RNS Number : 5088C South32 Limited 30 April 2026
30 April 2026
South32 Limited
(Incorporated in Australia under the Corporations Act 2001 (Cth))
(ACN 093 732 597)
ASX / LSE / JSE Share Code: S32; ADR: SOUHY
ISIN: AU000000S320
south32.net
HERMOSA PROJECT UPDATE
Conference call at 9.00am Australian Western Standard Time, details overleaf.
South32 Limited (ASX / LSE / JSE: S32; ADR: SOUHY) (South32) provides an
update on the Taylor zinc-lead-silver project (Taylor), the first development
at our Hermosa project in Arizona, United States.
South32 Chief Executive Officer, Graham Kerr said: "Our investment in Hermosa
has established a regional-scale project with the potential to produce
critical minerals over several decades, with Taylor as the first stage.
"Our updated assessment of project execution has reaffirmed Taylor's potential
to deliver our shareholders attractive returns from its long-life, low-cost
production of zinc, silver and lead.
"Taylor's initial operating life has been extended by 5 years to ~33
years(1)since final investment approval, driven by successful infill drilling
programs. The deposit remains open in several directions, providing further
growth potential, with life extensions beyond the mine plan of operations
subject to future regulatory approvals.
"At the adjacent Peake deposit, continued exploration success has underpinned
a 32% increase in its Mineral Resource estimate to 33Mt(2), supporting our
expectation that Peake will become a source of future copper production and
mine life extension within the Taylor development.
"Recently completed study work for the co-located Clark deposit has confirmed
the opportunity for additional Taylor orebody access from Clark's decline
infrastructure, improving operational flexibility and unlocking value across
the life of mine. This approach will enable first production ahead of shaft
commissioning and increase ore handling capacity by approximately 25%,
providing potential to increase production above current design capacity.
"First production is expected in H2 FY28 and nameplate capacity by FY31,
reflecting our revised expectation for shaft construction, due to contractor
performance and productivity challenges. While targeted measures have been
implemented to improve shaft construction productivity, our latest assessment
has determined that these measures will only partially mitigate the impact of
contractor underperformance.
"Our expected growth capital expenditure for Taylor has been updated to
~US$3,300M(3). This includes scope changes with the addition of decline
access, revised shaft construction costs, materially higher inflation,
industry-wide increases in key input costs such as steel, piping, concrete and
electrical, and United States tariffs.
"Based on our updated assumptions, Taylor continues to demonstrate its
quality, with expected steady-state EBITDA of ~US$650M per annum(4) and a net
present value of ~US$3,100M(5).
"Demonstrating the significant leverage to prices this long-life, high-quality
project will deliver for years to come, these returns increase further to
steady-state EBITDA of ~US$800M per annum4 and a net present value of
~US$4,500M, at spot commodity prices(5)."
1 The information in this announcement that refers to Production Target and
forecast financial information is based on Proved (41Mt, 32%) and Probable
(58Mt, 44%) Ore Reserves and Measured (1.1Mt, 1%), Indicated (4.2Mt, 3%),
Inferred (13Mt, 10%) Mineral Resources and Exploration Target (13Mt, 10%) for
the Taylor deposit. The Ore Reserves, Mineral Resources and Exploration Target
underpinning the Production Target, included in this announcement, have been
prepared by Competent Persons and reported in accordance with the JORC Code
(2012). All material assumptions on which the Production Target and forecast
financial information is based are provided in Annexure 2 of this
announcement. There is low level of geological confidence associated with
Inferred Mineral Resources and there is no certainty that further exploration
work will result in the determination of Indicated Mineral Resources or that
the Production Target will be realised. The potential quantity and grade of
the Exploration Target is conceptual in nature. In respect of Exploration
Target used in the Production Target, there has been insufficient exploration
to determine a Mineral Resource and there is no certainty that further
exploration work will result in the determination of Mineral Resources or that
the Production Target itself will be realised. The stated Production Target is
based on South32's current expectations of future results or events and should
not be solely relied upon by investors when making investment decisions.
Further evaluation work and appropriate studies are required to establish
sufficient confidence that this Production Target will be met. South32
confirms that inclusion of 20% of tonnage (10% Inferred Mineral Resources and
10% Exploration Target) is not the determining factor of the project viability
and the project forecasts a positive financial performance when using 80%
tonnage (32% Proved and 44% Probable Ore Reserves and 1% Measured and 3%
Indicated Mineral Resources). South32 is satisfied, therefore, that the use of
Inferred Mineral Resources and Exploration Target in the Production Target and
forecast financial information reporting is reasonable.
2 The information in this announcement that relates to Mineral Resource
estimate for Peake represents an estimate as at 30 April 2026 and is based on
information compiled by Patrick Garretson. Mr Garretson is a full-time
employee of Terra Resources Consulting Group LLC. Mr Garretson is a member of
the Australasian Institute of Mining and Metallurgy and has sufficient
experience relevant to the style of mineralisation and type of deposit under
consideration and to the activities being undertaken, to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC
Code). Mr Garretson consents to the inclusion in this announcement of the
matters based on their information in the form and context in which it
appears. Refer to Annexure 2 for further details.
3 Growth capital expenditure incurred since 1 January 2024 to 31 March 2026
and remaining growth capital expenditure to be invested from 1 April 2026 to
H2 FY28 (real as at 1 July 2026).
4 Average EBITDA and EBITDA margin calculated over the steady state production
years (FY31-FY59).
5 Based on a valuation date of 1 July 2026.
------------------------------------------------------------------------------------------------------------------------------------------
Conference call
South32 will hold a conference call at 9.00am Australian Western Standard Time
(11.00am Australian Eastern Standard Time) on 30 April 2026 to provide an
update of the Hermosa project including Q&A, the details of which are as
follows:
Conference ID
Please pre-register for this call at link
(https://s1.c-conf.com/diamondpass/10054554-m5nckt.html) .
Website
A replay of the conference call will be made available on the South32 website.
------------------------------------------------------------------------------------------------------------------------------------------
Taylor project update
In February 2026, we advised that an assessment of Taylor project milestones
and capital expenditure would be completed in the June 2026 half year. The
recent receipt of updated pricing for the remaining surface and underground
construction packages, has enabled us to advance key estimates for capital
expenditure and schedule. Along with these updates, we have increased our Ore
Reserve and Mineral Resource estimates for Taylor following successful infill
drilling.
The assessment has reaffirmed Taylor's potential to deliver attractive returns
as a large‑scale, long‑life, low-cost producer of zinc, silver and lead.
Taylor is expected to operate as a highly productive underground mine and a
conventional process plant with a nameplate capacity of 4.3Mtpa. Work
completed since final investment approval in February 2024 has also supported
an extension of Taylor's mine life and confirmed potential for future copper
production from the adjacent Peake deposit.
Following completion of the exploration decline for the co-located Clark
deposit in the December 2025 quarter, we assessed the feasibility of providing
additional access to the Taylor orebody via the Clark exploration decline.
This work highlighted significant benefits from an integrated underground
development standpoint, including the potential to access the Taylor orebody
ahead of full shaft commissioning, and an increase in ore handling capacity of
approximately 25%. Over the next 12-months, we will assess surface
infrastructure de-bottlenecking options, which combined with additional ore
handling capacity, have the potential to increase production above current
design rates.
First ore mined from Taylor via the Clark decline is expected in mid-FY28,
with first production expected in H2 FY28. First production from the shafts is
now expected from H1 FY29, reflecting recently revised timing for shaft
completion. This revised schedule is inclusive of targeted measures that have
been implemented to improve shaft construction productivity, including
strengthening contractor leadership, engaging specialist performance advisors,
and bringing critical scope under direct owner management. While these
measures have improved performance in shaft sinking rates, our latest
assessment has determined that these measures will only partially mitigate the
impact of contractor underperformance. As a result, we are now planning for a
more gradual ramp up to nameplate capacity, with full capacity expected in
FY31 (previously FY30).
Expected growth capital expenditure for Taylor has been increased by
~US$1,100M, compared to final investment approval, to ~US$3,300M (from 1
January 2024), reflecting a change in scope with the addition of decline
infrastructure (~US$100M), revised shaft construction costs (~US$450M),
materially higher inflation, industry-wide increases in key inputs including
steel, piping, concrete and electrical components, and United States tariff
impacts (~US$500M).
Key outcomes of the project update include:
· 52% increase in the Taylor Ore Reserve to 99Mt, supported by
successful infill drilling programs.
· 10% increase in the Taylor Mineral Resource to 169Mt, which
remains open at depth and laterally.
· 32% increase in the Peake Mineral Resource to 33Mt, with ongoing
drilling to test the potential for a continuous mineralised system connecting
Peake and Taylor Deeps.
· An increase in Taylor's initial operating life from ~28 years to
~33 years, with life extensions beyond the mine plan of operations subject to
future regulatory approvals.
· 17% increase in life of mine production to 10.4Mt ZnEq(6) (3.7Mt
zinc, 4.6Mt lead, 247Moz silver).
· Annual average steady-state production of 346kt ZnEq (123kt zinc,
155kt lead, 8.2Moz silver).
· Growth capital expenditure revised to ~US$3,300M, with ~US$2,100M
to be spent over Q4 FY26 to H2 FY28.
· Sustaining capital expenditure revised to average ~US$50M per
annum, including spend on the decline and underground infrastructure over FY28
to FY30.
· Operating unit costs revised to ~US$100/t, reflecting general
inflation and higher assumed energy costs.
6 Payable zinc equivalent (ZnEq) was calculated by aggregating revenues from
payable zinc, lead and silver, and dividing the total revenue by the price of
zinc. Our long-term price assumptions for zinc (~US$3,390/t), lead
(~US$2,200/t) and silver (~US$50/oz) have been used to calculate payable zinc
equivalent production.
Summary financial outcomes
Key estimated financial outcomes from the project update are summarised below.
Unless stated otherwise, currency is in US dollars (real) and units are
metric.
Table 1: Estimated project update outcomes - Taylor stage one
Unit Project Feasibility
update((a))
study((b))
Production Nameplate processing capacity Mtpa ~4.3 ~4.3
Initial operating life Years ~33 ~
2
8
First production FY H2 FY28 H
2
F
Y
2
7
Mined ore grades (average) %, g/t 3.7% Zn, 4.1% Pb, 76 g/t Ag 3
.
9
%
Z
n
,
4
.
3
%
P
b
,
7
8
g
/
t
A
g
Annual payable zinc production (average/steady state) kt ~111 / ~123 ~
1
1
4
/
~
1
3
2
Annual payable lead production (average/steady state) kt ~141 / ~155 ~
1
4
2
/
~
1
6
3
Annual payable silver production (average/steady state) ( ) Moz ~7.5 / ~8.2 ~
7
.
4
/
~
8
.
5
Annual payable ZnEq production (average/steady state) kt ~314 / ~346 ~
3
1
8
/
~
3
6
4
(
(
d
)
)
Operating costs Operating unit costs (average per tonne ore processed) US$/t ~100 ~86
Capital expenditure Pre-production growth capital expenditure US$M ~3,300((c)) ~2,160
Sustaining capital expenditure (annual average) ( ) US$M ~50 ~
3
6
a) Project update reflects values in real terms as at 1 July
2026.
b) Feasibility study reflects values in real terms as at 1
January 2024.
c) Includes actual expenditure incurred since 1 January 2024
to 31 March 2026 and forecast expenditure from 1 April 2026 to H2 FY28 (real
as at 1 July 2026).
d) Zinc equivalent values from the feasibility study have been
restated to reflect South32's updated long-term commodity price assumptions.
Table 2: Estimated project update returns - Taylor stage one
Unit Project Spot
update((a)) case((b))
Financial Annual average EBITDA (steady state) US$M ~650 ~800
Average EBITDA margin (steady state) % ~58% ~64%
Annual average net cash flow (post tax, steady state) US$M ~500 ~650
Post tax NPV (real, 7.0% discount rate)(7) US$M ~3,100 ~4,500
Post tax IRR (nominal)7 % ~19% ~22%
Commodity price assumptions Zinc US$/t ~3,390 (from FY34)((c)) ~3,470
Lead US$/t ~2,200 (from FY34)((c)) ~1,940
Silver US$/oz ~50 (from FY34)((c)) ~77
a) Project update reflects values in real terms as at 1 July
2026.
b) Reflects spot prices as at April 2026.
c) Commodity prices assumed for FY28 to FY33 are within the
ranges: Zinc ~US$3,250/t to ~US$3,400/t, Lead ~US$2,000/t to ~US$2,200/t,
Silver ~US$50/oz to ~US$70/oz.
7 Based on a valuation date of 1 July 2026.
Hermosa project overview
Hermosa is a regional-scale project located in Santa Cruz, Arizona, 100% owned
by South32. It comprises multiple deposits with the potential to produce
critical minerals for several decades, with the large-scale, long-life Taylor
zinc-lead-silver project as the first development. Hermosa also includes the
Peake copper deposit located south of Taylor, the Clark battery-grade
manganese deposit, and an extensive, highly prospective land package with the
potential for further polymetallic and copper mineralisation.
Taylor was approved for development in February 2024 and is being constructed
as a modern, highly efficient underground mine and conventional process plant
with a nameplate capacity of 4.3Mtpa. Taylor is now expected to deliver 10.4Mt
of ZnEq production (3.7Mt zinc, 4.6Mt lead, 247Moz silver) over an extended
initial operating life of ~33 years, with life extensions beyond the mine plan
of operations subject to future regulatory approvals. There is significant
opportunity for life extension from Taylor, with the deposit remaining open in
several directions, and the adjacent Peake copper deposit. The development of
Taylor will also establish significant shared infrastructure, including water
management, permanent power and non-processing infrastructure, that is
expected to unlock value for future growth phases at Hermosa.
Hermosa was the first mining project added to the US Government's FAST‑41
process, recognising its potential to strengthen the domestic supply of
critical minerals in the US. Federal permitting under FAST-41 is progressing
to schedule, based on the existing mine plan of operations, with a Final
Record of Decision and notice to proceed on-track for H1 FY27. All State
approvals required to construct Taylor have been received.
Taylor Mineral Resource
The Taylor deposit is a carbonate replacement style zinc-lead-silver massive
sulphide deposit. It is hosted in Permian carbonates of the Pennsylvanian Naco
Group of south-eastern Arizona. The Taylor deposit comprises the upper Taylor
sulphide (Taylor Mains) and lower Taylor deeps (Taylor Deeps) domains that
have a general northerly dip of 30° and are separated by a low angle thrust
fault.
The deposit has an approximate strike length of 2,500m and a width of 1,900m.
Mineralisation extends 1,200m from near-surface and is open in several
directions, offering the potential for further growth. Recent exploration
drilling at Taylor has been focused on infill programs, with extensional drill
targets identified and prioritised for future exploration programs.
Taylor's Mineral Resource estimate is reported in accordance with the 2012
Edition of the 'Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves' (JORC Code). We have today announced a 10%
increase in the Mineral Resource estimate to 169Mt at 3.51% zinc, 3.88% lead
and 76 g/t silver, compared to the previously disclosed Mineral Resource
estimate as at 30 June 2025(8) (see Annexure 1 - Table 1 and Table 2).
The increase is due to additional drilling.
Table 3: Mineral Resource estimate for the Taylor deposit as at 30 April 2026
Ore Type Measured Indicated Inferred Total
Mineral Resources Mineral Resources Mineral Resources Mineral Resources
Mt % % g/t Ag Mt % % g/t Ag Mt % % g/t Ag Mt % % g/t Ag
Zn Pb Zn Pb Zn Pb Zn Pb
UG Sulphide((a)) 57 4.56 4.68 75 86 3.11 3.86 78 26 2.48 2.18 67 169 3.51 3.88 76
Mt - Million dry metric tonnes, % Zn - percent zinc, % Pb - percent lead, g/t
Ag - grams per tonne of silver.
a) Cut-off grade: Net Smelter Return (NSR) of US$90/dmt for UG
Sulphide.
b) Metallurgical weighted recovery assumptions in Taylor
Sulphide are 85-92% for zinc, 89-92% for lead, and 76-83% for silver.
c) All masses are reported as dry metric tonnes (dmt). All
tonnes and grade information have been rounded to reflect relative uncertainty
of the estimate, hence small differences may be present in the totals.
d) Mineral Resources are reported inclusive of Ore Reserves.
Competent Person's Statement
The information in this announcement that relates to Mineral Resources for the
Taylor and Peake Deposit are presented on a 100% basis, represent an estimate
as of 30 April 2026, and are based on information compiled by Patrick
Garretson. Mr Garretson is a consultant employed by Terra Resources Consulting
Group LLC and is a member of the Australasian Institute of Mining and
Metallurgy. Mr Garretson has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration, and to the activities
being undertaken, to qualify as a Competent Person as defined in the 2012
Edition of the 'Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves'. The Competent Person consents to the
inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
8 Information in this announcement that relates to Mineral Resource estimate
for Taylor deposit was declared as part of South32's annual Resource and
Reserve declaration in the FY25 Annual Report (www.south32.net) issued on 28
August 2025 and prepared by a Competent Person in accordance with the
requirements of the JORC Code. South32 confirms that it is not aware of any
new information or data that materially affects the information included in
the original announcement. South32 confirms that the form and context in which
the Competent Person's findings are presented have not been materially
modified from the original announcement.
Taylor Ore Reserve
Taylor's Ore Reserve estimate is reported in accordance with the JORC Code.
Following final investment approval, 95 infill drill holes have been completed
at Taylor to enhance orebody definition and enable further efficiency gains.
This work has supported a significant 52% increase in the Ore Reserve estimate
to 99Mt at 3.95% zinc, 4.50% lead and 77 g/t silver, compared to the
previously disclosed estimate as at 30 June 2025(9) (see Annexure 1 - Table 3
and Table 4). The Ore Reserve underpins approximately 25 years of Taylor's
initial operating life of ~33 years, providing strong orebody definition.
Table 4: Ore Reserve estimate for Taylor deposit as at 30 April 2026
Ore Type Proved Ore Reserves Probable Ore Reserves Total Ore Reserves Reserve life
Mt % % g/t Mt % % g/t Mt % % g/t Years
Ag
Ag
Ag
Zn Pb Zn Pb Zn Pb
UG Sulphide((a)) 41 5.02 5.12 79 58 3.19 4.05 76 99 3.95 4.50 77 25
Mt - Million dry metric tonnes, % Zn - percent zinc, % Pb - percent lead, g/t
Ag - grams per tonne of silver.
a) Cut-off grade: NSR of US$90/dmt.
b) Metallurgical weighted recovery assumptions in Taylor
Sulphide are 85-92% for zinc, 89-92% for lead, and 76-83% for silver.
c) All masses are reported as dry metric tonnes (dmt). All
tonnes and grade information have been rounded to reflect relative uncertainty
of the estimate, hence small differences may be present in the totals.
Competent Person's Statement
The information in this announcement that relates to Ore Reserves for the
Taylor deposit is presented on a 100% basis, represents an estimate as of 30
April 2026, and is based on information compiled by Kevin McCoy. Mr McCoy is a
full-time employee of South32 and is a member of the Australasian Institute of
Mining and Metallurgy. Mr McCoy has sufficient experience relevant to the
style of mineralisation and type of deposit under consideration, and to the
activities being undertaken, to qualify as a Competent Person as defined in
the 2012 Edition of the 'Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves'. The Competent Person consents to
the inclusion in this announcement of the matters based on his information in
the form and context in which it appears.
9 Information in this announcement that relates to Ore Reserve estimates for
the Taylor deposit was declared as part of South32's annual Resource and
Reserve declaration in the FY25 Annual Report (www.south32.net) issued on 28
August 2025 and prepared by a Competent Person in accordance with the
requirements of the JORC Code. South32 confirms that it is not aware of any
new information or data that materially affects the information included in
the original announcement. All material assumptions and technical parameters
underpinning the estimate in the relevant announcement continue to apply and
have not materially changed. South32 confirms that the form and context in
which the Competent Person's findings are presented have not been materially
modified from the original announcement.
Peake Mineral Resource
Peake is a copper-lead-zinc-silver deposit located south of the Taylor
deposit, at a depth of approximately 1,300m-1,500m. Since our reporting of an
initial Mineral Resource estimate as at 30 June 2023, subsequent diamond
drilling has returned high-grade copper and polymetallic intercepts that
support the interpretation of a potentially continuous mineralised system
connecting Peake and Taylor Deeps.
We have today announced a 32% increase in the Mineral Resource estimate for
Peake to 33Mt at 1.78% CuEq(10) (0.87% Cu, 0.28% Zn, 0.32% Pb and 36g/t Ag),
compared to the previously published 30 June 2025 estimate(11) (see Annexure 1
- Table 5 and Table 6). This reflects successful extensional and infill
drilling to the south and southwest of the existing high-grade mineralised
domain. The deposit remains open, with further drilling planned to test the
extent of mineralisation.
We are continuing to assess the potential to integrate Peake within the Taylor
development. Under this scenario, the Peake orebody would be accessed
utilising the shaft infrastructure established for Taylor. The Taylor process
plant has been designed with flexibility to allow for the addition of a
low-cost copper circuit, enabling production of copper and other base and
precious metals from Peake and Taylor Deeps.
With high-grade Taylor zinc-lead-silver mining zones expected to underpin
production during the first several years, a future development of Peake could
add copper production in the medium to longer-term in a combined development
with Taylor, extending overall mine life. Further updates on Peake will be
provided as work progresses.
Table 5: Mineral Resource estimate for the Peake deposit as at 30 April 2026
Ore Type Measured Indicated Inferred Total
Mineral Resources
Mineral Resources
Mineral Resources
Mineral Resources
Mt % % % g/t Mt % % % g/t Mt % % % g/t Mt % % % g/t
Cu Zn Pb Ag Cu Zn Pb Ag Cu Zn Pb Ag Cu Zn Pb Ag
UG Sulphide((a)) - - - - - - - - - - 33 0.87 0.28 0.32 36 33 0.87 0.28 0.32 36
Mt - Million dry metric tonnes, % Zn - percent zinc, % Pb - percent lead, g/t
Ag - grams per tonne of silver.
a) Cut-off grade: Net Smelter Return (NSR) of US$90/dmt for UG
Sulphide.
b) Total metallurgical recovery assumptions are 73% for
copper, 75% for Zn, 85% for Pb, and 52% for Ag in Pb Concentrate and 30% for
Ag in Cu Concentrate.
10 CuEq (%) = Cu (%) + 0.3577 * Zn (%) + 0.2421 * Pb (%) + 0.0203 * Ag (g/t).
The copper equivalent (CuEq %) was calculated using South32's internal price
forecasts and laboratory tests completed to derive metallurgical recovery. The
price is commercially sensitive and is not disclosed. Average payable
metallurgical recovery assumptions are 75% for Zn, 85% for Pb, 82% for Ag and
73% for Cu.
11 Information in this announcement that relates to Mineral Resource estimate
for the Peake deposit was declared as part of South32's annual Resource and
Reserve declaration in the FY25 Annual Report (www.south32.net) issued on 28
August 2025 and prepared by Competent Persons in accordance with the
requirements of the JORC Code. South32 confirms that it is not aware of any
new information or data that materially affects the information included in
the original announcement. South32 confirms that the form and context in which
the Competent Persons' findings are presented have not been materially
modified from the original announcement.
Taylor construction
Non-process infrastructure
The first of two dry stack tailings storage facilities (TSF) has already been
established as part of our voluntary remediation program completed in CY20.
The second TSF will be constructed on federal land in CY29, following federal
approvals under FAST-41.
All required dewatering infrastructure for Taylor, Peake and Clark, including
two water treatment plants and associated dewatering wells, has been
successfully commissioned, with flow rates lower than expected.
A permanent 138kV transmission line to the local grid will provide all site
power, with discussions ongoing with local providers to potentially secure
100% renewable energy. Construction of the transmission line will enable a
transition from temporary, self-generated natural gas power to cost-efficient,
long-term supply. Construction on private lands is underway, with construction
of the remaining approximately seven miles on federal land scheduled to
commence in H1 FY27, following federal approvals under FAST-41.
Mine infrastructure
Integrated underground access and mine development
An exploration decline for the Clark battery-grade manganese deposit was
completed in the December 2025 quarter, on-schedule and on-budget, benefitting
from favourable ground conditions. Following completion, we assessed the
feasibility of providing additional access to the Taylor orebody via the Clark
exploration decline. This work has highlighted significant benefits from an
integrated underground development standpoint, including the potential to
access the Taylor orebody ahead of full shaft commissioning, and an increase
in ore handling capacity of approximately 25%. First ore from decline access
is expected in mid-FY28. Over the next 12-months, we will assess surface
infrastructure de-bottlenecking options, which combined with additional ore
handling capacity, have the potential to increase production above current
design rates.
Underground infrastructure and shafts
In addition to decline access, we are constructing dual shafts for underground
mining operations. Ore will be mined in an optimised sequence across four
independent mining areas, crushed underground and hoisted to the surface for
processing.
Sinking of the ventilation and main shafts commenced during FY25. The
ventilation shaft has reached a depth of approximately 618 metres (~75%
complete) as at April 2026, with lateral development and construction of the
first underground mining level from the ventilation shaft completed in the
March 2026 quarter. Shaft sinking and construction productivity on the
ventilation shaft has been impacted by challenges related to contractor
performance and engineering and procurement delays. While targeted measures to
address shaft sinking productivity have improved performance, our latest
assessment has determined that these measures will only partially mitigate the
impact of contractor underperformance. As a result, construction of the
ventilation shaft is expected to be completed in H2 FY27 (previously H1 FY27).
The main shaft has reached a depth of approximately 478 metres (~53% complete)
as at April 2026. Despite some carry-over delays from ventilation shaft
activity, main shaft sinking rates have benefitted from improvement measures
implemented on the ventilation shaft. Sinking of the main shaft is now
expected to be completed in H1 FY28, with additional underground
infrastructure to be installed following shaft sinking.
Figure 1: Taylor mine plan
Process infrastructure
The process plant is designed as a sulphide ore flotation circuit producing
separate zinc and lead concentrates, with silver by-product credits, and has a
nameplate capacity of 4.3Mtpa.
Following final investment approval, construction of process infrastructure
has reached several key milestones, with the flotation circuit and process
plant tracking to plan. The process plant is expected to be commissioned in H1
FY28, coinciding with completion of the decline access, with first production
expected in H2 FY28, and nameplate capacity from FY31.
Figure 2: Hermosa surface infrastructure as at April 2026
Taylor production profile
The production profile for Taylor is shown in Figure 3 below. First ore is
expected in mid-FY28, first production in H2 FY28 and full capacity from FY31.
Taylor's initial operating life has been extended by approximately 5 years to
~33 years, with life extensions beyond the mine plan of operations subject to
future regulatory approvals. Total production has increased by approximately
17% to 10.4Mt ZnEq (3.7Mt of zinc, 4.6Mt of lead and 247Moz of silver).
Annual average production over the steady-state years (FY31 to FY59) is
expected to be approximately 123kt of zinc, 155kt of lead and 8.2Moz of
silver, for 346kt ZnEq (previously 132kt of zinc, 163kt of lead and 8.5Moz of
silver, for 364kt ZnEq), with the value uplift from additional ore processed
over the initial operating life more than offsetting slightly lower average
metal grades.
Figure 3: Ore processed and payable ZnEq production
Table 6: Project update production vs. FS production
Item Unit Project update Feasibility study
Initial operating life Years ~33 ~28
Total payable zinc production Mt ~3.7 ~3.2
Total payable lead production Mt ~4.6 ~4.0
Total payable silver production Moz ~247 ~208
Total payable ZnEq production Mt ~10.4 ~8.9((a))
a) Zinc equivalent values from the feasibility study have been
restated to reflect South32's updated long-term commodity price assumptions.
Taylor capital expenditure estimate
The project update was undertaken with approximately 80% of Taylor's growth
capital expenditure now invested, contracted or subject to final pricing.
Taylor's expected growth capital expenditure has been revised to ~US$3,300M
(real), with ~US$2,100M remaining to be invested over Q4 FY26 to H2 FY28. This
update reflects a change in scope with construction costs to establish decline
access (~US$100M), revised shaft construction costs (~US$450M), and materially
higher inflation, industry-wide cost increases in key input costs such as
steel, piping, concrete and electrical components, and United States tariff
impacts (~US$500M).
Following our final investment approval, external factors including
geopolitical tensions and higher tariffs in the United States, have driven
materially higher inflation and escalation in key input costs. Compared to our
feasibility study estimate, installed prices for steel, piping and concrete
have more than doubled. While steel requirements have been optimised and
reduced by approximately 30% following detailed engineering, the
uncontrollable pricing impacts have driven higher than expected capital costs.
This has been reflected in recently priced surface infrastructure and
underground development work packages.
Looking ahead, the capital risk profile is significantly lower with, the
majority of work packages now contracted or subject to final pricing,
remaining shaft development delivered under unit rate contracts, and detailed
engineering further advanced.
Sustaining capital expenditure is expected to average approximately US$50M per
annum over the life of the mine, including spend on the decline and
underground infrastructure across FY28 to FY30. Annual average sustaining
capital during steady state years is largely unchanged at approximately
US$37M.
Figure 4: Capital expenditure (US$M, real) (from 1 January 2024)((a))
a) Sustaining capital expenditure in FY28 to FY30 includes
spend on the decline and underground infrastructure. This amount is included
in in the life of mine sustaining capital expenditure.
Taylor project summary
Our Taylor project update has reaffirmed its potential to deliver attractive
returns as a large‑scale, long‑life, low-cost producer of zinc, silver and
lead. Key estimated economic outcomes from the project update are summarised
below. Unless stated otherwise, currency is in US dollars (real) and units are
metric.
Table 7: Estimated Taylor financial returns - stage one
Unit Project update((a)) Spot case((b))
Zinc revenue((c)) US$M ~10,800 ~11,150
Lead revenue((c)) US$M ~9,200 ~8,050
Silver revenue((c)) US$M ~12,600 ~19,000
Total revenue((c)) US$M ~32,600 ~38,200
Total EBITDA US$M ~18,900 ~24,200
Total net cash flow US$M ~12,200 ~16,350
Annual average EBITDA (steady state) US$M ~650 ~800
Average EBITDA margin (steady state) % ~58% ~64%
Annual average net cash flow (post tax, steady state) US$M ~500 ~650
Post tax NPV (real, 7.0% discount rate)(12) US$M ~3,100 ~4,500
Post tax IRR (nominal)12 % ~19% ~22%
a) Project update reflects values in real terms as at 1 July
2026.
b) As at April 2026.
c) Revenue is net of treatment and refining charges and
penalties.
12 Based on a valuation date of 1 July 2026.
Clark battery-grade manganese deposit
Clark is currently the only advanced project in the US with a clear pathway to
produce battery-grade manganese for the domestic electric vehicle market from
locally sourced ore. Recognising Clark's strategic importance, we have
received two grants from the US Government, with a US$20M grant from the US
Department of War used to part fund construction of the exploration decline,
and a US$166M grant from the US Department of Energy to support the potential
development of a future commercial-scale manganese production facility.
In FY23, we completed a selection phase pre-feasibility study (PFS-S) for
Clark, confirming the potential to produce ~185ktpa of high-purity manganese
sulphate monohydrate (HPMSM), together with zinc and silver by-products, over
an operating life of up to ~70 years(13).
Following the PFS-S, we undertook pilot-scale production of HPMSM, with
samples provided to potential customers for initial qualification. An
exploration decline to access the Clark orebody was completed on-schedule and
on-budget in the December 2025 quarter. This has enabled collection of the
first bulk ore sample and will provide the feedstock for an integrated test
plant (ITP). The ITP is expected to complete in FY27 and will inform flowsheet
and engineering design, while supporting further customer qualification.
Regional exploration
Hermosa hosts a highly prospective regional land package which offers the
potential for further polymetallic and copper resource growth. Since our
initial acquisition, we have more than doubled our land tenure in the most
prospective areas. We have used quantitative approaches utilising data
analysis, geophysics, soil sampling and mapping to identify a highly
prospective corridor with over 15 prospects identified for future drill
testing.
Within this corridor, the Flux prospect is located approximately 5km from
Taylor. The Flux prospect is located down-dip of a historic mining area, where
initial drilling has returned high-grade polymetallic intersections from
shallow depths, highlighting the potential for Taylor-like mineralisation.
Looking ahead, our exploration strategy will focus on prioritising, permitting
and drilling exploration prospects in this highly prospective corridor.
Figure 5: Hermosa land package and high priority corridor
13 The information in this announcement that refers to the Production Target
for Clark is based on Indicated (69%) and Inferred (31%) Mineral Resources and
was originally disclosed in "Hermosa Project Update" dated 9 May 2023. The
Mineral Resources underpinning the Production Target is based on Mineral
Resources disclosed in South32's Annual Report published on 28 August 2025 and
is available to view on www.south32.net. South32 confirms that all the
material assumptions underpinning the Clark Production Target as set out in
the ASX announcement dated 9 May 2023 continue to apply and have not
materially changed. There is low level of geological confidence associated
with Inferred Mineral Resources and there is no certainty that further
exploration work will result in the determination of Indicated Mineral
Resources or that the Production Target will be realised. The stated
Production Target for Clark is based on South32's current expectations of
future results or events and should not be solely relied upon by investors
when making investment decisions. Further evaluation work and appropriate
studies are required to establish sufficient confidence that this Production
Target will be met. South32 confirms that inclusion of 31% of Inferred Mineral
Resources is not the determining factor of the project viability and the
project forecasts a positive financial performance when using 69% Indicated
Mineral Resources. South32 is satisfied, therefore, that the use of Inferred
Mineral Resources in the Production Target for Clark is reasonable.
Update on estimates of Mineral Resources, Ore Reserves, and Exploration Target
for the Taylor deposit
The estimates of Mineral Resources and Ore Reserves are reported in accordance
with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves, 2012 (JORC Code) and the Australian Securities
Exchange Listing Rules. The breakdown of the total estimates of Mineral
Resources and Ore Reserves into the specific JORC Code categories is contained
in the Annexure 1 tables. This announcement summarises the information
contained in the JORC Code Table 1 which is included in Annexure 2.
Estimate of Mineral Resources for Taylor
Geology and geological interpretation
The Taylor deposit within the Hermosa project is a Carbonate Replacement
Deposit (CRD) style zinc-lead-silver massive sulphide deposit located in
south-eastern Arizona in the US (Annexure 2 - Figure 1). It is hosted in
Permian carbonates of the Pennsylvanian Naco Group within the Concha,
Scherrer, and Epitaph lithological units and the Jurassic Hardshell Volcanic
sequence (Annexure 2 - Figure 4).
The Taylor deposit comprises the upper Taylor sulphide and lower Taylor deeps
domains that have a general northerly dip of 30° and are separated by a low
angle thrust fault. Mineralisation within the stacked profile of the thrusted
host stratigraphy extends 1,200m from near-surface and is open at depth.
Mineralisation is modelled for an approximate strike length of 2,500m and
width of 1,900m (Annexure 2 - Figure 5 and Figure 6).
Drilling techniques
The Mineral Resource estimate is based on data from 740 surface diamond drill
holes (Annexure 2 - Figure 8) of HQ (95.6mm) or NQ (75.3mm) diameter. Since
August 2018, holes have been drilled between 60° and 75° dip to maximise the
angle at which mineralisation is intersected. Oriented drilling was introduced
in October 2018 to incorporate structural measurements into geological
modelling for stratigraphy and fault interpretation. In September 2020,
acoustic televiewer data capture was implemented for downhole imagery for most
drilling to improve orientation and geotechnical understanding. From September
2021 onwards, the acoustic televiewer was the sole drill core orientation
method applied. Structural measurements from oriented drilling are
incorporated in geological modelling to assist with fault interpretation.
All diamond core holes were used for geology, geometallurgy and geotechnical
purposes. The drill half cores were sampled at either 1.5m intervals or
terminated at litho-structural boundaries. Samples were submitted for
preparation at an external ISO-17025 certified laboratory, Australian
Laboratory Services (ALS). Preparation was completed by the ALS laboratory in
Tucson, Arizona, US and then chemical analyses was completed in Vancouver,
Canada. Preparation involved crushing to 2mm, a rotary split to 250g and
pulverisation to 85% passing 75µm from which a 0.25g pulp was measured for
assay. The mineralised intersections were verified by geologists throughout
each drilling program and reviewed independently against core photos by an
alternate geologist prior to geological interpretation.
Sample analysis method
Samples of 0.25g from 1kg pulps were processed at ALS Vancouver using a
combination of inductively coupled plasma - mass spectrometry ICP-MS four-acid
48 element assay and the addition of overlimit packages. A range of certified
reference materials (CRM) were routinely submitted to monitor assay accuracy,
with low failure rates within expected ranges for this deposit style,
demonstrating reliable laboratory accuracy.
External third-party laboratory pulp duplicate and CRM checks indicate no
significant bias for the primary assay laboratory. Results of field
duplicates, laboratory pulp duplicates, and certified blanks were all within
acceptable range for resource modelling.
Estimation methodology
Resource estimation was performed by ordinary kriging interpolation for four
elements of economic interest (Zn, Pb, Ag, Cu), three potentially
deleterious elements (As, Mn, Sb) and two estimation elements (Ca, S) used for
environmental reporting. Search estimation criteria were consistent with
geostatistical models developed for each estimation domain according to the
appropriate geological controls. Validation includes statistical analysis,
swath plots and visual inspection.
Specific gravity measurements from drill cores were used as the basis for
estimating dry bulk density in tonnage calculations for both mineralised and
non-mineralised material.
Mineral Resource classification
Mineral Resource classification criteria are based on the level of data
informing both the geological model and grade estimation. Grade estimation
confidence is overlain on the geological modelling classification criteria
whereby kriging variance is matched to block estimation conditions - that
relates to the number and distance of data informing the estimate in relation
to semivariogram models for Zn, Pb and Ag. Measured Resources are interpolated
from data within a range equivalent to a likely drill spacing of 30m to 50m.
Indicated Resources are estimated from data spacing within approximately 180m,
120m and 15m in the maximum, intermediate and short-range grade continuity
directions respectively. Inferred Resources are constrained by the reporting
of estimates to within demonstrated grade and geological continuity ranges,
and generally to a maximum of 250m beyond data.
Mining and metallurgical methods and parameters
Reasonable prospects for eventual economic extraction have been determined
through assessment of the Mineral Resource at a scoping study level for
processes, ranging from stope optimisation and mine scheduling through to
mineral processing and detailed financial modelling. Underground mining
factors and assumptions for longhole stoping on a sub- or full-level basis
with subsequent paste backfill are made based on industry benchmark mining
production and project related studies, and calibrated against South32's
Cannington zinc, lead and silver mine production.
Cut-off grade
The Taylor deposit of the Hermosa project is a polymetallic deposit which uses
an equivalent net smelter return (NSR) value as a grade descriptor. Input
parameters for the NSR calculation are based on South32's long-term forecasts
for zinc, lead and silver pricing, haulage, treatment, shipping, handling and
refining charges. Metallurgical recovery assumptions differ for geological
domains and vary from 85% to 92% for zinc, 89% to 92% for lead, and 76% to 83%
for silver. NSR considers the remaining gross value of the in-situ revenue
generating elements once processing recoveries, royalties, concentrate
transport, refining costs and other deductions have been considered.
A dollar equivalent cut-off of NSR US$90/dmt (dry metric tonne) forms the
basis of assessment for reasonable prospects for eventual economic extraction,
supported by scoping level studies.
Estimate of Ore Reserves for Taylor
The declared Ore Reserves are based on the updated Mineral Resource estimate
as at 30 April 2026.
Material and economic assumptions
The Taylor project is currently in the construction phase. Sufficient studies
have been undertaken to enable Mineral Resources to be converted to Ore
Reserves on the basis of detailed cost estimates and benchmarking of similar
South32 operations. The run-of-mine (ROM) ore will be beneficiated on site
before being transported by road to the port in Guaymas, Sonora in Mexico or
Corpus Christi, Texas in the US.
Capital costs are based on the expected development of the mine, supported by
contractor bids and engineering procurement activities. The costs are
accounted for in the valuation model. Operating costs are estimated primarily
using first principles and as part of the internal budgeting process.
Transport charges are based on estimates at the time of reporting. Other
economic assumptions used for valuation reflect South32's view on demand,
supply, volume forecasts, and competitor analysis and are commercially
sensitive.
Ore Reserve classification
Proved Ore Reserves are derived from the Measured Mineral Resource and
Probable Ore Reserves are derived from Indicated Mineral Resource estimate.
Internal dilution, defined as blocks with NSR value less than processing
operating cost, within Ore Reserve stope boundaries represents 17% of the Ore
Reserve by mass and less than 1% of NSR value and is considered to have the
same level of confidence as the reported Mineral Resource.
The Mineral Resource inside each stope is considered for Ore Reserve if the
Measured and Indicated Mineral Resources within the stope return positive
economic value (more than US$90/dmt) considering other material as waste.
Stopes within the life of operation plan are excluded from the Ore Reserve if
they are considered uneconomic, or where there is uncertainty in the modifying
factors.
Mining method and assumptions
The mine design for Taylor is a dual shaft underground mine with decline
access, employing longhole open stoping with paste backfill. The mine
development schedule has been aligned to a federal permitting process under
FAST-41, which enables earlier access to multiple mining areas and an
efficient ramp up to nameplate processing capacity of 4.3Mtpa.
Ore will be mined in an optimised sequence concurrently across four
independent mining areas, crushed underground and hoisted to the surface for
processing. The mine design contemplates two vertical shafts, for access, ore
hoisting, ventilation and cooling. The primary haulage and material handling
level is expected to be located at a depth of approximately 800m. The mine
design incorporates battery electric load-haul-dump vehicles, drilling and
ancillary fleets, resulting in improved efficiency, reduced diesel consumption
and greenhouse gas (GHG) emissions. We have embedded flexibility in the mine
design to utilise an all-electric underground fleet to reduce operational GHG
emissions as these options become commercially available. The operation will
be largely resourced with a local owner-operator workforce. Construction has
commenced for an integrated remote operations centre (iROC) located in
Nogales, Arizona. The iROC will monitor and control mining, processing,
maintenance and engineering to ensure the integration of activities and
optimise the entire value chain.
Mining dilution was derived from extensive geotechnical modelling. Anticipated
slough was applied to the stope shapes based on rock mass properties, in-situ
stress, stope dimensions and extraction sequencing. Average waste and backfill
dilution were calculated and applied to each stope. Stope optimisation was
performed using Deswik-SO and material below cut-off grade was allowed to be
included in the development of the stope shapes. The mining recovery factor is
based on the stope dimension and ranges from 95% to 96%.
Processing method and assumptions
The process plant design is based on a sulphide ore flotation circuit to
produce separate zinc and lead concentrates, with silver by-product credits.
The flowsheet adheres to conventional principles with an underground primary
crusher, crushed ore bins, comminution circuit, sequential flotation circuit,
thickening and filtration. Tailings are filtered and either dry-stacked or
converted to paste capable of being returned underground. Approximately half
of the planned tailings will be sent underground as paste fill, reducing the
surface environmental footprint. Pre-flotation cleaning steps have been
included in the plant design to prevent talc from affecting flotation
performance and concentrate quality. Jameson cell technology has been selected
to enhance recoveries and deliver power efficiencies. Once filtered,
concentrate would be loaded directly into specialised bulk containers.
Test work has confirmed the key processing assumptions, with average design
process recoveries of 90% for zinc and 91% for lead, and target concentrate
grades of 54% for zinc and 70% for lead. Silver primarily reports to the lead
concentrate, with a design process recovery of 81%. Additionally, silver
reports to the zinc concentrate with a design process recovery of 9%. The zinc
concentrate will be considered a clean, mid-grade product, and the lead
concentrate considered a clean, high-grade product with mid-range silver
content.
Cut-off grade
The Taylor deposit uses an equivalent NSR value as a grade descriptor. NSR
considers the remaining gross value of the in-situ revenue generating elements
once processing recoveries, royalties, concentrate transport, refining costs
and other deductions have been considered. The elements of economic interest
used for cut-off determination include silver, lead and zinc. The cut-off
grade strategy employed at Taylor is to optimise the NPV of the operation. A
variable cut-off grade was considered in the creation of mineable stope
shapes. Early mining area designed stope shapes greater than US$100/tonne.
Mid-mine life areas designed with US$95/tonne. Late mining areas designed with
US$80/tonne. After the mine was designed, all stopes with an NSR less than
US$90/tonne were excluded from the mine plan. All input assumptions are
included in Annexure 1 of this announcement.
Estimation methodology
The estimates for Proved and Probable Ore Reserves are defined based on
Measured and Indicated Mineral Resources. Stopes containing less than 50%
Measured and Indicated Resource, or where Measured and Indicated Resource
grade does not meet or exceed cut-off, are not included. Mine shapes not
meeting the above requirements are removed from the schedule. The resulting
Reserve plan is rescheduled and economically evaluated.
Material modifying factors
The reported Ore Reserves are those that are mined from underground using
current mining industry methods and practices. Early ore is contained on
claim. All ore is within South32 mining tenements. The Ore Reserves are
scheduled to be extracted within compliance of permits currently in progress.
Estimate of Exploration Target for Taylor
While exploration activity to date has predominantly focused on improving
resource definition to support the development of Taylor, work has also aimed
at developing an unconstrained, spatial view of the Exploration Target at
Taylor. The geological model interpreted from the results to date indicates
the potential for continued mineralisation down dip and along strike in the
favourable carbonate units. As a result of the improved understanding of the
Taylor sulphide deposit, an update to the Exploration Target has been
completed.
The Hermosa project has sufficient distribution of drill data to support
evaluation of the size and quality of Exploration Targets. Tables of
individual drill hole results to support the Taylor sulphide Exploration
Targets have been previously reported in several company disclosures from time
to time and is available to view at www.south32.net.
Deterministic estimates of maximum-case, mid-case, and minimum-case potential
volumes and grades within geological models were completed considering a range
of continuity assumptions and mineralisation extents consistent with available
data. These estimates were created using radial basis function (RBF) numeric
models following the same grade domain cut-offs as the Mineral Resource
Estimate using Leapfrog Geo 3D Modeling software. The Exploration Target
volumes were further improved by geologic trends and manual line work to
expand volumes along geologic contacts where drilling is too sparse for
implicit modelling. The volumes were clipped to the Mineral Resource boundary
to avoid double counting of tonnes. The Exploration Target reported in
Annexure 1 - Tables 7 and 8 is exclusive of the Mineral Resource reported. The
estimates were input into a Monte Carlo style Crystal Ball probabilistic model
to derive a statistically reasonable distribution of outcomes to create a low
and high case for Exploration Target range reporting. The Exploration Target
range is reported from 5Mt to 45Mt with grades ranging from 3.51% to 1.63% for
Zn, 3.88% to 2.02% for Pb, and 76 to 43g/t for Ag.
The potential quantity and grade represented in defining Exploration Targets
is conceptual in nature. There has been insufficient exploration to define a
Mineral Resource, and it is uncertain if further exploration will result in
the determination of a Mineral Resource. Future exploration drilling is
planned to follow up the reported Exploration Target. An exploration program
starting in FY28 will begin to test the Exploration Target. Drill holes will
have a planned depth ranging from 600m to 1,600m, depending on location. These
drill holes are intended to test extensions of the favourable
carbonate/volcanic contact down dip and along strike from open-ended
mineralisation and reduce geological uncertainty in future Exploration Target
modelling. Hermosa Exploration is also currently assessing additional
geophysical inversion modelling to refine targeting and improve subsurface
imaging, including ambient noise tomography (ANT) and magnetotellurics (MT).
Competent Person's Statement
The information in this announcement that relates to the Exploration Target
for the Taylor deposit is presented on a 100% basis, represents an estimate as
of 30 April 2026, and is based on information compiled by Robert Wilson. Mr
Wilson is a full-time employee of South32 and is a member of the Australasian
Institute of Mining and Metallurgy. Mr Wilson has sufficient experience
relevant to the style of mineralisation and type of deposit under
consideration, and to the activities being undertaken, to qualify as a
Competent Person as defined in the 2012 Edition of the 'Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves'. The
Competent Person consents to the inclusion in this announcement of the matters
based on his information in the form and context in which it appears.
Additional information is contained in Annexure 1 and 2.
Forward-looking statements
This release contains forward-looking statements, including statements about
trends in commodity prices and currency exchange rates; demand for
commodities; production forecasts; plans, strategies and objectives of
management; capital costs and scheduling; operating costs; anticipated
productive lives of projects, mines and facilities; and provisions and
contingent liabilities. These forward-looking statements reflect expectations
at the date of this release, however they are not guarantees or predictions of
future performance. They involve known and unknown risks, uncertainties and
other factors, many of which are beyond our control, and which may cause
actual results to differ materially from those expressed in the statements
contained in this release. Readers are cautioned not to put undue reliance on
forward-looking statements. Except as required by applicable laws or
regulations, the South32 Group does not undertake to publicly update or review
any forward-looking statements, whether as a result of new information or
future events. Past performance cannot be relied on as a guide to future
performance. South32 cautions against reliance on any forward-looking
statements or guidance.
About us
Our purpose is to make a difference by developing natural resources, improving
people's lives now and for generations to come. We are trusted by our owners
and partners to realise the potential of their resources. We produce minerals
and metals critical to the world's energy transition from operations across
the Americas, Australia and Southern Africa and we are discovering and
responsibly developing our next generation of mines. We aspire to leave a
positive legacy and build meaningful relationships with our partners and
communities to create brighter futures together.
Investor Relations Media Relations
Ben Baker Jamie Macdonald
T +61 8 9324 9363
T +61 8 9324 9000
M +61 403 763 086
M +61 408 925 140
E Ben.Baker@south32.net (mailto:Ben.Baker@south32.net)
E Jamie.Macdonald@south32.net
(mailto:Jamie.Macdonald@south32.net)
Further information on South32 can be found at www.south32.net
(http://www.south32.net) .
This announcement contains inside information.
Approved for release to the market by Graham Kerr, Chief Executive Officer
JSE Sponsor: The Standard Bank of South Africa Limited
30 April 2026
Annexure 1: Taylor, Peake Mineral Resource, Ore Reserve and Exploration Target
Table 1: Mineral Resource estimate for the Taylor deposit as at 30 April 2026
Ore Type Measured Indicated Inferred Total
Mineral Resources Mineral Resources Mineral Resources Mineral Resources
Mt % % g/t Ag Mt % % g/t Ag Mt % % g/t Ag Mt % % g/t Ag
Zn Pb Zn Pb Zn Pb Zn Pb
UG Sulphide((a)) 57 4.56 4.68 75 86 3.11 3.86 78 26 2.48 2.18 67 169 3.51 3.88 76
Mt - Million dry metric tonnes, % Zn - percent zinc, % Pb - percent lead, g/t
Ag - grams per tonne of silver.
a) Cut-off grade: Net Smelter Return (NSR) of US$90/dmt for UG
Sulphide.
b) Metallurgical recovery assumptions in Taylor Sulphide are
85-92% for zinc; 89-92% for lead, and 76-83% for silver.
c) All masses are reported as dry metric tonnes (dmt). All
tonnes and grade information have been rounded to reflect relative uncertainty
of the estimate, hence small differences may be present in the totals.
d) Mineral Resources are reported inclusive of Ore Reserves.
Table 2: Mineral Resource estimate for the Taylor deposit as at 30 June 2025
Ore Type Measured Indicated Inferred Total
Mineral Resources Mineral Resources Mineral Resources Mineral Resources
Mt % % g/t Ag Mt % % g/t Ag Mt % % g/t Ag Mt % % g/t Ag
Zn Pb Zn Pb Zn Pb Zn Pb
UG Sulphide((a)) 41 4.22 4.25 67 83 3.38 3.91 76 28 2.96 2.97 93 153 3.53 3.83 77
Mt - Million dry metric tonnes, % Zn - percent zinc, % Pb - percent lead, g/t
Ag - grams per tonne of silver.
a) Cut-off grade: NSR of US$80/dmt for UG Sulphide.
b) Metallurgical weighted recovery assumptions in Taylor
Sulphide are 90% for zinc; 91% for lead, and 81% for silver.
c) All masses are reported as dry metric tonnes (dmt). All
tonnes and grade information have been rounded to reflect relative uncertainty
of the estimate, hence small differences may be present in the totals.
d) Mineral Resources are reported inclusive of Ore Reserves.
Table 3: Ore Reserve estimate for Taylor deposit as at 30 April 2026
Ore Type Proved Ore Reserves Probable Ore Reserves Total Ore Reserves Reserve life
Mt % % g/t Mt % % g/t Mt % % g/t Years
Ag
Ag
Ag
Zn Pb Zn Pb Zn Pb
UG Sulphide((a)) 41 5.02 5.12 79 58 3.19 4.05 76 99 3.95 4.50 77 25
Mt - Million dry metric tonnes, % Zn - percent zinc, % Pb - percent lead, g/t
Ag - grams per tonne of silver.
a) Cut-off grade: NSR of US$90/dmt.
b) Metallurgical recovery assumptions in Taylor Sulphide are
85-92% for zinc; 89-92% for lead, and 76-83% for silver.
c) All masses are reported as dry metric tonnes (dmt). All
tonnes and grade information have been rounded to reflect relative uncertainty
of the estimate, hence small differences may be present in the totals.
Table 4: Ore Reserve estimate for Taylor deposit as at 30 June 2025
Ore Type Proved Ore Reserves Probable Ore Reserves Total Ore Reserves Reserve life
Mt % % g/t Mt % % g/t Mt % % g/t Years
Ag
Ag
Ag
Zn Pb Zn Pb Zn Pb
UG Sulphide((a)) - - - - 65 4.35 4.90 82 65 4.35 4.90 82 19
Mt - Million dry metric tonnes, % Zn - percent zinc, % Pb - percent lead, g/t
Ag - grams per tonne of silver.
a) Cut-off grade: NSR of US$90/dmt.
b) Metallurgical weighted recovery assumptions in Taylor
Sulphide are 90% for zinc; 91% for lead, and 81% for silver.
c) All masses are reported as dry metric tonnes (dmt). All
tonnes and grade information have been rounded to reflect relative uncertainty
of the estimate, hence small differences may be present in the totals.
Table 5: Mineral Resource estimate for the Peake deposit as at 30 April 2026
Ore Type Measured Indicated Inferred Total
Mineral Resources
Mineral Resources
Mineral Resources
Mineral Resources
Mt % % % g/t Mt % % % g/t Mt % % % g/t Mt % % % g/t
Cu Zn Pb Ag Cu Zn Pb Ag Cu Zn Pb Ag Cu Zn Pb Ag
UG Sulphide((a)) - - - - - - - - - - 33 0.87 0.28 0.32 36 33 0.87 0.28 0.32 36
Mt - Million dry metric tonnes, % Zn - percent zinc, % Pb - percent lead, g/t
Ag - grams per tonne of silver.
a) Cut-off grade: NSR of US$90/dmt for UG Sulphide.
b) Total metallurgical recovery assumptions are 73% for copper,
75% for Zn, 85% for Pb, and 52% for Ag in Pb Concentrate and 30% for Ag in Cu
Concentrate.
Table 6: Mineral Resource estimate for the Peake deposit as at 30 June 2025
Ore Type Measured Indicated Inferred Total
Mineral Resources
Mineral Resources
Mineral Resources
Mineral Resources
Mt % % % g/t Mt % % % g/t Mt % % % g/t Mt % % % g/t
Cu Zn Pb Ag Cu Zn Pb Ag Cu Zn Pb Ag Cu Zn Pb Ag
UG Sulphide((a)) - - - - - - - - - - 25 0.79 0.45 0.47 42 25 0.79 0.45 0.47 42
Mt - Million dry metric tonnes, % Zn - percent zinc, % Pb - percent lead, g/t
Ag - grams per tonne of silver.
a) Cut-off grade: NSR of US$80/dmt for UG Sulphide.
b) Total metallurgical recovery assumptions are 73% for copper,
75% for Zn, 85% for Pb, and 52% for Ag in Pb Concentrate and 30% Ag in Cu
Concentrate.
Table 7: Ranges for the Exploration Target for Taylor sulphide mineralisation
(as at 30 April 2026)
Low Case Mid Case High Case
Mt % % g/t Mt % % g/t Mt % % g/t
Ag
Ag
Ag
Zn Pb Zn Pb Zn Pb
Taylor Sulphide((a)) 5 3.51 3.88 76 25 3.62 4.61 71 45 1.63 2.02 43
Mt - Million dry metric tonnes, % Zn - percent zinc, % Pb - percent lead, g/t
Ag - grams per tonne of silver.
a) Cut-off grade: NSR of US$90/dmt for UG Sulphide.
b) Total metallurgical recovery assumptions are 85-92% for zinc,
89-92% for lead, and 76-83% for silver.
Table 8: Ranges for the Exploration Target for Taylor sulphide mineralisation
(as at 31 January 2024)
Low Case Mid Case High Case
Mt % % g/t Mt % % g/t Mt % % g/t
Ag
Ag
Ag
Zn Pb Zn Pb Zn Pb
Taylor Sulphide((a)) - - - - 33 3.60 3.69 72 64 3.58 3.57 73
Mt - Million dry metric tonnes, % Zn - percent zinc, % Pb - percent lead, g/t
Ag - grams per tonne of silver.
a) Cut-off grade: NSR of US$80/dmt for UG Sulphide.
b) Total metallurgical recovery assumptions are 90% for zinc,
91% for lead, and 81% for silver.
Annexure 2: JORC Table 1
The following table provides a summary of important assessment and reporting
criteria used at the Hermosa project for the reporting of the Taylor deposit
Mineral Resource and Ore Reserve in accordance with the Table 1 checklist in
The Australasian Code for the Reporting of Exploration Results, Mineral
Resources and Ore Reserves (The JORC Code, 2012 Edition) on an 'if not, why
not' basis.
Section 1: Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria Commentary
Sampling techniques · The FY26 Taylor Mineral Resource Estimate is based on a database
comprising of 740 drill holes, including 166 historical reverse circulation
(RC/RCD) and 574 diamond core (DD) drill holes of primarily HQ and NQ sizes.
· In total, this database features approximately 634,100m of
drilling. 227 holes totalling approximately 51,653m are excluded from the
database where twinned holes were drilled or where the quality of drilling was
compromised due to deficiencies in logging, survey, lack of assays, or quality
assurance/control.
· 70 drill holes were used to refine the geological model but were
not used in estimation.
· A heterogeneity study was undertaken in FY24 to determine sample
representativity with recommendations to improve duplicate performance
including increasing sub-sample and pulverising volumes.
· Sampling is predominantly at 1.5m intervals on a half-core basis.
· Core is competent to locally vuggy and sample representativity is
monitored using half core field duplicates submitted at a rate of
approximately 1:40 samples. Field duplicates located within mineralisation
envelopes demonstrate an 80% performance to within 30% of original sample
splits.
· Core assembly, interval mark-up, recovery estimation (over the 3m
drill string) and photography are all activities that occur prior to sampling
and follow documented procedures.
· Sample size reduction during preparation involves crushing and
splitting of PQ (122.6mm), HQ (95.6mm) or NQ (75.3mm) half-cores.
· All 1.5m half core samples are crushed to 70% passing
two-millimetre mesh and reduced to 1kg. 1kg sample is pulverised to 85%
passing 75µm. Samples of 0.25g from pulps are processed at ALS (Australian
Laboratory Services) Vancouver using a combination of inductively coupled
plasma - mass spectrometry ICP-MS (ME-MS61) four-acid 48 element assay and
addition of overlimit packages of OG62 for Ag, Pb, Zn, Mn, S-IR07 for sulphur,
VOL50 for high grade Zn, VOL70 for high grade Pb, and ME-ICP81 for higher
grade Mn.
Drilling techniques · Data used for reporting results is based on logging and sampling
of PQ, HQ, and NQ diamond core. Triple and split-tube drilling methods are
employed in situations where ground conditions require such coring mechanisms
to improve core recovery.
· From mid-August 2018 until September 2021, all drill cores were
oriented using the Boart Longyear 'Trucore' system. In Q3 FY20, acoustic
televiewer data capture was implemented for downhole imagery for most drilling
to improve orientation and geotechnical understanding. From September 2021,
the acoustic televiewer was the sole drill core orientation method applied.
Structural measurements from oriented drilling are incorporated in geological
modelling to assist with fault interpretation.
Drill sample recovery · Core recovery is determined by summation of measurement of
individual core pieces within each 3m drill string during the logging
process.
· Core recovery is recorded for all diamond drill holes. Recovery
on a hole basis exceeds 90%.
· Poor core recovery can occur when drilling through the oxide
material and in major structural zones. To maximise core recovery, drillers
vary speed, pressure, and composition of drilling muds, reduce PQ to HQ to NQ
core size and use triple tube and '3 series' drill bits.
· When core recovery is compared to Cu, Zn, Pb, and Ag grades for
either a whole data set or within individual lithology, there is no
discernible relationship between core recovery and grade.
· Correlation analysis suggests there is no relationship between
core recovery and depth from surface except where structure is a
consideration. In isolated cases, lower recovery is observed at intersections
of the carbonates with a major thrust structure, or when locally natural
karstic voids have been encountered alongside shallow historic workings.
Logging · The entire length of core is photographed and logged for
lithology, alteration, structure, rock quality designation (RQD) and
mineralisation.
· Logging is both quantitative and qualitative, of which there are
several examples including estimation of mineralisation percentages and
association of preliminary interpretative assumptions with observations.
· All logging is peer reviewed against core photos. The context of
current geological interpretation and information from surrounding drill holes
are used when updating geological model.
· Geologic and geotechnical logging is recorded on a tablet with
inbuilt Quality Assurance and Quality Control (QA/QC) processes to minimise
entry errors before synchronising with the site database.
· Logging is completed to an appropriate level to support
assessment of mineral resource estimates and exploration results.
Sub-sampling techniques and sample preparation · Sawn half core samples are taken on predominantly 1.5m intervals
for the entire drill hole after logging. Mineralisation is highly visual.
Sampling is also terminated at
litho-structural and mineralogical boundaries to reduce the potential for
boundary/dilution effects on a local scale.
· Sample lengths vary between 0.6m and 3m. The selection of the
sub-sample size is not supported by sampling studies.
· All sample preparation is performed offsite at Australian
Laboratory Services (ALS), an ISO 17025 certified laboratory. Samples
submitted to ALS are generally four to six kilograms in weight.
· Sample size reduction during preparation involves crushing of PQ
(122.6mm), HQ (95.6mm) or NQ (75.3mm) half or whole core, splitting of the
crushed fraction, pulverisation, and splitting of the sample for analysis.
· Core samples are crushed and rotary split in preparation for
pulverisation. Depending on the processing facility, splits are completed via
riffle or rotary. Splits are used for pulp samples.
· Samples are crushed to 70% passing two-millimetre mesh. A 1kg
split of crushed sub-sample is obtained via rotary or riffle splitter and
pulverised to 85% passing 75µm. The 1kg pulp samples are taken for assay, and
0.25g splits are used for digestion.
· ALS protocol requires five percent of samples to undergo a random
granulometry QC test. Samples are placed on a 2mm sieve and processed
completely to ensure the passing mesh criterion is maintained. Pulps undergo
comparable tests with finer meshes. Results are uploaded to an online portal
for review by the client.
· The sub-sampling techniques and sample preparation procedures
employed are adequate for generating reliable assay data necessary for the
reporting of exploration results.
· Precision in sample preparation is monitored with blind
laboratory duplicates assayed at a rate of 1:50 submissions.
· Coarse crush preparation duplicate pairs show that more than 85%
of all Cu, Zn, Pb, and Ag pairs for sulphide mineralisation report within
+/-30% of original samples. Performance significantly improves to 98.5% for
all analytes in higher grade samples. With Cu and Zn reporting 100% pass
rates.
· Pulp duplicates for Ag pass at 83%, Cu at 90%, Pb at 87%, and Zn
at 92% within +/-20% tolerances. For higher pulp grade samples, the
performance improves to 99% or higher for all elements of concern.
Quality of assay data and laboratory tests · Historical descriptions of the analytical techniques conducted by
ASARCO from 1950-1991 for 113 drill holes (15 drill holes are used in this
mineral resource) from ASARCO AC (air circulation), RAB (rotary air blast), RC
(reverse circulation) and DD (diamond drilling) are not available. As infill
drilling continues near the original 113 drill holes, historical data is
updated with modern techniques.
· From 2006 to 2009, Arizona Mining Inc (AMI) used Skyline
Laboratories sampling with ICP-AES with atomic absorption spectrometry (AAS)
to test for copper, lead, zinc and manganese after a multi-acid digestion.
Silver and gold fire assays were undertaken by Assayers Canada in Vancouver
from a split of each pulp using a 30g charge that was reduced in weight on
occasion for high manganese oxide samples. In 2006, 4,272 ASARCO pulp samples
(90% of sampling except for the silver, where the re-analysis program
represented 77% of the total silver assays) were re-analysed to validate the
copper, lead, zinc and manganese assay results.
· In 2010 to 2012, AMI changed to Inspectorate in Reno, Nevada
laboratories for gravimetric fire assay of gold and silver, with repeat assays
of silver values greater than 102g/t (3 ounces per US ton).
· From 2014 to 2020, samples of 0.25g from pulps were processed at
ALS Vancouver. ME-ICP61 analysis was used where the samples were totally
digested using a four-acid method followed by analysis with a combination of
Inductively Coupled Plasma - Mass Spectrometry (ICP-MS) and Inductively
Coupled Plasma - Atomic Emission Spectroscopy (ICP-AES) determination for 33
elements. Overlimit values for Ag, Pb, Zn and Mn utilise OG-62 analysis.
· In November 2020, the analytical method improved with ME-MS61 for
the four-acid 48 element assay. Samples of 0.25g from 1kg pulps were processed
at ALS Vancouver using a combination of inductively coupled plasma - mass
spectrometry ICP-MS (ME-MS61) four-acid 48 element assay and addition of
overlimit packages of OG62 for Cu, Ag, Pb, Zn, Mn, S-IR07 for sulphur, VOL50
for high grade Zn, VOL70 for high grade Pb, and ME-ICP81 for higher grade Mn.
· Digestion batches comprising 36 samples plus four internal ALS
control samples (one blank, two certified reference material (CRM), and one
duplicate) are processed using four-acid digestion. Analysis is conducted in
groups of three larger digestion batches. Instruments are calibrated for each
batch before and after analysis.
· The performance of ALS internal QA/QC samples is continuously
monitored. In the event of a blank failure, the entire batch is re-processed
from the crushing stage. If one CRM fails, data reviewers internal to ALS
examine the location of the failure in the batch and determine how many
samples around the failure should be re-analysed. If both CRMs fail, the
entire batch is re-analysed. No material failures have been observed from the
data.
· Coarse and fine-grained certified silica blank material
submissions, inserted at the beginning and end of every work order of
approximately 200 samples, indicate a lack of systematic sample contamination
in sample preparation and ICP solution carryover. Systematic contamination
issues are not observed for the blanks.
· A range of CRMs are submitted at a rate of 1:40 samples to
monitor assay accuracy. All CRMs near mineralised intervals passed QA/QC.
· The nature and quality of assaying and laboratory procedures are
appropriate for supporting the disclosure of mineral resource estimates and
exploration results.
Verification of sampling and assaying · Core photos of the entire hole are reviewed by modelling
geologists to verify significant intersections and to finalise the geological
interpretation of core logging.
· In September of 2023, the database was migrated from a software
as a service (SAAS) product (Plexer) to an internally hosted web application
and database (acQuire) hosted on South32's Azure environment. Geological data
is uploaded via the acQuire Arena web application by onsite geologists.
Laboratory information management system (LIMS) data from the ALS laboratory
is uploaded digitally using an import object that writes directly to the
acQuire database. Uploaded results are reconciled after this import process
utilising quality control (QC) objects within the acQuire 4 interface.
· No adjustment to assay data has been undertaken.
Location of data points · Drill hole collar locations are surveyed using a GPS Real Time
Kinematic (RTK) rover station correlating with the Hermosa project RTK base
station and Global Navigation Satellite Systems with up to 1cm accuracy.
· In August 2023, the downhole survey tool switched to the Reflex
OMNIx42 multi-shot survey tool with Earth rate delta recorded, and surveys are
rejected and reshot if the delta is above a set threshold. From mid-August
2018 to end-August 2023, surveys were undertaken with a 'TruShot' single shot
tool. In August 2019, downhole survey incidence was increased from every 76m
and at the bottom of the hole to every 30m and at the bottom of the hole.
· The Hermosa project uses the Arizona State Plane (grid)
Coordinate System, Arizona Central Zone, and International Feet. The datum is
NAD83 with the vertical heights converted from the ellipsoidal heights to
NAVD88 using GEOID12B.
· All drill hole collar and downhole survey data was audited
against source data.
· Survey collars have been compared against a 1ft topographic
aerial map. Discrepancies exceeding 1.8m were assessed against a current
aerial flyover and the differences attributed to surface disturbance from
construction development and/or road building.
· Survey procedures and practices result in data location accuracy
suitable for the information disclosed in this announcement.
Data spacing and distribution · Drill hole spacing ranges from 10m to 500m. The spacing supplies
sufficient information for geological interpretation and mineral resource
estimation.
· Drill holes are composited to nominal 5ft (1.5m) downhole
composites.
Orientation of data in relation to geological structure · Mineralisation varies in dip. 30°NW in the upper Taylor Sulphide
20°N and 30°N in the lower Taylor Deeps.
· Drilling is oriented at a sufficiently high angle and close drill
spacing to allow for accurate representation of grade and tonnage using
three-dimensional modelling methods.
· There is indication of sub-vertical structures, conduits for or
offsetting mineralisation, which have been accounted for at a regional scale
through the integration of mapping and drilling data. Angled, oriented core
drilling introduced from October 2018 is designed to improve understanding of
the relevance of structures to mineralisation as well as the implementation of
acoustic televiewer capture in 2020.
Sample security · Samples are tracked and reconciled through a sample numbering and
dispatch system from site to the ALS sample distribution and preparation
facility in Tucson or other ALS preparation facilities as needed. The ALS LIMS
assay management system provides an additional layer of sample tracking from
the point of sample receipt. Movement of samples from site to the Tucson
distribution and preparation facility is currently conducted through
contracted transport. Distribution to other preparation facilities and
Vancouver is managed by ALS dedicated transport.
· Assays are reconciled and results are processed in a secure
database (acQuire) which has password and user level security.
· Core is stored in secured onsite storage prior to processing.
After sampling, the remaining core, returned sample rejects and pulps are
stored at a purpose-built facility that has secured access.
· All sampling, assaying and reporting of results are managed with
procedures that provide adequate sample security.
Audits or reviews · The FY26 Mineral Resource was externally audited by an
independent consultant. The audit concluded that the information used in the
resource estimation is managed to industry standard.
· The ALS laboratory sample preparation and analysis procedures
were audited by internal South32 Geoscientists during the drilling campaign
with no significant issues identified. Outcomes of the audit were communicated
to ALS and recommendations implemented.
· Recent changes to improve duplicate performance by increasing the
size of sub-sample splits and pulverising volumes have been implemented.
Section 2: Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria Commentary
Mineral tenement and land tenure status · The Hermosa project mineral tenure (Annexure 2 - Figure 1 and
Figure 2) is secured by 30 patented mining claims totalling 228 hectares that
have full surface and mineral rights owned fee simple. These claims are
retained in perpetuity by annual real property tax payments to Santa Cruz
County in Arizona and have been verified to be in good standing until 31
December 2026.
· The patented land is surrounded by 2,505 unpatented lode mining
claims totalling 19,225 hectares. These claims are retained through payment of
federal annual maintenance fees to the Bureau of Land Management (BLM) and
filing record of payment with the Santa Cruz County Recorder. Payments for
these claims have been made for the period up to their annual renewal on or
before 1 September 2026.
· Title to the mineral rights is vested in South32's wholly owned
subsidiary South32 Hermosa Inc. No approval is required in addition to the
payment of fees for the claims.
· AMI purchased the project from ASARCO, but no legacy royalties,
fees or other obligations are due to ASARCO or its related claimants (i.e. any
previous royalty holders under ASARCO royalty agreements). At present, four
separate royalty obligations apply to the Hermosa project (Annexure 2 - Figure
3):
o Ozama River Corporation: A 2% NSR royalty payable by AMI to Ozama River
Corporation (Ozama) for the future sale of all production minerals from
certain identified claims.
o Osisko Gold Royalties Ltd.: A 1% NSR royalty to Osisko Gold Royalties Ltd.
(Osisko) on all sulphide ores of lead and zinc (and any copper, silver or gold
recovered from the concentrate from such ores) in, under, or upon the surface
or subsurface of the Hermosa project.
o Bronco Creek Exploration, Inc.: A 2% NSR Allis Holdings Arizona.
o LLC: A 1.5% NSR royalty on all production minerals extracted from three
patented mining claims consisting of approximately 60.94 acres (24.66
hectares).
· In addition to the 30 patented mining claims with the surface and
mineral rights owned fee simple, South32 Hermosa Inc. also owns other fee
simple properties totalling 1,609 hectares which are not patented mining
claims, and which are a mix of residential and vacant properties.
Exploration done by other parties · ASARCO LLC (ASARCO) acquired the property in 1939 and completed
intermittent drill programs between 1940 and 1991. ASARCO initially targeted
silver and lead mineralisation near historical workings of the late 19th
century. ASARCO identified silver-lead-zinc bearing manganese oxides in the
manto zone of the overlying Clark deposit between 1946 and 1953.
· Follow up rotary air hammer drilling, geophysical surveying,
detailed geological, and metallurgical studies on the manganese oxide manto
mineralisation between the mid-1960's and continuing to 1991 defined a heap
leach amenable, low-grade manganese and silver resource reported in 1968,
updated in 1975, 1979 and 1984.
· In March 2006, AMI purchased the ASARCO property and completed a
re-assay of pulps and preliminary SO(2) leach tests on the manto
mineralisation to report a Preliminary Economic Assessment (PEA) in February
2007. Drilling of RC and diamond holes between 2006 and 2012 focused on the
Clark deposit (235 holes) and early definition of the of the Taylor deposit
sulphide mineralisation (16 holes), first intersected in 2010. Data collected
from the AMI 2006 campaign is the earliest information contributing to
estimation of the Taylor deposit Mineral Resource. AMI drill programs between
2014 and August 2018 (217 diamond holes) focused on delineating Taylor deposit
sulphide mineralisation, for which Mineral Resource estimates were reported in
compliance to NI 43-101 (Foreign Estimate) in November 2016 and January 2018.
Geology · The regional geology is set within Lower-Permian carbonates,
underlain by Cambrian sediments and Proterozoic granodiorites. The carbonates
are unconformably overlain by Triassic to late-Cretaceous volcanic rocks
(Annexure 2 - Figure 4). The regional structure and stratigraphy are a result
of late-Precambrian to early Paleozoic rifting, subsequent widespread
sedimentary aerial, and shallow marine deposition through the Paleozoic Era,
followed by Mesozoic volcanism and late batholitic intrusions of the Laramide
Orogeny. Mineral deposits associated with the Laramide Orogeny tend to align
along regional NW and NE structural trends.
· Cretaceous-age intermediate and felsic volcanic and intrusive
rocks cover much of the Hermosa project area and host low-grade disseminated
silver mineralisation, epithermal veins and silicified breccia zones that have
been the source of historic silver and lead production.
· Mineralisation styles in the immediate vicinity of the Hermosa
project include the carbonate replacement deposit (CRD) style zinc-lead-silver
base metal sulphides of the Taylor deposit and the lateral skarn-style
copper-zinc-lead-silver Peake deposit, and an overlying manganese-zinc-silver
oxide manto deposit of the Clark deposit (Annexure 2 - Figure 5, Figure 6, and
Figure 7).
· The Taylor deposit comprises the overlying Taylor Sulphide and
Taylor Deeps domains separated by a thrust fault.
· The north-bounding edge of the thrusted carbonate rock is marked
by a thrust fault where it ramps up over the Jurassic/Triassic 'Older
Volcanics' and 'Hardshell Volcanics'. This interpreted pre-mineralising
structure that created the thickened sequence of carbonates also appears to be
a key mineralising conduit. The thrust creates a repetition of the carbonate
formations below the Taylor Sulphide domain, which hosts the Taylor Deeps
mineralisation.
· The Taylor Deeps mineralisation dips 10°N to 30°N, is
approximately 100m thick, and primarily localised near the upper contact of
the Concha Formation and unconformably overlying Older Volcanics. Some of the
higher-grade mineralisation is also accumulated along a westerly plunging
lineation intersection where the Concha Formation contacts the Lower Thrust.
Mineralisation has not been closed off down-dip or along strike.
Drill hole information · The Taylor deposit drill hole information, including tabulations
of drill hole positions and lengths, is stored within project data files
created for this estimate on a secure server.
· Hole depths vary between 15m and 2075m and have been collared
across the patented land block (Annexure 2 - Figure 8).
Data aggregation methods · Data is not aggregated other than length-weighted compositing for
grade estimation.
Relationship between mineralisation widths and intercept lengths · Vertical (90-85 degrees dip) and angled drilling is used in the
creation of the geology model. For vertical holes, where they intersect the
low to moderately dipping (30 degree) stratigraphy, the intersection length
can be up to 15% longer than true width.
· Since August 2018, drilling has been intentionally angled between
60 and 85 degrees to maximise the angle at which mineralisation is
intersected.
· The mineralisation is modelled in 3D to appropriately account for
sectional bias or apparent thickness issues which may result from 2D
interpretations.
Diagrams · Relevant maps and sections are included with this announcement.
Balanced reporting · Exploration results are not specifically reported as part of this
disclosure.
Other substantive exploration data · Aside from drilling, the geological model is compiled from local
and regional mapping, geochemistry sampling and analysis and geophysical
surveys. Metallurgical test work, specific gravity sampling and preliminary
geotechnical logging have contributed to evaluating the potential for
reasonable economic extraction at a scoping study level.
Further work · Planned elements of the resource development strategy include
extensional and infill drilling, all oriented and logged for detailed
structural and geotechnical analysis, sample representivity determination,
comprehensive specific gravity sampling and moisture analysis, further
geophysical, geochemical and geotechnical analysis, and structural and
paragenesis studies.
Section 3: Estimation and Reporting of Mineral Resources
(Criteria listed in section 1, and where relevant in section 2, also apply to
this section.)
Criteria Commentary
Database integrity · Drill hole data is stored in an internally hosted database hosted
on South32's Azure environment. Collar, survey, sample dispatch data and
analytical results are uploaded from csv files as they become available. The
upload process includes validation checks for consistency and anomalous
values.
· Digital logging was implemented in October 2018 and continued
with an internally hosted web application whereby this data is generated as
csv files for upload and validation.
· All logging is peer reviewed by experienced geologists against
core photos and in the context of surrounding geological interpretation as
part of update of the geological model.
Site visits · The Competent Person has reviewed the Taylor deposit Mineral
Resource Estimates and visited the site regularly as a full-time employee of
the company prior to recent retirement.
· The site visit objectives are to understand all inputs and
processes contributing to the FY26 Mineral Resources including core drilling,
changes in core logging procedures, digital core logging, database audits and
resampling programs to improve confidence in geological interpretation,
density estimation and geometallurgical inputs.
· The Competent Person discussed sample preparation and laboratory
procedures with ALS representatives to ensure that these procedures are
applied.
· The findings of site visits indicate the data and procedures are
of sufficient quality for Mineral Resource estimation and reporting. Review
and required improvement are continuously discussed and required changes are
implemented.
Geological interpretation · 'Mineralisation domains' are created within bounding lithologies
using indicator modelling methods of the cumulative in situ value of metal
content. The metal content descriptor, "Metval" and "Oxval", is calculated by
summing the multiplication of economic analyte grades for Mn, Zn, Pb, Cu and
Ag, price, and recovery. Metval and Oxval cut-off ranges for mineralisation
domains ranged from US$7-50 for the different litho-structural domains.
Material above the Metval and Oxval cut-off is modelled utilising the
indicator numerical model function in Leapfrog Geo™ to create volumes.
· Indicator models are guided using geologic trends based on
modeled lithologic contacts and structures within a post mineralisation fault
block model. Constraints on these domains include known bounding structures,
stratigraphy, and manually digitised limits on the extents of mineralisation.
In addition to drill hole data, historic underground mine plans and mapping
and surface geologic mapping is used to help extend geologic features to the
topography. The purpose of these domains is to provide mineralised volumes
within the larger lithologic boundaries, and to ensure relevant geological
controls and constraints are considered. Indicator cut-offs are selected to
create continuous volumes consistent with the overall modelling approach for a
CRD-style of mineralisation.
· Mineralised domains are evaluated against multiple indicator
scenarios for parameters such as inherent dilution, exclusion, and volumetric
changes to balance these parameters with understood continuity of
mineralisation from site geological staff interpretation.
· Alternate geological interpretations have not been used, however,
the model is evolving as new data is collected.
Dimensions · The mineralising system is yet to be fully drilled in multiple
directions. The Taylor sulphide mineralisation is constrained up-dip where it
transitions to oxide mineralisation, representing a single contiguous
mineralised system. Taylor is open in multiple directions.
· The north-bounding edge of the thrusted carbonate rock is marked
by a thrust fault where it ramps up over the Jurassic/Triassic 'Older
Volcanics' and 'Hardshell Volcanics'. This interpreted pre-mineral structure
that duplicated and thickened the sequence of carbonates also appears to be a
key conduit for mineralisation.
· The Taylor Sulphide Deposit has an approximate strike length of
2,500m and width of 1,900m. The stacked profile of the thrusted host
stratigraphy extends 1,200m from near-surface and is open in several
directions (Annexure 2 - Figure 6, Figure 7 and Figure 8).
Estimation and modelling techniques · Geologic modelling and grade estimations use Leapfrog Geo™ and
Maptek Vulcan, respectively.
· Elemental estimation includes Zn, Pb, Ag and Cu. As, Sb, Na, K,
Bi, Mn and Mg are estimated as potential deleterious analytes and Fe, Ca, S
and Mg are estimated as tonnage inputs.
· The specific gravity is also estimated using a restricted search
guided by geologic trends.
· Estimation and modelling techniques reflect the interpreted
structural and lithological controls on mineralisation apparent in the core
and data. These align with the current understanding of the formation of
CRD-style mineralisation. Key assumptions include:
o The relative importance of structure and lithology in either facilitating
or constraining the deposition of mineralisation;
o Geological domaining according to these controls; and
o All boundaries are considered 'hard'.
· Search orientations are aligned with mineralised structures and
lithological contacts using locally varying anisotropy to assign directions on
a block-by-block basis. Search distances and variography parameters are
interpolated into 'parent' blocks of 9m by 9m by 4.5m from 3D geological
wireframes taken from the geological model.
· Assay data is composited to a nominal interval of 1.5m within
mineralisation domains for the purpose of exploratory data analysis to derive
estimation parameters for ordinary kriging.
· To manage the risk of local grade overestimation, high-grade
outliers in the drill holes are capped prior to compositing. Cap values are
determined using log probability plots for each domain. Selected thresholds
are typically above the 99.5 percentile where the distribution or sample
support deteriorates and to minimise the co-efficient of variation. No bottom
caps are applied.
· The outputs of geostatistical analysis, including variography and
quantitative kriging neighborhood analysis (QKNA), are used to optimise grade
estimation parameters. This includes search distances, sample selection
criteria, and block dimension. A parent block size of 9m by 9m by 4.5m is
selected, relative to a data spacing of between 25m and 150m but typically
approximately 50m within the core of mineralisation allows for mining study
selectivity within the minimum selective mining unit (SMU) dimension.
· Sub-cells to a 1.5m minimum are built along the contacts of the
estimation domains to reduce the volume variance between wireframe models and
the orthogonal block model.
· The dimensions of the anisotropic search ellipses for each
estimation pass are matched to the ranges of the first and second structures
of the variograms per domain using ranges of the overall structure of grade
continuity for the zinc variogram models. The search ellipse ranges vary
between estimation domains but remain the same for all elements within
individual domains. While related elements (Pb-Ag, Pb-Zn, Ag-Zn) are not
co-kriged, their correlated nature is validated to be preserved in block
estimates.
· Minimum and maximum sample criteria, an octant search strategy
and a restriction of samples used from each drill hole are applied to help
reduce local grade bias. A second search pass, set at the entire range of the
zinc variogram, is used to estimate lower confidence areas of the model.
· Kriging tests with visual and statistical validation of results
indicate the appropriateness of an initial top cap applied, which is then
adjusted up or down to counter any introduced global bias. The degree of grade
smoothing between data and block values is analysed through comparison of mean
differences, histograms, q-q plots, and swath plots.
· Classification criteria constrain the reporting of estimates to
within demonstrated grade and geological continuity ranges. As all estimation
passes rely on at least two holes to inform the estimate, there is no
extrapolation from single holes in any classified material.
· The appropriateness of estimation techniques contributes to the
high confidence estimation outcome achieved in areas of data spacing within
the full ranges of grade continuity.
· The grade estimations are compared against previous estimates and
reviewed locally for differences in data/interpretation, as well as globally
using graded tonnage plots and waterfall analysis.
· The Mineral Resource is reported for Zn, Pb and Ag, without any
assumptions relating to recovery of by-products.
Moisture · Based on logging observations and pre- and post-dried sample
weights tested by ALS on assay samples from July 2019 to February 2022 on over
50,000m, moisture content of the core is minimal. A dry bulk density is
assumed for estimation and reporting purposes.
Cut-off parameters · NSR reporting cut-off values are based on relevant project study
operational costs and pricing scenarios. Application of a nominal lower limit
of breakeven economics from these costs is considered to have reasonable
prospects for eventual economic extraction under current economic modelling.
· The calculations for each block are used to determine resource
block cut-off according to variability of physical costs such as logistics,
treatment and refining costs, and economic factors such as metal pricing.
· The NSR cut-off values for reporting the FY26 Taylor Sulphide
Deposit Mineral Resource is US$90/dmt for material considered extractable by
underground open-stope methods.
· The input parameters for the NSR calculation include South32
long-term forecasts for manganese, zinc, lead, copper and silver pricing,
haulage, treatment, shipping, handling, and refining charges.
· NSR considers the remaining gross value of the in situ revenue
generating elements once processing recoveries, royalties, concentrate
transport, refining costs and other deductions have been considered.
Mining factors or assumptions · Underground mining factors and assumptions are based on
feasibility level project studies and are calibrated against South32's
Cannington zinc, lead, and silver mine production. Longhole stopes on a sub-
or full-level basis with subsequent paste backfill is the assumed mining
method.
· Reasonable prospects for eventual economic extraction are
determined through assessment of the model at scoping, feasibility
study/pre-feasibility study levels using processes ranging from stope
optimisation and mine scheduling through to detailed financial modelling.
Metallurgical factors or assumptions · The NSR block value incorporates metallurgical recovery based on
test work for composite and individual mineralisation domains.
· Total metallurgical recovery assumptions for sulphide are domain
dependent and as follows: Zn (85%-92%), Pb (89%-92%) and Ag (76%-83%).
Environmental factors or assumptions · Feasibility level environmental assumptions, including waste and
process residue disposal options, are factored into physical and financial
modelling used to evaluate reasonable prospects for eventual economic
extraction.
Bulk density · Dry bulk density is estimated for mineralisation domains where
data density is sufficient to estimate zinc on the first pass. Zinc variograms
and first pass search criteria are applied to density measurements. The
current database records 26,394 specific gravity (SG) measurements.
· SG was originally calculated beyond the range of the first pass
using Zn, Pb, Ag, Fe, Ca and Mg using a regression formula. Measurements from
previous campaigns, small numbers of which were taken from sulphide and oxide
mineralisation in carbonates, are excluded from the analysis as assaying did
not include the full complement of elements used for the regression formulae.
· A final pass of assigned average density values is applied to
fill blocks on the outskirts that did not have grade in them.
· Historically, SG measurements were taken from an approximate 20cm
representative section of competent core within a 1.5m sample interval. Since
May 2021, to improve the SG regression analysis the SG measurements are broken
out with an associated assay interval greater than 60cm. The measurement
technique uses the core weight in air and weight immersed in water to
determine a specific gravity. Routine calibration of scales and duplicate
measurements are undertaken for quality control.
· The core is not oven dried or coated to prevent water ingress
prior to immersion unless porosity is noted in the sample, in which case the
core was coated in plastic film.
· Lithology outside of mineralisation domains have an average bulk
density assigned by rock type.
Classification · Mineral Resource classification criteria are based on the level
of data informing the geological model and grade estimation.
· Classification is achieved by manual selection of blocks within a
triangulation designated by the Competent Person. The triangulation is a
smoothed version of a model calculation field.
· The calculation used to guide the Competent Person in creation of
the triangulation overlays grade estimation confidence indicators, such as
kriging variance, on block estimation conditions that relate to the number and
distance of data informing the estimate in relation to semivariogram models
for Mn, Zn, Pb, Cu and Ag.
· Classification criteria are determined on an individual
estimation domain basis:
o Measured Mineral Resource classification approximates an area of high
geological modelling confidence that has block grades for Mn, Zn, Pb and Ag
informed by a high number of data sourced within first pass search radii. The
block is also interpolated from data within a range equivalent to 'two-thirds'
of the variogram range.
o Indicated Mineral Resource classification meets similar conditions to that
of the Measured, except data spacing criteria are expanded to ranges matching
the final range in variography. Search ranges constraining this classification
are typically around 150m for Sulphide.
· Estimated blocks exceeding prior criteria are classified as an
Inferred Mineral Resource up to about 250m from contributing data.
· The FY19 through FY25 geological models were developed internally
by South32. Estimation up to FY23 has been a collaboration with SRK and
South32 geology staff, with internal South32 estimation starting in FY24. Peer
review at various stage gates of the modelling and estimation process was
conducted by South32.
Audits or reviews · The FY26 Mineral Resource estimate was reviewed by an Independent
Consultant. The outcome suggests the model is appropriate for mine planning
and reporting purposes. The recommendations will be attended to in the next
resource update.
Discussion of relative accuracy/confidence · Geological modelling is at a level where there is a moderate to
high degree of predictability of the position and quality of mineralisation
where infill drilling is being conducted. Geostatistical analysis indicates a
low nugget effect, and ranges of grade continuity are beyond drill spacing in
Measured and Indicated areas of the deposit.
· Measured Resources of the FY26 Taylor deposit Mineral Resource
global estimate are expected to be within 15% accuracy for tonnes and grade
when reconciled over any production quarter using mining assumptions matched
to the determination of reasonable prospects for eventual economic extraction.
Indicated Mineral Resource uncertainty should be limited to ±30% quarterly
and ±15% on an annualised basis. Inferred Mineral Resources are expected to
be converted to higher confidence classifications before extraction.
· The Competent Person is satisfied that the accuracy and
confidence of the Mineral Resource estimation is well established and
reasonable for the deposit.
Section 4: Estimation and Reporting of Ore Reserves
(Criteria listed in Section 1, and where relevant in Sections 2 and 3, also
apply to this section.)
Criteria Commentary
Mineral Resource estimate for conversion to Ore Reserves · The Ore Reserve estimation is based on 57Mt of Measured and 86Mt
of Indicated Mineral Resources as at 30 April 2026. The Mineral Resource
estimate has been updated and reported as part of this disclosure.
· Mineral Resources are inclusive of Ore Reserves.
Site visits · The Competent Person is a full-time employee of South32 and works
as the Manager of Project Strategy & Performance for Hermosa (site and
Tucson office). The Competent Persons reviewed all input that has been used as
modifying factors including understanding of legal and environmental
assessment.
Study status · A feasibility study (FS) was completed for the Taylor deposit in
2023 in compliance with the AACE International Class 3 cost estimation
standard. The study was reviewed in accordance with South32's internal
processes to validate all inputs and outcome.
· A technically achievable and economically viable mine plan was
developed as part of the FS.
· Additional work has been performed since FS, including detailed
engineering as part of project execution.
· All modifying factors have been reviewed based on the additional
work and are included in this announcement.
Cut-off parameters · Taylor is a polymetallic deposit which uses an equivalent NSR as
grade descriptor. NSR considers the remaining gross value of the in situ
revenue generating elements once processing recoveries, royalties, concentrate
transport, refining costs and other deductions have been considered.
· The elements of economic interest used for cut-off determination
include silver, lead and zinc.
· The cut-off strategy employed at Taylor is to optimise the NPV of
the operation. All material assumptions used to calculate NSR values are
included in this announcement.
· A variable NSR cut-off grade was used in the development of
mineable stope shapes. Early mining areas, Zones ABCD, designed stope shapes
with a minimum of US$100/tonne. Mid-mine life mining areas, Zone FG, designed
stope shapes with a minimum of US$95/tonne. Late mining areas, Zones EHJ,
designed stope shapes with a minimum of US$80/tonne.
· After development design and scheduling was completed, all stopes
with an NSR less than US$90/tonne were excluded from the mine plan.
Mining factors or assumptions · The mining method applied is longhole open stoping with paste
backfill. This is the preferred mining method based on a combination of
orebody geometry, productivity, cost, resource recovery and risk of surface
subsidence. (Annexure 2 - Figure 9: Mine design).
· Geotechnical recommendations based on deposit geology,
geotechnical data, and numerical modelling have been used to develop the stope
shape dimensions and preferred stope extraction sequence.
· There are three areas of varying stope dimensions in the Taylor
mine design. Above the Taylor thrust fault, stope dimensions are 27.4m high,
22.9m wide and between 15.2m and 36.6m long. Below the Taylor thrust level,
spacing remains at 27.4m but stope widths are reduced to 19.8m in accordance
with geotechnical modelling. Above the 1,122m elevation, stope dimensions have
been reduced to 19.8m high by 10.7m wide where appropriate, to be more
selective as the sulphide and oxide ore bodies overlap.
· Mining dilution was derived from extensive geotechnical
modelling. An in situ stress model was developed during the FS and was used to
quantify anticipated slough based on rock mass properties, in situ stress,
stope dimensions, and extraction sequencing. Internal ore dilution was ignored
and average external waste and backfill dilution were calculated and applied
to each stope. This methodology has remained unchanged since the previous
declaration.
· Stopes identified for the Ore Reserve estimation were created
using Deswik-SO (Stope Optimizer) without a limit on waste that could be
included in the stope shape. An analysis was completed on the stope shapes
created and it was found that 17% of tonnes within the stope shapes have
blocks with NSR grades less than US$20/tonne, representing a secondary
cut-off. This material could be optimised in short-range mine planning and is
considered as internal dilution within the reserve inventory.
· The mining recovery factor is based on the stope dimension and
ranges from 95% to 96%, with the greatest number of stopes having the 96%
factor. The recovery factor was applied to all stope tonnes.
· Inferred Mineral Resources were included in the development of
the mine plan. Inferred Mineral Resources were considered as diluting material
or waste. The total Inferred Resources considered in the mine plan constitutes
1% of the total tonnes.
· Primary access to the orebody will be through one of two shafts.
Ore passes, haulage levels and ventilation raises will be established to move
material internally within the mine and to provide ventilation and cooling.
Secondary access is achieved via continuing the existing decline from surface
to both the 3,680L and 2,550L stations.
· Underground mining equipment selected for use includes jumbo
development drills, ground support drills, LHD underground loaders, haul
trucks, and LH drills. This prime fleet is industry standard for this mining
method.
· Backfill of open voids will consist of waste rock or cemented
paste backfill. Paste backfill will be produced in a surface backfill plant
and distributed underground via a backfill reticulation system.
· The proposed mining method with modifying factors applied
supports a ramp up to the preferred mine plan of up to 4.3Mt per annum.
Metallurgical factors or assumptions · The Taylor process plant will consist of well-established
processing techniques. Primary crushing will be conducted underground, and
crushed ore will be hoisted to the surface. Grinding will be conducted by a
primary AG mill, secondary vertical tower mill, and pebble crusher, to a size
suitable for flotation. Sequential flotation will be followed by pressure
filtration for concentrates and tailings.
· Metallurgical test work has been conducted using samples which
cover the orebody vertically and horizontally. Process design was developed
based on the results from test work and has been reviewed by independent
consultants.
· Total metallurgical recovery assumptions differ between
geological domains ranges from 85% to 92% for Zn, 89% to 92% for Pb, and 76%
to 83% for Ag.
· Lead is found to occur primarily as galena and zinc is found to
occur primarily as sphalerite, with small amounts of non-sulphide zinc
occurring in the geological domains close to surface. Galena and sphalerite
are coarse grained and easily liberated for effective recovery by sequential
flotation.
· Manganese occurs in relatively high concentrations in gangue and
can occur as an inclusion of sphalerite especially in the higher geological
domains. This can cause manganese in zinc concentrate to exceed penalty limits
for most smelters. No other deleterious elements are expected to exceed
penalty limits for lead or zinc concentrates.
· Metallurgical test work programs have included:
o Comminution - crushing work index (CWi), rod work index (RWi), SAG power
index (SPi), Bond ball mill work index (BWi), abrasion index (Ai),
high-pressure grinding rolls (HPGR), SMC and JK drop weight tests, low-impact
energy test (formerly crushing work index), MacPherson autogenous grindability
test, and advance media competency tests (AMCT);
o Flotation - rougher variability, rougher and cleaner kinetics, primary
grind size variability, regrind size variability, conventional locked cycle
tests, dilution cleaner and dilution locked cycle tests (Jameson cell
amenability);
o Preconcentration - heavy media separation followed by flotation on HMS
concentrates and rejects and ore sorting;
o Stockpile oxidation simulation;
o Humidity cell testing;
o Cyanide destruction; and
o Solid-liquid separation testing.
· Metallurgical test work has been conducted at discrete drill hole
intervals to capture the full variability of the orebody as well as on
composite samples. Samples were selected from all geological domains and cover
the orebody vertically and horizontally.
Environmental factors or assumptions · The project consists of patented claims surrounded by the
Coronado National Forest and unpatented claims located within the surrounding
Coronado National Forest and managed by the United Sates Forest Service.
· A permitting schedule has been developed for obtaining all
critical state and federal approvals consistent with South32's Annual
Declaration of Resources and Reserves in the Annual Report published on 28
August 2025. A further schedule consistent with this updated declaration
will be developed in due course as planning efforts advance.
· Waste rock generated from surface and underground excavations is
delineated into potentially acid generating (PAG) or non-acid generating (NAG)
rock. As often as practical, waste rock excavated underground will remain
underground for use as backfill. All PAG material not being used as backfill
will report to a lined facility. NAG material not being used as backfill will
be placed in surface stockpiles or within the lined facilities, except for a
limited amount that will be used for construction material.
· The tailings storage facilities have been designed in accordance
with South32's Dam Management Standard and are consistent with the
International Council on Mining and Metals (ICMM) Tailings Governance
Framework, in addition to the Australian National Committee on Large Dams
(ANCOLD) guidelines.
· Tailings from processing will be filtered and stored in
purpose-built, lined, surface storage facilities or returned underground in
the form of paste backfill. An existing tailings storage facility on patented
claims will be used to store tailings from early operations.
Infrastructure · Current site activity is supported by and consists of office
buildings, core processing facilities, existing tailings storage facility,
water treatment plants, dewatering wells, ponds, road network and laydown
yards.
· Planned infrastructure currently in construction, or that will be
installed to support future operations, will consist of:
o Dual shafts;
o Decline extension (of exploration decline);
o Ventilation and refrigeration systems;
o Process comminution, flotation and concentrate loadout;
o Tailings filtration plant and tailings storage facilities;
o Paste backfill plant;
o Dewatering wells and pipelines;
o Surface shops, fuel bays, wash bays and office buildings;
o Powerlines and substations;
o Surface stockpile bins; and
o Underground maintenance shops and ore and waste storage.
· A site layout plan and construction schedule support the above
listed infrastructure.
Costs · The capital cost estimate is supported by sufficient engineering
scope and definition for preparation of an AACE International Class 2 cost
estimate.
· The operating cost estimate was developed in accordance with
industry standards and South32 project requirements.
· Mining costs were calculated primarily from first principles and
were substantiated by detailed labour rate calculations and vendor-provided
equipment operating costs. Materials and consumables costs were escalated
from the feasibility study's budgetary quotations by 6% and applied on a first
principles basis.
· Processing costs account for plant consumables and reagents,
labour, power and maintenance materials and tailings storage facility costs.
· General and administrative costs are based on current operating
structures and have been optimised based on industry benchmarks and
fit-for-purpose sizing. Permitting and environmental estimates are based on
current permitting timelines.
· Long-term commodity price forecasts for silver, lead and zinc,
and foreign exchange rates, are based on South32 internal analysis. Long-term
price protocol reflects South32's view of demand, supply, volume forecasts and
competitor analysis.
· Transportation charges have been estimated using information on
trucking costs, rail costs, export locations, transload capabilities and
transit time associated with moving concentrate from site to port to market.
· Treatment and refining charges used for valuation are based on a
long-term view of the refining costs and metal prices for zinc concentrate and
an average consensus view for lead concentrate.
· Applicable royalties and property fees have been applied using
current private royalty agreements.
Revenue factors · The life of operation plan provides the mining and processing
physicals such as volume, tonnes and grades, to support the valuation.
· Revenue is calculated by applying forecast metal prices and
foreign exchange rates to the scheduled payable metal. Metal payability is
based on contracted payability terms typical for the lead and zinc concentrate
markets.
Market assessment · The South32 price protocols reflect its view on demand and
supply, including customer analysis, competitor analysis, identification of
major market windows and volume forecasts.
Economic · Economic inputs are described in the cost, revenue, and
metallurgical factors commentary. Key economic assumptions are assessed in
ranging workshops with project and industry leaders to ensure base case
assumptions are appropriate.
· Sensitivity analyses have been completed on metal prices,
metallurgical recoveries, mine operating costs, growth capital costs and use
of Inferred Mineral Resources to understand the value drivers and impact on
valuation.
· Sensitivities were evaluated to assess the impact of changes in
mineable tonnes and head grades, initial capital expenditure, project
execution schedule, production ramp up period, steady-state production rate,
metallurgical recoveries, mining and processing operating costs, refining
costs, metal prices, and local and federal tax policy.
Social · South32 maintains relationships with stakeholders in its host
communities through structured and meaningful engagement including community
forums, industry involvement, employee participation, local procurement and
local employment.
· A community management plan has been developed in accordance with
the South32 Social Performance Standard and includes baseline studies,
community surveys, risk assessments, stakeholder identification, engagement
plans, cultural heritage, a community investment plan and closure and
rehabilitation.
Other · Hermosa has developed a comprehensive risk register and risk
management system to address foreseeable risks that could impact the project
and future operations.
· An assessment of physical climate risks((a)) in 2022 identified
climate hazards of concern for Hermosa including extreme rainfall and flooding
events, drought, increased wildfires and more extreme temperatures. However,
the 2022 assessment did not identify any material change to Hermosa's risk
profile as a result of considering the physical impacts of climate change.
· No other material naturally occurring risks have been identified
and the project is not subject to any material legal agreements or marketing
arrangements.
· The inclusion of Hermosa in the FAST-41 process is expected to
make federal permitting more efficient and transparent, supporting the
attainment of federal permits. The current, published date for a federal
permitting decision is in July 2026 and the Mine Plan of Operation (notice to
proceed) in September 2026.
Classification · Proved Ore Reserve is derived from Measured Mineral Resource and
Probable Ore Reserves is derived from Indicated Mineral Resource. Internal
dilution within Ore Reserve stope boundaries represents 17% of the Ore Reserve
by mass and is considered to have the same level of confidence as the reported
Mineral Resource.
· Inferred Mineral Resources are used to define the economic mining
limits but are excluded from the Ore Reserve estimate. The Taylor deposit is
well understood through drilling as defined by the high percentage of Proved
and Probable Ore Reserve.
· Ore Reserves are classified and reported in accordance with the
JORC Code guidelines. Modifying factors including stope size, stope geometry,
geotechnical parameters, mining cost, processing cost, metallurgical recovery,
transportation and refining costs and royalty fees have been applied
accordingly.
· The Ore Reserve classifications reflect the Competent Person's
view of the deposit.
Audits or reviews · An independent audit was completed by an independent consulting
firm. The following areas were identified to be considered in future Ore
Reserve updates:
o Create procedures and processes for variances prior to commencing
production
o Revisit recovery factors of small stope subshapes
o Revise cut-off grade strategy in future planning processes to reflect
changes in metal price and operating costs
Discussion of relative accuracy/confidence · Ore Reserve estimation techniques are robust and well understood.
The estimates are global with local estimates plan to be achieved following
grade control drilling during execution.
· Ore Reserves are based on a set of stopes of sufficient value to
maintain a stable reporting platform and positive NPV over an expected range
of modifying factors.
· Sensitivity analysis conducted on the feasibility evaluation
considered external factors (variances to ROM head grade, foreign exchange,
commodity prices, capital and operating costs, and mill recovery) and various
internal factors. The resultant NPV is sensitive to commodity price.
· Sufficient studies, reviews, and audits have been conducted both
internally and externally to confirm the modifying factors used.
· The Competent Person is comfortable that these estimates are
tabulated in accordance with the JORC guidelines and are suitable for the
reporting of Ore Reserves for the Taylor deposit.
(a) South32's physical climate risk assessment methodology is
presented in our Climate Change Action Plan 2022 which is available to view at
www.south32.net. (http://www.south32.net/)
Figure 1: Regional location plan
Figure 2: Hermosa project tenement map
Figure 3: Patented and unpatented claim boundaries and royalties
Figure 4: Hermosa project regional geology
Figure 5: Plan view of mineralisation domains with drilling
Figure 6: Oblique NE view of mineralisation domains and drilling
Figure 7: Cross section of geology and structure
Figure 8: Plan view of drilling locations
Figure 9: Taylor mine plan
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
or visit
www.rns.com (http://www.rns.com/)
.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
. END DRLMZGFDGGRGVZG
Copyright 2019 Regulatory News Service, all rights reserved