REG - Thor Mining PLC - New Drill Programme Close to Planned Molyhil Mine <Origin Href="QuoteRef">THRL.L</Origin>
RNS Number : 1285HThor Mining PLC15 August 201615 August 2016
THOR MINING PLC
NEW DRILL PROGRAMME TO WIDEN TUNGSTEN RESOURCE CLOSE TO PLANNED MOLYHIL MINE
The Board of Thor Mining Plc ("Thor" or the "Company") (AIM, ASX: THR), is pleased to announce a new drill campaign designed to confirm the close proximity of additional tungsten mineralisation within a six kilometre radius of the Company's existing Molyhil tungsten deposit in the Northern Territory.
Highlights
50 hole drill programme designed to test bedrock through shallow alluvial cover;
Targeting magnetic anomalies with similar characteristics to Molyhil;
Key objective of new drilling programme is to find additional ore sources for Molyhil project, thereby extending mine life and reducing costs;
Targets include; Solar Farm, Stock Yard, Think Big and Gap Track areas, all of which are located within 6km of Molyhil; and
The low cost programme, estimated at less than A$100,000 is expected to commence in late-August 2016.
Mr Mick Billing, Executive Chairman of Thor:"Improvements in the APT price combined with renewed interest in the sector leads us to believe that now is the ideal time to test these exciting targets, as we move to the next phase of work at Molyhil with renewed vigour."
"The key objective is to extend the mine life of Molyhil, and hopefully increase the scale of operations to reduce unit production costs.
"Exploration of adjacent known deposits is a sound and cost effective exploration tactic and this initial test of these Molyhil lookalike targets will hopefully lead to a significant increase in the project's current known mining inventory."
The tungsten and molybdenum mineralisation at Molyhil is contained within a magetite skarn, which can be detected using geophysical techniques. The Molyhil deposit was first discovered in the 1970s through drill testing a magnetic anomaly to follow up nearby outcropping tungsten. The edges of Mt Sainthill fault zone, where Molyhil is located, host several magnetic anomalies, identified from regional geophysical studies, with properties similar to that of Molyhil.
Thor plans a shallow aircore drilling programme to test a series of these anomalies, all within 6 kilometres of the proposed Molyhil mine site. These prospects, within the exploration licence surrounding Molyhil, are believed to be at shallow depth beneath between 2 and 20 metres of sedimentary cover.
A 50 hole drilling programme designed to penetrate this cover and test the top of the bedrock beneath is scheduled to commence prior to the end of August.
Preliminary estimates show a cost for the programme below A$100,000, although this may vary depending upon drilling rates and the time taken to execute the programme.
Depending upon the results of this programme, further deeper drilling is expected to be required.
Competent Person's Report
The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Enquiries:
Mick Billing
+61 (8) 7324 1935
Thor Mining PLC
ExecutiveChairman
Ray Ridge
+61 (8) 7324 1935
Thor Mining PLC
CFO/Company Secretary
Colin Aaronson/
Daniel Bush/
Richard Tonthat
+44 (0) 207 383 5100
Grant Thornton UK LLP
Nominated Adviser
Gerry Beaney/
David Hignell
John Howes
+44 (0) 0203 861 6625
Northland Capital Partners Limited
Broker
Tim Blythe/
Camilla Horsfall
+44 (0) 207 138 3222
Blytheweigh
Financial PR
Updates on the Company's activities are regularly posted on Thor's website, www.thormining.com,
which includes a facility to register to receive these updates by email.
About Thor Mining PLC
Thor Mining PLC is a resources company quoted on the AIM Market of the London Stock Exchange and on ASX in Australia.
Thor holds 100% of the advanced Molyhil tungsten project in the Northern Territory of Australia, for which an updated feasibility study in 2015 suggested attractive returns. Thor also holds 100% of the Pilot Mountain tungsten project in Nevada USA which has a JORC 2012 Indicated Resources Estimate on 1 of the 4 known deposits.
In February 2016, Thor announced the sale of its Spring Hill Gold project for A$3.5million, of which A$1.5 remains due for settlement in February 2017, plus a royalty of:
A$6 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for up to A$1,500 per ounce; and
A$14 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for amounts over A$1,500 per ounce.
Notes
Refer ASX and AIM announcement of 12 January 2015
Refer ASX and AIM announcement of 10 June 2014
Refer ASX and AIM announcement of 29 February 2016
At the date of this announcement gold is trading at approximately A$1,750/oz
This information is provided by RNSThe company news service from the London Stock ExchangeENDDRLLIFLETIIELIR
Recent news on Thor Energy
See all newsREG - Thor Energy PLC - Award of Two New Prospective Licence Applications
AnnouncementREG - Thor Energy PLC - Quarterly Activities and Cash Flow Report Q4 2025
AnnouncementREG - Thor Energy PLC - Molyhil Update - A$2,250,000 Payment Received
AnnouncementREG - Thor Energy PLC - HY-Range Seismic, Geochemistry & Portfolio Update
AnnouncementREG - Thor Energy PLC - Director/PDMR Shareholding
Announcement