RNS Number : 5657A SDIC Power Holdings Co., LTD 15 April 2026
SDIC Power Holdings Co., Ltd.
(GDR under the symbol: "SDIC")
First Quarter 2026 Operating Results
This announcement contains the English translation of the Chinese version of
"SDIC Power Holdings Co., Ltd. First Quarter 2026 Operating Results" as
published on the website of the Shanghai Stock Exchange, and is provided for
your reference only. In case of discrepancy between the Chinese version and
the English version, the Chinese version shall prevail.
I. Electricity Volume and Tariff
According to the preliminary statistics of SDIC Power Holdings Co., Ltd.
(hereinafter referred to as the "Company"), from January to March 2026, the
Company's holding enterprises cumulatively achieved power generation of 37.907
billion kWh and on-grid energy of 37.048 billion kWh, a year-on-year decrease
of 2.78% and 2.77% respectively.
From January to March 2026, the average on-grid tariff of these enterprises
was RMB 0.354/kWh, a year-on-year decrease of 0.28%.
Main Operating Data of the Company's Holding Enterprises from January to March
2026
Item Power generation On-grid energy
(100 million kWh)
(100 million kWh)
Current period Same period Change Current period Same period Change
last year
(YOY%)
last year
(YOY%)
Sichuan Yalong Hydro 209.29 232.37 -9.93% 208.13 231.14 -9.95%
Yunnan SDIC Dachaoshan 17.64 13.68 28.95% 17.54 13.60 29.04%
Gansu SDIC Xiaosanxia 6.01 6.67 -9.90% 5.92 6.56 -9.77%
Subtotal of hydropower 232.94 252.71 -7.82% 231.59 251.30 -7.84%
Tianjin SDIC Beijiang 29.81 29.85 -0.15% 27.80 27.80 -0.02%
Guangxi SDIC Qinzhou Electric Power 17.96 22.24 -19.25% 17.07 20.71 -17.61%
SDIC Qinzhou Second Power 10.48 6.02 74.07% 9.73 5.70 70.81%
Fujian Huaxia Power 13.63 9.55 42.66% 12.81 8.95 43.08%
Meizhouwan Electric Power 22.48 26.73 -15.92% 21.48 25.24 -14.89%
Guizhou SDIC Panjiang 9.82 7.89 24.51% 9.01 7.17 25.64%
Guizhou New Sky 0.43 0.36 20.32% 0.36 0.30 21.96%
Thailand C&G Environmental Protection 0.23 0.22 3.06% 0.19 0.19 3.76%
Subtotal of thermal power 104.84 102.87 1.91% 98.45 96.06 2.49%
Wind power 20.43 19.14 6.76% 19.95 18.70 6.68%
Solar power generation 20.87 15.20 37.29% 20.48 14.97 36.78%
Total of holding enterprises 379.07 389.92 -2.78% 370.48 381.03 -2.77%
Explanation of the year-on-year change in power generation of holding
enterprises from January to March 2026:
1. Main reasons for the year-on-year change in hydropower generation
The water inflow in the Yalong River Basin and the basin where Xiaosanxia
Hydropower Station is located was relatively low; the rainfall in the basin
where Dachaoshan Hydropower Station is located was more abundant than that in
the same period last year, coupled with the impact of increased water release
from the upstream power stations for power generation and water diversion.
2. Main reasons for the year-on-year change in thermal power generation
Main reasons for the change in power generation of Guangxi's thermal power
enterprises: Generally, power generation remained largely flat compared to the
same period last year, with divergent year-on-year changes among internal
power plants (some increased while others decreased) mainly due to the unified
balancing dispatch within the region.
Main reasons for the change in power generation of Fujian's thermal power
enterprises: Huaxia Power carried out less unit maintenance year on year,
leading to higher power generation. The Meizhouwan Phase I BOT project was
handed over in the second quarter of the previous year and is therefore
excluded from the statistics for the current period, resulting in a
year-on-year decrease in power generation.
Main reasons for the increase in power generation of Guizhou's thermal power
enterprises: Higher power generation year-on-year was mainly driven by
increased social electricity consumption and outbound power transmission in
Guizhou, as well as the province's proactive participation in the long-cycle
trial operation of the spot market.
3. Main reasons for the year-on-year increase in wind power generation
Multiple wind power projects were put into operation successively.
4. Main reasons for the year-on-year increase in solar power generation
Multiple solar power projects were put into operation successively.
II. Installed Capacity Status
In Q1 2026, the holding installed capacity put into operation by the Company
increased by 300,000 kW, attributable to the Shandong Tai'an Solar Power
Project. As of the end of Q1 2026, this figure reached about 47,195,600 kW,
including 21,304,500 kW of hydro power, 13,074,800 kW of thermal power
(including waste-to-energy generation), 4,140,300 kW of wind power, 7,989,400
kW of solar power, and 686,600 kW of energy storage.
The Board of Directors of SDIC Power Holdings Co., Ltd.
April 15, 2026
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
or visit
www.rns.com (http://www.rns.com/)
.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
. END UPDDELBFQZLLBBF
Copyright 2019 Regulatory News Service, all rights reserved