilst the South Pit comprises up to five distinct and well separated elongate
                                              ·    The use of geology in guiding and controlling Mineral Resource              tin-enriched zones with parallel strike and dip.
                                              estimation.

                                                                                ·      The host rock is the result of relatively uniform hornfelsing of
                                              ·    The factors affecting continuity both of grade and geology.                 either siltstone or sandstone.

                                                                                                                               ·      Mineralisation consists of quartz-cassiterite veins from hairline
                                                                                                                               fractures to veins up to 5-10cm thick. Chalcopyrite and arsenopyrite
                                                                                                                               disseminations, blebs and veinlets are commonly associated with the
                                                                                                                               tin-bearing veins. Minor pyrite zones are occasionally visible.

                                                                                                                               ·      There is no obvious visible lithological or structural control to
                                                                                                                               the tin mineralisation, save for a broad NE/SW striking enriched zone,
                                                                                                                               presumably some form of structural corridor. The system has been interpreted
                                                                                                                               as a sheeted vein deposit.

                                                                                                                               ·      No geological interpretation per se for the mineralisation has
                                                                                                                               been completed as the tin grades define the tin mineralisation in the rather
                                                                                                                               amorphous-looking hornfels. Any wireframe for the tin mineralisation would
                                                                                                                               ultimately be a simple grade shell.

                                                                                                                               ·      There is insufficient data to define with confidence any specific
                                                                                                                               or significant fault structure playing a role in the control of
                                                                                                                               mineralisation.

                                                                                                                               ·      A review of multi-element data from the recent drilling has
                                                                                                                               allowed for the interpretation of a sodium depletion zone corresponding with a
                                                                                                                               weak potassic enrichment as matching the definition of the tin mineralisation.
                                                                                                                               The study also highlighted a lithogeochemical difference between the host
                                                                                                                               rocks for the South and North Pit areas.

                                                                                                                               ·      An oxidation surface, reflecting both complete and partial
                                                                                                                               weathering, was developed by H&SC from logged historic and recent drilling
                                                                                                                               data, with support from the multielement assays. Confidence in the surface is
                                                                                                                               moderate as the data is incomplete and there is uncertainty as to whether
                                                                                                                               weathering has formed a broad, horizontal front roughly parallel to the
                                                                                                                               surface topography and/or that there are more isolated, penetrative fingers of
                                                                                                                               weathering to greater depths via fault structures.
 Dimensions                                   ·    The extent and variability of the Mineral Resource expressed as             ·      The Mineral Resources have a strike length of around 2.7km in a
                                              length (along strike or otherwise), plan width, and depth below surface to the   north easterly (grid north) direction. The plan width of the resource varies
                                              upper and lower limits of the Mineral Resource.                                  from 200m to 400m with an average of around 270m. The upper limit of the
                                                                                                                               mineralisation is exposed with the fresh rock generally occurring around 20m
                                                                                                                               below surface and the lower limit of the Mineral Resources extends to an
                                                                                                                               approximate depth of 550m below surface (400mRL).

                                                                                                                               ·      The lower limit to the Mineral Resource is a direct function of
                                                                                                                               the depth limitations to the drilling in conjunction with the search
                                                                                                                               parameters. The mineralisation is open at depth and laterally to the
                                                                                                                               southwest, beyond the South Pit zone.
 Estimation and modelling techniques          ·    The nature and appropriateness of the estimation technique(s) applied       ·      The drillhole database was composited with no constraints to 1m
                                              and key assumptions, including treatment of extreme grade values, domaining,     composites covering the whole of the prospect.
                                              interpolation parameters and maximum distance of extrapolation from data

                                              points. If a computer assisted estimation method was chosen include a            ·      Ordinary Kriging (OK) with two search domains was used to
                                              description of computer software and parameters used.                            complete the tin grade estimation using H&SC's in-house GS3M modelling

                                                                                software. The geological interpretation and block model creation and
                                              ·    The availability of check estimates, previous estimates and/or mine         validation was completed using the Surpac mining software. H&SC considers
                                              production records and whether the Mineral Resource estimate takes appropriate   OK to be an appropriate estimation technique for the type of mineralisation
                                              account of such data.                                                            and extent of data available. The tin composite data has a relatively low

                                                                                coefficient of variation of approximately 1.6 (CV = standard deviation divided
                                              ·    The assumptions made regarding recovery of by-products.                     by the mean).

                                              ·    Estimation of deleterious elements or other non-grade variables of          ·      Regression equations based on newly available assay data were
                                              economic significance (eg sulphur for acid mine drainage characterisation).      used to estimate missing copper, arsenic and sulphur values. The arsenic and

                                                                                sulphur datasets are a lot smaller in number compared to the copper and silver
                                              ·    In the case of block model interpolation, the block size in relation        data. Correlation between the various elements was modest to weak but
                                              to the average sample spacing and the search employed.                           generated regression equations using the Conditional Expectation technique

                                                                                resulted in plausible outcomes. It should be noted that the copper, arsenic,
                                              ·    Any assumptions behind modelling of selective mining units.                 silver and sulphur are not reported as part of the Mineral Resources and that

                                                                                the numbers are generated from less data than that used in the tin Mineral
                                              ·    Any assumptions about correlation between variables.                        Resources; the elements were modelled to allow for waste rock

                                                                                characterisation.
                                              ·    Description of how the geological interpretation was used to control

                                              the resource estimates.                                                          ·      A total of 42,747 1m composites, excluding residuals (137), were

                                                                                generated from the drillhole database and modelled for tin, copper, arsenic,
                                              ·    Discussion of basis for using or not using grade cutting or capping.        silver & sulphur.

                                              ·    The process of validation, the checking process used, the comparison        ·      Grade interpolation was unconstrained, except by the search
                                              of model data to drill hole data, and use of reconciliation data if available.   parameters and the variography, in acknowledgement of the gradational nature
                                                                                                                               to the margins of the tin mineralisation and the abundance of buffering low
                                                                                                                               grade peripheral assays.

                                                                                                                               ·      There were very minor zones of unsampled core which were
                                                                                                                               generally surrounded by very low grades and therefore did not require the
                                                                                                                               insertion of very low grades. These areas were invariably allocated very low
                                                                                                                               block grades from the subsequent grade interpolation.

                                                                                                                               ·      The base of oxidation was treated as a soft boundary. No cover
                                                                                                                               surface was created as the mineralisation is outcropping and is exposed in
                                                                                                                               many places along its ridge line and flanks.

                                                                                                                               ·      No top-cutting was applied as extreme values were considered by
                                                                                                                               H&SC as not significant (an noting the low CV) and therefore top-cutting
                                                                                                                               was considered unnecessary.

                                                                                                                               ·      Block dimensions are 5m by 10m by 5m (Local E, N, RL
                                                                                                                               respectively) with no sub-blocking. The north dimension was chosen as it is
                                                                                                                               around half to a third of the nominal drillhole distances in the detailed
                                                                                                                               drilled area of the South Pit. The east dimension was chosen to take into
                                                                                                                               account the geometry and thickness of the mineralisation in the South Pit. The
                                                                                                                               vertical dimension was chosen to reflect the sample spacing and possible
                                                                                                                               mining bench heights and to allow for flexibility in potential mining
                                                                                                                               scenarios.

                                                                                                                               ·      Two search domains were employed, one for the South Pit (domain
                                                                                                                               1) and another for the North Pit (domain 2) respectively, reflecting a modest
                                                                                                                               change in strike between the two zones.

                                                                                                                               ·      All elements were modelled as a combined dataset. 5 search passes
                                                                                                                               were employed with progressively larger radii or decreasing data point
                                                                                                                               criteria. The Pass 1 used radii of 35m by 35m by 5m (along strike, down dip
                                                                                                                               and across mineralisation respectively), Passes 2, 3 and 4 used 50m by 50m by
                                                                                                                               10m, 70m by 70m by 10m & 100m by 100m by 20m respectively, Minimum number
                                                                                                                               of data was 12, maximum number of data was 32 with a minimum of 4 octants. A
                                                                                                                               fifth pass used 100m by 100m by 20m with a minimum of 6 data points from at
                                                                                                                               least 2 octants.

                                                                                                                               ·      The maximum extrapolation for the Mineral Resources was in the
                                                                                                                               order of 100m down dip and 100m along strike to the NE.

                                                                                                                               ·      The resource estimates are controlled by the data point
                                                                                                                               distribution, the variography, block size and the search ellipse. Conventional
                                                                                                                               use of wireframes to control the mineralisation was not considered necessary.
                                                                                                                               A preliminary resource model had been completed prior to the 2022/3 drilling
                                                                                                                               to ascertain likely dilution grades for peripheral material to the main tin
                                                                                                                               mineralisation with the subsequent infill drilling results generally matching
                                                                                                                               this preliminary model.

                                                                                                                               ·      The new block model was reviewed visually by H&SC and it was
                                                                                                                               concluded that the block model fairly represents the grades observed in the
                                                                                                                               drill holes. H&SC also validated the block model using a variety of
                                                                                                                               summary statistics and statistical plots. No issues were noted.

                                                                                                                               ·      Previous work for the 2023 MRE included check models comprising
                                                                                                                               an OK check model using the same composite data was completed using the OK
                                                                                                                               option in Surpac. The outcome confirmed the original model. A check Multiple
                                                                                                                               Indicator Kriging model (in the GS3M software) was completed using the same
                                                                                                                               composite data. Again the outcome confirmed the original model. An OK check
                                                                                                                               model without the JACRO composite data yielded very similar outcomes to the
                                                                                                                               original Measured and Indicated Resources.

                                                                                                                               ·      Comparison with the 2023 estimates for a 0.05% Sn cut-off,
                                                                                                                               indicates an approximate 0.75% decrease in the size of the resource with a
                                                                                                                               very modest drop in tin grade (-1%). The decrease in tonnes is potentially
                                                                                                                               mainly due to a slight drop in density (by 0.62%). The main change is the
                                                                                                                               increase in Measured and Indicated by 19% with a corresponding drop in tin
                                                                                                                               grade of 5.3% but a total increase by 13% of contained tin metal. The increase
                                                                                                                               in size is a response to the infill drilling on the periphery of the deposit.

                                                                                                                               ·      Comparison with the 2013 resource estimates indicated a larger
                                                                                                                               tonnage for the 2023 Mineral Resource at approximately the same tin grade. The
                                                                                                                               main increase in tonnage was for the South Pit due to the modelling method
                                                                                                                               extrapolating much further than the rather tight wireframes that were used
                                                                                                                               previously to constrain the mineralisation. The increase is also mainly the
                                                                                                                               result of the additional exploratory TMPL drilling to the south west. Also
                                                                                                                               greater confidence in the Newmont drilling data was achieved with the twin
                                                                                                                               holes and the repeat adit sampling to allow for Measured Resource to be
                                                                                                                               categorised.
 Moisture                                     ·    Whether the tonnages are estimated on a dry basis or with natural           ·      Tonnages of the Mineral Resources are estimated on a dry weight
                                              moisture, and the method of determination of the moisture content.               basis.
 Cut-off parameters                           ·    The basis of the adopted cut-off grade(s) or quality parameters             ·      The resources are reported at a tin cut-off of 0.05% based on the
                                              applied.                                                                         outcome of a recently completed throughput study by independent mining
                                                                                                                               consultants AMDAD of Brisbane.

                                                                                                                               ·      The cut-off grade at which the resource is quoted reflects the
                                                                                                                               intended bulk-mining approach.
 Mining factors or assumptions                ·    Assumptions made regarding possible mining methods, minimum mining          ·      The Mineral Resources were estimated on the assumption that the
                                              dimensions and internal (or, if applicable, external) mining dilution. It is     material is to be mined by open pit using a bulk mining method.
                                              always necessary as part of the process of determining reasonable prospects

                                              for eventual economic extraction to consider potential mining methods, but the   ·      The proposed mining method is a conventional drill & blast,
                                              assumptions made regarding mining methods and parameters when estimating         truck & excavator with extracted material sent to an on-site ROM pad with
                                              Mineral Resources may not always be rigorous. Where this is the case, this       a processing plant adjacent to the planned pit.
                                              should be reported with an explanation of the basis of the mining assumptions

                                              made.                                                                            ·      Minimum mining dimensions are envisioned to be around 10m by 5m
                                                                                                                               by 5m (strike, across strike, vertical respectively). The block size is
                                                                                                                               relatively larger than the likely minimum mining dimensions.

                                                                                                                               ·      The resource estimation includes internal mining dilution.
 Metallurgical factors or assumptions         ·    The basis for assumptions or predictions regarding metallurgical            ·      A processing flowsheet has been proposed that will involve
                                              amenability. It is always necessary as part of the process of determining        comminution, gravity separation and floatation to generate a tin concentrate.
                                              reasonable prospects for eventual economic extraction to consider potential

                                              metallurgical methods, but the assumptions regarding metallurgical treatment     ·      The hardness of ore material is at a manageable level.
                                              processes and parameters made when reporting Mineral Resources may not always

                                              be rigorous. Where this is the case, this should be reported with an             ·      The testwork has shown that a saleable tin concentrate can be
                                              explanation of the basis of the metallurgical assumptions made.                  produced using a simple coarse gravity flowsheet comprising:

                                                                                                                               o  crushing to -6mm

                                                                                                                               o  screening at 0.6mm

                                                                                                                               o  jigging of plus 0.6mm fraction with concentrate and middlings ground to
                                                                                                                               -0.6mm

                                                                                                                               o  recombining ground jig cons/mids with screen undersize followed by cyclone
                                                                                                                               classification and spiral separation

                                                                                                                               o  re-grind of spiral concentrate/middlings followed by sulphide flotation to
                                                                                                                               remove sulphides

                                                                                                                               o  dressing via magnetic separation and shaking tables.

                                                                                                                               ·      Recoveries of 55-60% tin have been confirmed, with additional
                                                                                                                               recoveries possible via a fine tin recovery circuit

                                                                                                                               ·      Tin concentrate grades of over 60% (up to 73%) Sn (dominantly as
                                                                                                                               cassiterite) have been produced with acceptable penalty element concentrations
                                                                                                                               Initial testwork has demonstrated that penalty elements can be limited to
                                                                                                                               acceptable levels.

                                                                                                                               ·    Waste products from processing can suitably be dealt with.
 Environmen-tal factors or assumptions        ·    Assumptions made regarding possible waste and process residue               ·      The deposit lies within hilly, open country typical of the NSW
                                              disposal options. It is always necessary as part of the process of determining   Northern Tablelands.
                                              reasonable prospects for eventual economic extraction to consider the

                                              potential environmental impacts of the mining and processing operation. While    ·      Land use is predominantly cattle grazing on native or improved
                                              at this stage the determination of potential environmental impacts,              pasture.
                                              particularly for a greenfields project, may not always be well advanced, the

                                              status of early consideration of these potential environmental impacts should    ·      There are limited flat areas for waste and tailings disposal.
                                              be reported. Where these aspects have not been considered this should be         Most likely sites are north of a ridge line just north of the proposed pits.
                                              reported with an explanation of the environmental assumptions made.

                                                                                                                               ·      There are a small number of creeks with seasonal flows.

                                                                                                                               ·      The host rocks have relatively low sulphur contents.

                                                                                                                               ·      A full environmental impact assessment has been completed and
                                                                                                                               lodged with the DPHI. This has been put on public exhibition with only 5
                                                                                                                               objections recorded, meaning the project does not need to go through the
                                                                                                                               Independent Planning Commission (IPC) process. Various government departments
                                                                                                                               have made submissions regarding development consent conditions, and these are
                                                                                                                               currently being addressed by TMPL.
 Bulk density                                 ·    Whether assumed or determined. If assumed, the basis for the                ·    Original bulk density measuring work completed by Newmont used single
                                              assumptions. If determined, the method used, whether wet or dry, the frequency   pieces of core subjected to the weight in air/weight in water method
                                              of the measurements, the nature, size and representativeness of the samples.     (Archimedes Principle). The result was a set of default densities: 2.8t/m(3)

                                                                                for 'ore' (>0.1%Sn) and 2.7t/m(3) for waste.
                                              ·    The bulk density for bulk material must have been measured by methods

                                              that adequately account for void spaces (vugs, porosity, etc), moisture and      ·    The 2013 Mining One estimate used a global default of 2.75t/m(3).
                                              differences between rock and alteration zones within the deposit.

                                                                                ·    Work completed by TMPL used a weight in air/weight in water procedure
                                              ·    Discuss assumptions for bulk density estimates used in the evaluation       on 415 samples of diamond core. The average value was 2.75t/m(3).
                                              process of the different materials.

                                                                                                                               ·    Core inspection indicated very competent core with no significant
                                                                                                                               vughs.

                                                                                                                               ·    H&SC subdivided the samples using the base of oxidation surface
                                                                                                                               to ascertain the impact of surface weathering on the density. The impact was
                                                                                                                               marginal with slightly lower values in the oxidized zone as would be expected.
                                                                                                                               Default values were inserted into the block model for oxide and fresh rock
                                                                                                                               that had interpolated grades for the North Pit, and the Hillside and Payback
                                                                                                                               subdivisions of the South Pit.

                                                                                                                               ·    A density of 2.65t/m(3) was applied to all 'waste' i.e. blocks with
                                                                                                                               no interpolated tin grade.
 Classification                               ·    The basis for the classification of the Mineral Resources into              ·      The classification of the resource estimates is based on the data
                                              varying confidence categories.                                                   point distribution which is a function of the drillhole spacing.

                                              ·    Whether appropriate account has been taken of all relevant factors          ·      A defined shape was used for the Measured Resource in the North
                                              (ie relative confidence in tonnage/grade estimations, reliability of input       Pit in order to remove a 'spotted dog' effect.
                                              data, confidence in continuity of geology and metal values, quality, quantity

                                              and distribution of the data).                                                   ·      Other aspects have been considered in the classification

                                                                                including, the style of mineralisation, the geological model, validation of
                                              ·    Whether the result appropriately reflects the Competent Person's view       the historic drilling, sampling methods and recoveries, non-sampled zones, the
                                              of the deposit.                                                                  QAQC programme and results and comparison with previous resource estimates.

                                                                                                                               ·      H&SC believes the confidence in tonnage and grade estimates,
                                                                                                                               the continuity of geology and grade, and the distribution of the data reflect
                                                                                                                               Measured, Indicated and Inferred categorisation. The estimates appropriately
                                                                                                                               reflect the Competent Person's view of the deposit. H&SC has assessed the
                                                                                                                               reliability of the input data and takes responsibility for the accuracy and
                                                                                                                               reliability of the data used to estimate the Mineral Resources.
 Audits or reviews                            ·    The results of any audits or reviews of Mineral Resource estimates.         ·      No audits or reviews have been completed.
 Discussion of relative accuracy/ confidence  ·    Where appropriate a statement of the relative accuracy and confidence       ·      No statistical or geostatistical procedures were used to quantify
                                              level in the Mineral Resource estimate using an approach or procedure deemed     the relative accuracy of the resource. The global Mineral Resource estimates
                                              appropriate by the Competent Person. For example, the application of             of the Taronga Tin deposit are moderately sensitive to higher cut-off grades
                                              statistical or geostatistical procedures to quantify the relative accuracy of    but does not vary significantly at lower cut-offs.
                                              the resource within stated confidence limits, or, if such an approach is not

                                              deemed appropriate, a qualitative discussion of the factors that could affect    ·      The relative accuracy and confidence level in the Mineral
                                              the relative accuracy and confidence of the estimate.                            Resource estimates are considered to be in line with the generally accepted

                                                                                accuracy and confidence of the nominated Mineral Resource categories. This has
                                              ·    The statement should specify whether it relates to global or local          been determined on a qualitative, rather than quantitative, basis, and is
                                              estimates, and, if local, state the relevant tonnages, which should be           based on the Competent Person's experience with similar deposits and geology.
                                              relevant to technical and economic evaluation. Documentation should include

                                              assumptions made and the procedures used.                                        ·      The Mineral Resource estimates are considered to be accurate

                                                                                globally, but there is some uncertainty in the local estimates due to the
                                              ·    These statements of relative accuracy and confidence of the estimate        current drillhole spacing, a lack of geological definition in certain places
                                              should be compared with production data, where available.                        eg fault zones and penetration depths of surface weathering,

                                                                                                                               ·      No mining of the deposit has taken place, so no production data
                                                                                                                               is available for comparison.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
 or visit
www.rns.com (http://www.rns.com/)
.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
.   END  UPDBLGDSGXDDGLC



            Copyright 2019 Regulatory News Service, all rights reserved

Recent news on First Tin

See all news