Molefe Mine Phase 1 Drilling Results
RNS Number : 0425Y
Jubilee Metals Group PLC
25 March 2026
Jubilee Metals Group PLC
Registration number: 4459850
AIM share code: JLP
Altx share code: JBL
ISIN: GB0031852162
('Jubilee' or 'the Company' or 'the Group')
Dissemination of a Regulatory Announcement that contains inside information according to UK Market Abuse Regulations. Not for release, publication or distribution in whole or in part in, into or from any jurisdiction where to do so would constitute a violation of the relevant laws or regulations of such jurisdiction.
Molefe Mine Phase 1 Drilling Confirms Continuity of Copper Mineralisation and Extends Mineralised Zone
Jubilee, the Zambia focused copper producer, is pleased to provide an update on the latest drilling results at the open-pit Molefe copper mine (Molefe Mine), located within trucking distance of the Company's Sable refinery.
The Phase 1 infill drilling programme has confirmed the continuity of near-surface copper oxide mineralisation and consistency of grades, supporting the Molefe Mine's expansion program and Jubilee's strategy of securing high-quality copper feed sources from owned resources to underpin its growing processing operations in Zambia (Pillar 2 of its Zambian strategy as previously announced).
Highlights
· Infill drilling completed to date confirms copper ore grades consistent with those incorporated in Molefe Mine's expansion mine plan
· New near surface zone, identified and validated based on visual and handheld pXRF assessment, extending copper oxide mineralisation by approximately 250 metres beyond the expansion mine plan with mineralisation remaining open to the east
· Phase 2 drilling program is currently under way by project partner, Galileo Resources Plc (Galileo), targeting the eastern extension to determine the full extent of the mineralised zone
· Consistency of grades and thicknesses supports confidence in the resource and provides a strong foundation for the advancement of a formal resource estimate
· Results continue to demonstrate shallow, copper oxide mineralisation suitable for processing at Jubilee's Sable Refinery
· Infill drilling of oxide mineralisation reinforces projected grades of ore currently incorporated into the mine plan
· Peak intercepts include the following:
§ MNKDD010 16.00m @8.01% TCu ("total copper"), 1.60 % ACu ("acid soluble copper") from 18.00m (TCu cut off 0.6%, ACu cut off 0.35%)
§ MNKDD011 20.0m @5.33% TCu, 0.92% ACu from 22.0m (TCu cut off 0.6%, ACu cut off 0.35%)
§ MNKDD012 10.7m @ 6.54% TCu, 2.17% ACu from 37.00m (TCu cut off 0.6%, ACu cut off 0.35%) from 33.8m
§ MNKDD013 6.00m @1.07% AsCu from 79.00 m (TCu cut off 0.6%) from 81.0m
§ MNKDD014 6.80m @5.40% TCu, 2.06% ACu from 54.20m (TCu cut off 0.6%) from 54.2m
§ MNKDD015 7.50m @ 9.17% TCu, 1.30% ACu from 43.00 m (TCu cut off 0.6%, ACu cut off 0.35%)
§ MNKDD016 2.17m @ 5.40% TCu, 1.80% ACu from 60.83m (TCu cut off 0.6%)
Leon Coetzer, CEO of Jubilee, commented:
"We are very excited by these results, delivered in a few short months, which confirm the apparent continuation of the high-grade copper reef close to surface that is currently being accessed at the Molefe Mine operations. The high-grade intersections of shallow copper oxide is perfectly suited for processing and refining at the nearby Sable refinery.
The extension identified to the eastern boundary provides a strong indication of the further continuation of the mineralised reef, particularly given the additional approximately 12 300ha of exploration ground we hold to the east of the 400ha Molefe mining area.
We have commenced phase 2 drilling to further define this eastern extension and the Company will update the market as results become available.
Results from the phase 2 drilling program will be used to provide a clearer timeline for the release of a formal resource estimate. The updated expanded mine plan, incorporating the latest drill results and developed in partnership with Galileo, is expected to be published on the Company's website within the coming three weeks."
Drilling Results
The Phase 1 drilling programme was designed to confirm the continuity and grade of the oxide mineralisation within the current mine expansion plan at Molefe Mine.
Results demonstrate consistent near-surface copper oxide mineralisation that is amenable to Jubilee's existing processing capabilities at its nearby Sable refinery and reinforcing previously projected grades incorporated into the mine plan. The consistency of grades and thicknesses supports confidence in the resource and provides a strong foundation for the advancement of a formal resource estimate.
A total of 3,390m of drilling has been completed during the Phase 1 program with drill holes still pending final assay results.
| Borehole or Trench ID | From (m) | To (m) | Interval (m) | EOH (m) | Grade (TCu%) | Grade (AsCu%) |
| MNKDD001 | 50.0 75.9 | 54.6 81.9 | 4.6 6.0 | 150.9 | 2.94 7.16 | 0.15 3.35 |
| MNKDD002 | 73.0 99.0 | 76.0 107.0 | 3.0 8.0 | 151.0 | 3.03 7.40 | 0.26 0.03 |
| MNKDD003 | No | Intercept | 150.6 | |||
| MNKDD004 | 103.0 116.0 139.8 | 106.0 121.0 142.0 | 3.0 5.0 2.20 | 150.3 | 3.90 N/A 5.57 | 0.09 0.82 1.10 |
| MNKDD005 | 123.32 | 124.44 | 1.12 | 135.0 | 2.59 | 0.09 |
| MNKDD006 | 102.5 114.0 120.0 | 106.0 117.6 121.0 | 3.50 3.60 1.00 | 150.7 | 2.13 3.21 1.02 | 0.30 0.08 0.08 |
| MNKDD007 | 36.0 | 46.0 | 10.0 | 150.1 | 3.03 | 2.60 |
| MNKDD008 | 24.54 | 29.54 | 5.00 | 65.2 | 7.37 | 0.66 |
| MNKDD009 | 44.3 | 47.0 | 2.70 | 65.3 | 7.47 | 0.70 |
| MNKDD010 | 18.0 | 34.0 | 16.0 | 100.3 | 8.01 | 1.60 |
| MNKDD011 | 22.0 | 42.0 | 20.0 | 57.7 | 5.33 | 0.92 |
| MNKDD012 | 12.0 33.8 | 19.5 44.5 | 7.50 10.7 | 70.0 | 5.50 6.54 | 0.38 2.17 |
| MNKDD013 | 81.0 | 87.0 | 6.00 | 107.9 | N/A | 1.07 |
| MNKDD014 | 36.0 54.2 | 47.0 61.0 | 11.0 6.80 | 69.6 | 1.11 5.40 | 0.38 2.06 |
| MNKDD015 | 43.0 | 50.5 | 7.50 | 60.1 | 9.17 | 1.30 |
| MNKDD016 | 60.83 | 63.0 | 2.17 | 68.3 | 5.40 | 1.80 |
| MNKDD017 | 43.0 | 59.0 | 16.0 | 74.4 | 2.04 | 0.17 |
| MNKDD018 | 50.1 | |||||
| MNKDD019 - 29 | Results | Pending | 1,252.7 | |||
| Infill 02 H1 | 27.5 | 21.0 | 51.5 | 1.82 | 1.40 | |
| Infill 12 H5 | 9.50 | 6.00 | 53.4 | 1.25 | 0.86 | |
| Infill 04 H6 | 30.5 | 15.0 | 45.5 | 1.33 | 0.98 | |
| Infill 03 H3 | 15.5 | 4.5 | 48.5 | 0.75 | 0.43 | |
| Infill 10 H4 | Results | Pending | N/A | 51.9 | ||
| Infill 19 H2 | Results | Pending | N/A | 59.28 | ||
| Total | 3,390.28 |
| Borehole or Trench ID | From (m) | To (m) | Interval (m) | Grade (TCu%) | Grade (AsCu%) |
| MNKCH001 | 0.0 | 17.0 | 17.0 | 1.14 | 0.53 |
| MNKCH002 | 0.0 | 12.0 | 12.0 | 1.00 | 0.62 |
| MNKCH003 | No | Intercept | |||
| MNKCH004 | No | Intercept | |||
| MNKCH005 | 11.0 | 19.0 | 8.00 | 1.09 | 0.53 |
| MNKCH006 | 0.0 | 9.0 | 9.00 | 1.11 | 0.70 |
| MNKCH007 | 0.0 | 2.0 | 2.0 | 1.60 | 1.03 |
| MNKCH008 | No | Intercept | |||
| MNKCH009 | No | Intercept | |||
| MNKCH010 | No | Intercept | |||
| MNKCH011 | No | Intercept | |||
| MNKCH012 | No | Intercept | |||
| MNKCH013 | 0.0 | 8.0 | 8.0 | 1.90 | 1.60 |
| MNKCH014 | 0.0 | 1.0 | 1.0 | 0.78 | 0.44 |
| MNKCH015 | 0.0 | 9.0 | 9.0 | 0.93 | 0.48 |
| MNKCH016 | 0.0 | 7.0 | 7.0 | 2.30 | 1.71 |
| MNKCH017 | 0.0 | 6.0 | 6.0 | 1.56 | 1.17 |
| MNKCH018 | No | Intercept | |||
| MNKCH019 | 0.0 | 19.0 | 19.0 | 0.34 | 0.22 |
| MNKCH020 | 0.0 | 13.0 | 13.0 | 1.20 | 0.85 |
| MNKCH021 | 0.0 | 11.0 | 11.0 | 1.48 | 0.96 |
Recent news on Jubilee Metals
See all newsUpdate on Large Waste Project Disposal
Brief: Jubilee Metals Reports FY2026 Combined Copper Production Totals 3,739T
FY2026 Production and Operational Update
UK's Jubilee rises after selecting buyer for waste project in $35 million deal
Brief: Jubilee Metals Selects Preferred Purchaser For Large Waste Project Sale For $35 Mln