Picture of Griffin Mining logo

GFM Griffin Mining News Story

0.000.00%
gb flag iconLast trade - 00:00
Basic MaterialsAdventurousMid CapHigh Flyer

REG - Griffin Mining Ltd - Drilling/Production Report

For best results when printing this announcement, please click on link below:
https://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20260212:nRSL6707Sa&default-theme=true

RNS Number : 6707S  Griffin Mining Limited  12 February 2026

 

 

8(th) Floor, 54 Jermyn Street, London, SW1Y 6LX. United Kingdom
Telephone: + 44 (0)20 7629 7772  Facsimile:  + 44 (0)20 7629 7773

Email: griffin@griffinmining.com (mailto:griffin@griffinmining.com)

 

12(th) February 2026
 
Gold Production, Expansion & Discovery

 

Griffin Mining Limited ("Griffin" or the "Company) is pleased to announce that
gold production has successfully commenced in Zone III of the Yuan Long
("YL") orebody at the Caijiaying Mine, marking the transition into sustained
gold production from gold only stopes. Initial stopes are contributing
approximately 5-10% of total daily Caijiaying Mine production, establishing
gold as a recurring feed source to the processing plant. The YL orebody
remains open to the south and at depth, with further diamond drilling and
underground development planned to expand the production footprint. Ongoing
drilling continues to materially expand the contained gold of the YL system
whilst also defining a new, high‑grade, Fu Long ("FL") feeder system, which
the Company believes could potentially provide multiple avenues for
near‑term growth and longer-term resource expansion.

 

Drilling within the YL orebody continues to return high‑grade gold
intercepts, at mineable widths, confirming strong continuity along strike and
down‑plunge and supporting ongoing stope development and resource growth.
Selected significant true‑width intercepts include:

 

·      UGCJY‑6485: 6.0 m @ 31.5 g/t Au (including 0.6m @ 312g/t)

·      UGCJY‑6488: 11.9 m @ 5.3 g/t Au (including 0.6m @ 92 g/t)

·      UGCJY‑6202: 6.9 m @ 4.7 g/t Au (including 2.5m @ 11.8 g/t)

 

These results demonstrate the robust grade, thickness and continuity of the
YL gold system.

 

Drilling within the Fu Long orebody has confirmed the presence of a distinct,
high‑grade, feeder system which is interpreted to contribute to the broader
YL-FL mineralised corridor. Selected true‑width intercepts include:

 

·      UGCJY 6047: 5.9 m @ 71.2 g/t Au (including 0.8m @ 479.8 g/t, 4.7m
@ 2.2 g/t, 13.0m @ 1.0 g/t)

·      UGCJY 6508: 9.2 m @ 1.4 g/t Au (including 3.7 m @ 16.1 g/t, 1.0 m
@ 53.5 g/t, 11.4m @ 3.6 g/t, 0.9 m @ 34.4 g/t, 4.3m @4.3 g/t)

·      UGCJY-5961: 12.2m @ 8.3 g/t Au (including 5.3m @ 16 g/t)

·      UGCJY‑6045: 6.8 m @ 5.9 g/t Au (including 0.5m @ 63.6 g/t)

·      UCCJY-6048: 13.9m @ 5.8g/t Au (including 2.0 m @ 30.1 g/t, 10.5 m
@ 3.7 g/t)

·      UGCJY‑6063: 7.9 m @ 5.1 g/t Au

·      UGCJY-6050: 15.7m @ 4.6 g/t Au (including 15.7m @ 34.6 g/t, 2.6 m
@ 23.2 g/t)

·      UGCJY-6057: 29.0m @ 4.0 g/t Au (including 5.1m @ 9.2 g/t)

·      UGCJY-6046: 18.4m @ 3.3g/t Au

 

The identification of this feeder system introduces additional high‑grade
gold growth and enhances long‑term production flexibility at the Caijiaying
Mine.

 

Full detail of intercepts are set out further below in this announcement.

 

Chairman's Statement

 

Chairman Mladen Ninkov commented, "The continuing success of not only
discovering more gold at the Caijiaying Mine, but also incorporating new
discoveries into the production profile, confirms the quick nature in which
newly discovered gold can be profitably extracted for the benefit of the
Company and, ultimately, the shareholders. We look forward to further news in
due course."

 

 

 

 

 

Further information

 

Griffin Mining Limited

Mladen Ninkov -
Chairman
Telephone: +44(0)20 7629 7772

Roger Goodwin - Finance Director

 

Panmure Liberum Limited - Nominated Adviser & Joint
Broker                               Telephone:
+44 (0)20 7886 2500

             James Sinclair-Ford

              Zak Wadud

 

Berenberg - Joint Broker
 
Telephone: +44(0)20 3207 7800

                Matthew Armitt

Jennifer Lee

 

This announcement contains inside information for the purposes of Article 7 of
the Market Abuse Regulation (EU) No. 596/2014

 

Griffin Mining Limited's shares are quoted on the Alternative Investment
Market (AIM) of the London Stock Exchange (symbol GFM)

 

The Company's news releases are available on the Company's web site:
www.griffinmining.com
(https://protect.checkpoint.com/v2/r04/___http:/www.griffinmining.com/___.Y3A0YTplbi1nZm06YzpvOmJmNjNmNWViYTQ4YmYyNzNjNDQ1M2M5ZWQwNTkyMGIwOjc6YTk5OTo2MjY4MzRiZDAyZTA0OGU4N2M2MTU1NmJlZTRhODVjNzk0ZWYzMGFhZGE2MTgyOGU4Nzk3ZDc0ZjI1ZjZjNWUxOnA6VDpU)

 

Appendix 1:    Supporting Diagrams and Tables.

 

 

Figure 1. Long section looking west on the left and cross-section looking
north on the right. All Yuan and Fu Long significant gold intercept traces
(April 2025- January 2026). Significant intercepts are coloured by the sum of
grams*metres Au values. 3D views, with semi-transparent Dec 2024 Mineral
Resource wireframes (Not all significant intercept traces are annotated with
grade information, refer to complete significant intercepts table (Appendix)
for full details, and to Figure 2 for location diagram)

 

Figure 2: Long section looking west. Location of Yuan and Fu Long high-grade
gold shoots and April 2025 to January 2026 significant intercepts with respect
to current mine development at Caijiaying and previous high grade gold
drilling intercepts.

 

2.1 Detailed significant intercepts table, April 2025 to January 2026, Yuan/Fu
Long drilling

 Site_ID     East (Mine)  North (Mine)  RL      Azi (Mine)  Dip   DEPTH FROM  Interval (m true width)  Au (g/t)  Au gram * metres (g*m Au)  Zn_%  Location & Comments
 UGCJY-5956  5035.2       39541         1190.8  256.3       24.2  83.8        11.5                     1.3       14.9                       0.59  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-5959  5035.1       39539.2       1190.2  258         -20   92.0        10.6                     1.1       11.5                       0.09  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-5961  5035.2       39541         1190.8  257.2       -55   98.0        12.2                     8.3       100.3                      0.06  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            106.0       5.3                      16.0      85.3
 UGCJY-6041  5043.7       39500.8       1192.3  283.7       31.5  64.0        22.6                     0.6       12.6                       0.68  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6042  5043.7       39500.8       1191.6  284.5       14.8  50.2        7.6                      2.6       19.5                       0.06  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6045  5044.5       39500.3       1189.7  284.4       -44   99.3        6.8                      5.9       40.4                       0.01  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            99.3        0.5                      63.6      33.2
 UGCJY-6046  5044.8       39500.2       1189.8  285.3       -54   111.0       18.4                     3.3       59.9                       0.40  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            138.0       2.3                      17.4      39.4
 UGCJY-6047  5043.8       39500.1       1192.6  270.3       38.1  49.0        5.9                      71.2      417.5                      0.02  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 Incl.                                                            49.0        0.8                      479.8     401.9
 and                                                              62.0        4.7                      2.2       10.1                       0.02  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 and                                                              83.0        13.0                     1.0       13.3                       0.48  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6048  5043.6       39500.1       1192.2  270.2       24.1  40.0        10.4                     2.3       23.7                       0.19  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 and                                                              58.0        13.9                     5.8       80.6                       0.47  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 Incl.                                                            60.0        2.0                      30.1      59.8
 and                                                              88.5        10.5                     3.7       38.6                       0.24  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6049  5043.7       39499.9       1191.3  270.4       12.2  64.7        16.1                     0.9       14.5                       0.17  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 and         5043.7       39499.9       1191.3                    92.0        7.6                      3.8       29.2                       0.01  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6050  5043.7       39499.9       1191    270.4       -0.2  57.0        11.3                     1.9       21.1                       0.06  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 and                                                              80.9        15.7                     4.6       72.5                       0.03  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            93.3        2.6                      23.2      59.8
 UGCJY-6051  5044         39500         1190.6                    84.0        26.1                     1.9       48.9                       0.35  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6052  5044.2       39500         1190.1  270.3       -25   65.0        7.7                      1.7       12.9                       0.01  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6053  5044.2       39500         1190.1  269         -46   95.4        11.0                     1.9       20.6                       0.02  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6054  5043.9       39500.1       1192.7  255.1       43.6  85.0        17.1                     1.2       21.1                       0.39  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6055  5043.7       39500         1192.1  256         25.3  50.0        18.3                     2.2       40.9                       0.09  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            57.0        1.0                      18.6      18.0
 UGCJY-6056  5043.6       39499.9       1191.3  256.4       14.8  55.0        7.7                      1.5       12.0                       0.02  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 and                                                              83.0        18.1                     3.7       67.5                       0.03  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            86.0        2.9                      14.2      41.0
 and                                                              110.0       7.7                      2.9       22.1                       0.99  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6057  5043.6       39499.9       1191    254.8       7.1   64.0        29.0                     4.0       117.4                      0.02  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            92.0        5.1                      9.2       46.9
 UGCJY-6063  5044.8       39500         1189.7  254.7       -61   152.0       7.9                      5.1       40.5                       0.14  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6192  5073.4       39459.2       1191.8  260.7       20.2  96.0        26.7                     0.9       23.9                       0.08  Resource Infill Drilling. True thickness (20.4 g*m Inside 2024 Resource, 3.5
                                                                                                                                                  g*m Outside 2024 Resource)
 UGCJY-6197  5102         39418.4       1191.9  259.9       16.9  169.0       15.4                     2.7       41.5                       0.62  Resource Infill Drilling. True thickness (37.9 g*m Inside 2024 Resource, 3.6
                                                                                                                                                  g*m Outside 2024 Resource)
 incl.                                                            170.0       1.9                      18.7      35.9
 UGCJY-6202  5124.5       39378.7       1192.2  260.2       13.9  173.3       6.9                      4.7       32.5                       0.03  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            178.0       2.5                      11.8      30.0
 UGCJY-6404  4947         39460.5       1273.3  89          -57   56.0        12.9                     1.7       22.5                       0.16  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6406  4946.1       39450.6       1275.7  90.8        34.4  5.0         10.5                     2.5       25.8                       0.08  Resource Infill Drilling. True thickness (14.9 g*m Inside 2024 Resource, 10.9
                                                                                                                                                  g*m Outside 2024 Resource)
 UGCJY-6407  4946.1       39450.5       1275    89.5        9.4   3.9         14.7                     2.5       36.4                       0.12  Resource Infill Drilling. True thickness (6.5 g*m Inside 2024 Resource, 29.9
                                                                                                                                                  g*m Outside 2024 Resource)
 incl.                                                            7.0         1.7                      11.6      20.2
 UGCJY-6411  4944.7       39440         1276    91.1        37.4  12.0        8.6                      3.2       27.4                       0.14  Resource Infill Drilling. True thickness (2.1 g*m Inside 2024 Resource, 25.3
                                                                                                                                                  g*m Outside 2024 Resource)
 incl.                                                            22.0        1.6                      13.6      22.0
 UGCJY-6412  4944.7       39440         1275.4  90.6        16    17.0        8.9                      2.7       23.7                       0.02  Resource Infill Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            20.0        1.3                      15.8      21.0
 UGCJY-6413  4944.9       39439.9       1273.7  89.5        -33   3.1         18.8                     1.7       31.6                       0.02  Resource Infill Drilling. True thickness (7.2 g*m Inside 2024 Resource, 24.5
                                                                                                                                                  g*m Outside 2024 Resource)
 UGCJY-6416  4943.9       39430.2       1276    89.8        30.6  0.0         15.1                     1.2       17.8                       0.98  Resource Infill Drilling. True thickness (0.8 g*m Inside 2024 Resource, 17 g*m
                                                                                                                                                  Outside 2024 Resource)
 UGCJY-6417  4944         39430.2       1274.6  88.2        -11   5.2         14.0                     2.4       33.1                       0.07  Resource Infill Drilling. True thickness (14.2 g*m Inside 2024 Resource, 18.8
                                                                                                                                                  g*m Outside 2024 Resource)
 UGCJY-6430  4946.6       39460.5       1273.3  89.3        -70   24.3        2.2                      5.3       11.8                       0.07  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6485  4943.7       39430.3       1276.7                    16.5        6.0                      31.5      188.0                      0.02  Resource Infill Drilling. True thickness (10.7 g*m Inside 2024 Resource, 177.3

                                                                   g*m Outside 2024 Resource)

 Incl.                                                            22.0        0.6                      312.0     176.7
 UGCJY-6486  4944         39430.2       1274.8  89          7.3   1.7         8.8                      1.5       13.6                       0.52  Resource Infill Drilling. True thickness (0.4 g*m Inside 2024 Resource, 13.1
                                                                                                                                                  g*m Outside 2024 Resource)
 and                                                              16.6        4.8                      2.8       13.5                       0.27  Resource Infill Drilling. True thickness (Entire intercept inside 2024
                                                                                                                                                  Resource)
 incl.                                                            16.6        0.6                      15.2      9.4
 UGCJY-6488  4944.4       39440         1276.6                    15.0        11.9                     5.3       62.8                       0.17  Resource Infill Drilling. True thickness (61.2 g*m Inside 2024 Resource, 1.6
                                                                                                                                                  g*m Outside 2024 Resource)
 incl.                                                            15.0        0.6                      92.0      57.1
 UGCJY-6491  5073.5       39460.3       1192.4  255         18.7  100.1       23.2                     2.2       51.0                       0.01  Resource Infill Drilling. True thickness (50.5 g*m Inside 2024 Resource, 0.5
                                                                                                                                                  g*m Outside 2024 Resource)
 incl.                                                            111.0       2.7                      12.6      33.6
 UGCJY-6492  5073         39460.7       1191.7  255.3       11.5  104.0       16.4                     1.4       22.6                       0.03  Resource Infill Drilling. True thickness (3.4 g*m Inside 2024 Resource, 19.4
                                                                                                                                                  g*m Outside 2024 Resource)
 UGCJY-6493  5072.8       39460.7       1191.6  256.3       4     70.7        7.2                      1.5       11.0                       0.01  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 and                                                              103.0       9.7                      2.0       19.1                       0.08  Resource Infill Drilling. True thickness (Entire Intercept on 2024 Resource
                                                                                                                                                  Boundary)
 Incl.                                                            110.0       1.0                      17.0      16.4
 UGCJY-6507  5073.1       39460.7       1191.7  269.5       14.2  86.0        7.8                      1.6       12.5                       0.04  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6508  5073         39460.8       1191.6  270         7.1   65.8        9.2                      1.4       12.6                       0.02  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 and                                                              87.0        3.7                      16.1      60.2                       0.02  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            89.0        1.0                      53.5      53.5
 and                                                              105.0       11.4                     3.6       41.2                       0.01  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            110.0       0.9                      34.4      30.6
 and                                                              122.3       4.3                      4.3       18.3                       0.26  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6509  5072.9       39460.6       1191.1  269.8       1.2   86.8        12.3                     3.8       46.7                       0.02  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 UGCJY-6599  5072.9       39460.6       1190.9  269.9       -6.3  87.0        12.5                     4.3       53.3                       0.05  Resource Extension Drilling. True thickness (Entire intercept outside 2024
                                                                                                                                                  Resource)
 incl.                                                            90.4        4.2                      8.4       34.8

 

Competent Persons' Statements and JORC Compliance Statements

Information in this announcement that relates to new underground diamond drill
results is based on and fairly represents information and supporting
documentation compiled by Mr Paul Benson (BSc). Mr Benson has over 30 years of
industry experience and is a full-time employee of Hebei Hua Ao Mining
Industry Company Limited ("Hebei Hua Ao"). Griffin Mining Limited owns a 88%
equity interest in Hebei Hua Ao which is the operating Company of the
Caijiaying Mine. Mr Benson has been Geology Manager with Griffin Mining
Limited and Hebei Hua Ao for more than 9 years and is a Member of the
Australian Institute of Mining and Metallurgy (AusIMM). Mr Benson has
sufficient experience which is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves (2012 JORC Code). Mr Benson consents to the inclusion in this
announcement of all technical statements based on his information in the form
and context in which they appear.

JORC Code, 2012 Edition - Table 1

Section 1: Sampling Techniques and Data

 Criteria                                                 JORC Code explanation                                                            Commentary
 Sampling techniques                                      Nature and quality of sampling (e.g. cut channels, random chips, or specific     The sample database is made up of surface diamond (DD) and reverse circulation
                                                          specialised industry standard measurement tools appropriate to the minerals      (RC) drilling, underground diamond drilling and representative continuous chip
                                                          under investigation, such as downhole gamma sondes, or handheld XRF              sampling of underground development walls.
                                                          instruments, etc). These examples should not be taken as limiting the broad
                                                          meaning of sampling.
                                                          Include reference to measures taken to ensure sample representivity and the      Diamond core was cut in half using a diamond saw, with the cut line determined
                                                          appropriate calibration of any measurement tools or systems used.                by the core orientation line or by mineralisation angles when ori-line is
                                                                                                                                           absent. RC samples were split through a riffle splitter. Underground
                                                                                                                                           development drive & cross-cut wall samples were collected using a rock
                                                                                                                                           hammer with best efforts made to collect representative ~1m samples
                                                          Aspects of the determination of mineralisation that are Material to the Public   Diamond holes were sampled after standard logging and photography. Sampling
                                                          Report.                                                                          intervals were 0.5-1.5 m with 1.0 m being the most common interval. RC

                                                                                drilling was used to obtain 1 m samples from which 3 kg was pulverised to
                                                          In cases where 'industry standard' work has been done this would be relatively   produce a 50 g charge for fire assay and a 20 g charge for base metal
                                                          simple (e.g. 'reverse circulation drilling was used to obtain 1 m samples        assay.
                                                          from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In
                                                          other cases, more explanation may be required, such as where there is coarse
                                                          gold that has inherent sampling problems. Unusual commodities or
                                                          mineralisation types (e.g. submarine nodules) may warrant disclosure of
                                                          detailed information.
 Drilling techniques                                      Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air         Drilling was completed using a face sampling hammer or NQ2/BQ size diamond
                                                          blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or    core. All holes were surveyed upon completion of drilling using
                                                          standard tube, depth of diamond tails, face-sampling bit or other type,          single/multi-shot electronic or mechanical survey cameras.
                                                          whether core is oriented and if so, by what method, etc.).
 Drill sample recovery                                    Method of recording and assessing core and chip sample recoveries and results    Core recovery is measured for diamond core by measuring the length of core for
                                                          assessed.                                                                        each core run. This is recorded in a table called GEOTECH. There is no
                                                                                                                                           recovery recorded for RC holes, but these constitute only 50 holes within the
                                                                                                                                           Mineral Resource and have been mainly used to provide information about the
                                                                                                                                           depth of overburden. There are no RC hole data for the Yuan/Fu Long high-grade
                                                                                                                                           gold domain work reported here.
                                                          Measures taken to maximise sample recovery and ensure representative nature of   Diamond coring is carried out using equipment in good working order to ensure
                                                          the samples.                                                                     no loss of core. Any core loss during drilling is noted on a core block placed
                                                                                                                                           into the core tray and then discussed with the geologist. Core loss is
                                                                                                                                           generally rare and related to fault zones away from mineralisation. RC sample
                                                                                                                                           recovery was maximised by using a modern rig with sufficient air to keep the
                                                                                                                                           hole dry.
                                                          Relationship between sample recovery and grade/sample bias.                      This analysis was not carried out because core recovery has generally been
                                                                                                                                           high through the mineralised zones.
 Logging                                                  Whether core and chip samples have been geologically and geotechnically logged   All RC samples were geologically logged to record weathering, regolith, rock
                                                          to a level of detail to support appropriate Mineral Resource estimation,         type, colour, alteration, mineralisation, structure and texture and any other
                                                          mining studies and metallurgical studies.                                        notable features that are present. All diamond core was logged for structure
                                                                                                                                           and geologically logged using the same system as that for RC.

                                                                                                                                           The logging information was recorded into Microsoft (MS) Excel format on paper
                                                                                                                                           and then transferred into the company's drilling database once the log was
                                                                                                                                           complete. Since 2017 core logging has been directly into MS Excel sheets on
                                                                                                                                           laptop computers.
                                                          Whether logging is qualitative or quantitative in nature. Core (or costean,      Logging was qualitative; however, the geologists also record visual
                                                          channel, etc) photography.                                                       quantitative mineral percentage ranges for the sulphide minerals present.

                                                                                                                                           Diamond core was photographed wet one core tray at a time using a standardised
                                                                                                                                           photography jig.

                                                                                                                                           Samples from RC holes were archived in standard 20 m plastic chip trays.
                                                          The total length and percentage of the relevant intersections logged.            All holes and intersections have been logged.
 Subsampling techniques and sample preparation            If core, whether cut or sawn and whether quarter, half or all core taken.        Core samples were taken from half core, cut using a diamond core saw. The
                                                                                                                                           remainder of the core was retained in core trays tagged with a hole number and
                                                                                                                                           metre mark. Since 2016 small diameter (BQ) underground holes (dominantly grade
                                                                                                                                           control holes) have been whole core sampled, to remove the need for core
                                                                                                                                           cutting and to increase the sample weight.
                                                          If non-core, whether riffled, tube sampled, rotary split, etc and whether        RC samples were cone split to a nominal 2.5 kg to 3 kg sample weight. The
                                                          sampled wet or dry.                                                              drilling method was designed to maximise sample recovery and delivery of a
                                                                                                                                           clean, representative sample into the calico bag.

                                                                                                                                           Where possible all RC samples were drilled dry to maximise recovery. The use
                                                                                                                                           of a booster and auxiliary compressor provide dry sample for depths below the
                                                                                                                                           water table.

                                                                                                                                           Sample condition was recorded (wet, dry or damp) at the time of sampling and
                                                                                                                                           recorded in the database.

                                                                                                                                           Samples were collected in a pre-numbered calico bag bearing a unique sample
                                                                                                                                           ID. Samples were crushed to 75 µm at the laboratory and riffle split (if
                                                                                                                                           required) to a maximum 3 kg sample weight. Gold analysis was determined by a
                                                                                                                                           50 g fire assay with an inductively coupled plasma-optical emission
                                                                                                                                           spectrometry (ICP-OES) or atomic absorption spectroscopy (AAS) finish.
                                                          For all sample types, the nature, quality and appropriateness of the sample      The assay laboratories' sample preparation procedures follow industry best
                                                          preparation technique                                                            practice, with techniques and practices that are appropriate for this style of
                                                                                                                                           mineralisation. Pulp duplicates were taken at the pulverising stage and
                                                                                                                                           selective repeats conducted at the laboratories' discretion.
                                                          Quality control procedures adopted for all subsampling stages to maximise        Cut lines are marked on diamond drill core to ensure that the core to minimise
                                                          representivity of samples.                                                       bias when cutting.

                                                                                                                                           The RC drilling was carried out several years ago, and no documentation
                                                                                                                                           remains on QAQC of subsampling. RC samples are not material to the Mineral
                                                                                                                                           Resource estimate (MRE) or to this announcement.
                                                          Measures taken to ensure that the sampling is representative of the in-situ      Hua Ao inserts approximately three standards and three blanks for every 100
                                                          material collected, including for instance results for field                     samples. Field duplicates were collected from the cone splitter on the rig for
                                                          duplicate/second-half sampling.                                                  RC samples at a frequency of one duplicate every 20 samples, excluding the
                                                                                                                                           100(th) sample as this was a standard. Diamond core field duplicates are not
                                                                                                                                           taken.

                                                                                                                                           Regular reviews of the sampling are carried out by the supervising geologist
                                                                                                                                           and senior field staff, to ensure all procedures were followed and best
                                                                                                                                           industry practice carried out.
                                                          Whether sample sizes are appropriate to the grain size of the material being     The sample sizes were appropriate for the type, style and consistency of
                                                          sampled.                                                                         mineralisation encountered during this phase of exploration.
 Quality of assay data and laboratory tests               The nature, quality and appropriateness of the assaying and laboratory           The assay method and laboratory procedures were appropriate for this style of
                                                          procedures used and whether the technique is considered partial or total.        mineralisation. The fire assay technique was designed to measure total gold in
                                                                                                                                           the sample.
                                                          For geophysical tools, spectrometers, handheld XRF instruments, etc, the         No geophysical tools, spectrometers were used. Handheld x-ray fluorescence
                                                          parameters used in determining the analysis including instrument make and        (XRF) instruments are used; however, the values were only used to support
                                                          model, reading times, calibrations factors applied and their derivation, etc.    geological modelling of the lithology. The values were not used for grade
                                                                                                                                           estimation.
                                                          Nature of quality control procedures adopted and whether acceptable levels of    The QAQC process described above was sufficient to establish acceptable levels
                                                          accuracy (i.e. lack of bias) and precision have been established.                of accuracy and precision. All results from assay standards and duplicates
                                                                                                                                           were scrutinised to ensure they fell within acceptable tolerances.
 Verification of sampling and assaying                    The verification of significant intersections by either independent or           Primary data is sent in digital format to the company's Database Administrator
                                                          alternative company personnel.                                                   (DBA) as often as was practicable. The DBA imports the data into a GeoBank (MS
                                                                                                                                           SQL) database, with assay results merged into the database upon receipt from
                                                                                                                                           the laboratory. Once loaded, data was extracted for verification by the
                                                                                                                                           geologist in charge of the project.
                                                          The use of twinned holes.                                                        Twinned holes have not been drilled at Caijiaying because the MRE is
                                                                                                                                           predominantly based on diamond drillholes with demonstrated good recovery
                                                                                                                                           through the ore zones. Several years of production give confidence to the
                                                                                                                                           geometry and persistence of mineralisation.
                                                          Documentation of primary data, data entry procedures, data verification, data    All primary data is collected on paper logs, which are filed and stored.
                                                          storage (physical and electronic) protocols.                                     Procedures are documented for data recording and entry. Data from paper logs
                                                                                                                                           is transferred to MS Excel files and then imported into GeoBank drillhole
                                                                                                                                           database. A back up of the database is maintained in ERM's Perth office. Since
                                                                                                                                           2017, logging has been directly into MS Excel tables on a laptop. These files
                                                                                                                                           are transferred to a server. The server has a backup system.
                                                          Discuss any adjustment to assay data.                                            No adjustments were made to any current or historical data. If data could not
                                                                                                                                           be validated to a reasonable level of certainty it was not used in any
                                                                                                                                           resource estimations.
 Location of data points                                  Accuracy and quality of surveys used to locate drillholes (collar and downhole   Surface RC drill collars were surveyed after completion, using a differential
                                                          surveys), trenches, mine workings and other locations used in Mineral Resource   global positioning system (GPS) instrument. Downhole RC surveys were completed
                                                          estimation.                                                                      using a mechanical single-shot survey camera. Underground holes were surveyed
                                                                                                                                           by mine surveyors using a total station theodolite. Downhole surveys were
                                                                                                                                           completed using single/multi-shot electronic survey instruments or single-shot
                                                                                                                                           survey camera. Downhole surveys are recorded relative to magnetic north.
                                                                                                                                           Corrections are made, depending on the year of survey, for magnetic
                                                                                                                                           declination, to give azimuths in terms of the Hua Ao mine grid system.
                                                          Specification of the grid system used.                                           All coordinates and bearings use the Hua Ao mine grid system.
                                                          Quality and adequacy of topographic control.                                     The quality of the topographic control is considered to be sufficient. The
                                                                                                                                           mine is in operation and has a site-based survey department. Their work is of
                                                                                                                                           good quality, supported by development breakthroughs occurring as expected;
                                                                                                                                           being able to connect two drives being developed towards each other and so on.
 Data spacing and distribution                            Data spacing for reporting of Exploration Results.                               The data spacing is irregular, with a clustering in the main part of the mine,
                                                                                                                                           but average spacings are approximately 40 m x 40 m.
                                                          Whether the data spacing and distribution is sufficient to establish the         Refer to December 2024 Mineral Resource estimation report.
                                                          degree of geological and grade continuity appropriate for the Mineral Resource

                                                          and Ore Reserve estimation procedure(s) and classifications applied.             Resource extension drilling is designed to produce data density suitable for
                                                                                                                                           future Mineral Resource estimation updates.
                                                          Sample compositing                                                               Sample composites have not been used.
 Orientation of data in relation to geological structure  Whether the orientation of sampling achieves unbiased sampling of possible       Drilling was designed based on known geological models, underground mapping,
                                                          structures and the extent to which this is known, considering the deposit        verified historical data, cross-sectional and 3D interpretation.
                                                          type.

                                                                                                                                           Drillholes oriented at right angles to strike of deposit, with dip optimised
                                                                                                                                           for drill capabilities and the dip of the orebody.
                                                          If the relationship between the drilling orientation and the orientation of      This is not considered to be a material factor because of the style of
                                                          key mineralised structures is considered to have introduced a sampling bias,     mineralisation and the use of underground drill fans to intersect the
                                                          this should be assessed and reported if material.                                mineralisation at various angles.
 Sample Security                                          The measures taken to ensure sample security.                                    All samples were reconciled against the sample submission with any omissions
                                                                                                                                           or variations reported to back to the logging geologists.

                                                                                                                                           All samples were bagged in a tied numbered calico bag, grouped into green
                                                                                                                                           plastic bags. The bags were placed into cages with a sample submission sheet
                                                                                                                                           and delivered directly from site to the SGS and Intertek laboratories in
                                                                                                                                           Beijing and Tianjin by HHA personnel.
 Audits or reviews                                        The results of any audits or reviews of sampling techniques and data.            An audit of the underground mining geology systems, including sampling, was
                                                                                                                                           carried out in 2018 by Aaron Meakin of CSA Global. This included work on ideal
                                                                                                                                           sample spacing. In general, this audit supported current practice.

Section 2: Reporting of Exploration Results

 Criteria                                                          JORC Code explanation                                                            Commentary
 Mineral tenement and land tenure status                           Type, reference name/number, location and ownership including agreements or      All exploration was conducted on tenements 100% owned by Hebei Hua Ao or its
                                                                   material issues with third parties such as joint ventures, partnerships,         related companies. The leases are the Hua Ao Mining Licence (Zone II and III)
                                                                   overriding royalties, native title interests, historical sites, wilderness or    and the Hua Ao Retention Licence (Zone V and VIII).
                                                                   national park and environmental settings.

                                                                                                                                                    The Zone II and III Mining Licence has been granted with a term through to
                                                                                                                                                    28(th) August 2054. See Company Announcement "Renewal of Caijiaying Mining
                                                                                                                                                    Licence to 2054" dated 19th January 2026.

                                                                   The security of the tenure held at the time of reporting along with any known    All tenements are in good standing. The Zone III mining licence extends down
                                                                   impediments to obtaining a licence to operate in the area.                       to 1000 mRL. There are processes in place in Chinese mining law to allow this
                                                                                                                                                    to be extended deeper.
 Exploration done by other parties                                 Acknowledgment and appraisal of exploration by other parties.                    All exploration has been undertaken by Hua Ao or the Third Geological Brigade
                                                                                                                                                    of Hebei who now form part of the Hua Ao Joint Venture.
 Geology                                                           Deposit type, geological setting and style of mineralisation.                    Distal magmatic hydrothermal skarn-style mineralisation at Caijiaying is
                                                                                                                                                    believed to be related to a Jurassic igneous event that affected the
                                                                                                                                                    2.3 billion-year-old metamorphic basement rocks. Base metal and gold
                                                                                                                                                    mineralisation associated with Jurassic intrusives have replaced favourable
                                                                                                                                                    horizons in the metamorphic rocks, most notably calcsilicates and marble.
                                                                                                                                                    Porphyry sills and dykes intruding along faults have then cut across the
                                                                                                                                                    sequence.
 Drillhole information                                             A summary of all information material to the understanding of the exploration    Greenfield exploration results are not being reported. All drilling related to
                                                                   results including a tabulation of the following information for all Material     this announcement has been completed from underground using drill cuddies on
                                                                   drillholes:                                                                      varying mine levels, with hole fans drilled up and down dip as well as fanning

                                                                                laterally. The significant intercepts table contains 3D collar co-ordinates,
                                                                   ·   easting and northing of the drillhole collar                                 drill hole azimuth and dip for 2025-26 drilling reported here for the

                                                                                Yuan/Fu-Long high-grade gold domain.
                                                                   ·   elevation or RL (Reduced Level - elevation above sea level in metres)
                                                                   of the drillhole collar

                                                                   ·   dip and azimuth of the hole

                                                                   ·   downhole length and interception depth

                                                                   ·   hole length.
                                                                   If the exclusion of this information is justified on the basis that the          NOTE: This announcement relates to 2025-2026 drilling results into a single
                                                                   information is not Material and this exclusion does not detract from the         high-grade gold domain (Yuan Long and Fu Long Lode) within the Caijiaying
                                                                   understanding of the report, the Competent Person should clearly explain why     Zn-Pb-Ag-Au mine.
                                                                   this is the case.

                                                                                                                                                    Yuan Long and Fu Long are two of at least five interpreted high grade gold
                                                                                                                                                    domains at Caijiaying and are the only gold zones that currently has
                                                                                                                                                    significant new drilling beneath the existing Mineral Resource. Following the
                                                                                                                                                    recent dramatic increase in gold price and thus the potential in-ground value
                                                                                                                                                    of high-grade gold domains at Caijiaying, additional resource extension
                                                                                                                                                    drilling has been designed to better define these structurally controlled
                                                                                                                                                    gold-rich shoots with the aim to increase gold-rich mining inventory. This
                                                                                                                                                    announcement aims to demonstrate the nature and continuity of one of the
                                                                                                                                                    high-grade gold domains at Caijiaying for which there is material new drilling
                                                                                                                                                    data.

                                                                                                                                                    Caijiaying is an operating Zn-Pb-Ag-Au mine Exploration results are not
                                                                                                                                                    routinely reported by the Company unless they reflect a potentially materially
                                                                                                                                                    different mineralisation style or grade profile. It is not possible to present
                                                                                                                                                    all historic exploration and resource extension drilling data here. Please
                                                                                                                                                    refer to the December 2024 MRe for more detailed consolidated information on
                                                                                                                                                    Mineral Resources and geological context.
 Data aggregation methods                                          In reporting Exploration Results, weighting averaging techniques, maximum        Significant intercepts reported here are calculated using a 0.2 g/t Au lower
                                                                   and/or minimum grade truncations (e.g. cutting of high grades) and cut-off       cutoff and a maximum 3m consecutive internal waste. No upper cutoff grade has
                                                                   grades are usually Material and should be stated.                                been applied.

                                                                   Where aggregate intercepts incorporate short lengths of high-grade results and   Shorter high-grade intervals within significant intercepts are reported as
                                                                   longer lengths of low-grade results, the procedure used for such aggregation     "incl." Au values and intervals in the significant intercept table.
                                                                   should be stated and some typical examples of such aggregations should be

                                                                   shown in detail.                                                                 Significant intercepts are presented as (length) weighted average grades and
                                                                                                                                                    as grams * metres values for the intercept. (for example a 2 metre significant
                                                                                                                                                    intercept containing 1m @ 10 g/t Au and 1m @ 20 g/t Au would be reported as a
                                                                                                                                                    30g*m Au intercept comprising 2m @ 15 g/t Au, incl. 1m @ 20 g/t Au)
                                                                   The assumptions used for any reporting of metal equivalent values should be      Metal equivalent values are not reported here.
                                                                   clearly stated.
 Relationship between mineralisation widths and intercept lengths  These relationships are particularly important in the reporting of Exploration
                                                                   Results.
                                                                   If the geometry of the mineralisation with respect to the drillhole angle is     Most holes were drilled approximately orthogonal to mineralisation (+/- 10
                                                                   known, its nature should be reported.                                            degrees); where reported drill holes are not approximately orthogonal to
                                                                                                                                                    mineralisation an estimated true width is provided based on 3D interpretation
                                                                                                                                                    of the drill intercept.
                                                                   If it is not known and only the downhole lengths are reported, there should be
                                                                   a clear statement to this effect (e.g. 'downhole length, true width not
                                                                   known').
 Diagrams                                                          Appropriate maps and sections (with scales) and tabulations of intercepts        All drilling reported here has been completed from underground drill cuddy
                                                                   should be included for any significant discovery being reported These should     locations with drill holes fanning up and down as well as laterally. As such,
                                                                   include, but not be limited to a plan view of drillhole collar locations and     it is difficult to provide serial cross sections, drill hole collar plans etc.
                                                                   appropriate sectional views.                                                     3D long sections and selected horizontal level plan slice views are provided
                                                                                                                                                    (to the extent possible given the geometry and density of the drilling) in
                                                                                                                                                    Appendix 2 to demonstrate the mineralisation trends and continuity.

 Balanced reporting                                                Where comprehensive reporting of all Exploration Results is not practicable,     Significant intercepts have been reported for all 2025-26 drill holes into the
                                                                   representative reporting of both low and high grades and/or widths should be     Yuan Long and Fu Long gold domains below the limit of underground development
                                                                   practiced to avoid misleading reporting of Exploration Results.                  and mining in this zone. No results have been reported outside this domain,
                                                                                                                                                    and any 2025 drilling into the upper part of Yuan Long (above the 1320m RL)
                                                                                                                                                    that has since been mined has been excluded.
 Other substantive exploration data                                Other exploration data, if meaningful and material, should be reported           This data has been covered in detail in the Dec 2024 Mineral Resource
                                                                   including (but not limited to): geological observations; geophysical survey      estimation report.
                                                                   results; geochemical survey results; bulk samples - size and method of

                                                                   treatment; metallurgical test results; bulk density, groundwater, geotechnical   Refer to Company Announcement "Exceptional Gold Mineralisation At The
                                                                   and rock characteristics; potential deleterious or contaminating substances.     Caijiaying Mine" dated 15(th) April 2025.
 Further work                                                      The nature and scale of planned further work (e.g. tests for lateral             Underground drilling is ongoing across the mine site with eight underground
                                                                   extensions or depth extensions or large-scale step-out drilling).                drill rigs delivering a mixture of grade control, resource extension and
                                                                                                                                                    infill drilling, as well as some deeper and more distal conceptual exploration
                                                                                                                                                    targeting.
                                                                   Diagrams clearly highlighting the areas of possible extensions, including the    Areas interpreted to be prospective for down plunge extensions of the
                                                                   main geological interpretations and future drilling areas, provided this         high-grade gold domains are highlighted in figures. Discussion of ongoing
                                                                   information is not commercially sensitive.                                       routine Zn-Pb-Ag-Au resource extension drilling is beyond the scope of this
                                                                                                                                                    announcement.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
 or visit
www.rns.com (http://www.rns.com/)
.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
.   END  DRLFLFSTFFILLIR



            Copyright 2019 Regulatory News Service, all rights reserved

Recent news on Griffin Mining

See all news