** Citi upbeat on Woodside Energy WDS.AX as construction
progress at its Pluto LNG worksite in Western Australia leads to
an estimated reduction in cost overrun
** Brokerage expects oil and gas producer's cost overrun to
drop to $500 mln from $1 bln due to lowered construction risks
from topsides being built in a yard
** Citi projects first LNG production from Pluto T1 in
2H2026, says this might dampen over-optimistic 2026 earnings
projections
** Maintains "sell" rating and PT of A$23
** Woodside Energy shares down as much as 0.41% to A$24.140
** Stock down 22% YTD, as of 2323 GMT
(Reporting by Kumar Tanishk in Bengaluru)
((Tanishk.Kumar@thomsonreuters.com;))