REG - Hummingbird Res. - Significant Drill Results Continue at Yanfolila
RNS Number : 2125UHummingbird Resources PLC01 April 2021Hummingbird Resources plc / Ticker: HUM / Index: AIM / Sector: Mining
1 April 2021
Hummingbird Resources plc
("Hummingbird" or the "Company")
Significant Drill Results Continue at Yanfolila, Mali
Hummingbird Resources plc (AIM: HUM) is pleased to provide an update on the Company's 2021 exploration drilling programme at the Yanfolila gold mine, Mali. For the release details and graphics, please follow the link here http://www.rns-pdf.londonstockexchange.com/rns/2125U_1-2021-3-31.pdf.
As noted in the Company's Mineral Resource Estimate ("MRE") announcement on 30 March 2021, the Company's 2021 exploration drilling programme is focused on increasing mineral resources at known deposits and testing new greenfield targets. Approximately 5,800 metres ("m") have been drilled so far in 2021, which includes 3,367 m of reverse circulation ("RC") drilling at Sanioumale East ("SE") and 2,474 m of diamond core drilling at Komana East ("KE"). The drill results from SE and KE show continued resource upside potential at both deposits, as recently highlighted in the MRE announcement.
SE highlights
§ With the SE drill holes continuing to intersect mineralisation, the results highlight the potential for SE to be a material deposit, building on the positive 2020 exploration results which led to an increase of SE's JORC compliant MRE to 204,000 ounces ('oz')
§ Notable drill results from SE include:
§ 38 m at 5.39 g/t gold from 58 m depth (SNERCO421)
§ 5 m at 3.07 g/t gold from 79 m depth (SNERCO420: interval1)
§ 16 m at 2.94 g/t gold from 107 m depth (SNERCO420: interval 2)
§ 8 m at 4.58 g/t gold from 154 m depth (SNERC0419)
§ 14 m at 2.63 g/t gold from 51 m depth (SNERC0413)
§ 14 m at 2.27 g/t gold from 77 m depth (SNERC0410)
§ 16 m at 2.32 g/t gold from 12 m depth (SNERC0411)
KE highlights
· The drilling at KE is targeting mineralisation for underground development ("KEUG")
· Of the KEUG drill holes completed to date in the 2021 exploration programme all nine drill holes have intersected the targeted mineralised zones
· Notable ongoing drill results from KEUG include:
§ 5.2 m at 3.83 g/t gold from 156 m depth (KEUGDD015)
§ 8.8 m at 2.87 g/t gold from 205 m depth (KEUGDD017)
§ 1.3 m at 7.00 g/t gold from 242.7 m depth (KEUGDD018)
§ 3.4 m at 5.35 g/t gold from 221 m depth (KEUGDD022)
§ 5 m at 2.23 g/t gold from 203 m depth (KEUGDD022)
Dan Betts, CEO of Hummingbird, commented:
"These results for both SE and KEUG continue on from last year's drilling success, showing further upside growth potential in resources for both deposits. The SE results are indicating that the deposit is potentially of a material size and could be mined in the coming years. Hole SNERC0421, 38 m at 5.39 g/t gold from 58 m depth, is one of the best intersected drill results in the history of Hummingbird which is a pleasing achievement!"
"Our ongoing work at the KEUG deposit is progressing well, with the aim of bringing an underground mine into our future mine plans once final drilling, permitting, portal hole access and economic studies have been finalised."
SE drilling summary (see graphics below for more details on the deposit)
§ The 2021 drilling at SE has intersected mineralisation in 11 of the 12 holes drilled, with mineralisation remaining open
§ Drilling is now proceeding to extend the mineralisation further to the south of the central pit and at depth below the 'New Zone' discovery
§ Hole SNERC0421 (38 m at 5.39 g/t gold from 58 m depth) was drilled to confirm the widths and grade of the original discovery hole of the 'New Zone' by SNERC0402 (42 m at 4.07g/t gold from 80 m) as highlighted in the Company's announcement dated 3 February 2021
§ This 'New Zone' remains open at depth and will be drilled further with a diamond core rig to better understand its structural controls and style of mineralisation in order to ensure its mineral resource potential is targeted effectively
§ There is further exploration upside at the SE deposit, with only 1.5 kilometres ('km') having been tested along the highly prospective 3 km Sankarani Shear gold zone anomaly where SE is situated, with more than one zone of mineralisation having already been identified
§ 15,000 m of drilling is planned at SE in 2021
KEUG drilling summary (see graphics below for more details on the deposit)
§ Following the discovery of the continuation of mineralisation to the north of the deposit in the 2020 drilling programme, the 2021 programme is focussing on expanding and drill testing for further mineralisation in that region. So far nine holes have been drilled for 2,474m
§ These results continue to confirm mineralisation exists at depth at the northern part of the deposit, giving the Company increased confidence of further resource growth potential for the planned KE UG mining operation
§ Key next steps for KEUG include:
§ Finalising the surface drilling programme
§ Gaining permitting approval for the KEUG mine
§ Finalising portal location and underground mine design
§ Finalising economic studies in order to bring the underground mine into future mine plans
Sanioumale East Selected Drill Results
Hole Number*
Depth From
Depth To
Intercept Description
SNERC0410
77
91
14m @ 2.27 g/t
SNERC0411
12
28
16m @ 2.32 g/t
SNERC0413
51
65
14m @ 2.63 g/t
SNERC0414
162
210
48m @ 0.57 g/t
SNERC0415
27
33
6m @ 5.70 g/t
SNERC0415
118
140
22m @ 0.53 g/t
SNERC0419
154
162
8m @ 4.58 g/t
SNERC0420
79
84
5m @ 3.07 g/t
SNERC0420
107
123
16m @ 2.94 g/t
SNERC0421
58
96
38m @ 5.39 g/t
SNERC0421
102
125
23m @ 0.69 g/t
*Holes with the same number represent different interval sections
Komana East Deposit Selected Drill Results
Hole Number*
Depth From
Depth To
Intercept Description
KEUGDD015
156
161.2
5.2m @ 3.83 g/t
KEUGDD015
170
172
2m @ 2.06 g/t
KEUGDD016
173.85
177.35
3.5m @ 1.76 g/t
KEUGDD017
172.8
176
3.2m @ 1.17 g/t
KEUGDD017
205
213.8
8.8m @ 2.87 g/t
KEUGDD018
217.8
219.35
1.55m @ 3.75 g/t
KEUGDD018
242.7
244
1.3m @ 7.00 g/t
KEUGDD018
247
248
1m @ 3.20 g/t
KEUGDD018
254
255.5
1.5m @ 1.98 g/t
KEUGDD019
205.65
208
2.35m @ 2.56 g/t
KEUGDD020
250.4
251.65
1.25m @ 2.69 g/t
KEUGDD021
224
226
2m @ 3.48 g/t
KEUGDD022
204.5
208
3.5m @ 3.05 g/t
KEUGDD022
231.6
235
3.4m @ 5.35 g/t
KEUGDD023
264
270.5
6.5m @ 1.16 g/t
*Holes with the same number represent different interval sections
SE drilling long intersection deposit map
SE cross section view showing newly discovered 'New Zone' at the north end of the central pit
KEUG long intersection view with planned mine development
Qualified Person Review:
Murray Paterson has reviewed and approved the technical information contained within this announcement in his capacity as a Qualified Person, as required under the AIM Rules for Companies. Murray Paterson is the Chief Geologist for the Company and is a member of good standing with the Australasian Institute of Mining and Metallurgy (MAusIMM).
**ENDS**
For further information please visit www.hummingbirdresources.co.uk or contact:
Daniel Betts, CEO
Thomas Hill, FD
Edward Montgomery, CSO & ESG
Hummingbird Resources plc
Tel: +44 (0) 20 7409 6660
James Spinney
Ritchie Balmer
Strand Hanson Limited
Nominated Adviser
Tel: +44 (0) 20 7409 3494
James Asensio
Thomas Diehl
Canaccord Genuity Limited
Broker
Tel: +44 (0) 20 7523 8000
Tim Blythe
Megan Ray
Rachael Brooks
Blytheweigh
Financial PR/IR
Tel: +44 (0) 20 7138 3205
Notes to Editors:
Notes to Editors:
Hummingbird Resources (AIM: HUM) is a leading multi-asset, multi-jurisdiction gold production, development and exploration company and member of the World Gold Council ('WGC'). Hummingbird's vision is to continue to grow its asset base, producing highly profitable ounces, while continuing to focus on its Environmental, Social & Governance ('ESG') policies and practices. The Company currently has two core gold projects, the producing Yanfolila Gold Mine in Mali, and the Kouroussa gold development project in Guinea. Further, the Company has a controlling interest in the Dugbe Gold Project in Liberia that is being developed by Pasofino Gold Limited through an earn-in agreement.
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.ENDDRLSDMFAFEFSESD
Recent news on Hummingbird Resources
See all newsREG - Nioko Resources Corp Hummingbird Res. - Offer Closed and Compulsory Acquisition
AnnouncementREG - Nioko Resources Corp Hummingbird Res. - Notice of Closure of the Offer
AnnouncementREG - Nioko Resources Corp Hummingbird Res. - Offer Update - Compulsory Acquisition Procedure
AnnouncementREG - AIM Hummingbird Res. - Cancellation - Hummingbird Resources Plc
AnnouncementREG - Hummingbird Res. - Upcoming Final Day of Trading Reminder
Announcement