RNS Number : 8862Q Shanta Gold Limited 23 October 2023
23 October 2023
Shanta Gold Limited
("Shanta Gold", "Shanta", "Company", "Group")
Q3 2023 PRODUCTION & OPERATIONAL UPDATE
Shanta Gold (AIM: SHG), the East Africa-focused gold producer, developer and
explorer announces its production and operational results for the quarter
ended 30 September 2023 (the "Quarter", "Q3" or the "Period") for its East
African assets, comprising New Luika Gold Mine ("NLGM" or "New Luika") and
Singida Gold Mine ("Singida") in Tanzania and West Kenya Project ("West
Kenya") in Kenya.
Q3 2023 Highlights:
· Steady gold production in line with expectations
o Group: 27,935 ounces ("oz")
o NLGM: 18,271 oz
o Singida: 9,664 oz
· Balance sheet deleveraging with net debt of US$4.9 million ("m"),
down 44% from US$8.7 m in Q2;
· Adjusted EBITDA(3) of US$19.0 m,
· Cash Operating Costs and All in Sustaining Costs ("AISC")(2):
o Group: US$757 /oz and US$1,023 /oz
o NLGM: US$970 /oz and US$1,279 /oz
o Singida: US$713 /oz and US$899 /oz
· No gold hedging - 100% exposed to spot gold price;
· Cash, and available liquidity(1) of US$26.5 m at 30 September 2023
(Q2: US$25.0 m), including US$10.0 m undrawn (Q2: US$4.0 m) from the Stanbic
Revolving Credit facility; and
· Outstanding safety record: TRIFR rate of 0.00 in Q3 and 0.00 YTD;
zero LTIs.
(Note 1: Available liquidity has been derived as unrestricted cash, the sale
value of doré available for sale at the end of the Period (net of royalties
and expected selling costs).)
(Note 2: AISC figures published include development costs, in line with the
WGC definition.)
(Note 3: Adjusted EBITDA is earnings before interest, tax, depreciation, and
amortisation which has been derived as operating profit exclusive of
depreciation/depletion of tangible assets, amortisation of intangible assets
and exploration expenditure at the West Kenya Project totalling US$1.4
million.)
Eric Zurrin, Chief Executive Officer, commented:
"Our performance over the third Quarter demonstrates the stable and reliable
production volumes we have worked hard to achieve, with Group gold production
across our two operating mines of 27,935 ounces in line with expectations and
materially increasing our confidence in meeting our stated guidance of up to
98 Koz, which we will review as we get closer to the end of the year.
Our newest mine Singida continues to perform strongly, with 9,664 oz produced
during the Quarter, exceeding internal Q3 forecasts by 15 per cent. Production
throughout the Quarter remained above 3,000 oz per month, whilst operating
costs and AISC were materially better than budgeted.
In addition to our strong operational performance, exploration activities have
continued during the Quarter at both West Kenya and in Tanzania. At West
Kenya, we continued infill drilling totalling 8,387 meters while approximately
10,000 meters is planned for Q4. At NLGM, the Phase 1 drilling program is
ongoing, while at Singida we commenced with the first few holes at the western
deeper extension of Jem pitshell.
"As always, we maintained our outstanding safety record, with no Lost Time
Injury's and a Total Recordable Injury Frequency Rate of 0.00. Meanwhile, we
finished the quarter with a strong balance sheet, with net debt reduced to
US$4.9 m, down from US$8.7 m in the second quarter, putting us in an optimal
position to further enhance growth initiatives."
Analyst conference call and presentation
Shanta Gold will host an analyst conference call and presentation today, 23
October 2023, at 09:00am BST. Participants can access the call by registering
via the link below.
https://secure.emincote.com/client/shanta/shanta006/vip_connect
(https://secure.emincote.com/client/shanta/shanta006/vip_connect)
The presentation will be available for download from the Company's website:
www.shantagold.com. A recording of the conference call will subsequently be
available on the Company's website.
Investor Conference Call
Shanta Gold is hosting a live investor presentation via the Investor Meet
Company platform today, 23 October 2023, at 10:00am BST. The presentation is
open to all existing and potential shareholders and questions can be submitted
any time during the live presentation.
Investors can sign up to Investor Meet Company for free and add to meet Shanta
Gold via:
https://www.investormeetcompany.com/shanta-gold-limited/register-investor
(https://www.investormeetcompany.com/shanta-gold-limited/register-investor)
Investors who already follow Shanta Gold on the Investor Meet Company platform
will automatically be invited.
Enquiries:
Shanta Gold Limited
Eric Zurrin (CEO) +44 (0) 14 8173 2153
Michal Devine (CFO)
Nominated Adviser and Broker
Liberum Capital Limited
Scott Mathieson / Kane Collings / Nikhil Varghese +44 (0) 20 3100 2000
Public Relations
FTI Consulting
Sara Powell / Nick Hennis +44 (0) 20 3727 1426
About Shanta Gold
Shanta Gold is an East Africa-focused responsible gold producer, developer and
explorer. The company has an established operational track record, with
defined ore resources on the New Luika and Singida projects in Tanzania, with
reserves of 625 koz grading 2.91 g/t Au, and exploration licences covering
approximately 800 km(2) in the country. Alongside New Luika and Singida,
Shanta also owns the West Kenya Project in Kenya and licences with resources
of 1.7 million ounces including 722 koz in the Indicated category grading
11.45 g/t Au. With a strong balance sheet, a growing diversified portfolio and
a maiden dividend paid in 2021, Shanta offers a resilient investment
opportunity for the near and long-term. Shanta is quoted on London's AIM
market (AIM: SHG) and has approximately 1,051 million shares in issue.
The Information contained within this announcement is deemed by the Company to
constitute inside information as stipulated under the Market Abuse Regulation
(EU) No. 596/2014 as amended by The Market Abuse (Amendment) (EU Exit)
Regulations 2019.
Competent Person Statement
The technical information contained within this announcement has been reviewed
by Juma Kisunda (the Company's Technical Services Manager), who is a Member of
the Australasian Institute of Mining and Metallurgy (AusIMM) and Yuri
Dobrotin, P.Geo. Membership No.0702 (Shanta's Group Exploration Manager), who
is a practicing member of the Association of Professional Geoscientists of
Ontario, Canada (PGO). They have sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Persons as defined in the
2012 Edition of the ''Australasian Code for Reporting of Exploration Results,
Mineral Resources and Mineral Reserve'' and for the purposes of the AIM
Guidance Note on Mining and Oil & Gas Companies dated June 2009, and
National Instrument 43-101 (''NI 43-101).
Q3 2023 PRODUCTION & OPERATIONAL UPDATE
Operational Summary
Safety, Health and Environment
There were no Lost Time Injuries (LTI) in the Quarter across the Group's
operations with a total of 3,350,302 man-hours worked at New Luika and
1,676,717 man-hours worked at Singida without a LTI. Shanta continues its
track record of operating among the safest gold mining operations of its peers
and has achieved a Total Recordable Injury Frequency Rate ("TRIFR") (per 1
million hours worked) of 0.00 for all three Quarters in 2023.
New Luika Production Summary
Q3 2023 Q2 2023 Q1 2023 Q4 2022
Tonnes ore milled 226,358 219,978 217,478 227,207
Grade (g/t) 2.90 3.13 2.52 2.60
Recovery (%) 86.5 87.2 87.1 88.0
Gold (oz)
Production 18,271 19,338 15,317 16,742
Sales 17,477 20,704 15,995 16,621
Silver production (oz) 27,242 30,672 23,152 19,790
Realised gold price (US$/oz) 1,930 1,957 1,907 1,731
Operational and Financial Summary - New Luika Gold Mine
The New Luika Gold mine produced 18,271 oz during the Quarter, in line with
internal forecasts. Production was stable during the Quarter, continuing the
trend from Q2. The steady production achieved was mainly due to consistent
plant feed grades throughout the quarter, consistent power and equipment
availabilities and higher milled tonnes by the processing plant.
A total of 178,548 t of ore grading 3.48 g/t Au was mined from underground in
Q3 compared with 164,198 t of ore grading 3.81 g/t Au in Q2 2023. In Q3 2023,
65,448 t ore grading 1.62 g/t Au was mined from open pits compared with 63,308
t of ore grading 1.69 g/t Au in Q2 2023.
The ROM stockpile at the end of Q3 was 250,231 t of ore grading 0.93 g/t Au
for 7,453 oz contained (Q2: 234,300 t grading 0.95 g/t Au for 7,178 oz
contained). Average recoveries of 86.5% were achieved in the NLGM processing
plant during the Quarter (Q2: 87.2%).
Milled ore during the Quarter totalled 226,357 tonnes, slightly above the
previous quarter of 219,987 t. The average head grade of 2.90 g/t Au (Q2: 3.13
g/t Au) included a blend of material from underground, open pit, and existing
ROM ore stockpile sources.
Adjusted Operating Costs of US$970 /oz (Q2: US$904 /oz) and AISC(1) of
US$1,279 /oz (Q2: US$1,181 /oz) were achieved in the period, respectively. The
change from Q2 is primarily driven by less ounces produced for the Quarter and
more investment in sustaining capital including the planned power station
genset refurbishment after 18,000 hours of usage.
New Luika Underground mining cash costs were US$10.1 m for Q3, 3% below
budgeted costs of US$10.4 m. Open Pit mining cash costs were US$2.3 m,
compared to US$2.9 m budgeted costs.
Singida Production Summary
Q3 2023 Q2 2023 Q1 2023(1)
Tonnes ore milled 93,292 79,911 5,366
Grade (g/t) 3.4 4.0 3.2
Recovery (%) 97.4 97.9 99.3
Gold (oz)
Production 9,664 10,065 51
Sales 7,569 8,703 -
Realised gold price (US$/oz) 1,931 1,930 -
(1. The first gold pour on 30 March 2023. Commercial production declared on 1
June 2023.)
Operational and Financial Summary - Singida Gold Mine
The Singida mine produced 9,664 oz during the Quarter, exceeding internal Q3
forecasts by 15%. Production was stable during the Quarter with all three
months achieving over 3,000 oz per month. This was due to continued positive
reconciliation of ore grades versus reserve grade, steady mill throughput, and
attractive gold recoveries.
Open pit mining continued with operations focused on Gold Tree and Vivian
pits. Total ore of 108,253 t with an average grade of 2.83 g/t Au was mined in
the Quarter (Q2: 68,323 t grading 2.75 g/t Au).
Ore stockpile level at Singida excluding gravels at the end of Q3 was 201,256
t grading an average of 1.84 g/t Au (Q2: 147,986 t grading 3.07 g/t Au) for
11,919 contained ounces.
Milled ore during the Quarter totalled 93,292 tonnes, an increase of 17% from
the previous quarter (Q2: 79,911 t), due to Q3 running at commercial
production for all three months compared with the ramping up phase in Q2. The
average head grade of 3.4 g/t Au (Q2: 4.0 g/t Au) included a blend of material
from open pit, and stockpile sources.
Adjusted Operating Costs of US$713 /oz and AISC of US$899 /oz were achieved in
the Quarter, respectively. Operating costs and AISC were better than budget by
40% and 37% respectively, driven by strong gold production from the
consistency in gold grades, good recovery, and lower than budgeted operating
costs.
Singida Process Plant metrics Forecast Actual Actual
(Q2 2023)
(Q3 2023)
Dore bars gold purity 80% 91.0% 90.2%
Gold recovered from gravity 40% 44.7% 43.7%
Gold recoveries 91% 97.4% 97.9%
2023 Production and Cost Guidance(1)
Management reiterates NLGM and Singida guidance previously announced:
Production Cost (AISC)
(k oz)
US$/oz
NLGM FY'23 66 - 72 1,200 - 1,300
Q3'23 actual 18.3 1,279
YTD actual 52.9 1,289
Singida FY'23(1) 24 - 26 1,300 - 1,400
Q3'23 actual 9.6 899
YTD actual 19.7 816
Group FY'23(1) 90 - 98 1,200 - 1,300
Q3'23 actual 27.9 1,023
YTD actual 72.7 1,160
( )
(1. Singida for the 9-month period, April-December 2023.)
Group Financial Summary
Gold prices remained strong during the Period resulting in the average selling
price achieved per ounce being US$1,930 /oz (Q2: US$1,949 /oz). The Company
continues to be 100% exposed to the spot gold price and does not intend on
adding new gold hedges.
During the Quarter the Group deleveraged, with net debt reducing to US$4.9 m
(Q2: US$8.7 m), with repayments of US$6.0 m made against the short-term
working capital facility and US$1.8 m against the long term Stanbic facility.
The Group also paid its fifth consecutive Period dividend of 0.10 pence per
share during the Quarter and declared another interim dividend for payment in
November.
In Q3, capital expenditure at New Luika was US$3.1 m (Q2: US$3.2 m), which
predominantly related to the completion of the generator refurbishment,
underground development, and TSF expansion. US$2.8 m was spent at Singida (Q2:
$5.2m), mainly relating to construction work at the gold plant. A total of
US$1.4 m was invested in exploration at the West Kenya project.
EBTIDA Bridge Q2 to Q3 2023
Adjusted Group EBITDA of US$19.0 m (Q2: US$23.2 m) was achieved in the
Quarter. The movement was driven by:
· US$6.6 m NLGM revenue decrease due to 3,227 fewer ounces sold in the
Quarter;
· US$2.2 m Singida revenue decrease due to 1,134 fewer ounces sold in
the Quarter;
· US$2.1 m increase from a reduction in NLGM Cost of Sales ("COS") as
fewer ounces produced (18,271 oz vs 19,338 oz);
· US$5.3 m increase from Singida, as fewer ounces produced (9,664 oz vs
10,065 oz), and actual COS Jul-Sep comparing favourably versus Q2 Singida
normalised COS (which was done to match June sales and margins to Apr-May
costs).
During Q3 the Company received a cash VAT refund of US$6.7 m from the Tanzania
Revenue Authority ("TRA") in respect of the period from November 2022 to March
2023. A further VAT refund application has been made relating to the period
from April 2023 to July 2023 which is awaiting TRA audit. The expected VAT
refund is approximately US$5.6 m which may be set off against the Company's
year-end corporate tax payment. The Company's Tanzanian VAT receivable reduced
from US$31.0 m in Q2 to US$27.0 m in Q3. Approximately US$23.0 m of the total
VAT receivable relates to the legacy period from 2017-2020 which is currently
undergoing formal proceedings with the Tanzania Revenue Appeals Board.
West Kenya Project
Exploration and infill drilling continued during Q3 2023 with a total of 8,387
meters and planning for a further 10,000 meters in Q4 across 35 holes. This
will target extension of the Indicated and Inferred resources within the
designed pitshell on the Ramula deposits, as well as an additional conversion
of ounces to the Indicated category at the Isulu deposit. In addition,
drilling commenced on the highest potential targets within the Ramula Camp,
starting with the Miruka target, aiming to establish an initial Inferred
resource.
Geotechnical logging continued in the Quarter with the aim of the program to
carry out a detailed geotechnical logging on the Ramula and Isulu drill holes.
The mine shape optimisation work has commenced in the Quarter for Ramula and
Isulu deposits, and a structural model has also been developed for Ramula.
During the Quarter, the Company expanded its community engagement team and
expanded its stakeholder engagement plan as part of the Feasibility Study ESIA
workstream. Discussions and sensitisation continued with all levels of
communities and government as the potential for a mining operation at West
Kenya is socialised.
Tanzania Exploration
At NLGM, the Phase 1 drilling program has continued during Q3 with work
ongoing at Elizabeth Hill to identify and define the continuity of plunging
shoots and to test the continuity of narrow mineralized zones. In addition,
853m of drilling was completed at Luika Deep West (Underground), less than
expected due to lack of spares from the drilling contractor in Tanzania; work
remains ongoing.
The resource conversion programme at Singida during the Quarter commenced with
the first few holes drilled to test the structure extension below and to the
west of the Jem pitshell. A relogging programme also progressed with multiple
diamond drill holes across the entire licence area during the Period, aiming
to better establish the mineralisation controls, and outline the upside
potential of the Singida deposits.
Infill soil sampling for the high-precision multi-element analysis has also
now been completed for all Singida mining licences. Exploration work will
continue in earnest during Q4 to add to the geological understanding of the
greater potential system of mineralisation.
Drilling updates across the NLGM and Singida projects will be provided as and
when results are available from the service provider.
Corporate Social Responsibility ("CSR")
New Luika Community
At Mbangala, the old solar power system previously installed by Shanta was
repaired during the Period and a new solar power supply was successfully
installed. This will enable the health facility to operate smoothly during
TANESCO power outages and ensure the treatment of patients in the community
isn't disrupted.
Also at Mbangala, the Company continues to support improvements to the
secondary school's infrastructure. The construction of two classrooms, an
office, and teacher's accommodation was completed during the Period, a
significant upgrade to the previous buildings which will provide a safer space
for local children to learn.
At Saza and Patamela, the construction of two village markets commenced in
September. When completed, these markets will support the local economies of
Saza and Patamela by providing a dynamic centre for local suppliers to trade,
and also improve the access to goods for the local population.
Singida Community
Work progressed to support the agricultural livelihood of farmers in the
Ikungi District, with a Singida farmers group travelling to NLGM to learn
about the ongoing agricultural project supported by Shanta here. The Company
are engaging with the community in Ikungi to explore forming Agriculture
Marketing and Cooperative (AMCOS), mirroring what is already in place in
Songwe near NLGM. A total of 699 farmers from all 32 hamlets in 5 villages
have already registered their interest in this for farming in the coming
season commencing November 2023. The Company are planning to support the
formation of two AMCOS in Q4 to support this initiative.
CEO Succession
In April 2023, following the successful construction and completion of the
Singida Gold Mine, Shanta announced that Eric Zurrin, Chief Executive Officer,
had informed the Board of his decision to step down from his role after six
years with the Company. A formal search process has advanced, with the Board
currently in discussions with short-listed candidates. Mr Zurrin commits to
ensuring a smooth transition to new leadership for Shanta Gold, who will
inherit a transformed multi-asset gold producer with financial flexibility and
a strong management team in place to support the Company's ongoing stability.
Country Overview
In September 2022, the Government of Tanzania revoked the 2020 Mining (State
Participation) Regulations and reissued new regulations governing Section 10
of the Mining Act that had been amended in 2017. In April 2023, the Government
of Tanzania signed agreements worth approximately US$650 m with various
international mining companies to enable foreign investment. As disclosed by
the Company in October 2022, discussions between the Ministry of Minerals and
Shanta were expected to take place in 2023. The Company held an introductory
meeting in April 2023. Since the introductory meeting there have been no
developments in Q3.
ENDS
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
or visit
www.rns.com (http://www.rns.com/)
.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
. END UPDPPGUUUUPWPGP