- £0.69m
- £8.10m
- £3.74m
Half-year Report
£0.7 million contract award with Stannah UK Ltd
Director/PDMR Shareholding
Brief: Pipehawk FY Turnover Of 6.5 Mln Stg
Final Results for the year ended 30 June 2023
Brief: Pipehawk Says £0.8 Mln Contract Award With JVM
£0.8 million contract award with JVM
Brief: Pipehawk Wins Contract To Assemble Manufacturing, Test Facility For Fire Detection Products
Contract award
Brief: Pipehawk Plc HY Turnover £2.2 Mln
Half-year Report
Grant of Options
Director dealing
Result of Annual General Meeting
Pipehawk Plc climbs on unit's order intake
Brief: Pipehawk Reports YTD Order Intake Of 4.3 Million Stg At QM Systems
Brief: Pipehawk Says Order Intake For YTD At £4.3 Mln
AGM Statement
UK's Pipehawk plummets on swinging to annual loss