REG - Hummingbird Res. - Exploration Results Update
RNS Number : 3186KHummingbird Resources PLC13 December 2018Hummingbird Resources plc / Ticker: HUM / Index: AIM / Sector: Mining
Hummingbird Resources plc
("Hummingbird" or the "Company")
Exploration Results Update
Hummingbird Resources (AIM:HUM), the African gold producer, is pleased to announce its second set of drill results from the 2018 exploration campaign in Mali, the focus of which is to convert Resources to Reserves and, in time, to extend the life of mine from the Company's Yanfolila Gold Mine.
Drilling has been ongoing since it began in July and has now focused on the Resource definition at Gonka, with some further follow up drilling at Komana West. This second batch of results delivers further positive results from those announced in September and shows the high-grade potential at Gonka owing to the significant numbers of wide and high-grade drill intercepts encountered to date. The additional drilling at Komana West has been useful to the mining operations, since the newly drilled zones have been found outside the Resource model and positive results have been found inside the current pit shell, increasing the amount of mineable ore available.
Drilling Highlights:
Best Intersections
Gonka ('GK') Deposit
· 15m @ 16.03g/t from 207m depth (GKRCD0013)
· 20.05m @ 4.63g/t from 118m depth (GKDD0020)
· 11m @ 4.11g/t from 79m depth (GKRCD0044)
· 14m @ 3.88g/t from 178m depth (GKRCD0002)
· 13.6m @ 2.56g/t from 34m depth (GKDD0011)
Komana West ('KW') Deposit
· 15m @ 4.25 g/t from 8m depth (KWDD0609)
Komana West South Extension
· 12m @ 1.90 g/t from 90m depth (KWRC0419)
Murray Paterson, Chief Geologist for Hummingbird, commented:
"Following analysis of recent exploration results, Hummingbird is confident that it is now on target to achieve our operational objective, which is to increase the mine life at Yanfolila. In light of these results, the exploration team on site is now working diligently to build a mineable Resource that will aim to add more open pit and underground ore extending the current mine life.
So far, drilling has remained quite shallow, focussing on infilling the open pit Resources. Our attentions now switch to drilling out the underground Resources at Gonka, which is very exciting since this is where the highest grades and wider intervals have been drilled by Gold Fields Ltd."
Please click on the following link to see a long section of the Gonka deposit and a map of the deposit locations within the mining permit.
http://www.rns-pdf.londonstockexchange.com/rns/3186K_1-2018-12-12.pdf
Further information:
2018 Exploration Results
As at the end of November the total metres drilled to date is 23,697m. A breakdown of the numbers is as follows;
Gonka (metres)
· Reverse Circulation ('RC'): 6,206
· Diamond Drill Hole ('DDH'): 9,908
· Total : 16,114
Komana West (metres)
· RC: 3,091
· DDH: 2,536
· Total : 5,627
Guirin West (metres)
· RC: 1,956
Initially, around 50,000m of drilling was planned this year. Through the year the drilling schedule has become more targeted and has been adapted to fit with the updated LoM plan.
All currently planned exploration drilling is expected to be completed by year end 2018 allowing the mineral resource model and mine planning to commence. It is expected that by the end of the first quarter 2019 a new mineral Resource and Reserve update will be released by the company.
Komana West ('KW') Pit
The 2018 drilling programme at KW has been completed. Following the first round of results, another near-surface mineralised zone has been identified immediately west of the main North-South grade domain within the current pit. This new in-pit zone is in addition to the high-grade zones reported previously. These zones will add immediately to the mineable oxide ounces in the Reserve as they will be grade controlled drilled once mining reaches the relevant pit floor elevations over the next 6 months. The targeted diamond drilling that has been carried out has also allowed the structural model for the deposit to be refined, which has been a benefit to further exploration but also the grade control and Resource modelling.
Komana West - Southern Extension
RC drilling to test for the southern extension of mineralisation identified a broad zone of 12m @ 1.9g/t (open at depth below) in hole KWRC0419. The intersection is located 650m south of the boundary of the planned pit. Further follow up drilling will be planned next year to test for mineralised extensions along strike and down dip.
A total of 2,536m of Diamond Drilling and 3,091 metres of RC has been drilled at Komana West and its northern and southern extensions. There remain a few RC assays still outstanding. See table below for a complete set of results.
Gonka
Drilling at Gonka has identified a series of broad mineralised zones with intermittent, narrow high-grade zones, with both related to north plunging, open fold hinge zones proximal to a basalt-metasediment contact. These zones form a series of well-defined linear ore shoots which are proving to be predictable in nature. The predictability of the ore shoots is allowing for drilling to continue to define extensions to the shoots outside of the $1,100/oz pit shell used in the DRA's 2016 open pit and underground scoping study.
Mineralisation is typically defined by a fine, dark alteration of the basalt, with fine pyrite or narrow zones of coarse cubic pyrite +/- quartz veins and/or brecciated quartz-carbonate +/- tourmaline vein zones of various widths. Photos of these high-grade zones will be uploaded and sent out on Twitter shortly after the release of this announcement. The mineralised intersections have been identified at depths as shallow as 34m. However, very little surface expression of the ore body exists, which has limited the number of orpailleurs (artisanal miners) active at Gonka.
The geological and structural model has been under constant revision and has been used to assist with planning and following down plunge extensions to the main high-grade zones. The exploration team's primary drilling focus for this year has been to convert the previously defined Inferred Resources to Indicated. Once this is complete, the team's attention can move to the numerous other significant intercepts that have the potential to define new zones in the Gonka mineral resource model.
Gold Fields Ltd ("Gold Fields") had previously drilled +47,000m of drilling at Gonka defining over +300kozs in Inferred resources (DRA 2016 study indicated that there was some 92kozs @ 2.33g/t within the open pit and 77kozs @ 4.47g/t underground at $1,100/oz gold price). Drilling by Gold Fields identified mineralisation and resources along a >2km zone, making up the Gonka trend. The current drilling program has focused on an 800m long portion at the northern end of the Gonka trend. Some of Gold Fields' notable drill intersections were;
7m @ 7.65 g/t from 92m depth (KRC0578)
6m @ 9.18 g/t from 102m depth (KRC0578)
15m @ 7.51 g/t from 59m depth (KRC0806)
20m @ 4.19 g/t from 56m depth (KRCD0058)
7.2m @ 7.05 g/t from 139m depth (KRCD0233)
5.2m @ 9.42 g/t from 174.4m depth (KRCD0575)
4.85m @ 11.46 g/t from 109.55m (KRCD0587)
5.3m @ 18.80 g/t from 249m (KRCD0730)
3.5m @ 23.13 g/t from 162.6m (KRCD0756)
1.3m @ 39.71 g/t from 220.4m (KRCD0808)
To date a total of 9,908m (budget of 12,000m) of DD and 6,206 metres (budget of 10,000m) of RC pre-collars have been completed at Gonka. The current exploration drill programme will be finished by year end, and work has already begun to ensure the updated Resource and Reserve models are finalised by Q1 2019.
The Gonka deposit is situated just 5km from the process plant, making it suitable to be included in the current mine plan. The deposit is fully permitted and within the mining license, which will allow mining to start immediately, once the Resource modelling and mine planning is completed, expected by the end of first quarter 2019.
Guirin West
Mineral Resource modelling of the Guirin West infill RC drilling (1,956m) was completed by CSA Global - UK. The total mineral resource defined from this drilling was 64kt @ 2.26g/t for 4.6kozs (at a cut-off of 0.8g/t). All the material is oxide and is contained with a single grade domain. Only the southern-most zone within the 6 mineralised zones that make up Guirin West was able to be drilled at the time due to the extreme wet season. The remaining zones are being planned to be drilled in 2019.
Komana East Underground
No further drilling is being planned for 2018 at Komana East underground. Mining planning work is being scheduled to commence by CSA Global - Perth in February 2019 to prepare an underground mine design and schedule on the existing Indicated resources beneath the pit. This work is scheduled for completion by the end of quarter one 2019.
Sanioumale East and West "SE & SW"
The planned 2018 resource infill and fresh rock extensional drilling at Sanioumale East and West have been postponed until 2019. Mine planning work by CSA Global are running mine planning scenarios on the existing Indicated resources (oxide and transitional only) at SE & SW. With the planned second ball mill expansion ready by Q3 2019, the oxide / transitional resources of 200kozs at SE & SW will be blended with the hard rock resources from Gonka.
Komana West
Full drill results - 1m cut-off grade 0.5g/t
Hole_ID
Depth From (m)
Depth To (m)
Interval (m)
Grade (g/t)
Intercept Description
KWDD0600
139
146
7
1.88
7m @ 1.88 g/t
KWDD0601
109
110.2
1.2
0.8
1.2m @ 0.80 g/t
KWDD0601
118
119
1
3.23
1m @ 3.23 g/t
KWDD0601
133
134
1
0.8
1m @ 0.80 g/t
KWDD0601
143
144
1
2.25
1m @ 2.25 g/t
KWDD0601
159
160
1
0.58
1m @ 0.58 g/t
KWDD0601
164
165
1
3.04
1m @ 3.04 g/t
KWDD0602
119
120
1
22.9
1m @ 22.90 g/t
KWDD0603
72.4
80.45
8.05
4.98
8.05m @ 4.98 g/t
KWDD0603
84.9
92
7.1
6.25
7.1m @ 6.25 g/t
KWDD0603
96.1
98
1.9
24.87
1.9m @ 24.87 g/t
KWDD0603
105.55
107
1.45
0.57
1.45m @ 0.57 g/t
KWDD0603
118
142.75
24.75
3.06
24.75m @ 3.06 g/t
KWDD0603
173
174
1
3.83
1m @ 3.83 g/t
KWDD0604
64
66
2
0.58
2m @ 0.58 g/t
KWDD0604
69
82.5
13.5
5.33
13.5m @ 5.33 g/t
KWDD0604A
62.5
65
2.5
3.47
2.5m @ 3.47 g/t
KWDD0604A
69.7
79.7
10
9.9
10m @ 9.90 g/t
KWDD0605
102
103
1
0.73
1m @ 0.73 g/t
KWDD0605
134
136
2
5.12
2m @ 5.12 g/t
KWDD0605
139
145
6
2.17
6m @ 2.17 g/t
KWDD0605
154
157
3
0.96
3m @ 0.96 g/t
KWDD0606
115
116
1
0.63
1m @ 0.63 g/t
KWDD0607
121
123
2
2.71
2m @ 2.71 g/t
KWDD0607
127
128
1
0.81
1m @ 0.81 g/t
KWDD0608
43
54.8
11.8
1.12
11.8m @ 1.12 g/t
KWDD0608
61
62
1
10
1m @ 10.00 g/t
KWDD0608
80
81
1
0.53
1m @ 0.53 g/t
KWDD0608
86.3
88
1.7
0.92
1.7m @ 0.92 g/t
KWDD0608
93
94.7
1.7
1.15
1.7m @ 1.15 g/t
KWDD0608
98
99
1
0.62
1m @ 0.62 g/t
KWDD0608
125
126.8
1.8
10.11
1.8m @ 10.11 g/t
KWDD0608
142
143
1
0.85
1m @ 0.85 g/t
KWDD0609
8
23
15
4.25
15m @ 4.25 g/t
KWDD0609
78
79
1
0.59
1m @ 0.59 g/t
KWDD0609
92.43
93.45
1.02
0.8
1.02m @ 0.80 g/t
KWDD0609
150
152
2
0.87
2m @ 0.87 g/t
KWDD0609
164
165
1
0.54
1m @ 0.54 g/t
KWDD0612
112
113
1
0.81
1m @ 0.81 g/t
KWDD0613
85.3
87
1.7
5.96
1.7m @ 5.96 g/t
KWDD0613
97
98
1
14.3
1m @ 14.30 g/t
KWDD0613
121.25
123
1.75
2.21
1.75m @ 2.21 g/t
KWDD0614
104
105
1
1.06
1m @ 1.06 g/t
KWDD0614
114.4
118
3.6
4.95
3.6m @ 4.95 g/t
KWDD0614
126
134
8
1.99
8m @ 1.99 g/t
KWDD0614
137.05
139.1
2.05
7.33
2.05m @ 7.33 g/t
KWRC0400
13
14
1
2.7
1m @ 2.70 g/t
KWRC0406
36
39
3
1.34
3m @ 1.34 g/t
KWRC0408
110
112
2
2.45
2m @ 2.45 g/t
KWRC0408
114
115
1
0.6
1m @ 0.60 g/t
KWRC0417
0
1
1
16.8
1m @ 16.80 g/t
KWRC0419
90
102
12
1.9
12m @ 1.90 g/t
KWRCD0003
11
12
1
0.54
1m @ 0.54 g/t
KWRCD0003
28
29
1
12.8
1m @ 12.80 g/t
KWRCD0003
48
49
1
8.4
1m @ 8.40 g/t
KWRCD0003
59
60
1
1.47
1m @ 1.47 g/t
KWRCD0003
71
72
1
1.1
1m @ 1.10 g/t
KWRCD0003
91.25
92.75
1.5
0.75
1.5m @ 0.75 g/t
KWRCD0003
195
196
1
0.83
1m @ 0.83 g/t
KWRCD0004
47
48
1
0.56
1m @ 0.56 g/t
KWRCD0004
77
80
3
3.26
3m @ 3.26 g/t
KWRCD0004
94.5
95.9
1.4
20.46
1.4m @ 20.46 g/t
KWRCD0004
104.4
105.4
1
2.4
1m @ 2.40 g/t
KWRCD0004
121
123
2
0.8
2m @ 0.80 g/t
KWRCD0004
133
134
1
29.7
1m @ 29.70 g/t
Gonka
Full drill results - 1m cut-off grade 0.5g/t
Hole_ID
Depth From (m)
Depth To (m)
Interval Width (m)
Grade (g/t)
Intercept Description
GKDD0001
132
134
2
2.12
2m @ 2.12 g/t
GKDD0001
153
155
2
3.72
2m @ 3.72 g/t
GKDD0001
167
168
1
1.77
1m @ 1.77 g/t
GKDD0002
80
82
2
4.34
2m @ 4.34 g/t
GKDD0002
88
89
1
2.54
1m @ 2.54 g/t
GKDD0002
108
111
3
5.5
3m @ 5.50 g/t
GKDD0002
157
158
1
0.5
1m @ 0.50 g/t
GKDD0003
78.4
80.45
2.05
1.11
2.05m @ 1.11 g/t
GKDD0004
39
41
2
1.77
2m @ 1.77 g/t
GKDD0004
60
61
1
0.9
1m @ 0.90 g/t
GKDD0006
90
91.25
1.25
0.6
1.25m @ 0.60 g/t
GKDD0007
134
136
2
8.18
2m @ 8.18 g/t
GKDD0007
158
161
3
1.84
3m @ 1.84 g/t
GKDD0007
187
193
6
4.41
6m @ 4.41 g/t
GKDD0007
199
200
1
0.5
1m @ 0.50 g/t
GKDD0008
206
207
1
1.7
1m @ 1.70 g/t
GKDD0009
109
110
1
2.97
1m @ 2.97 g/t
GKDD0009
116
118
2
1.69
2m @ 1.69 g/t
GKDD0009
177.2
179.15
1.95
2.37
1.95m @ 2.37 g/t
GKDD0010
85
89
4
2.78
4m @ 2.78 g/t
GKDD0010
112
117
5
2.97
5m @ 2.97 g/t
GKDD0010
120
121
1
0.66
1m @ 0.66 g/t
GKDD0010
132.15
133.8
1.65
0.67
1.65m @ 0.67 g/t
GKDD0011
34
47.6
13.6
2.56
13.6m @ 2.56 g/t
GKDD0012
156
157
1
0.61
1m @ 0.61 g/t
GKDD0012
160
164
4
0.98
4m @ 0.98 g/t
GKDD0012
185
186
1
2.13
1m @ 2.13 g/t
GKDD0012
198
200
2
0.54
2m @ 0.54 g/t
GKDD0015
144.5
150.8
6.3
2.88
6.3m @ 2.88 g/t
GKDD0015
186.25
187.25
1
0.52
1m @ 0.52 g/t
GKDD0017
116.2
117.4
1.2
0.87
1.2m @ 0.87 g/t
GKDD0017
141
144
3
1.19
3m @ 1.19 g/t
GKDD0018
91
92
1
0.74
1m @ 0.74 g/t
GKDD0018
170
171
1
0.68
1m @ 0.68 g/t
GKDD0019
146
154.5
8.5
1.36
8.5m @ 1.36 g/t
GKDD0019
184
185
1
0.52
1m @ 0.52 g/t
GKDD0020
90.6
97
6.4
2.9
6.4m @ 2.90 g/t
GKDD0020
111.2
114.8
3.6
0.85
3.6m @ 0.85 g/t
GKDD0020
118.35
126.1
7.75
2.95
7.75m @ 2.95 g/t
GKDD0020
128.9
132
3.1
20.39
3.1m @ 20.39 g/t
GKDD0021
177
179
2
0.98
2m @ 0.98 g/t
GKDD0022
45
46
1
1.16
1m @ 1.16 g/t
GKDD0022
56.05
57.05
1
1.5
1m @ 1.50 g/t
GKDD0024
136
137
1
5.06
1m @ 5.06 g/t
GKDD0024
146
147
1
30.8
1m @ 30.80 g/t
GKDD0024
167
169
2
1.57
2m @ 1.57 g/t
GKDD0025
147
148.56
1.56
0.59
1.56m @ 0.59 g/t
GKDD0027
68
70
2
1.24
2m @ 1.24 g/t
GKDD0027
86
89
3
1.19
3m @ 1.19 g/t
GKRCD0002
169
171
2
1.61
2m @ 1.61 g/t
GKRCD0002
178
192
14
3.88
14m @ 3.88 g/t
GKRCD0002
205
207
2
0.95
2m @ 0.95 g/t
GKRCD0004
281
282.2
1.2
1.29
1.2m @ 1.29 g/t
GKRCD0013
207
222
15
16.03
15m @ 16.03 g/t
GKRCD0013
228
230.5
2.5
0.87
2.5m @ 0.87 g/t
GKRCD0020
195
198
3
1.8
3m @ 1.80 g/t
GKRCD0020
202
203.1
1.1
0.63
1.1m @ 0.63 g/t
GKRCD0020
206.3
216
9.7
2.15
9.7m @ 2.15 g/t
GKRCD0020
219
220
1
1.97
1m @ 1.97 g/t
GKRCD0022
219
220
1
0.86
1m @ 0.86 g/t
GKRCD0023
158
159
1
5.5
1m @ 5.50 g/t
GKRCD0023
162.7
165
2.3
6.55
2.3m @ 6.55 g/t
GKRCD0023
187
191
4
0.51
4m @ 0.51 g/t
GKRCD0023
199
203
4
0.58
4m @ 0.58 g/t
GKRCD0023
210
212
2
1.56
2m @ 1.56 g/t
GKRCD0023
229
230.8
1.8
1.06
1.8m @ 1.06 g/t
GKRCD0033
49
55
6
2.29
6m @ 2.29 g/t
GKRCD0033
60
61
1
0.58
1m @ 0.58 g/t
GKRCD0033
70
71
1
1.19
1m @ 1.19 g/t
GKRCD0033
78
79
1
1.84
1m @ 1.84 g/t
GKRCD0035
74
75
1
0.99
1m @ 0.99 g/t
GKRCD0035
79
80
1
0.8
1m @ 0.80 g/t
GKRCD0035
87
88
1
0.55
1m @ 0.55 g/t
GKRCD0035
92
93
1
0.79
1m @ 0.79 g/t
GKRCD0035
100
119.55
19.55
1.8
19.55m @ 1.80 g/t
GKRCD0035
123
126
3
1.13
3m @ 1.13 g/t
GKRCD0036
87.7
90
2.3
0.73
2.3m @ 0.73 g/t
GKRCD0036
118
119
1
1.85
1m @ 1.85 g/t
GKRCD0036
158.74
167
8.26
1.73
8.26m @ 1.73 g/t
GKRCD0042B
121
122
1
2.13
1m @ 2.13 g/t
GKRCD0042B
125
126.08
1.08
1.16
1.08m @ 1.16 g/t
GKRCD0042B
160
161
1
0.6
1m @ 0.60 g/t
GKRCD0044
8
9
1
0.5
1m @ 0.50 g/t
GKRCD0044
34
38
4
3.2
4m @ 3.20 g/t
GKRCD0044
44
46
2
1.93
2m @ 1.93 g/t
GKRCD0044
62
65
3
2.35
3m @ 2.35 g/t
GKRCD0044
79
90
11
4.11
11m @ 4.11 g/t
GKRCD0056
48
55
7
1.29
7m @ 1.29 g/t
GKRCD0056
59
60
1
0.65
1m @ 0.65 g/t
GKRCD0057
11
14
3
0.86
3m @ 0.86 g/t
GKRCD0057
53
56
3
0.66
3m @ 0.66 g/t
GKRCD0057
60
72
12
1.04
12m @ 1.04 g/t
Qualified Person Review
Murray Paterson has reviewed the technical information contained within this announcement in his capacity as a Qualified Person, as required under the AIM Rules for Companies. Murray Paterson is the Chief Geologist for the Company and is a member of good standing with the Australasian Institute of Mining and Metallurgy (MAusIMM).
**ENDS**
For further information, please visit www.hummingbirdresources.co.uk or contact:
Daniel Betts, CEO
Thomas Hill, FD
Robert Monro, IR
Hummingbird Resources plc
Tel: +44 (0) 20 7409 6660
James Spinney
Ritchie Balmer
James Bellman
Strand Hanson Limited
Nominated Adviser
Tel: +44 (0) 20 7409 3494
Martin Davison
James Asensio
Canaccord Genuity Limited
Broker
Tel: +44 (0) 20 7523 8000
Gordon Poole
Owen Roberts
James Crothers
Camarco
Financial PR/IR
Tel: +44 (0) 20 3 757 4980
About Hummingbird Resources Plc
Notes to Editors
Hummingbird Resources (AIM: HUM) is a leading gold production, development and exploration company. The Company has two core gold projects, the Yanfolila Gold Mine in Mali and the Dugbe Gold Project in Liberia.
Yanfolila produced its first gold pour on time and budget in December 2017 and is expected to produce approximately 107,000oz gold/year on average over the Life of Mine. Yanfolila holds pre-production Probable Reserves of 709,800oz @ 3.14g/t, and total Resources of 1.8Moz of gold and an additional 390,700oz of non-compliant exploration potential.
The Dugbe Gold Project has Resources currently totalling 4.2Moz of gold and a completed NI 43-101 compliant PEA on the project showing a 29% IRR and US$186m NPV at a US$1,300 gold price.
In addition to Hummingbird's production and development assets, the Company also has an exploration footprint of ~4,000km2 and a 34% interest in AIM listed Cora Gold, which is advancing a portfolio of prospects in Mali and Senegal.
The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014.
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.ENDDRLFKBDBCBDDPBD
Recent news on Hummingbird Resources
See all newsREG - Nioko Resources Corp Hummingbird Res. - Offer Closed and Compulsory Acquisition
AnnouncementREG - Nioko Resources Corp Hummingbird Res. - Notice of Closure of the Offer
AnnouncementREG - Nioko Resources Corp Hummingbird Res. - Offer Update - Compulsory Acquisition Procedure
AnnouncementREG - AIM Hummingbird Res. - Cancellation - Hummingbird Resources Plc
AnnouncementREG - Hummingbird Res. - Upcoming Final Day of Trading Reminder
Announcement