For best results when printing this announcement, please click on link below:
https://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20250106:nRSF2189Sa&default-theme=true
RNS Number : 2189S Great Southern Copper PLC 06 January 2025
THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION AS STIPULATED UNDER THE UK
VERSION OF THE MARKET ABUSE REGULATION NO 596/2014 WHICH IS PART OF ENGLISH
LAW BY VIRTUE OF THE EUROPEAN (WITHDRAWAL) ACT 2018, AS AMENDED. ON
PUBLICATION OF THIS ANNOUNCEMENT VIA A REGULATORY INFORMATION SERVICE, THIS
INFORMATION IS CONSIDERED TO BE IN THE PUBLIC DOMAIN.
06 January 2025
Great Southern Copper plc
("GSC" or the "Company")
Diamond drilling commences at Cerro Negro targeting high-grade Cu-Ag-Au
Phase I resource extension and grade confirmation drilling begins
Great Southern Copper plc (LSE: GSCU), the company focused on
copper-gold-lithium exploration in Chile, is pleased to announce that diamond
drilling has commenced at its Cerro Negro prospect targeting high-grade
Cu-Ag-Au mineralisation at the Mostaza mine.
Highlights:
· Phase I diamond drilling has commenced at the Company's high-grade
Mostaza Cu-Ag-Au mine prospect with hole CNG25-DD001 in progress
· Diamond drilling aims to confirm historical drilling grades and
thickness plus step-out holes are designed to extend the known mineralised
zone to depth and along-strike
· Initial drilling plan at Mostaza is for up to 5 to 10 diamond drill
holes for up to 500-1,000m
· A historical (1981) non-JORC mineral resource estimate for Mostaza
reported 190,600t of measured & indicated sulphide with grades of 1.2% Cu,
80 g/t Ag, and 0.45 g/t Au, plus an additional 63,000t of inferred sulphide
resource at depth(1)
· High-grade (>1.0% Cu) Cu-Ag mineralisation at Mostaza is open in
all directions
· Hole CNG25-001 targets reported results of historical resource
drilling including(2);
§ EDH15: 8m of 2.63% Cu, 153g/t Ag from 37m, within a broader zones of,
· 19m of 1.52% Cu, 92 g/t Ag from 33m, and
· 54m of 0.62% Cu (Ag assays incomplete over full interval) from 10m
· At Viuda prospect, scout RC drilling has been completed and
successfully identified porphyry type alteration in all drill holes. Assay
results are awaited
Cerro Negro is situated within the Company's Especularita project which is
ideally located close to national infrastructure including main highways,
powerlines, and towns. The project is located 170km from the port city of
Coquimbo, and 130km from Antofagasta Minerals' copper concentrate port at Los
Villos. The area lies at an elevation between 800 and 1200m and is accessible
year-round for all exploration and mining activity (Figure 1).
The project is located within the north-south trending Cretaceous metallogenic
belt that includes Teck's Carmen de Andacollo Cu-Au Mine 80km to the north,
and Pucobre's El Espino Cu-Au development project 30km to the south. At
Especularita, this under-explored belt intersects with a northwest-trending
structural corridor that controls the "Colorada" advanced argillic lithocap
and extends to the Piuquénes porphyry Cu-Au deposit in Argentina.
Sam Garrett, Chief Executive Officer of Great Southern Copper, said: "We are
excited to start the new year with the diamond drilling programme at Mostaza
mine. Historical drilling at Mostaza has clearly not tested the extents of
mineralisation and was focussed on high grade lenses ignoring broader zones of
copper-silver mineralisation.
"Diamond drilling will initially focus on confirming historical grades and
drilling out the known high-grade copper-silver-gold mineralisation at the
Mostaza mine, before testing along trend to the south where our recent
exploration results have confirmed evidence of similar mineralisation at
surface.
"The Viuda scout RC drilling programme was completed just before Christmas and
successfully identified porphyry style alteration in all the holes. All
samples are at the laboratory and we look forward to reporting the results of
this work soon."
Drilling Plan at Mostaza:
Phase 1 diamond drilling at Mostaza is planned to confirm historical grades
and thickness of mineralisation, infill mineralisation between lenses 1 and 2,
and test extensions of the mineralisation both at depth and along trend to the
south of Lens 2.
Diamond hole CNG25-DD001 is currently in progress and is designed to confirm
historical grades and mineralisation thicknesses intersected in holes EDH 25
plus test down-dip extension of results in holes EDH 23 and EDH 25 (Figure
2,3) which include;
· EDH 15: 54m of 0.62% Cu from 10m (Ag assays not available),
including,
o 19m of 1.52% Cu and 92g/t Au from 33m, including
o 8m of 2.63% Cu and 153g/t Ag from 37m
· EDH 23: 16m of 0.47% Cu from 33m (Ag assays not available), including
o 5m of 1.07% Cu and 75g/t Ag from 40m
· EDH 25: 33m of 0.53% Cu from 46m (Ag assays not available), including
o 6m of 1.05% Cu and 81g/t Ag from 49m, and
o 9m of 0.92% Cu and 73g/t Ag from 62m.
Further step-out drillholes will test extensions of the mineralisation to
depth below the levels of historical drilling, plus infill mineralisation
undefined between Lenses 1 and 2 and test extensions of the mineralisation
along trend to the south of Lens 2.
The programme will initially comprise up to 5-10 diamond holes totalling up to
500-1,000m. Scout RC drilling may also be employed to target the strike extent
of mineralisation further to the south of the Mostaza pit testing the
potential for a broader zone of near-surface oxide copper mineralisation.
Previous work at Mostaza Cu-Ag-Au mine:
Assay results of historical drill holes at Mostaza, including 25 diamond holes
(1,025m) plus channel sampling of mine adits were used to report a non-JORC
mineral resource estimate of 190,600t of measured and indicated sulphide ore
with grades of 1.2% Cu, 80 g/t Ag, and 0.45 g/t Au, plus an additional 63,000t
of inferred sulphide resource at depth(1).
A review of the historical drilling by GSC demonstrates that high-grade
(>1.0% Cu) Cu-Ag mineralisation at Mostaza is open in all directions
defining an initial drill target to expand the known orebody along strike and
to depth. The data review also showed that 4 of the 25 holes failed to reach
the high-grade mineralisation target and 16 holes were terminated in lower
grade copper (>0.1% Cu) indicating that a lower cut-off grade has potential
to better define the mineralisation trend as well as up-scale the size of the
Mostaza deposit(2).
Results from recent geological mapping and sampling by GSC confirms that the
Mostaza mineralisation extends up to 1.5km along trend to the south of the
pit(3). To the east of the Mostaza mine mapping indicates potential for a
larger mineralised system up to 400m in width comprising an anastomosing
network of structurally-controlled Cu-Ag-Ba rich veins hosted within leached
and oxidised (lithocap), high sulphidation altered dacitic rocks.
Update on Scout RC Drilling at Viuda:
Scout RC drilling at the Company's Viuda prospect has been completed with 7
holes for 1,020m. Preliminary down-hole geology indicates pervasive
pyrite-albite-clay (PAC) alteration of host rocks is dominant and suggestive
of a large-scale porphyry type alteration system.
Samples for all the RC drill holes have been despatched to ALS Laboratories in
Santiago. Detailed geological logging of the RC holes is continuing in
conjunction with field mapping to update the Company's understanding of the
porphyry system discovered at Viuda.
Figure 1: Location of Cerro Negro prospect, Especularita Project, Chile, where
the Company's Phase 1 diamond drilling programme has commenced.
Figure 2: Cerro Negro Project, Mostaza Mine: Long section of Lens 2 showing
the location of the first diamond drillhole, CNG25-DD001, and other planned
Phase 1 drillholes. Historical resource blocks, underground mine workings, and
drillhole assay results are shown for reference. Hole CNG25-DD001 is located
approximately on local grid section S+00. (GSCU has not been able to
independently verify the historical channel sample or drill hole assay
results).
Figure 3: Cerro Negro Project, Mostaza Mine: Cross section S+00 (local mine
grid) of the first diamond drillhole, CNG25-DD001, where it is projected to
intersect Lens 2, here shown with a >0.3% Cu grade shell. Historical
drillhole assay results are shown for reference. Diamond drillhole CNG25-DD001
is planned to test the high-grade historical intercepts reported in hole EDH25
and test the depth extent of the mineralisation intersected in historical
holes EDH25, EDH23 and EDH15 at approximately 60m below the floor of the
historical open pit. (GSCU has not been able to independently verify the
historical channel sample or drill hole assay results).
Cautionary note on references to Resources:
The Company cautions that all references to "resources", "mineral resources",
or "mineral resource estimates" in this RNS were calculated internally and
reported prior to the implementation of the JORC code and therefore are
non-JORC compliant. The Company advises that the resource categories used in
the historical estimates, for example "measured, indicated, demonstrated and
inferred", may not have the same meaning or degree of confidence as current
JORC categories. Historical records indicate that the quoted non-JORC
resources were calculated using the polygonal method based on underground
sampling, 1024m of drilling in 25 holes, and geological cross-sections and
level plans. GSC is presenting this information for historical context only
and is not treating it as a current mineral resource estimate. The Company has
not been able to independently verify the results of historical drilling or
mine channel samples.
References:
1. RNS 4027V (08 July 2024): GSC signs Cerro Negro Purchase Option
Agreement,
2. RNS 6179C (03 Sep 2024): GSC expands target at Mostaza mine, Cerro
Negro,
3. RNS 3120K (31 Oct 2024): Cerro Negro results up to 4.64% Cu and
177ppm Ag.
Enquiries:
Great Southern Copper plc
Sam Garrett, Chief Executive Officer +44 (0) 20 4582 3500
SI Capital Limited
Nick Emerson +44 (0) 1483 413500
Gracechurch Group
Harry Chathli, Alexis Gore, Henry Gamble +44 (0) 20 4582 3500
Notes for Editors:
About Great Southern Copper
Great Southern Copper PLC is a UK-listed mineral exploration company focused
on the discovery of copper-gold and lithium deposits in Chile. The Company has
the option to acquire rights to 100% of two projects in the under-explored
coastal belt of Chile that are prospective for large scale copper-gold
deposits. In addition, the Company has the option to acquire rights to 100% of
a lithium project located in the Salar de Atacama district of Chile. Chile is
a globally significant mining jurisdiction being the world's largest copper
producer and the second-largest producer of lithium.
The two, early-stage Cu-Au projects comprise the San Lorenzo and Especularita
Projects, both located in the coastal metallogenic belt of Chile which hosts
significant copper mines and deposits, including Teck's Carmen de Andacollo
copper mine, and boasts excellent access to infrastructure such as roads,
power and ports. Significant historical small-scale and artisanal workings for
both copper and gold are readily evident in both exploration project areas.
The Company's Monti Lithium project is strategically located in the pre-Andean
region of Salar de Atacama which is Chile's premier lithium-producing region
with well-established lithium mining operations and infrastructure.
Great Southern Copper is strategically positioned to support the global market
for copper and lithium - both critical battery metals in the clean energy
transition around the world. The Company is actively engaged in exploration
and evaluation work programmes targeting both large tonnage, low to medium
grade Cu-Au and Li deposits as well as high-grade Cu-Au deposits.
Further information on the Company is available on the Company's website:
https://gscplc.com (https://gscplc.com)
Competent Person Statement
The information in this announcement that relates to exploration results is
based on and fairly represents information reviewed or compiled by Mr Sam
Garrett, a Competent Person who is a Member of the Australian Institute of
Geoscientists and a Fellow of the Society of Economic Geologists. Mr Garrett
is the CEO and a shareholder of Great Southern Copper PLC. Mr Garrett has
sufficient experience that is relevant to the styles of mineralisation and
types of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the
"Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves". Mr Garrett has provided his prior written consent to the
inclusion in this announcement of the matters based on information in the form
and context in which it appears.
This announcement includes information that relates to Exploration Results
prepared and first disclosed under the JORC Code (2012) and extracted from the
Company's previous LSE announcements as noted, and the Company's Prospectus
dated 20 December 2021. Copies of these announcements are available from the
LSE Announcements page of the Company's website: www.gscplc.com
(http://www.gscplc.com) .
The Company confirms that it is not aware of any new information or data that
materially affects the information included within the Prospectus dated 20
December 2021.
Forward Looking and Cautionary Statements
Some statements in this announcement regarding estimates or future events are
forward-looking statements. They include indications of, and guidance on,
future earnings, cash flow, costs and financial performance. Forward-looking
statements include, but are not limited to, statements preceded by words such
as "planned", "expected", "projected", "estimated", "may", "scheduled",
"intends", "anticipates", "believes", "potential", "predict", "foresee",
"proposed", "aim", "target", "opportunity", "could", "nominal", "conceptual"
and similar expressions. Forward-looking statements, opinions and estimates
included in this report are based on assumptions and contingencies which are
subject to change without notice, as are statements about market and industry
trends, which are based on interpretations of current market conditions.
Forward-looking statements are provided as a general guide only and should not
be relied on as a guarantee of future performance. Forward-looking statements
may be affected by a range of variables that could cause actual results to
differ from estimated or anticipated results and may cause the Company's
actual performance and financial results in future periods to materially
differ from any projections of future performance or results expressed or
implied by such forward-looking statements. So, there can be no assurance that
actual outcomes will not materially differ from these forward-looking
statements.
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
or visit
www.rns.com (http://www.rns.com/)
.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
. END DRLUNUNRVAUARRR