Metals Exploration: Interim Results
Metals Exploration: Interim Results METALS EXPLORATION PLC
INTERIM RESULTS FOR THE SIX MONTHS ENDED 30 JUNE 2026
Metals Exploration plc (AIM: MTL) (“Metals Exploration”, the “Company” or, together with its subsidiaries, the “Group”), a gold production, exploration and development company with assets in the Philippines and Nicaragua, announces its unaudited interim results for the six months ended 30 June 2026 (“H1 2026” or the “Period”). The results will be made available on the Company’s website at www.metalsexploration.com.
Highlights
- H1 2026 positive free cash flow of US$54.7 million (H1 2025: US$70.7 million) from operations - funding development at the La India gold project (the “Project”);
- H1 2026 earnings before tax, interest, depreciation, amortisation, impairment and share-based charges of US$55.9 million (H1 2025: US$72.3 million);
- H1 2026 gold production of 21,451 ounces (“oz”) (H1 2025: 40,985 oz);
- H1 2026 gold recoveries of 80.7% (H1 2025: 91.4%); and
- Construction and development of the Project in Nicaragua 56% complete as at 30 June 2026, and 74.4% complete as at the day of this report, with first gold pour on track for December 2026.
Production Summary
Runruno Project Production Summary Actual Actual Actual Units 6 Months to
30 June 20266 Months to
30 June 202512 Months to
31 December 2025Mining Ore Mined Tonnes 566,049 1,028,333 2,142,187 Waste Mined Tonnes 5,303,507 4,889,310 8,557,364 Total Mined Tonnes 5,869,556 5,917,643 10,699,551 Au Grade Mined g/tonne 1.02 1.54 1.28 Strip Ratio 7.26 4.65 3.92 Processing Ore Milled Tonnes 952,585 1,041,486 1,902,702 Gold (Au) Grade g/tonne 0.87 1.34 1.21 Sulphur Grade % 1.06 1.18 1.19 Au Milled (contained) Ounces 26,591 44,841 73,844 Recovery % 80.7 91.4 88.4 Au Poured Ounces 21,451 40,985 65,287 Sales Au Sold Ounces 21,373 41,240 66,082 Au Price US$/oz 4,677 2,884 3,154 Darren Bowden, CEO of Metals Exploration, commented:
“The first half of 2026 has been a period of significant progress for Metals Exploration. At Runruno, despite lower grades and recoveries as operations run-down to closure, the Company continued to generate substantial revenues, delivering free cash flow of US$54.7 million and further strengthening our balance sheet.
“At La India, construction continued to advance well, reaching 56% completion by the end of the Period. We achieved a number of key milestones, including the ongoing installation of major process plant infrastructure, the arrival of long-lead equipment and the commencement of mine fleet mobilisation. We are particularly proud that, after approximately two million hours worked, the Project remains free of lost time injuries, reflecting the successful transfer of the Group's safety culture and the dedication of our workforce and contractors in Nicaragua.
“While Project costs have been impacted by higher logistics expenses and import duties, first gold pour remains on track for December 2026. The recent US$27 million equipment financing facility further strengthens our funding position as we move towards commissioning.
“The Batong Buhay agreements represent an exciting addition to our Philippine growth pipeline. With encouraging historical drilling results, we look forward to advancing our understanding of the project's potential through a modern exploration programme.
“The Group was also pleased to release its sixth sustainability report for Runruno, covering our sustainability performance for 2025. The report outlines the significant environmental and community work that has been undertaken at Runruno, and it is our objective to mirror this in Nicaragua. Additionally, I am pleased to note that Runruno has maintained its strong safety performance, with 3.95 million hours worked without a lost time injury as at the end of the Period.
“Looking ahead, our priorities are clear: delivering La India into production safely and efficiently, maximising remaining value at Runruno as mining winds down, and advancing our exciting exploration portfolio in both Nicaragua and the Philippines. We believe these activities will continue to support the Company's growth and create long-term value for our shareholders.”
Nicaragua
La India Development
The La India gold project is approximately a two-hour drive from the Nicaraguan capital city, Managua. Construction activities progressed with overall construction on-track at 74.4% complete as at the date of this report (31 December 2025: 33% complete).The total Project budget has marginally increased to c.US$180 million due to unforeseen logistics costs and new import duties imposed on certain imported goods. The first gold pour at La India remains on track for December 2026.
Highlights for H1 2026 and post-Period end include:
- c. 2 million hours worked with no lost time injuries (“LTI”). The Company considers this an exceptional safety record given the start-up nature of this owner operated construction project. The successful transfer of the Company’s safety culture from the Philippines to Nicaragua is a testament to all employees and contractors in Nicaragua, who are congratulated on this ongoing achievement.
- Civil foundations progressed to 90% complete, with concrete and rebar installation ongoing across the tailings area (thickener and detox tank foundations), gold room, pebble crusher and reagents areas.
- Structural, mechanical, piping and electrical installation (“SMPEI”) is being delivered by Duroblock S.A., with Degbed Company Limited as specialist mill installation contractor. This has progressed across the process plant with the CIL 10 tanks ring fit-out being completed.
- Mechanical erection of the SAG mill feed conveyor (CV-004), pebble crusher and grinding circuit structure continued, with Level 1 steelwork installed around the SAG mill and progressing around the ball mill.
- Long lead items delivered to site included the cooling water surge tank, gold room hopper, agitators and primary crusher components.
- The thickener arrived on site, with shake-out and support column installation underway. Ring installation on the first Detox Tank also commenced.
- The on-site laboratory was completed and became fully functional in early August 2026.
- Bulk earthworks progressed to 93% complete; cumulative material delivered to the ROM pad reached 211,000 tonnes, against the 500,000-tonne pre-commissioning target.
- The first units of the Group’s initial mine fleet arrived on site. The first ten 777 Caterpillar (“CAT”) dump trucks, and two CAT 6020 excavators are on site and operational. A further five haul trucks, a third excavator, two wheel loaders, a telehandler and a second bulldozer also arrived on site during H2 2026 in-line with a ramp up of mining operations via the Company’s owner-operator mining model.
- Foundation improvement for Stage 1 of the tailings storage facility (“TSF”) has been completed, and backfilling of the starter dam has commenced.
- The main risk to the construction schedule remains the completion of the main-grid power transmission connection. This risk arises due the third party delivery of key infrastructure and the connection itself. However, the Company is working closely with Entrail (the government power company) in an endeavour to ensure that delivery meets Project timelines.
La India Exploration
Drilling of the La India project areas by the previous Condor management outlined a 2.2 million ounce (“Moz”) gold resource in, and around, the La India project area. Since acquiring the Project, the Company’s focus has been on initial pit in-fill grade confirmation drilling, extensional drilling from planned mining areas and the Cacao prospect. Please refer to the Company’s announcement dated 16 July 2026 for further information.Also, during H1 2026, the Company was granted four new exploration tenements in the La Crecia area. Preliminary exploration, including a maiden drill programme is underway. Please refer to the Company’s announcement dated 10 April 2026 for further information.
Finance
Since Period end, the Company secured a US$27 million equipment loan from a Nicaraguan located bank, which was fully drawn down in August and September 2026. Please refer to the Company’s announcements dated 21 August 2026 and 25 September 2026 for further information.Philippines
Review of Runruno Gold Mine Operations
Health and Safety
No LTI has been recorded at Runruno since 30 March 2025, finishing the reporting period with 3.95 million hours since the last reported LTI. The health and safety of all employees and contractors remains a key priority to the Company. The Company remains incredibly proud of its exceptional safety record achieved by employees and contractors in the Philippines.Finance
Gold sales were 21,373 oz for revenues of US$100.0 million (H1 2025: 41,240 oz for revenues of US$118.9 million) at an average price of US$4,677 per oz (H1 2025: US$2,884 per oz), resulting in positive free cash flow of US$54.7 million (H1 2025: US$70.7 million).Mining
Mining production of ore and waste was 5.9 million tonnes (“Mt”) for H1 2026 (H1 2025: 5.9Mt). Total ore mined was lower at 0.6Mt (H1 2025: 1.0Mt), and at a lower grade of 1.02 grammes per tonne (“g/t”) (H1 2025: 1.54g/t). Current forecasts confirm that mining operations at Runruno will cease in Q4 2026.Process plant
Gold production during H1 2026 was 21,451 oz (H1 2025: 40,985 oz). Throughput for H1 2026 was 0.95Mt (H1 2025: 1.04Mt) at a head grade of 0.87g/t (H1 2025: 1.34g/t). Average overall gold recovery in H1 2026 was 80.7% (H1 2025: 91.4%).Both head grade and average recovery are expected to improve during H2 2026 as ore from deeper levels of Stages 5 and 6 of the mine are accessed and processed.
Unplanned process plant downtime during H1 2026 did not materially interrupt production and consisted mainly of disruption to the BIOX circuit due to contaminated ore and power interruptions. Other unplanned downtime resulted from repairs to the return discharge and final tails lines, switchyard, agitator gearbox, conveyor belts, rollers and trommel panel screens.
Residual Storage Impoundment (“RSI”)
The RSI in-rock spillway is approaching completion and fully operational, designed to handle a maximum probable flood event. The Company has an ongoing RSI maintenance and monitoring obligation which lasts for 10-years following the end of processing operations at Runruno. The day-to-day performance of the RSI continues to be monitored by an independent consulting group.Community & Government Relations
Productive relations with both the community and the Philippine government continue.Sustainability
On 9 April 2026, the Company released its 2025 Sustainability Report, which covers its sustainability performance in the Philippines for the year ended 31 December 2025. This report can be found on the Company’s website at: www.metalsexploration.com/esg/esg-overview/.Philippine Exploration
Batong Buhay Project
As announced on 15 June 2026, Metals Exploration has signed a series of agreements to develop the Batong Buhay Porphyry Copper-Gold Project. Located c. 200km north of Runruno, Batong Buhay was drilled in the late 1970s via a 21-hole drilling programme. The main porphyry target, Dickson, has a historical non-JORC compliant resource of 86.9 million tonnes at 0.83% copper equivalent (“CuEq”) from surface.Historical drill intercepts include:
Dickson:
- DDH-6A, 160.93m at 0.92% copper (“Cu”) and 0.60 g/t gold (“Au”) (1.48% CuEq)
- DDH-10, 182.88m at 0.73% Cu and 0.36 g/t Au (1.06% CuEq)
- DDH-12, 173.74m at 0.33% Cu and 0.95 g/t Au (1.21% CuEq)
Maalinao North:
- DDH-02, 198.12m at 1.15% Cu and 0.10 g/t Au (1.24% CuEq)
- DDH-01, 134.36m at 0.76% Cu and 0.16 g/t Au (0.91% CuEq)
The Company has commenced pre-drilling activities that will determine the design of a drilling campaign which is expected to commence in Q4 2026.
Abra Project
The National Commission for Indigenous Peoples (“NCIP”) process to advance, and finalise, their consultation activities with the impacted local indigenous communities continues. No exploration work was undertaken during the Period.For further information please visit or contact www.metalsexploration.com
Metals Exploration PLC Via BlytheRay +44 (0) 207 138 3204 Nominated & Financial Adviser: STRAND HANSON LIMITED James Spinney, James Dance, Rob Patrick +44 (0) 207 409 3494 Joint Broker: HANNAM & PARTNERS Matt Hasson, Sam Quinn +44 (0) 207 907 8500 Joint Broker: PANMURE LIBERUM Scott Mathieson, Amrit Mahbubani, Zak Wadud +44 (0) 203 100 2000 Public Relations: BLYTHERAY Megan Ray, Said Izagaren +44 (0) 207 138 3204 Competent Person's Statement
Mr Maxwell Donald Tuesley, BSc (Hons) Economic Geology, a member of the Australasian Institute of Mining and Metallurgy (No 111470 and employee of the Company, has compiled, read and approved the technical disclosure in relation to the projects in this regulatory announcement in accordance with the AIM Rules - Note for Mining and Oil & Gas Companies.
Forward Looking Statements
Certain statements relating to the estimated or expected future production, operating results, cash flows and costs and financial condition of Metals Explorations, planned work at the Company's projects and the expected results of such work contained herein are forward-looking statementswhich are based on current expectations, estimates and projections about the potential returns of the Group, industry and markets in which the Group operates in, the Directors’ beliefs and assumptions made by the Directors. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by words such as the following: “expects”, “plans”, “anticipates”, “forecasts”, “believes”, “intends”, “estimates”, “projects”, “assumes”, “potential” or variations of such words and similar expressions. Forward-looking statements also include reference to events or conditions that will, would, may, could or should occur. Information concerning exploration results and mineral reserve and resource estimates may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed.These statements are not guarantees of future performance or the ability to identify and consummate investments and involve certain risks, uncertainties and assumptions that are difficult to predict, qualify or quantify. Among the factors that could cause actual results or projections to differ materially include, without limitation: uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from logistical, technical or other factors; the possibility that results of work will not fulfil projections/expectations and realize the perceived potential of the Company's projects; uncertainties involved in the interpretation of drilling results and other tests and the estimation of gold reserves and resources; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of environmental issues at the Company's projects; the possibility of cost overruns or unanticipated expenses in work programs; the need to obtain permits and comply with environmental laws and regulations and other government requirements; fluctuations in the price of gold and other risks and uncertainties.
The Company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward looking statements contained herein to reflect any change in the Group’s expectations with regard thereto or any change in events, conditions or circumstances on which any such statements are based unless required to do so by applicable law or the, AIM Rules.
CONDENSED CONSOLIDATED STATEMENT OF TOTAL COMPREHENSIVE INCOME for the six months ended 30 June 2026
Notes 6 month period ended 30 June 2026 (unaudited) 6 month period ended
30 June 2025 (unaudited)Year ended
31 December 2025 (audited)US$ US$ US$ Continuing Operations Revenue 99,954,497 118,948,548 208,413,419 Cost of sales (62,535,110) (83,275,388) (135,356,661) Gross profit 37,419,387 35,673,160 73,056,758 Administrative expenses (7,254,825) (6,529,654) (11,495,137) Operating profit 30,164,562 29,143,506 61,561,621 Impairment (loss)/gain (829,667) 4,937,917 908,828 Other income/expenses 6/7 (1,734,714) (18,798,365) (22,798,678) Provision for (loss)/gain on derivatives (916,937) 1,535,541 5,453,412 Share of profit/(loss) of associates 47,632 (3,458) (5,158) Profit before tax 26,730,876 16,815,141 45,120,025 Tax expense 4,599,245 309,234 16,502,303 Profit for the period 22,131,631 16,505,907 28,617,722 Non-controlling interest 41,787 9,301 274,217 Profit for the period attributable to equity holders of the parent 22,173,418 16,515,208 28,891,939 Other comprehensive income: Items that may be re-classified subsequently
to profit or loss:Exchange differences on translating foreign operations 97,874 (646,177) (1,560,023) Items that will not be re-classified subsequently
to profit or loss:Re-measurement of pension liabilities - - (53,375) Total comprehensive profit for the period attributable to equity holders of the parent 22,271,292 15,869,031 27,278,541 Earnings per voting share: 9 Basic cents per voting share
Diluted cents per voting share0.75
0.700.64
0.601.05
0.97
CONDENSED CONSOLIDATED INTERIM BALANCE SHEET
as at 30 June 2026
Notes 30 June 2026 (Unaudited) 30 June 2025 (Unaudited) 31 December 2025 (Audited) US$ US$ US$ Non-current assets Property, plant and equipment 264,067,519 85,674,859 218,147,243 Other assets 13,830,000 92,969,213 13,830,000 Investment in associate companies 175,885 129,953 128,253 Trade and other receivables 13,429,354 17,288,365 15,622,039 291,502,758 196,062,390 247,727,535 Current assets Inventories 18,041,722 17,348,922 17,206,016 Trade and other receivables 8 24,061,974 13,346,673 17,047,585 Cash and cash equivalents 9,001,213 45,916,669 41,171,536 Provision for gain on derivatives - 265,503 - 51,104,909 76,877,767 75,425,137 Non-current liabilities Trade and other payables (15,161,184) (14,470,850) (15,155,336) Retirement benefits obligations - (3,154,594) (164,470) Provision for loss on derivatives (1,356,570) - - Deferred tax liabilities (14,591,783) (557,047) (14,530,453) Provision for mine rehabilitation (8,846,061) (4,302,525) (8,253,228) (39,955,598) (22,485,016) (38,103,487) Current liabilities Trade and other payables (20,889,529) (9,654,958) (28,483,299) Provision for loss on derivatives (992,425) (5,610,776) (1,429,405) Retirement benefits obligations (2,096,923) - (2,350,444) (23,978,877) (15,265,734) (32,263,148) Net assets 278,673,192 235,189,407 252,786,037 Equity Share capital 11 393,235 384,048 387,136 Share premium account 11 83,158,113 76,524,105 79,260,654 Capital redemption reserve 38,266 38,266 38,266 Treasury shares (19,278,326) (19,278,326) (19,278,326) Translation reserve 7,934,465 8,750,437 7,836,591 Re-measurement reserve (624,007) (570,632) (624,007) Other reserves 2,484,136 (938,558) 2,737,779 Profit and loss account 204,486,410 169,892,464 182,305,257 Non-controlling interests 80,900 387,603 122,687 Equity attributable to equity holders of the parent
278,673,192
235,189,407
252,786,037CONDENSED CONSOLIDATED INTERIM STATEMENT OF CHANGES IN EQUITY for the six months ended 30 June 2026
Share capital Share premium Capital redemption reserve Treasury shares Translation reserve Re-measurement reserve
Other reserves
Non-controlling interestsProfit and loss account Total equity US$ US$ US$ US$ US$ US$ US$ US$ US$ US$
Balance at 1 January 2026 387,136 79,260,654 38,266 (19,278,326) 7,836,591 (624,007) 2,737,779 122,687 182,305,257 252,786,037 Exchange differences on translating foreign operations - - - - 97,874 - - - - 97,874 Profit for the period - - - - - - (41,787) 22,173,418 22,131,631 Total comprehensive income for the period - - - - 97,874 - (41,787) 22,173,418 22,229,505 Share based payment - 1,546,512 - - - - (253,643) - 7,735 1,300,604 Equity issues 6,099 2,350,947 - - - - - - - 2,357,046
Balance at 30 June 2026393,235 83,158,113 38,266 (19,278,326) 7,934,465 (624,007) 2,484,136 80,900 204,486,410 278,673,192 Equity is the aggregate of the following:
- Share capital; being the nominal value of shares issued.
- Share premium; being the excess received over the nominal value of shares issued less direct issue costs.
- Capital redemption reserve being the share capital of ordinary shares held in Treasury.
- Treasury shares; being Company shares acquired and placed in Treasury in 2024 via an off-market share buy-back.
- Translation reserve; being the foreign exchange differences on the translation of foreign subsidiaries.
- Re-measurement reserve; being the cumulative actuarial gains and losses, return on plan assets and changes in the effect of the asset ceiling (excluding net interest on defined benefit liability) recognised in the statement of total comprehensive income.
- Other reserves; include amounts recognised on acquiring additional equity in a controlled subsidiary and the cumulative share-based payments expense.
- Non-controlling interest; being the share of equity owned by minority parties.
- Profit and loss account; being the cumulative profit attributable to equity shareholders.
CONDENSED CONSOLIDATED INTERIM STATEMENT OF CHANGES IN EQUITY for the six months ended 30 June 2025
Share capital Share premium Capital redemption reserve Treasury shares Translation reserve Re-measurement reserve
Other reserves
Non-controlling interestsProfit and loss account Total equity US$ US$ US$ US$ US$ US$ US$ US$ US$ US$ Balance at 1 January 2025 235,366 313,458
50,401
(25,345,845)9,396,614 (570,632) (4,289,234)
396,904153,363,118 133,550,150 Exchange differences on translating foreign operations - - - - (646,177) - - - - (646,177) Profit for the period - - - - - - - (9,301) 16,515,208 16,505,907 Total comprehensive income for the period - - - - (646,177) - - (9,301) 16,515,208 15,859,730 Share based payment - - - - - - 18,178,937 - - 18,178,937 Equity issues 136,547 74,997,143 - - - - (14,814,123) - - 60,319,567 Transfer of other reserve re options lapsing - - - - - - (14,138) - 14,138 - Shares issued from Treasury 12,135 1,213,504 (12,135) 6,067,519 - - - - - 7,281,023
Balance at 30 June 2025384,048 76,524,105
38,266
(19,278,326)8,750,437 (570,632) (938,558) 387,603 169,892,464 235,189,407 Equity is the aggregate of the following:
- Share capital; being the nominal value of shares issued.
- Share premium; being the excess received over the nominal value of shares issued less direct issue costs.
- Capital redemption reserve being the share capital of ordinary shares held in Treasury.
- Treasury shares; being Company shares acquired and placed in Treasury in 2024 via an off-market share buy-back.
- Translation reserve; being the foreign exchange differences on the translation of foreign subsidiaries.
- Re-measurement reserve; being the cumulative actuarial gains and losses, return on plan assets and changes in the effect of the asset ceiling (excluding net interest on defined benefit liability) recognised in the statement of total comprehensive income.
- Other reserves; include amounts recognised on acquiring additional equity in a controlled subsidiary and the cumulative share-based payments expense.
- Non-controlling interest; being the share of equity owned by minority parties.
- Profit and loss account; being the cumulative profit attributable to equity shareholders.
CONDENSED CONSOLIDATED INTERIM STATEMENT OF CHANGES IN EQUITY for the year ended 31 December 2025
Share capital Share premium account Capital redemption reserve Treasury shares Translation reserve Re-measurement reserve
Other reserves
Non-controlling interestsProfit and loss account Total equity US$ US$ US$ US$ US$ US$ US$ US$ US$ US$ Balance at 1 January 2025 235,366 313,458
50,401
(25,345,845)9,396,614 (570,632) (4,289,234)
396,904153,363,118 133,550,150 Exchange differences on translating foreign operations - - - - (1,560,023) - - - - (1,560,023) Change in pension liability - - - - - (53,375) - - - (53,375) Profit for the year - - - - - - - (274,217) 28,891,939 28,617,722 Total comprehensive income for the year - - - - (1,560,023) (53,375) (274,217) 28,891,939 27,004,324 - - Share-based payment - - - - - - 7,027,013 - 50,200 7,077,213 Share issue 151,770 78,947,196 (12,135) 6,067,519 - - - - - 85,154,350 Balance at 31 December 2025 387,136 79,260,654 38,266 (19,278,326) 7,836,591 (624,007) 2,737,779 122,687 182,305,257 252,786,037
Equity is the aggregate of the following:
- Share capital; being the nominal value of shares issued.
- Share premium account; being the excess received over the nominal value of shares issued less direct issue costs.
- Capital redemption reserve; being the share capital of ordinary shares held in Treasury.
- Treasury shares; being Company shares acquired and placed in Treasury in 2024 via an off-market share buy-back.
- Translation reserve; being the foreign exchange differences on the translation of foreign subsidiaries.
- Re-measurement reserve; being the cumulative actuarial gains and losses, return on plan assets and changes in the effect of the asset ceiling (excluding net interest on defined benefit liability) recognised in the statement of total comprehensive income.
- Other reserves being amounts recognised on acquiring additional equity in a controlled subsidiary and cumulative share-based payments expense.
- Non-controlling interest; being the share of equity owned by minority parties.
- Profit and loss account; being the cumulative profit attributable to equity shareholders.
CONDENSED CONSOLIDATED INTERIM CASH FLOW STATEMENT for the six months ended 30 June 2026
6 month period ended
30 June 2026 (unaudited)6 month period ended
30 June 2025 (unaudited)Year ended
31 December 2025 (audited)Note US$ US$ US$
Net cash arising from operating activities
10
37,954,423
59,572,252107,868,980 Investing activities Purchase of subsidiaries, net cash acquired - (23,141,452) (21,599,629) Interest income 190,797 381,487 925,471 Purchase of mineral properties and exploration expenses
(143,459)
(2,900,967)- Purchase of property, plant and equipment (72,331,377) (19,965,398) (79,620,087) Net cash used in investing activities (72,284,039) (45,626,330) (100,294,245) Financing activities - Share issues 2,116,459 2,052,375 4,173,479 Net cash arising from/(used in) financing activities
2,116,459
2,052,3754,173,479 Net (decrease)/increase in cash and cash equivalents
(32,213,157)
15,998,29711,748,214 Cash and cash equivalents at beginning of period 41,171,536 31,224,696 31,224,696 Effects of exchange rate changes on cash and cash equivalents
42,834
(1,306,324)(1,801,374) Cash and cash equivalents at end of period 9,001,213 45,916,669 41,171,536 The following were material non-cash transactions during the FY2025 period:
- The issue of 830,145,141 new Ordinary Shares at an issue price of £0.057 per share as part consideration for the acquisition of Condor;
- the transfer from Treasury of 94,127,854 Ordinary Shares at a price of £0.06 per Ordinary Share to fully repay the Drachs bridging loan; and
- the issue of options and warrants as part of the acquisition of Condor.
Notes to the condensed consolidated interim financial statements
1. General information
These condensed consolidated interim financial statements of Metals Exploration and its subsidiaries (the “Group”) were approved by the Board of Directors on 29 September 2026. Metals Exploration is the parent company of the Group. Its shares are quoted on AIM market of the London Stock Exchange plc. The registered address of Metals Exploration plc is 27-28 Eastcastle Street, London, W1W 8DH.
The condensed consolidated interim financial statements for the period 1 January 2026 to 30 June 2026 are unaudited. The group has chosen not to adopt IAS 34 “Interim Financial Statements” in preparing the interim financial information. The condensed consolidated interim financial statements incorporate unaudited comparative figures for the interim period from 1 January 2025 to 30 June 2025 and the audited financial year ended 31 December 2025.
The financial information set out in this interim report does not constitute statutory accounts as defined in Section 434 of the Companies Act 2006. The Group’s statutory accounts for the year ended 31 December 2025, which were prepared under UK-adopted international financial accounting standards, were filed with the Registrar of Companies. The auditors reported on these accounts and their report was unqualified and did not contain a statement under either Section 498 (2) or Section 498 (3) of the Companies Act 2006.
2. Basis of preparation
The interim financial information in this report has been prepared using accounting policies consistent with UK-adopted international accounting standards. The financial information has been prepared based on UK-adopted international accounting standards that the Board of Directors expect to be applicable as at 31 December 2026.
These condensed consolidated interim financial statements have been prepared under the historical cost convention, except for derivative financial instruments, which are measured at fair value, and in accordance with UK-adopted international accounting standards. There have been no changes in accounting policies as described in the 2025 annual financial statements.
3. Going concern
These condensed consolidated interim financial statements of the Group have been prepared on a going concern basis, which contemplates the continuity of business activities, the realisation of assets and the settlement of liabilities in the normal course of business.
The Group and its ability to operate as a going concern and to meet its commitments as and when they fall due is dependent upon the ability of the Group to operate the Runruno Project, and to bring the La India project into production, successfully to generate sufficient cash flows to enable the Group to settle its liabilities as they fall due.
The Board of Directors believes that the Runruno Project will continue to operate successfully and produce positive cash flows until at least the end of December 2026. Further, it expects to bring the La India project into commercial production from Q1 2027 generating positive cash flows from that point on until at least 12 months from the date of this interim report, being 29 September 2026. As a result, the Board of Directors considers it appropriate that the half-year financial information should be prepared on a going concern basis.
4. Risks and uncertainties
The Board continuously assesses and monitors the key risks of the business. The key risks that could affect the Group’s medium term performance and the factors that mitigate those risks have not substantially changed from those set out in the Group’s statutory accounts for the year ended 31 December 2025, a copy of which is available on the Company’s website: https://metalsexploration.com/.
5. Critical accounting estimates
The preparation of condensed consolidated interim financial statements requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities at the end of the reporting period. Significant items subject to such estimates are set out in Note 2 of the Group’s statutory accounts for the year ended 31 December 2025. The nature and amounts of such estimates have not changed significantly during the interim period.
6. Financial performance
Operations during H1 2026 produced a strong financial outcome for the Group. A reconciliation of Operating Profit to an alternate non-IFRS compliant performance measure is set out below:
6 month period ended 30 June 2026 6 month period ended 30 June 2025 Year ended 31 December 2025 (unaudited) (unaudited) (audited) US$’000s US$’000s US$’000s Operating profit before income tax 26,731 16,815 45,120 Add back: Interest expenses 245 397 849 Depreciation and amortisation 26,759 42,272 59,254 EBITDA 53,735 59,484 105,223 Add back: Impairment charges/(reversals), net 830 (4,938) (909) Share-based payment expense* 1,300 17,739 21,622 EBITDA, impairments and share based payment expenses
55,865
72,285125,936 * Share-based payment expense
A significant portion of the FY2025 share-based payment expense related to the issue of the Company’s long-term incentive programme (“LTIP”) options in February 2025. The implementation of the LTIP had been delayed for several years due to various disputes with the Group’s debt providers. Following satisfaction of vesting hurdles during FY2025, approximately 70% of the LTIP options were exercised. This resulted in bringing to account the full share-based payment expense relating to the exercised options in FY2025, rather than having this expense spread over the life of the options. The H1 2026 share-based payment expense has not been impacted to the same extent by a similar event.7. Other income and expenses
6 month period ended 30 June 2026 6 month period ended 30 June 2025 Year ended 31 December 2025 (unaudited) (unaudited) (audited) US$ US$ US$
Condor Gold takeover direct costs
-
(904,212)
(913,452)Exchange (loss) (384,098) (139,392) (373,730) Interest income 195,308 381,487 921,159 Interest expenses (245,320) (397,498) (849,103) Share based payment expense (note 6) (1,300,604) (17,738,751) (21,621,805) Sundry income - - 38,253
Other income and expenses(1,734,714) (18,798,366) (22,798,678) 8. Current trade and other receivables
6 month period ended 30 June 2026 6 month period ended 30 June 2025 Year ended 31 December 2025 (unaudited) (unaudited) (audited) US$ US$ US$ Receivables from gold sales 7,870,946 8,962,558 12,972,171 Other receivables* 14,670,471 2,928,531 3,294,374 Prepayments 1,520,557 1,455,584 781,039
Current trade and other receivables24,061,974 13,346,673 17,047,585 * The significant increase in current other receivables at 30 June 2026 is due to advance payments to international suppliers of La India construction items including payments for new mining fleet equipment, civil and general infrastructure works, electrical and general process plant items.
9. Earnings per voting share
The earnings per voting share was calculated based on the net profit attributable to equity shareholders divided by the weighted average number of ordinary voting shares.
6 month period ended 30 June 2026 6 month period ended 30 June 2025 Year ended 31 December 2025 (unaudited) (unaudited) (audited) US$ US$ US$ Earnings Net income attributable to equity shareholders for the purpose of basic and diluted earnings per voting share
22,173,418
16,515,20828,891,939 Number of voting shares Weighted average number of ordinary voting shares for the purpose of basic earnings per voting share
2,971,947,964
2,593,310,1492,759,500,878 Number of dilutive voting shares under warrant/option 197,353,761 180,224,296 209,389,388 Weighted average number of ordinary voting shares for the purpose of diluted earnings per voting share 3,169,301,725 2,773,534,445 2,968,890,266 Basic earnings cents per voting share 0.75 0.64 1.05 Diluted earnings cents per voting share 0.70 0.60 0.97 10. Reconciliation of profit after tax to net cash arising from operating activities
6 month period ended 30 June 2026 6 month period ended 30 June 2025 Year ended 31 December 2025 (unaudited) (unaudited) (audited) US$ US$ US$ Profit after tax 22,131,631 16,505,907 28,617,722 Depreciation and amortisation 26,758,614 42,271,858 59,254,031 Provisions 2,518,826 (1,535,541) (5,217,476) Impairment charge/(reversal) 829,667 (4,937,917) (908,828) Share of (profits)/losses of associates (47,632) 3,458 5,158 Share based payment expense 1,300,604 17,738,751 21,621,805 Shares issued in lieu of cash bonus 240,587 577,984 577,984 Interest income (190,797) (381,487) (925,471) Foreign exchange (gain)/loss (42,831) 1,696,948 2,158,130 (Increase) in receivables (6,263,957) (1,767,449) (5,201,695) (Increase)/Decrease in inventories (1,335,706) 773,472 242,849 (Decrease)/increase in payables (7,944,583) (11,373,732) 7,644,771 Net cash arising from operating activities
37,954,423
59,572,252107,868,980 11. Share capital
During H1 2026 the Company made the following issues of new ordinary shares of £0.0001 each (“Ordinary Shares”):
- 1,182,210 new Ordinary Shares at an average issue price of £0.1543 per share in accordance with the Company’s 2025 short-term management incentive programme;
- 16,500,000 new Ordinary Shares at an issue price of £0.0001 per share being the exercise of options issued in accordance with the Company’s LTIP;
- 7,488,584 new Ordinary Shares at an issue price of £0.0829 per share being the exercise of options issued to Condor shareholders as part consideration for the acquisition of Condor;
- 7,236,750 new Ordinary Shares at an issue price of £0.0492 per share being the exercise of options issued to Condor shareholders as part consideration for the acquisition of Condor;
- 2,894,700 new Ordinary Shares at an issue price of £0.0484 per share being the exercise of options issued to Condor shareholders as part consideration for the acquisition of Condor;
- 7,236,750 new Ordinary Shares at an issue price of £0.0397 per share being the exercise of options issued to Condor shareholders as part consideration for the acquisition of Condor; and
- 2,774,026 new Ordinary Shares at an issue price of £0.0605 per share being the exercise of warrants issued in relation to the acquisition of Condor.
During H1 2025 the Company made the following issues of new Ordinary Shares:
- 830,145,141 new Ordinary Shares at an issue price of £0.057 per share as part consideration for the acquisition of Condor;
- 13,563,930 new Ordinary Shares at an average issue price of £0.03439 per share in accordance with the Company’s 2022, 2023 and 2024 short-term management incentive programmes;
- 229,600,000 new Ordinary Shares at an issue price of £0.0001 per share being the exercise of options issued in accordance with the Company’s LTIP;
- 11,122,524 new Ordinary Shares at an issue price of £0.0725 per share being the exercise of options issued to Condor shareholders as part consideration for the acquisition of Condor; and
- 11,122,876 new Ordinary Shares at an issue price of £0.0605 per share being the exercise of warrants issued in relation to the acquisition of Condor.
Further, on 7 March 2025, the Company repaid a bridging loan, principal and interest, by the transfer from Treasury of 94,127,854 Ordinary Shares at a price of £0.06 per Ordinary Share.
June 2026 June 2025 December 2025 June 2026 June 2025 December 2025 Number of shares Number of shares Number of shares US$ US$ US$ Ordinary shares of £0.0001 Opening balance 3,240,242,138 2,121,729,717 2,121,729,717 387,136 235,366 235,366 Shares issued 45,313,020 1,095,554,471 1,118,512,421 6,099 136,547 139,635 Treasury shares (299,385,458) (299,385,458) (299,385,458) - 12,135 12,135 Closing balance – voting shares 2,986,169,700 2,917,598,730 2,940,856,680 393,235 384,048 387,136
Share premiumOpening balance 79,260,654 313,458 313,458 Shares issued 3,897,459 74,997,143 77,733,692 Treasury shares - 1,213,504 1,213,504 Closing balance 83,158,113 76,524,105 79,260,654 Shares held in Treasury do not have voting rights.
12. Share options and warrants
Movements in the period in options over Ordinary Shares were as below:
Expiry date Exercise price
£Opening balance Issued during period Exercised during the period Lapsed during the period Closing balance 31 May 2026* 0.0829 8,142,786 - 7,488,584 654,202 - 13 September 2027* 0.0492 16,051,104 - 7,236,750 - 8,814,354 5 July 2028* 0.0397 22,160,029 - 7,236,750 - 14,923,279 29 May 2029* 0.0484 25,444,412 - 2,894,700 - 22,549,712 27 August 2031 0.0001 38,000,000 - 16,500,000 - 21,500,000 7 February 2032 0.0001 95,000,000 - - - 95,000,000 25 June 2032 0.0001 10,600,000 - - - 10,600,000 2 February 2033** 0.0001 - 12,000,000** - - 12,000,000 * Issued to Condor option holders in accordance with the Scheme of Arrangement takeover of Condor.
** Issued to directors and senior management in accordance with the Company’s (“LTIP”) approved by shareholders at the 27 August 2024 general meeting.Movements in the period in warrants over Ordinary Shares were as below:
Expiry date Exercise price
£Opening balance Issued during period Exercised during the period Lapsed during the period Closing balance
21 January 2028*
0.060518,179,174 - 2,774,026
-15,405,148 * Issued to Condor warrant holders in accordance with the Scheme of Arrangement takeover of Condor.
13. Contingent liabilities and capital commitments
The Group has no contingent liabilities identified as at 30 June 2026 (2025: US$ nil) other than:
- There is potentially up to a further US$14.4 million of deferred consideration payable as part of the acquisition of Condor on the basis of US$18 per ounce of additional contained gold JORC Mineral Resource discovered on the Condor tenement areas in excess of a total 3.158 Moz of gold, subject to a cap of 800,000oz above 3.158 Moz. This potential liability that has been treated as a contingent liability as it is not possible to predict with certainty the amount, if any, that will be payable, given it is dependent upon future exploration drilling success on the Condor tenements.; and
- In June 2024, the Company entered into a Production Fee agreement with Runruno Holdings Limited (“RHL”) as part of the settlement of all debt related issues. Under this agreement the Company will pay RHL a production fee of US$164 per ounce of gold produced from mining at the Runruno FTAA contract area on any production from 1 May 2024 that exceeds 204,269 ounces (being equal to approximately 105 per cent. of the then current forecast for production from such date on the basis of the Group’s life of mine plan for the Runruno mine). The Company does not expect to make any Production Fee payment.
As at 30 June 2026 the Group had the below outstanding capital commitments:
- Commitments in place for La India project capital expenditure including new mining fleet equipment, civil and general infrastructure works, electrical and general process plant items totaled US$36.5 million (H1 2025: US$nil). These commitments are all expected to be funded during FY2026.
14. Subsequent events
Other than the below, there has been no period end subsequent disclosable events.
Equity issues
74,296,422 ordinary shares have been issued at an average issue price of 0.69p following the exercise of options and warrants.Debt finance
The Company secured a US$27 million equipment loan from a central American bank, which was fully drawn down in August and September 2026. The loan is secured against the Company’s mining fleet combined with a parent company guarantee.
Recent news on Metals Exploration
See all newsMetals Exploration: La India – Resumption of Construction Activities
Metals Exploration: La India Construction Site - Fatal Accident
AIM - AIM Notice - 06/10/2026
Metals Exploration: Exercise of Options and Total Voting Rights
UK's Metals Exploration Plc H1 revenue falls on lower production at Runruno mine