RNS Number : 3349X
Panther Metals PLC
19 March 2026
NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY IN OR INTO AUSTRALIA, CANADA, JAPAN, THE REPUBLIC OF SOUTH AFRICA, THE UNITED STATES OR ANY OTHER JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OF SUCH JURISDICTION
THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF REGULATION 2014/596/EU WHICH IS PART OF DOMESTIC UK LAW PURSUANT TO THE MARKET ABUSE (AMENDMENT) (EU EXIT) REGULATIONS (SI 2019/310) ("UK MAR"). UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION (AS DEFINED IN UK MAR) IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.
FOR IMMEDIATE RELEASE
PANTHER METALS PLC
("Panther" or the "Company")
(Incorporated in the Isle of Man with company number 009753V)
19 March 2026
Winston Tailings Project: Batch 2 Assay Results
Panther Metals Plc (LSE: PALM), the exploration company focused on mineral projects in Canada, is very pleased to report the second batch of Vibracore sample assay results for the Winston Tailings Project near Schrieber, Ontario, Canada.
The Vibracore tailings sampling is in support of the Mineral Resource estimate ("MRE") programme, the first of a series of ongoing workstreams progressing to quantify, evaluate and permit the contained high-grade gold (Au), gallium (Ga), silver (Ag), zinc (Zn), copper (Cu), indium (In) and cobalt (Co) and other recoverable minerals located within the historic Winston Lake Mine tailings storage facility ("TSF").
Key points:
· Second batch of tailings core sample assay results (Table 1) received for eleven Vibracore collar locations (WT-26-005, WT-26-007, WT-26-011 / 11A, WT-26-012, WT-26-013, WT-26-014, WT-26-015, WT-26-018, WT-26-021 & WT-26-026) situated upon six east-west profiles (Figure 1).
· Assayed intersections reported to date are taken from total tailings thicknesses varying between 2.4m to 13.1m (Table 2). The maximum vertical thickness of tailings (below ice and water) intersected across the TSF is 16.8m with an average vertical thickness of 8.7m.1, 2
· Samples comprise HQ core (63.5mm) diameter cylinders of tailings material through the vertical profile of the tailings, collected from the surface of the tailings (situated below ice and water cover) to the base of the tailings.
· Results continue to show good grade consistency across the vertical depth-profile and laterally between Vibracore hole collar locations, and support or exceed the 2025 preliminary assay results announced 31 July 2025 and the results announced 17 March 2026.1, 3
Darren Hazelwood, Chief Executive Officer commented:
"These latest results continue to highlight the strong production potential offered by the Winston Tailings Project. We are consistently confirming the continuity of mineralisation within the tailings, which closely aligns with our expectations based on our review of the historical production data from the Winston Lake Mine."
Table 1: Winston Tailings Vibracore Sample Assay Results Batch 2
Vibracore Hole ID
Vertical Depth (m)
Au
Ag
Zn*
Cu
Co
Ga
In
From
To
(g/t)
(g/t)
(%)
(%)
(ppm)
(ppm)
(ppm)
WT-26-005
1.77
3.27
0.26
9.09
1.480
0.125
203
71
10
3.27
4.77
0.29
7.93
1.225
0.102
260
81
12
4.77
6.27
0.42
10.20
0.820
0.093
270
77
8
6.27
6.88
0.64
11.90
1.285
0.120
237
91
11
WT-26-007
4.77
6.27
0.42
11.50
1.315
0.131
323
88
13
6.27
7.77
0.69
11.10
1.405
0.133
200
88
12
7.77
9.27
0.63
10.00
1.570
0.132
190
82
13
9.27
10.27
0.44
8.55
1.755
0.111
205
90
16
WT-26-011
1.57
3.07
0.45
11.10
1.015
0.106
315
74
12
WT-26-011A
1.57
3.07
0.05
1.32
0.912
0.026
60
22
5
WT-26-012
0.51
1.77
0.34
10.25
1.675
0.170
358
103
20
1.77
3.27
0.53
13.40
1.260
0.127
430
103
17
3.27
4.77
0.35
12.25
1.240
0.109
383
98
14
4.77
6.27
0.51
11.60
1.135
0.105
341
86
11
6.27
7.77
0.63
13.40
1.510
0.136
286
88
14
7.77
9.27
0.62
12.80
1.470
0.126
289
97
14
9.27
10.77
1.32
18.65
2.240
0.155
262
97
18
10.77
11.71
0.53
13.65
3.290
0.188
303
101
24
WT-26-013
1.77
3.27
0.52
13.30
1.405
0.134
366
83
14
3.27
4.77
0.42
14.45
1.255
0.126
370
95
12
4.77
6.27
0.57
11.55
0.713
0.085
374
66
6
6.27
7.77
0.54
14.10
1.385
0.127
270
86
11
WT-26-014
1.77
3.27
0.43
10.05
1.340
0.131
349
84
14
3.27
4.31
0.30
12.45
1.380
0.122
392
114
15
WT-26-015
3.27
4.77
0.41
12.55
0.895
0.102
330
97
10
4.77
5.82
0.48
12.90
1.240
0.105
370
92
12
5.82
6.27
0.52
11.90
0.890
0.095
340
88
10
WT-26-018
3.27
4.07
0.26
13.50
1.410
0.105
305
92
14
WT-26-021
3.27
4.77
0.64
14.20
1.145
0.118
334
83
10
4.77
5.74
0.71
13.80
1.105
0.110
281
79
9
WT-26-026
1.77
4.77
0.71
11.65
0.885
0.113
308
74
8
4.77
6.27
0.76
11.50
1.035
0.126
315
75
9
6.27
6.60
0.67
12.35
1.800
0.142
258
77
17
Table Note: Assay results by ALS Laboratory methods ME-MS61, Au-ICP21 (for gold) and Zn-OG62 (for Zn>1%). * Zinc results >1% Zn by method Zn-OG62, Zn <1% by method ME-MS61. Batch 2 samples reported under ALS certificate TB26067642. Future sample batches may contain further results for the reported Hole IDs.
Analytical Methods
The certified assay results are by ALS Laboratories using four-acid super trace multielement method ME-MS61 (four-acid digestion for near-total recovery across a suite of 48 elements), Au-ICP21 (gold by fire assay with an inductively coupled plasma atomic emission spectroscopy finish) and Zn-OG62 (four-acid overlimit method for high-grade zinc).
Figure 1: Winston Tailings 2026 Vibracore Sample Result Locations for this Announcement
Table 2: Vibracore Sample Collar Locations and Tailings Depths
Vibracore Hole ID #
UTM Northing
UTM Easting
Collar Elevation (m)
Depth to Tailings Surface (m)
Depth to Tailings Base (m)
Tailings Thickness* (m)
WT-26-001
5424415
473016
464.1
0.6
6.6
6.0
WT-26-002
5424415
473042
463.8
1.3
5.5
4.2
WT-26-003
5424415
473091
463.4
1.1
9.3
8.2
WT-26-004
5424415
473141
463.3
0.9
14.0
13.1
WT-26-005
5424414
473191
464.0
1.0
6.9
5.9
WT-26-007
5424364
473215
463.2
0.8
10.3
9.5
WT-26-011
5424315
473090
464.4
0.6
3.1
2.5
WT-26-011A
5424315
473094
463.3
0.6
3.1
2.4
WT-26-012
5424315
473140
463.7
0.5
11.7
11.2
WT-26-013
5424314
473191
463.4
0.6
7.8
7.2
WT-26-014
5424313
473235
464.2
0.6
4.3
3.7
WT-26-015
5424263
473215
462.9
0.6
6.3
5.7
WT-26-018
5424264
473065
463.3
0.6
4.1
3.5
WT-26-021
5424214
473190
463.7
0.6
5.7
5.1
WT-26-026
5424064
473165
462.1
0.8
6.6
5.8
Table Note: UTM Zone 16N NAD83 Datum. WT-26-011A drilled to test for a suspected false bottom encountered in WT-26-011. Table includes statistics for four Vibracore holes reported 17 March 2026. * Apparent tailings thickness and vertical profile tested by assays may differ. Depth figures rounded to 1 decimal place.
Further Information
The Winston Tailings Project Vibracore sampling grid comprises a total of 109 collar locations, staggered at a nominal spacing of 50m along east-west fence lines spaced at 25m north-south, for an effective horizontal sample spacing averaging either 25m or 35m between fences. Duplicate 'twin' core material was retrieved at 3 locations, whilst vertical profiles were restarted at 6 of the locations. The completed sample grid measures up to 904m along the long axis and up to 230m perpendicular to the TSF long axis.
Vibracore tailings cylinders continue to be logged and sampled by Bayside Geoscience Ltd in the city of Thunder Bay, with sample batches submitted to ALS Laboratories for geochemical analysis in support of the Mineral Resource estimate.
The MRE is an integral part of the process to advance the Winston Tailing Project towards a cashflow proposition and will be based upon the resource sampling programme, mineralogical and metallurgical testwork and associated studies. The MRE work will also provide inputs into the Application for Recovery of Minerals Permit (the "Recovery Permit") process as announced 1 September 2025.4, 5
Background
The Winston Tailings Project entails a series of workstreams to quantify, evaluate and permit the contained high-grade gold (Au), gallium (Ga), silver (Ag), zinc (Zn), copper (Cu) and cobalt (Co) and other recoverable minerals located within the historic Winston Lake Mine tailings storage facility (Figure 2). Based on historic processing recoveries it is believed that a significant quantity of valuable material was not captured and remains in the tailing storage facility. Reprocessing the mine tailings, potentially offers Panther the opportunity to unlock residual metal value and contribute to the long-term environmental rehabilitation of the Winston Project site.
The Winston Lake Mine was operational from 1988 to 1998, producing approximately 3.3 million tonnes of ore and yielding zinc, copper, silver, and gold. Based on historic recoveries from mining activities in the 1980s and 1990s, it is believed that a significant quantity of valuable material remains in the tailing storage facility.
Source: NI 43-101 Technical Report Feasibility Study for the Superior Zinc and Copper Project, 2021. Site is connected to high-voltage grid power.
Figure 2: Existing Infrastructure at Winston Tailings Storage Facility
Qualified Person Statement
Technical information in this announcement has been prepared by Nicholas O'Reilly BSc (Hons) MSc DIC MIMMM QMR MAusIMM FGS, a director of the Company. He has over 20 years' experience in mining, exploration and development across all major commodities and is a Qualified Person ("QP") as defined in NI 43-101 and is the Competent Person for UK Listing Rules purposes.
References
1. Panther Metals PLC, announcement, Winston Tailings Project: Batch 1 Assay Results, dated 17 March 2026 ( https://polaris.brighterir.com/public/panther_metals/news/rns/story/xo9z89x )
2. Panther Metals PLC, announcement, Winston Tailings Project: Sample Collection Complete, dated 16 March 2026 ( https://polaris.brighterir.com/public/panther_metals/news/rns/story/xjl3qkw )
3. Panther Metals PLC, announcement, Winston Tailings Assays Confirm Gold, Gallium, Silver, Zinc, Copper & Cobalt, Tailings Sample Assay Results Exceed Expectations, dated 31 July 2025 ( https://polaris.brighterir.com/public/panther_metals/news/rns/story/w00eo6w )
4. Panther Metals PLC, announcement, Winston Tailings Project Update and Warrant Expiry, Permitting Process Commenced. Warrant Expiry Notice , dated 1 September 2025
( https://polaris.brighterir.com/public/panther_metals/news/rns/story/x20od6r )
5. Recovery of Minerals Permitting process details available at https://www.ontario.ca/page/recovery-minerals
For further information, please contact:
Panther Metals PLC: Darren Hazelwood, Chief Executive Officer:
+44 (0)1462 429 743 +44 (0)7971 957 685
Brokers:
Optiva Securities Limited Christian Dennis Mick McNamara
+44 (0)20 3137 1902
Hybridan LLP Claire Louise Noyce
+44 (0)20 3764 2341
SI Capital Limited Nick Emerson
+44 (0)1438 416 500
Obonga Project - Advancing a High-Impact VMS and Critical Minerals District
Panther Metals' Obonga Project in Ontario continues to demonstrate strong potential as a district-scale exploration opportunity targeting base and critical minerals. Since acquiring the Obonga Greenstone Belt in July 2021, the Company has advanced multiple high-priority targets including Wishbone, Awkward, Survey, Ottertooth, and Silver Rim.
On 9 February 2026 Panther announced plans for an approximately 2,000-metre diamond drilling program at the Wishbone Prospect, following the grant of an Exploration Permit in June 2024 valid through 2027. Previous work confirmed compelling VMS-style mineralisation, including 27.3m of massive sulphide and 51m of sulphide-dominated mineralisation across multiple lenses, supported by high-grade copper anomalies in lake sediments.
In July 2024, Panther secured an Exploration Permit for Awkward West, enabling up to 31 drill holes. Historic drilling returned 27.2m at 2.25% TGC, with zones exceeding 5% TGC, alongside indications of nickel, copper, and platinum group elements, aligning with the Company's critical minerals strategy.
High-resolution magnetic and electromagnetic surveys continue to refine drill targeting across Obonga. Survey and Ottertooth remain highly prospective, hosting multiple untested geophysical anomalies and historic massive sulphide intercepts.
Winston Tailings Project - Tailings Evaluation and MRE Pathway
Panther Metals' Winston Project represents a near-term, development-focused opportunity centred on the evaluation of historic mine tailings and has been the subject of prior technical and commercial assessment involving Extrakt.
Current work is focused on tailings sampling, metallurgical testing, and data validation to define metal content, recoverability, and support the preparation of a NI 43-101 compliant Mineral Resource estimate (MRE). This approach provides a clear value-creation pathway with lower geological risk than greenfield exploration and aligns with modern reprocessing and critical mineral's themes.
Dotted Lake Project - Hemlo-Adjacent Polymetallic Opportunity
Panther Metals' Dotted Lake Project, acquired in July 2020, is located approximately 16km from Barrick Gold's Hemlo Mine, within a well-established mining region.
Early exploration identified multiple gold and base metal anomalies, with initial drilling confirming gold mineralisation. In early 2025, follow-up drilling materially advanced the project, confirming nickel and magnesium mineralisation within an ultramafic intrusion and identifying a VMS-style system, significantly expanding the project's polymetallic potential.
The program refined structural controls, extended mineralisation, and identified multiple new drill targets, positioning Dotted Lake as a high-upside, multi-commodity exploration asset.
Commercial Strategy - Focused Value Creation
Panther Metals is focused on disciplined, discovery-driven value creation through efficient capital deployment and technical execution. With Obonga delivering high-impact exploration, Winston providing a resource-focused development pathway, and Dotted Lake offering polymetallic upside, the Company maintains a balanced portfolio aligned with favourable commodity market conditions.
The Company's strategy is to advance high-quality assets along the most efficient technical pathway, delivering tangible milestones that underpin long-term shareholder value.
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
END
DRLBKLFFQXLBBBB