For best results when printing this announcement, please click on link below:
https://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20260513:nRSM0614Ea&default-theme=true
RNS Number : 0614E Orosur Mining Inc 13 May 2026
Pepas West Expanding
· Ongoing drilling at Pepas West continues to show positive results:
o PEP085, 16.1m @ 2.68g/t Au
o PEP087, 21.7m @ 1.42g/t Au
o PEP088, 9.8m @ 1.41g/t Au
o PEP090, 23.45m @ 2.98g/t Au
· Hole PEP090 stepped out 30m north of previous holes, demonstrating
extension potential.
· Rig currently drilling south of Pepas, will return to Pepas West in
several weeks.
· Hole MAP-106 at APTA now in the target zone.
London, May 13th, 2026. Orosur Mining Inc. ("Orosur" or the "Company")
(TSXV/AIM:OMI), is pleased to announce an update on the progress of
exploration activities at the Company's exploration project at Anzá in
Colombia ("Anzá" or the "Project").
Anzá - Colombia
The Anzá Project in Colombia comprises a number of granted exploration titles
and applications totalling roughly 330km(2), within the Mid-Cauca gold belt,
west of the city of Medellín.
These titles and applications are owned by two Colombian companies, Minera
Anzá, and Minera Monte Aguila, both wholly owned subsidiaries of the Company.
The latter of these was acquired by Orosur in November 2024 from the Company's
previous JV partners, Newmont Mining and Agnico Eagle Mines. Orosur thus owns
100% of the Anzá Project.
Since acquiring 100% control, the Company has focussed its attention on three
prospects:
· Pepas - a shallow, high-grade ore body of gold mineralisation for
which the Company has calculated a Mineral Resource Estimate ("MRE"),
announced February 10(th) 2026.
· APTA - a high-grade body of gold mineralisation that has to date seen
almost 39,000m of historical drilling, and at which drilling has recently
recommenced.
· El Cedro - a cluster of gold porphyry intrusions in the south of the
Project area that are currently subject to mapping and sampling programs, with
a view to potentially being drilled as soon as targets can be finalised and
logistics arranged.
Figure 1. Anzá Project
Pepas
The Company's primary focus since reassuming control of the Project in late
2024, was to explore the immediate area of Pepas, ultimately leading to the
publication of a maiden MRE for the Pepas gold deposit on February 10(th),
2026.
This MRE was based upon drilling undertaken by the Company and its previous JV
partner from 2022 to late 2025. Results from the final hole included in the
MRE, PEP074, were announced on January 8(th), 2026.
Following completion of the MRE drillout in late 2025, the Company then
embarked on a semi-regional drilling program around the Pepas deposit. The
objective of this drilling program was to better understand the larger scale
litho-structural controls that led to formation of the Pepas deposit, such
that, in combination with additional mapping and sampling in the wider region,
vectors toward additional mineralisation might be developed.
As announced on April 14(th), 2026, a new zone of mineralisation, geologically
similar to Pepas, has been discovered approximately 100m west of the main
Pepas zone.
This zone had been first identified in two drill holes from early 2025, but
only returned to in early 2026 once the Pepas MRE had been completed.
A number of holes (PEP082 to PEP090) have now been completed into this zone,
from various positions and in various directions, in order to gain some
understanding of the nature, orientation and controls upon this zone. Results
thus far are highly encouraging with thick intersections of shallow gold
mineralisation being recorded. Particularly encouraging was PEP090, drilled
some 30m NW of previous holes, demonstrating mineralisation over 100m in
strike with untested strike extension.
Hole Number From (m) To (m) Interval (m) Au (g/t)
PEP084 0 6.95 6.95 0.98
8.5 10.8 2.3 0.48
PEP085 0 3.7 3.7 0.63
14.95 31.05 16.1 2.68
including 20.9 26.25 5.35 4.18
PEP086 0 9.8 9.8 0.96
including 0 4.3 4.3 1.83
PEP087 9.4 31.1 21.7 1.42
including 19.05 27.8 8.75 2.28
PEP088 4.9 14.7 9.8 1.41
PEP089 6.9 11.15 4.25 0.38
PEP090 9.6 14.15 4.55 0.46
17.95 41.4 23.45 2.98
including 29.9 37.3 7.4 7.23
64.1 69.9 5.8 1.94
including 67.6 69.9 2.3 3.19
Table 1. Latest drill Intercepts, Pepas Prospect
As previously announced, after completion of hole PEP090, the rig operating at
Pepas has been moved southward to other targets, to allow time for geological
and assay information from Pepas West to be compiled. This is an ongoing
process; however, the Company's geological team note that Pepas West is worthy
of follow-up and it is planned that the rig will return here in several weeks
to begin to define the size of this mineralised zone.
Figure 2. Plan of holes, Pepas West
Figure 3. Section PEP084,85,86
Figure 4. Section PEP087
Figure 5. Section PEP088
Figure 6. Section PEP090
APTA
The APTA prospect in the centre of the Project area has seen almost 39,000m of
drilling by various companies since 2012. This work has identified a
substantial epithermal gold system.
The last phase of drilling was undertaken by the Company's previous JV
partner, MMA, from late 2020 through early 2022, at which time the abatement
of Covid related operational restrictions allowed MMA field crews to begin to
explore the wider Anzá project area. Results from the final holes of this
phase of work were announced on 27(th) June 2022.
A new phase of drilling was commenced some weeks ago, with hole MAP-106
planned to assess several new geological concepts to assist in planning a
larger drill campaign that may, if successful, allow APTA to move to resource
status.
Progress of MAP-106 has been very slow due to several zones of difficult and
broken ground. However, the hole is now well past 300m and within the target
zone. Going forwards, new drill pads are being developed in different
locations such that these issues are not repeated.
Orosur CEO Brad George commented:
"It is encouraging to see Anzá now beginning to delivery on its promise.
Pepas now has a resource, with more being found nearby, APTA being drilled and
El Cedro yet to come."
For further information, visit www.orosur.ca (http://www.orosur.ca) , follow
on X @orosurm or please contact:
Orosur Mining Inc
Louis Castro, Chairman,
Brad George, CEO
info@orosur.ca
Tel: +1 (778) 373-0100
SP Angel Corporate Finance LLP - Nomad & Joint Broker
Caroline Rowe / Jen Clarke / Devik Mehta
Tel: +44 (0) 20 3470 0470
Turner Pope Investments (TPI) Ltd - Joint Broker
Andy Thacker/Guy McDougall
Tel: +44 (0)20 3657 0050
Flagstaff Communications and Investor Communications
Tim Thompson
Alison Allfrey
Fergus Mellon
orosur@flagstaffcomms.com
Tel: +44 (0)207 129 1474
The information contained within this announcement is deemed by the Company to
constitute inside information as stipulated under the Market Abuse Regulations
(EU) No. 596/2014 ('MAR') which has been incorporated into UK law by the
European Union (Withdrawal) Act 2018. Upon the publication of this
announcement via Regulatory Information Service ('RIS'), this inside
information is now considered to be in the public domain.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that
term is defined in policies of the TSX Venture Exchange) accepts
responsibility for the adequacy or accuracy of this release.
Drill Hole Details - Pepas prospect 2022/2026 Programme*
Hole ID Easting (m) Northing (m) Elevation asl (m) Dip (°) Azimuth (°)
PEP-001 403384 705000 1001 -50 150
PEP-002 403384 705000 1001 -60 290
PEP-003 403240 705142 1001 -49.60 95.2
PEP-004 403508 705671 838 -59.8 99.8
PEP-005 403373 704990 1008 -49.8 94.6
PEP-007 403374 704990 1008 -69.9 170
PEP-008 403232 704803 971 -50 60
PEP-009 403032 705057 1055 -50 80
PEP-010 403375 705106 982 -50.31 190.4
PEP-011 403573 704939 1001 -50.3 255
PEP-012 403415 704890 997 -56 352
PEP-013 403413 704887 997 -50 43
PEP-014 403400 704910 1007 -50 43
PEP-015 403375 704938 1017 -50 43
PEP-016 403326 704912 999 -50 43
PEP-017 403365 704848 976 -40 47
PEP-018 403345 704851 977 -45 43
PEP-019 403446 704890 991 -45 43
PEP-020 403446 704890 991 -75 43
PEP-021 403424 704935 1012 -62 223
PEP-022 403424 704935 1012 -42 223
PEP-023 403245 704927 969 -50 43
PEP-024 403245 704927 969 -78 43
PEP-025 403369 704888 1001 -45 43
PEP-026 403339 704955 1008 -63 50
PEP-027 403468 704909 1003 -46 228
PEP-028 403398 704957 1012 -58 223
PEP-029 403311 705018 1011 -50 50
PEP-030 403311 705018 1011 -50 000
PEP-031B 403486 704901 998 -52 220
PEP-032 403431 704861 982 -60 15
PEP-033 403431 704861 982 -65 100
PEP-034 403431 704861 982 -45 315
PEP-035 403369 704882 996 -45 223
PEP-036 403311 705152 989 -45 30
PEP-037 403354 705227 958 -50 210
PEP-038 403332 705219 967 -45 128
PEP-039 403411 704798 957 -45 73
PEP-040 403369 704882 995 -80 212
PEP-041 403373 704936 1008 -50 3
PEP-042 403396 705038 716 -50 82
PEP-043 403298 704942 981 -50 43
PEP-044 403402 704948 1011 -62 33
PEP-045 403406 704949 1011 -60 223
PEP-046 403420 704933 1007 -53 43
PEP-047 403414 704927 1008 -74 223
PEP-048 403448 704922 1005 -54 043
PEP-049 403447 704920 1005 -55 223
PEP-050 403459 704905 1003 -45 43
PEP-051 403391 704928 1011 -61 43
PEP-052 403391 704928 1011 -87 43
PEP-053 403391 704929 1012 -60 223
PEP-054 403380 704954 1011 -52 43
PEP-055 403380 704954 1011 -86 223
PEP-056 403371 704970 1012 -61 43
PEP-057 403371 704970 1012 -71 223
PEP-058 403371 704970 1012 -85 223
PEP-059 403384 704976 1007 -59 43
PEP-060 403372 704908 1005 -55 43
PEP-061 403361 704988 1010 -80 223
PEP-062 403361 704988 1010 -61 43
PEP-063 403345 705005 1009 -50 80
PEP-064 403356 704923 1005 -51 43
PEP-065 403359 704949 1008 -59 43
PEP-065B 403359 704949 1008 -50 43
PEP-066 403423 704938 1009 -64 223
PEP-067 403400 704870 990 -53 43
PEP-068 403342 704989 1010 -56 43
PEP-069 403342 704987 1010 -80 218
PEP-070 403260 705071 1013 -50 30
PEP-071 403333 705005 1009 -51 90
PEP-072B 403435 704879 989 -70 43
PEP-073 403423 704917 1006 -50 307
PEP-074 403423 704917 1006 -60 127
PEP-075 403240 705267 946 -50 221
PEP-076 403240 705267 946 -60 042
PEP-077 403304 705228 959 -60 042
PEP-078 403304 705228 959 -60 222
PEP-079 403304 705228 959 -50 120
PEP-080 403093 705100 1026 -50 042
PEP-081 403215 705006 984 -55 032
PEP-082 403261 704941 977 -58 190
PEP-083 403267 704913 972 -45 342
PEP-084 403267 704913 972 -50 125
PEP-085 403267 704913 972 -50 310
PEP-086 403272 704910 979 -55 310
PEP-087 403262 704941 977 -50 260
PEP-088 403252 704946 979 -50 202
PEP-089 403252 704946 979 -50 202
PEP-090 403238 704980 976 -45 200
*Coordinates WGS84, UTM Zone 18
About Orosur Mining Inc.
Orosur Mining Inc. (TSXV: OMI; AIM: OMI) is a minerals explorer and developer
currently operating in Colombia and Argentina.
Qualified Persons Statement
The information in this news release was compiled, reviewed, verified and
approved by Mr. Brad George, BSc Hons (Geology and Geophysics), MBA, Member of
the Australian Institute of Geoscientists (MAIG), CEO of Orosur Mining Inc.
and a qualified person as defined by National Instrument 43-101.
Orosur Mining Inc. staff follow standard operating and quality assurance
procedures to ensure that sampling techniques and sample results meet
international reporting standards.
Drill core is split in half over widths that vary between 0.3m and 2m,
depending upon the geological domain. One half is kept on site in the Minera
Anzá core storage facility in the case of the Anza Project, or on site in
temporary racks in the case of the El Pantano Project, with the other sent for
assay.
Industry standard QAQC protocols are put in place with approximately 10% of
total submitted samples being blanks, repeats or Certified Reference Materials
(CRMs).
Samples for holes PEP-001 to PEP-011 were sent to the Medellin preparation
facility of ALS Colombia Ltd, and then to the ISO 9001 certified ALS Chemex
laboratory in Lima, Peru.
Samples from PEP-012 onwards are sent to Medellin laboratory of Actlabs for
preparation and fire assay, with some sample then sent to the Canadian Actlabs
facility for multi element assay
Samples from the EL Pantano project are sent to the preparation facility and
fire assay laboratory of Alex Stewart Laboratories in Perito Moreno to be
assayed for gold. Pulps are then sent to the larger Alex Stewart facility in
Mendoza for multi-element analysis.
30 gram nominal weight samples are then subject to fire assay and AAS analysis
for gold with gravimetric re-finish for overlimit assays of >5 g/t.
ICP-MS Ultra-Trace level multi-element four-acid digest analyses may also
undertaken for such elements as silver, copper, lead and zinc, etc.
Gold intersections are reported using a lower cut-off of 0.3g/t Au over 3m.
Intersections are quoted as downhole thicknesses. True thicknesses are
unknown.
Forward Looking Statements
All statements, other than statements of historical fact, contained in this
news release constitute "forward looking statements" within the meaning of
applicable securities laws, including but not limited to the "safe harbour"
provisions of the United States Private Securities Litigation Reform Act of
1995 and are based on expectations estimates and projections as of the date of
this news release.
Forward-looking statements include, without limitation, the continuing focus
on the Pepas prospect, the exploration plans in Colombia and the funding of
those plans, and other events or conditions that may occur in the future.
There can be no assurance that such statements will prove to be accurate.
Actual results and future events could differ materially from those
anticipated in such forward-looking statements. Such statements are subject to
significant risks and uncertainties including, but not limited to, those
described in the Section "Risks Factors" of the Company's MD&A for the
year ended May 31, 2025. The Company's continuance as a going concern is
dependent upon its ability to obtain adequate financing. This material
uncertainty may cast significant doubt upon the Company's ability to realize
its assets and discharge its liabilities in the normal course of business and
accordingly the appropriateness of the use of accounting principles applicable
to a going concern. The Company disclaims any intention or obligation to
update or revise any forward-looking statements whether as a result of new
information, future events and such forward-looking statements, except to the
extent required by applicable law.
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
or visit
www.rns.com (http://www.rns.com/)
.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
. END DRLGPUPCAUPQPGP
Copyright 2019 Regulatory News Service, all rights reserved