Picture of Resolute Mining logo

RSG — Resolute Mining News Story

0.000.00%
gb flag iconLast trade - 00:00
Basic MaterialsHighly SpeculativeMid CapNeutral

September 2026 Quarterly Activities Report

For best results when printing this announcement, please click on link below:
https://newsfile.refinitiv.com/getnewsfile/v1/story?guid=urn:newsml:reuters.com:20261029:nRSc8933Aa&default-theme=true

RNS Number : 8933A  Resolute Mining Limited  28 October 2026

() 29 October 2026

Q3 2026 Activities Report
For the Quarter ended 30 September 2026 (‘Q3’, ‘September Quarter’ or
‘the Quarter’)

Quarterly Highlights

•       Total Recordable Injury Frequency Rate (TRIFR) year-to-date
was 0.85 with four recordable injuries during the Quarter

•       Group gold production of 44,398 ounces (oz) (Q2 2026:
45,192oz) with operating performance in line with the operational update
provided on 21 September 2026

•       All-In Sustaining Costs (AISC) of $2,506/oz (Q2 2026:
$2,484/oz) as expected as costs and production across the Group was similar to
the prior Quarter

•       Q3 capital expenditure of $85.3 million (Q2 2026: $63.5
million) consisting of $18.6 million at Syama, $3.3 million at Mako, $10.5
million exploration capital spend, $52.9 million at Doropo

•       Q3 operating cash flow generation of $55.8 million (Q2 2026:
$77.4 million) (operating cash flow before capital expenditure, exploration,
and working capital)

•       Q3 EBITDA of $64.0 million (Q2 2026: $128.5 million) from
$142.9 million of revenue (Q2 2026: $247.1 million)

•       Net cash of $276.1 million (Q2 2026: $317.4 million),
including cash, cash equivalents and bullion of $330.3 million (Q2 2026:
$332.7 million). Drawn overdraft balances, Doropo financing and equipment
financing were $54.2 million (Q2 2026: $15.2 million)

•       Syama Sulphide Conversion Project (SSCP) commissioning nearing
completion

•       Doropo construction remains on track and on budget:

o       Completion of earthworks design, mobilisation of additional
contractors, commencement of concrete works and continued awarding of major
equipment and infrastructure packages

o       Approximately $315 million of total Project capital expenditure
has been committed (out of $516 million)

•       ABC Project completed over 23,000m of infill drilling as
project remains on track to complete infill drilling campaign by end of 2026

•       La Debo Project expanded Mineral Resource Estimate (MRE) of
23.5 Mt grading 1.2 g/t for 0.9 Moz of contained gold (at 0.5 g/t cut-off,
unconstrained)

•       Group production guidance revised to 205 - 225 koz guidance
range, as communicated in the operational update on 21 September 2026, Group
AISC of $2,250 - 2,350/oz

Note: Unless otherwise stated, all dollar figures are United States dollars
($). AISC guidance is based on $4,000/oz gold price.

 

 

Resolute Mining Limited (Resolute, the Company or the Group) (ASX/LSE: RSG),
the West Africa-focused gold miner, is pleased to present its Quarterly
Activities Report for the period ended 30 September 2026.

 

Chris Eger, Chief Executive Officer, commented,

 

“While Q3 began with operational challenges in Mali, Resolute made
meaningful progress across its key development and exploration projects with
activities across all other assets performing well. Overall I am pleased with
the results delivered throughout the Quarter.

 

Group production for the Quarter was 44,398 ounces at an AISC of $2,506 per
ounce. Mako continued to perform well, while Syama, as noted in the
operational update on 21 September 2026, was affected by slower-than-planned
open pit mining rates, intermittent underground explosives supply and plant
downtime. Mobilisation of additional equipment accelerated towards quarter
end, and commissioning of the Syama Sulphide Conversion Project continued as
we focus on improving production through the final quarter.

 

Doropo, our new mine under construction in Côte d'Ivoire, is progressing to
plan and on budget. The project is fully funded with $260 million of local
financing secured. During Q3, earthworks progressed across key project areas,
contractors continued to mobilise, concrete works commenced and major
equipment and infrastructure packages were awarded. The project remains
LTI-free, and the site workforce increased to more than 600 people.

 

At ABC, we completed approximately 24,000 metres of infill drilling during the
Quarter, with the programme expected to be completed by year-end. This work,
together with ongoing metallurgical, environmental and social studies, is
designed to advance the project towards an updated Mineral Resource Estimate
as well as the next phase of feasibility and permitting work.

 

As we move through the final quarter we expect a strong end to the year. Our
focus remains improving performance at Syama, ramping up the SSCP, maintaining
momentum at Doropo, progressing the Mako Life Extension Project and finishing
infill drilling at ABC.“

 

 

 

 

() Webcast and Conference Call

Resolute will host a conference call for investors, analysts, and media on 29
October 2026, to discuss the Company’s Quarterly Activities Report for the
period ending 30 September 2026. This call will conclude with a
question-and-answer session.

 

Conference Call: 8:00pm (AEDT, Sydney) / 9:00am (GMT, London)

 

Webcast registration link:
https://sparklive.lseg.com/ResoluteMiningLtdAustralia/events/bcc6e8d2-ea0b-4438-b51e-18b237c2227a/resolute-mining-ltd-q3-2026-conference-call
(https://sparklive.lseg.com/ResoluteMiningLtdAustralia/events/bcc6e8d2-ea0b-4438-b51e-18b237c2227a/resolute-mining-ltd-q3-2026-conference-call)

 

Written questions can be submitted using the ‘Ask a Question’ button on
the webcast page. Those wishing to ask questions as part of the Q&A should
use the conference call facility (please join five minutes prior to the start
time).

 

Conference call registration link:
https://registrations.events/direct/LON34665VIPG05DJQfix1OXqQ
(https://registrations.events/direct/LON34665VIPG05DJQfix1OXqQ)

 

A presentation, to accompany the call, will be available for download on the
Company’s website: https://www.rml.com.au/investors/presentations/
(https://www.rml.com.au/investors/presentations/)

() Group Operations Overview

 Group Summary                    Units  September  June       Nine Months  Nine Months

2026
2026
2026
2025

Quarter
Quarter
YTD
YTD
 Mining
 Ore Mined                        t      790,252    696,506    2,281,194    3,392,489
 Mined Grade                      g/t    2.09       1.87       2.07         2.02
 Processing
 Ore Processed                    t      1,213,152  1,385,172  4,231,336    4,628,717
 Processed Grade                  g/t    1.54       1.26       1.40         1.70
 Recovery                         %      80         82         80           83
 Gold Poured                      oz     44,398     45,192     149,193      211,318
 Sales
 Gold Sold                        oz     33,035     54,599     156,986      208,603
 Average Realised Price           $/oz   4,325      4,526      4,631        3,175
 Financials
 Capital & Expl. Expenditure      $m     85.3       63.5       182.4        68.9
 Net Cash                         $m     276.1      317.4      276.1        136.6
 AISC                             $/oz   2,506      2,484      2,379        1,834

Table 1: Resolute Group Operational Performance Summary

During the Quarter, Resolute processed over 1.21 Mt across Syama (Mali) and
Mako (Senegal) at an average milled head grade of 1.54 g/t. In Q3 the Group
produced 44,398 oz of gold at an AISC of $2,506/oz.

() Environmental and Social Update

 

Resolute’s year-to-date Total Recordable Injury Frequency Rate (TRIFR) as of
30 September 2026 was 0.85, with a Q3 TRIFR of 1.27 and four recordable
injuries during the quarter. Year-to-date performance remains significantly
better than the full-year 2025 TRIFR of 1.87, reflecting the Company’s
continued focus on strengthening safety performance and preventive controls.

 

In Q3, Resolute recorded no reportable environmental, community incidents, or
regulatory non-compliances.

 

In Senegal, technical validation of the Environmental and Social Impact
Assessment (ESIA) for all major components of the Mako Life Extension Project
(MLEP) has been received and now await ministerial environmental approval.
Formal community engagement is ongoing to finalise compensation entitlements
arising from land acquisition, resettlement and livelihoods restoration.

 

At the Doropo Project, Côte d’Ivoire, environmental and social plans and
procedures continued to be reinforced in support of construction ramp-up,
prioritising opportunities to enhance local economic participation through
project-related employment and procurement. Formal engagement structures have
been established to support local participation, including monthly meetings
with the Local Consultative Committee comprising representation from affected
villages.

 

Also in Côte d’Ivoire, Resolute appointed an ESIA consultant to advance the
technical environmental and social assessment of the ABC Project. An
Environmental and Social Scoping Report including ESIA Terms of Reference and
preliminary baseline studies, are scheduled for the end of 2026.

 

()

Côte d’Ivoire

()

Doropo Project

 

The Doropo Project is located in northeastern Côte d’Ivoire approximately
480km north of Abidjan. The Project is in construction and once commissioned
will be Resolute's third gold mine and its first in Côte d’Ivoire.

 

Overall, the project remains on track and on budget with first gold expected
in H1 2028 with pre-stripping activities commencing in Q2 2027.

 

Figure 1: Doropo Project Timeline

 

During the Quarter capital expenditure on Doropo was $52.9 million with
capital expenditure for the first nine months of 2026 totalling $93.1 million.
Approximately $315 million (61%) of total capex has been committed.

 

 

Quarterly Activities

 

During Q3, procurement and construction activities advanced to plan. The
Project achieved over 500,000 work hours without a lost time injury or medical
treatment injury, with the site workforce increasing to more than 600 people.
Post-quarter-end, the number of personnel on site increased to over 860, of
whom approximately 80% are nationals with 25% from the local region.

 

Several key construction, engineering and procurement activities advanced
during Q3. These included completion of earthworks design, mobilisation of
additional contractors, commencement of concrete works and the continued
awarding of major equipment and infrastructure packages.

 

Procurement

 

Key contracts awarded during the Quarter included:

•          structural and platework fabrication,

•          supply and installation of the High-Voltage ("HV")
powerline, switchyard and HV transformer

•          transport and logistics

•          concrete works

 

Process equipment awards included the CIL gantry crane, wet vibrating screens,
centrifugal gravity concentrators, intense cyanide leach reactor and mill
reline equipment.

 

Tendering progressed for the CIL tank installation, steel-framed buildings and
plant buildings, while procurement commenced for piping and electrical bulk
materials.

 

Earthworks design for the TSF, water storage dam, water harvesting dam,
airstrip, main access road and sediment control structures was completed
during the Quarter.

 

 

Site Preparation and Construction

 

Earthworks for the construction camp and mine village were completed, while
plant-site earthworks continued. Earthworks commenced at the mine services
area, electrical switchyard, TSF and water storage dam. The exploration camp
expansion was completed and handed over to Resolute.

 

Water supply development also advanced, with 26 exploration bore targets
drilled and 11 additional pads identified and permitted. Installation
activities commenced on the approximately 5.4km raw-water pipeline to the
process plant raw-water pond.

 

The construction camp and village contractor completed mobilisation, with
concrete and services installation commencing. The first construction camp
buildings arrived on site and assembly began. Communications infrastructure
also advanced with the erection of a 5G tower.

 

Concrete works progressed too with the mobilisation of the concrete
contractor, excavation of the CIL ring beams and for the SAG and ball mill
foundations. To date. approximately 210 tonnes of reinforcement steel had been
delivered, the first concrete batch plant was commissioned, and formwork and
reinforcement installation progressed on the CIL ring beams and grinding area
foundations.

 

Grid power workstreams progressed with contracts awarded for the substations,
90/11 kV transformers and 90kV HV Transmission Line.

 

 

 

 

 

 

Figure 2: Ring Beam foundations

 

Figure 3: CIL Tank No. 8 Ring Beam

 

Figure 4: Mill area raft foundation

 

Figure 5: Concrete Batch Plant Commissioned

 

Land Access and Community Engagement

 

Land compensation and acquisition for project infrastructure areas was
completed during the period, with access granted for early works areas.

 

Mining, Power and Owner’s Team

 

Tender evaluations progressed for the mining contractor, dewatering, grade
control, explosives infrastructure and fuel and lubricant supply packages. The
mine services area layout was also agreed.

 

The HV installation contractors mobilised during the Quarter. The solar power
plant tender was issued and bids were received, with tender adjudication
underway.

 

The owner’s team continued to expand through the addition of roles across
ESG, accounting, construction and security.

 

Land Access and Compensation

 

The land survey for the mining area was concluded during the Quarter.
Compensation was agreed for the starter pit, magazine and emulsion plant
areas.

 

Planned Activities

 

During Q4, activities are planned to focus on progressing the Project into
broader construction execution, including:

 

•          Progressing the construction camp towards completion,
with the progressive handover of accommodation rooms, and commencing mine
village installation

•          Completing plant-site and mine services area bulk
earthworks and continuing works on the TSF, water storage dam and water
harvesting dam

•          Progressing concrete works across the CIL, milling,
thickener, reclaim and crushing areas

•          Mobilising the CIL tank installation contractor

•          Completing water bore drilling, equipping the borefield
and installing associated piping

•          Commencing work on the HV power supply installation,
including substation foundations and clearance of the overhead powerline
corridor

•          Awarding major mechanical, electrical, mining and solar
power packages

•          Progressing structural, mechanical, piping, electrical
and instrumentation installation contracts

•          Continuing detailed engineering, procurement and
owner’s team mobilisation

 

() ABC Project

() The ABC Project is a greenfield exploration project located in northwestern
Côte d'Ivoire. ABC is a priority growth project, and the Company continues to
believe it has the potential to become its fourth mine furthering Resolute’s
strategy of diversification in West Africa.

 

The current Mineral Resource Estimate at ABC is 133 Mt grading 0.71 g/t Au for
3.0 Moz (at 0.3 g/t cut off, $3,250/oz Au pit shell). The MRE is over the Kona
South and Kona Central deposits which are located 3km apart. The third
prospect, Moya, is located 8km north of Kona Central and represents a new
growth target within the Kona permit.

 

                   Constrained ABC Inferred MRE
 Prospect          Mt          Grade (g/t Au)  Moz (Au)
 Kona Central      64.6        0.62            1.29
  Kona South       68.1        0.79            1.72
 Total             132.7       0.71            3.02

Table 2:  ABC Mineral Resource Estimate (at 0.3 g/t cut-off, July 2026)

 

 

Since the MRE update, drilling activities at ABC have primarily focused on
converting Inferred Mineral Resources to the Indicated category and expanding
the overall Mineral Resource footprint.

 

During Q3, 23,900 m of infill drilling was completed. A remaining 33,000 m is
planned over Q4 2026 with 11 rigs in operation currently and an updated MRE is
targeted for Q1 2027. Drilling to date by Resolute has confirmed both Kona
South and Kona Central remain open along strike and depth.

 

 

 

 

 

 

Figure 6: Plan of ABC Project Drill Programme

 

In addition to upgrading the MRE the work programme over the next twelve
months will involve technical studies, environmental and social baseline work,
metallurgical testwork and site infrastructure upgrades.

 

These initial stages of the ESIA study commenced in Q3 2026. Along with
updating the MRE after completion of the current infill drilling programme,
technical workstreams are commencing to support the Company’s objective of
advancing ABC through feasibility studies by the end of 2027.

Figure 7: Approximate Study Schedule

 

 

 

 

() La Debo Project

The La Debo project is in the south of Côte d’Ivoire, approximately 280 km
west of Abidjan.

 

In October 2025 Resolute was granted two additional exploration permits,
Gagnoa and Soubre, situated to the south of the La Debo Project. In November
2025 Resolute announced an Inferred Mineral Resource Estimate for La Debo (G3N
and G3S prospects) of 17.6Mt grading 1.14 g/t Au for 643 koz of contained gold
at 0.5g/t cut-off.

 

A diamond drilling program to expand the Mineral Resources at G3 South
commenced in March 2026. Drilling last year identified a coherent linear zone
of very high-grade mineralisation at the deepest levels of G3 South which has
excellent potential for an underground operation.

 

This drilling program aimed to drill out a panel of gold mineralisation over a
strike length of 600m which may have the potential to form the basis of an
underground operation. The drilling program was completed in July 2026 with a
total of 52 diamond holes completed for 15,867m of drilling.

 

 

 

 

 

Figure 8: La Debo Project Permits and Prospect

 

 

The drilling in 2026 successfully extended the higher-grade mineralisation
down dip at G3 South with mineralisation intersected in the majority of holes.
A list of the significant drill intersections is attached as Appendix 2.

 

Figure 9: La Debo G3S Plan

 

Key intersections from the drilling program in 2026 are as follows.

 

LBDD0024 - 14m @ 8.70g/t Au from 154m

LBDD0026 - 9m @ 13.40g/t Au from 155m

LBDD0028 - 16m @ 4.57g/t Au from 141m

LBDD0053 - 15m @ 6.40g/t Au from 282m

LBDD0078 - 23m @ 3.38g/t Au from 176m

LBRC0034 - 23m @ 5.76g/t Au from 22m

 

 

 

 

Figure 10: La Debo G3S Cross Section

 

An updated global Mineral Resource Estimate was undertaken in September with a
75% increase in the G3S resource to 14.9Mt grading 1.39g/t Au for 668,000oz at
a cut off of 0.5g/t Au.

 

The total global Mineral Resource for the La Debo project is now 23.5Mt
grading 1.23g/t Au for 927,000 ounces.

 

The drilling confirmed the higher grade core within G3S with a Mineral
Resource of 4.2Mt grading 2.9g/t Au for 397,000 ounces.

 

                    2025                                 2026
 Prospect  Cut-Off  Tonnes      Au Grade (g/t)  Oz       Tonnes      Au Grade (g/t)  Oz
 G3 North  0.5      8,580,362   0.9             259,075  8,580,362   0.9             259,075
 G3 South  0.5      8,978,329   1.3             383,937  14,899,629  1.4             668,148
 Total     0.5      17,558,691  1.1             643,013  23,479,991  1.2             927,223

Table 3:  La Debo Global Mineral Resources at 0.5g/t Au cut off

 

 Weathering    Tonnes     Au Grade (g/t)  Ounces
 Oxide         570,098    2.9             52,870
 Transitional  81,091     2.8             7,313
 Fresh         3,545,807  3.0             336,506
 Total         4,196,996  2.9             396,689

Table 4: G3 South Prospect Mineral Resource at 1.5g/t Au cut off

 

La Debo Mineral Resource Estimation Summary

A summary of JORC Table 1 is provided below for compliance regarding the
Mineral Resources reported within and in-line with requirements of ASX Listing
Rule 5.8.1. More details are contained in the JORC Table 1.

 

The MRE for the G3 North prospect remains unchanged from July 2025. An updated
MRE has been calculated for the G3 South prospect following additional
drilling activity.

 

Geology and Geological interpretation

Mineralisation is currently interpreted to have a relatively simple geometry,
comprising mineralised shears dipping at approximately 60 degrees to the
east-south-east. G3S shows a mineralised zone of approximately 1.5km striking
at approximately 040°.

 

Drilling techniques

Drill types used include reverse circulation with face sampling bit and core
drilling using HQ and NQ sized bits. A total of 109 RC holes (10,422m) and 76
DD holes (20,618m) formed the input data to the updated MRE, which represents
all RC and DD holes available for the prospect to date.

 

Sampling and sub-sampling techniques

Reverse circulation samples were collected on 1m intervals by riffle split
(dry) or by scoop (wet) to obtain a 1-3kg sample.

 

Diamond drill core has been systematically cut lengthwise into half core with
a diamond saw. Half core samples were selected for analysis.

 

Sample preparation includes oven drying, crushing to 10mm, splitting and
pulverising to 85% passing - 75μm. These preparation techniques are deemed to
be appropriate to the material being sampled.

 

Reverse circulation and core field duplicates were inserted by the company at
a rate of 1:20 samples.

Sampling, sample preparation and quality control protocols are of industry
standard, with the intention of ensuring an unbiased representative sample was
collected.

 

Sample analysis method

All samples were dispatched to MSA Yamoussoukro for sample preparation and
gold analysis by Chrysos Photon Assay. The analytical method is considered
appropriate for the style of mineralisation.

No geophysical tools were used to determine elemental concentrations.

 

Quality control (QC) procedures included the use of certified standards
(1:40), non-certified sand blanks

(1:40) and reverse circulation/core field duplicates (1:20).

 

Laboratory quality control data, including laboratory standards, blanks,
duplicates, repeats, grind size results and sample weights were also captured
into the digital database.

 

Analysis of the QC sample assay results indicates that an acceptable level of
accuracy and precision has been achieved

 

Estimation Methodology

Volumes representing the mineralisation and weathering zones were built using
the gold assay data and geological information logged by the geologists at the
project site. Mineralised domains were built using a lower cut off grade of
0.2g/t Au to represent the mineralised envelope. Internal to some of the
domains, higher grade sub-domains were built based on a nominal cut off grade
of 1.5g/t.

 

Drill holes were flagged with the domain codes and composited to a standard 1m
length within the domains, which represents the majority sample length. Small
residual composites were spread equally across the composited interval.

 

Geostatistical analysis including continuity analysis (variography), and
assessment of top-cut requirements was made for each domain and sub domain.
Since the 1.5g/t Au sub domains are not yet confidently linked to an
identifiable geological change, variograms were calculated and modelled using
the entire domain datasets, combining the 1.5g/t and 0.2g/t composites where
applicable. Top cuts were applied to most domains to manage the influence of
outlier grades on the estimate.

 

A single block model was built to cover the entire prospect area, using a
parent block size of 20m x 20m x 5m. The model is rotated 40° around the Z
axis to align with the strike of the mineralisation. The estimates were made
using a three-pass Ordinary Kriging workflow, resulting in >90% of blocks
being estimated. Each pass used a broader search and fewer minimum required
samples than the previous pass. Spatial constraining of the influence of the
highest grades was applied in addition to top-cuts for one of the 0.2g/t Au
domains and two of the 1.5g/t Au sub-domains. This technique honours the (top
cut if applicable) composite grade locally, but beyond an applied distance
resets the grade to a supplied threshold grade, further constraining the
influence of high grades away from the drillholes, if required.

 

Unestimated blocks were applied the default value of the cut off grade used
during domain construction; 0.2g/t Au for the broader zones and 1.5g/t Au for
the internal sub-domains. The background waste zone was given the default
value of 0.005g/t Au.

 

Classification criteria

Mineral Resources were classified in accordance with the Australasian Code for
the Reporting of Exploration Results, Mineral Resources and Ore Reserves
(JORC, 2012).

 

The deposit has been classified as Inferred Mineral Resource based on a
combination of quantitative and qualitative criteria which include geologic
continuity, confidence in volume models, data quality, sample spacing, lode
continuity, and estimation parameters (number of informing composites,
estimation pass number, kriging quality parameters, and minimum and average
distance composites). Even where the geological and statistical factors may
support a higher classification, the Inferred status recognises the
requirement for more comprehensive metallurgical understanding.

 

The input data is consistent in its coverage of the modelled zones and does
not favour or misrepresent the in-situ mineralisation. The definition of the
mineralised zones is based on a moderate level of geologic understanding from
good quality sample data. Validation of the block model shows good correlation
of the input data to the block estimated grades.

 

Basis for selected cut-off grade

The cut-off grade of 0.5g/t Au is selected based on this being historically
used to define the Mineral Resources at similar deposits in terms of grade,
scale and proximity to surface in the Resolute portfolio. Further economic
analysis will determine if a different cut-off grade is more appropriate for
future La Debo Mineral Resource calculations.

 

Mining and metallurgical methods and other material modifying factors

Basic metallurgical testwork has been performed with more extensive
investigations planned for future sampling campaigns. No mining modifying
factors are yet applied to the MRE.

 

 

Planned Next Steps at La Debo

 

The high grade core at G3S remains open along strike and down dip and further
resource increases are expected with additional drilling.

 

Previous encouraging drilling results at the La Debo Main prospect will be
tested with upcoming exploration programs.

 

The Joint Venture has a newly granted permit named Soubre to the south-west of
the main La Debo permit. Soubre has previously untested widespread gold in
soil anomalies which will be drilled in 2027.

 

 

 

 

() Doropo Exploration

In Q3 2026, exploration drilling commenced at the Kilosegui prospect, which is
located within the Doropo Exploitation Permit. Of the eight pits that make up
the mine plan in the DFS Kilosegui has the largest Ore Reserve (21.8 Mt
grading 1.22 g/t for 856 koz of contained gold at a reserve gold price
assumption of $1,950/oz).

 

The current Mineral Resource at Kilosegui is 40Mt grading 1.1g/t for 1.4Moz
with excellent potential for resource expansion. Kilosegui has a 6km strike
length and is open at depth along the entire strike length of the deposit. The
initial strategy is to expand the Kilosegui Mineral Resources at depth but
within the top 200m.

 

An initial 20,000m combined RC and step out diamond drilling program is
planned to test the down dip extensions of a 1.8km section of Kilosegui West
and a 1.5km section of the Kilosegui Central zone.

 

The drilling program at Kilosegui will continue into 2027 and will expand to
include major drilling programs at the Main Cluster Zone.

 

Figure 11: Map of deposits and prospects at Doropo

()

Mali

() Syama Operations

Syama gold production for the Quarter was 31,777oz at an AISC of $2,596/oz.
The operational performance is set out in the table below.

 Summary                          Units  September  June      Nine Months  Nine Months

2026
2026
2026
2025

Quarter
Quarter
YTD
YTD
 Mining      Underground
             Ore Mined            t      490,070    542,483   1,744,271    1,450,177
             Mined Grade          g/t    2.09       1.90      2.09         2.38
             Open Pit
             Ore Mined            t      300,182    154,023   536,923      700,299
             Mined Grade          g/t    2.11       1.78      2.01         1.46
 Processing  Sulphide
             Ore Processed        t      655,115    486,231   1,843,597    1,777,320
             Processed Grade      g/t    2.15       1.95      2.15         2.22
             Recovery             %      72         75        74           76
             Gold Poured          oz     30,439     23,460    93,298       99,438
             Gold Sold            oz     20,762     27,457    98,007       100,919
             Oxide
             Ore Processed        t      53,741     272,632   683,596      1,174,109
             Processed Grade      g/t    0.61       0.82      0.69         0.97
             Recovery             %      76         73        74           82
             Gold Poured          oz     1,338      6,421     12,162       29,740
             Gold Sold            oz     1,338      6,421     12,162       29,740
 Cost        Syama combined
             Capital Expenditure  $m     18.6       15.6      54.5         42.5
             AISC                 $/oz   2,596      2,654     2,459        2,092

Table 5: Syama Production and Cost Summary

 

Production during Q3 was 31.8 koz with performance weighted towards the back
end of the quarter. Operational challenges including slower-than-planned open
pit mining rates at A21, intermittent explosive supply constraints
underground, periodic plant downtime and challenges with the Roaster upgrade
were most pronounced in July and August. However, September saw a meaningful
recovery, with monthly production of approximately 15.5 koz, reflecting the
mobilisation of additional contractor fleet, the resumption of underground
emulsion deliveries and improving access to ore. The Company expects this
improving trajectory to continue for the remainder of the year.

Underground mining produced 0.49 Mt of ore at an average grade of 2.09 g/t.
Ore tonnes were lower than Q2, while grade improved. Performance remained
constrained by intermittent explosive availability and blasting limitations in
wet production areas. During the quarter, underground emulsion deliveries
resumed which helped to improve underground mining activities. The on-site
emulsion plant is currently being commissioned with benefits expected to be
seen in Q4.

Open pit mining produced 0.30 Mt of ore at an average grade of 2.11 g/t, with
total material movement of 3.51 Mt. Mining rates at A21 remained below plan
during the quarter, due to the transition to a new mining contractor.
Mobilisation of the contractor fleet accelerated towards quarter end, with
additional equipment arriving to support higher mining rates and improved
access to ore.

 

During Q3, 0.71 Mt of ore was processed across the sulphide (0.66 Mt) and
oxide (0.05 Mt) circuits. For the remainder of the year, a blended sulphide
feed sourced from A21, underground ore and stockpiles is planned to support
plant and circuit optimisation as the SSCP is commissioned.

 

Oxide processing totalled 0.05 Mt during the quarter. Open pit mining at A21
and Folona is expected to continue building oxide stockpiles for future
processing, while the mobilisation of additional mining equipment is intended
to support improved ore availability. In-pit tailings disposal continues in
the beta pit with the Company liaising with the government on an extension
beyond the end of 2026 as well as alternative options.

 

Regarding the SSCP, commissioning on the Roaster circuit upgrades was
completed although behind schedule as visa restrictions in Mali allowed for
only half of the contractor workforce to mobilise. During Q3 work continued on
the secondary crusher and ball mill circuits which are due to be commissioned
over the coming months. The project has no LTIs after approximately 1.4
million person-hours worked until the end of September 2026.

 

During Q3 capital expenditure was $18.6 million. Expenditure for the Quarter
includes underground production mobile machinery, and TSF lift, with $6.3
million spent on the SSCP and Roaster upgrade as well as $11.3 million of
sustaining waste capital. Full year capital expenditure is expected to be
below original guidance ($70 - 85 million) due to reduced waste stripping.

 

In Q3 the AISC of $2,596/oz was lower than Q2, primarily due to lower
royalties on lower average realised gold prices. As noted previously Syama
full-year AISC is expected to be $2,300 - 2,400/oz on lower full-year
production (150 - 160 koz).

 

 

 

 

() Senegal

()

Mako Operations

Mako gold production for the Quarter was 12,621oz at an AISC of $1,516/oz The
operational performance for Mako is set out in the table below.

 Summary              Units  September  June      Nine Months  Nine Months

2026
2026
2026
2025

Quarter
Quarter
YTD
YTD
 Mining
 Ore Mined            t      -          -         -            1,242,013
 Mined Grade          g/t    -          -         -            1.9
 Processing
 Ore Processed        t      504,296    626,309   1,704,143    1,677,288
 Processed Grade      g/t    0.85       0.83      0.87         1.66
 Recovery             %      91         91        90           92
 Gold Poured          oz     12,621     15,311    43,733       82,140
 Gold Sold            oz     10,935     20,720    46,817       77,944
 Financials
 Capital Expenditure  $m     3.3        1.9       9.6          2.6
 AISC                 $/oz   1,516      1,538     1,579        1,180

Table 6: Mako Production and Cost Summary

 

During the Quarter, the plant treated 504.3 kt of stockpiled ore at a head
grade of 0.85 g/t Au and a recovery of 91%, producing 12,621oz of gold.
Throughput was lower than in the June quarter due to a mill motor failure
which resulted in ten days of downtime. Year-to-date gold production of 43.7
koz means Mako remains on track for full-year production guidance of 55 - 65
koz.

 

The Q3 AISC of $1,516/oz was below the lower end of Mako’s full-year
guidance of $1,600 – 1,800/oz. The result reflects the cost optimisation
programme, under which lower rehandle, processing and maintenance costs
reduced site operating costs.

 

Capital expenditure at Mako for the Quarter was $3.3 million. This includes
sustaining capital of $1.2 million and was associated with the planned plant
maintenance and upgrades, along with $2.1 million expenditure on MLEP.
Full-year capital expenditure remains within guidance of $5.0 million.

There were no material supply disruptions in Senegal during the Quarter.

 

 

() Mako Life Extension Project (MLEP)

The MLEP is expected to extend the life of the Mako Gold Mine through the
development of the Tomboronkoto and Bantaco satellite deposits, approximately
20 km from the Mako processing plant.

 

Work during Q3 focused on permitting, ESIA public hearings and the Relocation
Action Plan (RAP).

 

MLEP expenditure for the Quarter was $2.1 million, mainly on permitting and
the ESIA process, Bantaco infill drilling, RAP development and engineering
studies. Full year MLEP expenditure remains within guidance of $10-15 million.

 

The integrated MLEP schedule (Figure 12) and the phasing of remaining capital
have been updated. The exploration permit transfers remain on the critical
path and are expected in Q4 2026, with the exploitation permits for both
deposits expected in H1 2027. Bantaco mining is planned from July 2027 to the
end of 2028, subject to the update of its mining schedule, and Tomboronkoto
mining remains targeted to start in January 2029.

 

RAP work focused on agreeing the relocation package with the community.
Preliminary agreement on compensation rates and entitlement principles was
reached with the Tomboronkoto community consultation and resettlement
committee. The village housing and public facility designs are in final
review.

 

RAP Phase 1 (studies, designs and agreements) is scheduled for completion by
the end of Q1 2027. RAP Phase 2 (construction of the new village and physical
relocation) will start once the exploitation permit is granted and agreement
has been reached with the community and is scheduled from Q2 2027 to the end
of 2028. The mining and haulage and ore transport road construction tenders
closed during the Quarter through the Local Content Platform and are being
evaluated.

 

Figure 12: Approximate Timeline for the MLEP

 

 

 

Next Steps

 

Key next steps for the MLEP are:

 

•          Receipt of the Tomboronkoto and Bantaco exploration
permit transfer orders, expected in Q4 2026, followed by immediate lodgement
of the Tomboronkoto exploitation permit application and lodgement of the
Bantaco application once its ESIA attestation is received

•          Receipt of the ESIA attestations and environmental
compliance certificates for the three validated sectoral ESIAs

•          Agreement on the Tomboronkoto relocation package and the
Bantaco livelihood restoration approach, completing RAP Phase 1 by the end of
Q1 2027

•          Finalisation of the new village design and construction
tender documents, ready for RAP Phase 2 to start once the exploitation permit
is granted and agreement has been reached with the community

•          Completion of the mining and haulage and ore transport
road tender evaluations

 

 

 

 

() Guinea

()

During the quarter Resolute completed the incorporation of its joint venture
company with its state-owned partner Nimba Mining Gold (NMG). The joint
venture was officially named Landaya Gold. Each shareholder initially holds
50% in Landaya.

 

Subsequently the partners worked together to select areas of interest and to
prepare licence applications which are being filed.

 

In addition to the Landaya joint venture, Resolute is reviewing additional
partnership opportunities and is reinforcing its presence in the country.

 

 

 

() Financial Highlights and Balance Sheet Activities

 

Quarterly Net Cash Movements ($ million)

 

 

Figure 13: Q3 2026 Net Cash Movements

 

In Q3 gold sales of 33,035 oz (Q2 2026: 54,599 oz) were achieved at an average
realised gold price of $4,325/oz (Q2: $4,526/oz), with all gold being sold at
spot prices. The continued strong gold price environment helped the Company
generate an operating cashflow of $55.8 million in Q3.

 

For Q3 there was a working capital inflow of $6.2 million (Q2 2026: $2.2
million outflow). The working capital inflow was principally attributable to a
change in payables settled through the normal course of business.

 

EBITDA for Q3 was $64.0 million (Q2 2026: $128.5 million) reflecting $142.9
million of revenue (Q2 2026: $247.1 million). The decrease from the prior
quarter is due to the decrease in gold sales due to timing of gold shipments.

 

() Exploration Expenditure

Total Group exploration spend, including capital and operating expenditure, in
Q3 was $10.6 million (Q2 2026: $10.1 million), with drilling programs
continuing in Senegal ($0.9 million), Côte d’Ivoire ($9.0 million) and Mali
($0.7 million). The majority of exploration spend during the Quarter was at
the ABC Project in Côte d’Ivoire with 23,900 m of infill drilling
completed.

 

Year-to-date exploration expenditure is $25.2 million which is at the top end
of initial guidance ($15 - 25 million). In Q4 2026 the Company expects to
spend a further $10 million as a result of ongoing infill drilling at the ABC
Project and extension drilling at the Kilosegui deposit at Doropo.

 

() Net Cash Summary

Net cash (including fixed term deposits and bullion, less drawn overdraft and
borrowings) at 30 September 2026 was $276.1 million, increasing from $209.1
million at 31 December 2025. The Company has available liquidity of
approximately $479.6 million (including $95.4 million bullion on hand) as at
30 September 2026.

 

Total borrowings at 30 September 2026 were $54.2 million (Q2 2026: $15.2
million) which includes in-country overdraft facilities in Senegal of $1.2
million, Mali of $15.6 million, as well as $8.1 million for in-country
equipment financing in Mali. In Q3, Resolute secured local financing for the
capital spend in Doropo, of which $29.4 million has been drawn and included in
total borrowings. Cash, cash equivalents and bullion reduced by $2.4 million
in the Quarter to $330.3 million (Q2 2026: $332.7 million).

 

Financing Update

Post Quarter-End, Resolute secured the full local financing arrangements for
Doropo, with $260.0 million of credit facilities implemented. All facilities
have attractive terms including minimal security commitments and no financial
covenants.

 

As of 30 September, FCFA 17 billion were drawn (c. $29.4 million) under the
facilities, with remaining funds expected to be gradually drawn over 2026 and
2027, in line with increased capital spend at Doropo.

 

Local bank facilities along with Resolute's existing balance sheet and
operating cash flow provides sufficient liquidity to finance the development
of the Doropo Project under current market and regulatory conditions.

 

 

() Contact

 Resolute                                               Public Relations

Matthias O’Toole Howes,
Jos Simson, Tavistock

Corporate Development and Investor Relations Manager
resolute@tavistock.co.uk (mailto:resolute@tavistock.co.uk)

Matthias.otoolehowes@resolutemining.com
+44 207 920 3150
 (mailto:Matthias.otoolehowes@resolutemining.com)
 

+44 203 3017 620
Corporate Brokers

Jennifer Lee, Berenberg

+44 20 3753 3040

 

Tom Rider, BMO Capital Markets

+44 20 7236 1010

 

 

About Resolute

Resolute is an African-focused gold miner with more than 30 years of
experience as an explorer, developer and operator. Throughout its history the
Company has produced more than 9 million ounces of gold from ten gold mines.
The Company is now entering a growth phase through the development of the
Doropo project in Côte d’Ivoire which will supplement the existing
production from the Syama mine in Mali and Mako mine in Senegal.

 

Through all its activities, sustainability is the core value at Resolute. This
means that protecting the environment, providing a safe and productive working
environment for employees, uplifting host communities, and practicing good
corporate governance are non-negotiable priorities. Resolute’s commitment to
sustainability and good corporate citizenship has been cemented through its
adoption of and adherence to the Responsible Gold Mining Principles (RGMPs).
This framework, which sets out clear expectations for consumers, investors,
and the gold supply chain as to what constitutes responsible gold mining, is
an initiative of the World Gold Council of which Resolute has been a full
member since 2017.

() Appendix 1

Q3 Production and Costs (unaudited)

 September 2026 - Quarter to date                            Units  Syama          Mako         Group

Total
 UG Lateral Development                                      m       891            -            891
 UG Vertical Development                                     m       -              -            -
 Total UG Development                                        m       891            -            891
 UG Ore Mined                                                t       490,070        -            490,070
 UG Grade Mined                                              g/t     2.09           -            2.09
 OP Operating Waste                                          BCM     1,262,835      -            1,262,835
 OP Ore Mined                                                BCM     119,714        -            119,714
 OP Grade Mined                                              g/t     2.11           -            2.11
 Total Ore Mined                                             t       790,252        -            790,252
 Total Tonnes Processed                                      t       708,856        504,296      1,213,152
 Grade Processed                                             g/t     2.04           0.85         1.54
 Recovery                                                    %      73             91           80
 Gold Recovered                                              oz      33,612         12,645       46,257
 Gold in Circuit Drawdown/(Addition)                         oz      (1,835)        (24)         (1,859)
 Gold Produced (Poured)                                      oz      31,777         12,621       44,398
 Gold Bullion in Metal Account Movement (Increase)/Decrease  oz      (9,677)        (1,686)      (11,363)
 Gold Sold                                                   oz      22,100         10,935       33,035
 Achieved Gold Price                                         $/oz    -              -            4,325
 Cost Summary
 Mining                                                      $/oz    1,032          137          777
 Processing                                                  $/oz    1,175          831          1,077
 Site Administration                                         $/oz    287            347          304
 Site Operating Costs                                        $/oz    2,494          1,314        2,159
 Royalties                                                   $/oz    351            217          313
 By-Product Credits                                          $/oz    (6)            -            (4)
 Total Cash Operating Costs                                  $/oz    2,840          1,531        2,468
 Sustaining Capital & Others                                 $/oz    231            42           394
 Inventory Adjustments                                       $/oz    (474)          (58)         (356)
 All-In Sustaining Cost (AISC)                               $/oz    2,596          1,516        2,506

AISC is calculated on gold produced (poured)

 

() Year-to-date 2026 Production and Costs (unaudited)

 September 2026 - Year to date                               Units  Syama          Mako           Group

Total
 UG Lateral Development                                      m       2,471          -              2,471
 UG Vertical Development                                     m       -              -              -
 Total UG Development                                        m       2,471          -              2,471
 UG Ore Mined                                                t       1,744,271      -              1,744,271
 UG Grade Mined                                              g/t     2.09           -              2.09
 OP Operating Waste                                          BCM     2,082,994      -              2,082,994
 OP Ore Mined                                                BCM     207,981        -              207,981
 OP Grade Mined                                              g/t     2.01           -              2.01
 Total Ore Mined                                             t       2,281,194      -              2,281,194
 Total Tonnes Processed                                      t       2,527,193      1,704,143      4,231,336
 Grade Processed                                             g/t     1.75           0.87           1.40
 Recovery                                                    %       74             90             80
 Gold Recovered                                              oz      106,111        43,532         149,643
 Gold in Circuit Drawdown/(Addition)                         oz     -651           201            -450
 Gold Produced (Poured)                                      oz      105,460        43,733         149,193
 Gold Bullion in Metal Account Movement (Increase)/Decrease  oz      4,708          3,085          7,793
 Gold Sold                                                   oz      110,169        46,817         156,986
 Achieved Gold Price                                         $/oz    -              -              4,631
 Cost Summary
 Mining                                                      $/oz    769            173            594
 Processing                                                  $/oz    995            794            936
 Site Administration                                         $/oz    269            306            280
 Site Operating Costs                                        $/oz    2,033          1,273          1,810
 Royalties                                                   $/oz    522            278            450
 By-Product Credits                                          $/oz    (8)            -              (6)
 Total Cash Operating Costs                                  $/oz    2,547          1,551          2,254
 Sustaining Capital & Others                                 $/oz    152            26             294
 Inventory Adjustments                                       $/oz    (239)          3              (169)
 All-In Sustaining Cost (AISC) per ounce poured              $/oz    2,459          1,579          2,379

 

 

() ASX Listing Rule 5.23 Mineral Resources

This announcement contains estimates of Resolute’s mineral resources. The
information in this Quarterly report that relates to the mineral resources of
Resolute has been extracted from reports entitled ‘Ore Reserves and Mineral
Resource Statement’ announced on 5 March 2026, 'Updated Mineral Resource
Estimate at the ABC Project' announced on 22 July 2026. These are available to
view on Resolute’s website (www.rml.com.au) and www.asx.com (Resolute
Announcement).

 

For the purposes of ASX Listing Rule 5.23, Resolute confirms that it is not
aware of any new information or data that materially affects the information
included in the Resolute Announcement and, in relation to the estimates of
Resolute's ore reserves and mineral resources, that all material assumptions
and technical parameters underpinning the estimates in the Resolute
Announcement continue to apply and have not materially changed. Resolute
confirms that the form and context in which the Competent Person's findings
are presented have not been materially modified from that announcement.

 

() Cautionary Statement about Forward-Looking Statements

This announcement contains certain “forward-looking statements” including
statements regarding our intent, belief, or current expectations with respect
to Resolute’s business and operations, market conditions, results of
operations and financial condition, and risk management practices. The words
"likely", "expect", "aim", "should", "could", "may", "anticipate", "predict",
"believe", "plan", "forecast" and other similar expressions are intended to
identify forward-looking statements. Indications of, and guidance on, future
earnings, anticipated production, life of mine and financial position and
performance are also forward-looking statements. These forward-looking
statements involve known and unknown risks, uncertainties and other factors
that may cause Resolute’s actual results, performance and achievements or
industry results to differ materially from any future results, performance or
achievements, or industry results, expressed or implied by these
forward-looking statements. Relevant factors may include (but are not limited
to) changes in commodity prices, foreign exchange fluctuations and general
economic conditions, increased costs and demand for production inputs, the
speculative nature of exploration and project development, including the risks
of obtaining necessary licences and permits and diminishing quantities or
grades of reserves, political and social risks, changes to the regulatory
framework within which Resolute operates or may in the future operate,
environmental conditions including extreme weather conditions, recruitment and
retention of personnel, industrial relations issues and litigation.

 

Forward-looking statements are based on Resolute’s good faith assumptions as
to the financial, market, regulatory and other relevant environments that will
exist and affect Resolute’s business and operations in the future. Resolute
does not give any assurance that the assumptions will prove to be correct.
There may be other factors that could cause actual results or events not to be
as anticipated, and many events are beyond the reasonable control of Resolute.
Readers are cautioned not to place undue reliance on forward-looking
statements, particularly in the significantly volatile and uncertain current
economic climate. Forward-looking statements in this document speak only at
the date of issue. Except as required by applicable laws or regulations,
Resolute does not undertake any obligation to publicly update or revise any of
the forward-looking statements or to advise of any change in assumptions on
which any such statement is based. Except for statutory liability which cannot
be excluded, each of Resolute, its officers, employees and advisors expressly
disclaim any responsibility for the accuracy or completeness of the material
contained in these forward-looking statements and excludes all liability
whatsoever (including in negligence) for any loss or damage which may be
suffered by any person as a consequence of any information in forward-looking
statements or any error or omission.

() Competent Persons Statement

The information in this report that relates to the Exploration Results is
based on information compiled by Mr Bruce Mowat, a member of The Australian
Institute of Geoscientists. Mr Bruce Mowat has more than 15 years’
experience relevant to the styles of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a
Competent Person, as defined in the 2012 Edition of the “Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves”
(the JORC Code). Mr Bruce Mowat is a full-time employee of the Resolute Mining
Limited Group and holds equity securities in the Company. He has consented to
the inclusion of the matters in this report based on his information in the
form and context in which it appears. This information was prepared and
disclosed under the JORC Code 2012 except where otherwise noted.

 

The information in this announcement that relates to the Mineral Resource
estimate has been based on information and supporting documents prepared by Mr
James Woodward, a Competent Person who is a member of The Australasian
Institute of Mining and Metallurgy. Mr Woodward is a full-time employee
Resolute Mining Limited Group and has sufficient experience relevant to the
style of mineralisation and type of deposit under consideration and to the
activity which has been undertaken to qualify as a Competent Person. Mr
Woodward confirms that the Mineral Resource estimate is based on information
in the supporting documents and consents to the inclusion in the report of the
Mineral Resource estimate and related content based on the information in the
form and context in which it appears.

() Appendix 2. Recent drilling results at La Debo

 

 Prospect  Hole_ID    Nat_Grid   NAT_North  NAT_East  NAT_RL  Dip  Azimuth  From  To   Width  Au g/t
 G3S       LBDD0033   WGS84_29N  665684     815933    194     -60  315      222   239  17     3
 G3S       LBDD0033   WGS84_29N  665684     815933    194     -60  315      244   254  10     1
 G1        LBDD0035   WGS84_29N  660054     806251    215     -60  315      22    31   9      1
 G3S       LBDD0036   WGS84_29N  665719     815968    216     -60  315      225   238  13     2
 G3S       LBDD0038   WGS84_29N  665755     816002    196     -60  315      222   238  16     1
 G3S       LBDD0039   WGS84_29N  664938     815479    211     -60  315      260   265  5      2
 G3S       LBDD0040   WGS84_29N  665791     816039    212     -60  315      225   246  21     3
 G3S       LBDD0041   WGS84_29N  664872     815481    231     -60  315      307   324  17     1
 G3S       LBDD0043   WGS84_29N  665824     816004    213     -60  315      174   195  21     3
 G3S       LBDD0046   WGS84_29N  665864     816066    210     -60  315      192   201  9      1
 G3S       LBDD0048   WGS84_29N  665467     815808    202     -60  315      288   306  18     1
 G3S       LBDD0049   WGS84_29N  665649     815897    195     -60  315      238   243  5      6
 G3S       LBDD0049   WGS84_29N  665649     815897    195     -60  315      219   229  10     2
 G3S       LBDD0051   WGS84_29N  665621     815857    204     -60  315      208   220  12     4
 G3S       LBDD0051   WGS84_29N  665621     815857    204     -60  315      229   238  9      1
 G3S       LBDD0053   WGS84_29N  665501     815841    213     -60  315      282   297  15     6
 G3S       LBDD0055   WGS84_29N  665590     815816    217     -50  315      200   209  9      1
 G3S       LBDD0057A  WGS84_29N  665685     816075    185     -60  315      317   330  13     1
 G3S       LBDD0060   WGS84_29N  665038     815614    221     -60  315      370   373  3      4
 G3S       LBDD0061   WGS84_29N  665648     816039    215     -60  315      324   341  17     2
 G3S       LBDD0061   WGS84_29N  665648     816039    215     -60  315      349   355  6      3
 G3S       LBDD0062   WGS84_29N  665578     815970    216     -60  315      322   335  13     1
 G3S       LBDD0064   WGS84_29N  665614     816002    216     -60  315      324   335  11     2
 G3S       LBDD0065   WGS84_29N  665719     816110    212     -60  315      328   335  7      2
 G3S       LBDD0066   WGS84_29N  665549     815927    194     -60  315      316   325  9      1
 G3S       LBDD0066   WGS84_29N  665549     815927    194     -60  315      331   337  6      2
 G3S       LBDD0067   WGS84_29N  665790     816136    183     -60  315      281   294  13     1
 G3N       LBDD0069   WGS84_29N  665243     815659    211     -60  315      295   303  8      1
 G3S       LBDD0071   WGS84_29N  664795     815557    207     -60  315      401   408  7      3
 G3N       LBDD0073   WGS84_29N  665344     815576    187     -60  315      167   173  6      2
 G3S       LBDD0074   WGS84_29N  665629     815781    220     -60  315      168   179  11     2
 G3S       LBDD0075   WGS84_29N  665826     816100    210     -60  315      237   254  17     1
 G3S       LBDD0076   WGS84_29N  665752     816074    212     -60  315      262   279  17     1
 G3S       LBDD0077   WGS84_29N  665718     816040    214     -60  315      258   283  25     2
 G3S       LBDD0078   WGS84_29N  665788     815969    215     -60  315      176   199  23     3
 G3S       LBDD0078   WGS84_29N  665788     815969    215     -60  315      236   243  7      2
 G3S       LBDD0079   WGS84_29N  665748     815938    217     -60  315      185   210  25     2
 G3S       LBDD0079   WGS84_29N  665748     815938    217     -60  315      242   245  3      4
 G3S       LBDD0080A  WGS84_29N  665715     815902    211     -60  315      179   191  12     1
 G3S       LBDD0081   WGS84_29N  665510     815758    206     -60  315      199   206  7      4

 

 Notes to Accompany Table:
 • Grid coordinates are WGS84 Zone 29 North
 • RC intervals are sampled every 1m by dry riffle splitting or scoop to
 provide a 2-3kg sample
 • Diamond core are sampled every 1m by cutting the core in half to provide a
 2-4kg sample
 • Cut-off grade for reporting of intercepts is >0.5g/t Au with a maximum
 of 3m consecutive internal dilution included within the intercept; only
 intercepts =>3m and >10 gram x metres are reported
 • Drill samples are analysed for gold by MSA Labs CPA-Au1 500g sample gamma
 ray analysis by photon assay instrument

 

() JORC Code, 2012 Edition – Table 1 report

() Section 1 Sampling Techniques and Data

La Debo Project

 CRITERIA                                                 JORC CODE EXPLANATION                                                            COMMENTARY
 Sampling techniques                                                                                                                       Sampling has been by diamond drill coring and reverse circula-tion chip.

•        Nature and quality of sampling (e.g. cut channels, random
Diamond core has been geologically logged and sampled to geo-logical contacts
                                                          chips, or specific specialised industry standard measure-ment tools              with nominal sample lengths between 0.3m and 4.5m (most commonly 1m). Core
                                                          appropriate to the minerals under investigation, such as down hole gamma         selected for assay is systemati-cally cut lengthwise into half core by diamond
                                                          sondes, or handheld XRF instruments, etc.). These examples should not be taken   blade rock saw, numbered and bagged before dispatch to the laboratory for
                                                          as limiting the broad meaning of sampling.                                       anal-ysis.

•        Include reference to measures taken to ensure sample
 
                                                          representivity and the appropriate calibration of any measurement tools or
All core is photographed, wet and dry.
                                                          systems used.
Reverse circulation chips are geologically logged and sampled on regular

•        Aspects of the determination of mineralisation that are                lengths of 1m. Chip material selected for assay is sys-tematically divided to
                                                          Mate-rial to the Public Report.                                                  a 1/8 proportion using a rotary splitter at-tached to the cyclone sample

•        In cases where ‘industry standard’ work has been done                  recovery system, numbered and bagged before dispatch to the laboratory for
                                                          this would be relatively simple (e.g. ‘reverse circulation drilling was used     analysis.
                                                          to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge
                                                          for fire assay’). In other cases more explanation may be required, such as
                                                          where there is coarse gold that has inherent sampling problems. Unusual
                                                          commodities or mineralisation types (e.g. submarine nodules) may warrant
                                                          disclosure of detailed information.
 Drilling techniques                                                                                                                       Diamond core drilling with standard inner tubes. HQ diameter to target depth

•        Drill type (e.g. core, reverse circulation, open-hole                  where possible with some smaller NQ intervals as tails. Core is marked and
                                                          hammer, rotary air blast, auger, Bangka, sonic, etc.) and details (e.g. core     oriented.
                                                          diameter, triple or standard tube, depth of diamond tails, face-sampling bit
Reverse Circulation drilling with 4” or 4.5” hammer and 4” rod string to
                                                          or other type, whether core is oriented and if so, by what method, etc.).        target depth.

 
 Drill sample recovery                                    •        Method of recording and assessing core and chip sample                  Diamond core recoveries are measured in the core trays and recorded as
                                                          recoveries and results assessed.                                                 recovered metres and recovered % as part of the geological logging process.

•        Measures taken to maximise sample recovery and ensure
                                                          representative nature of the samples.
RC recoveries are monitored by chip sample weight recording. Sample weights

•        Whether a relationship exists between sample recovery and              have been analysed for cyclicity with no relation-ship between sample weight
                                                          grade and whether sample bias may have occurred due to preferential loss/gain    and depth noted.
                                                          of fine/coarse material.
 Logging                                                  •        Whether core and chip samples have been geologically and                Diamond core has been geologically and geotechnically logged to a level of
                                                          geotechnically logged to a level of detail to support appropriate Mineral        detail to support appropriate classification and re-porting of a Mineral
                                                          Resource estimation, mining studies and metallurgical studies.                   Resource.

•        Whether logging is qualitative or quantitative in nature.
Reverse circulation chip samples have been geologically logged to a level of
                                                          Core (or costean, channel, etc.) photography.                                    detail to support appropriate classification and re-porting of a Mineral

•        The total length and percentage of the relevant                        Resource.
                                                          intersections logged.
Total length of DD logged is 6,804m. Total length of RC logged is 9,849m.
 Sub-sampling techniques and sample preparation                                                                                            Historic core has been systematically cut lengthwise into half core with a

•        If core, whether cut or sawn and whether quarter, half or              diamond saw.
                                                          all core taken.
RC samples representing a 1/8 split are taken directly from the rig mounted

•        If non-core, whether riffled, tube sampled, rotary split,              cyclone by rotary splitter, sample weight is recorded, sample is bagged in pre
                                                          etc. and whether sampled wet or dry.                                             numbered plastic and sample tickets are inserted and bag is sealed for

•        For all sample types, the nature, quality and                          transport to preparation facility.
                                                          appropriateness of the sample preparation technique.
Generally, one of each of the two control samples (blank or CRM standard) is

•        Quality control procedures adopted for all sub-sampling                inserted into the sample stream every tenth sample. An industry standard,
                                                          stages to maximise representivity of samples.                                    documented process of sample mark-up, core splitting, bagging and ticketing

•        Measures taken to ensure that the sampling is representative           and recording is in place at the LaDebo site.
                                                          of the in situ material collected, including for instance re-sults for field
All samples were submitted to external certified analytical labora-tory,
                                                          duplicate/second-half sampling.                                                  MSALAB in Yamoussoukro. The 3kg sample were consid-ered appropriate samples

•        Whether sample sizes are appropriate to the grain size of              size for Photon Assays analysis.
                                                          the material being sampled.
 

MSA prepares the samples by weighing, drying, and crushing the entire samples
                                                                                                                                           to >70% passing 2mm, then prepared for PhotonAssay.
 Quality of assay data and laboratory tests                                                                                                Au assays are determined by Chrysos Photon assay at MSA labs in Yamoussoukro.

•        The nature, quality and appropriateness of the assaying and            Laboratory and assay procedures are ap-propriate for Mineral Resource
                                                          laboratory procedures used and whether the technique is considered partial or    estimation.
                                                          total.
QAQC consisted of standards, blanks and laboratory duplicates (both coarse and

•        For geophysical tools, spectrometers, handheld XRF                     pulp). The QAQC sample results showed ac-ceptable levels of accuracy and
                                                          instruments, etc., the parameters used in determining the analysis including     precision.
                                                          instrument make and model, reading times, calibrations factors applied and
The assay data is considered to be suitable for Mineral Resource estimation.
                                                          their derivation, etc.

•        Nature of quality control procedures adopted (e.g.
                                                          stand-ards, blanks, duplicates, external laboratory checks) and whether
                                                          acceptable levels of accuracy (i.e. lack of bias) and precision have been
                                                          established.
 Verification of sampling and assaying                                                                                                     All aspects of the core sampling, assay procedures and QA/QC program have been

•        The verification of significant intersections by either                reviewed and were judged to be suitable for use in the estimation of Mineral
                                                          inde-pendent or alternative company personnel.                                   Resources.

•        The use of twinned holes.
Drill hole assay result data has been checked against the original hardcopy

•        Documentation of primary data, data entry procedures, data             laboratory assay reports for a representative number of holes.
                                                          verification, data storage (physical and electronic) protocols.
Below detection limit values (negatives) have been replaced by background

•        Discuss any adjustment to assay data.                                  values.

Un-sampled intervals have been retained as un-sampled (null or blank). All of
                                                                                                                                           these intervals occur within the waste domain and have no material impact on
                                                                                                                                           the estimate.
 Location of data points                                  •        Accuracy and quality of surveys used to locate drill holes              Drill holes have been surveyed by contractor, SEMS Exploration staff using a
                                                          (collar and down-hole surveys), trenches, mine workings and other locations      DGPS.
                                                          used in Mineral Resource estimation.
Downhole surveys were undertaken by the drilling contractor us-ing a

•        Specification of the grid system used.                                 ReflexSprintIQ tool with a reading taken every 30m down-hole.

•        Quality and adequacy of topographic control.
Grid system is based on the UTM29N grid on the WGS84 (north-ern hemisphere)
                                                                                                                                           projection.

A topographic surface has been generated from the satellite im-ages of the
                                                                                                                                           area.
 Data spacing and distribution                            •        Data spacing for reporting of Exploration Results.                      Data spacing is Generally 50x50m. This spacing is adequate to determine the

•        Whether the data spacing and distribution is sufficient to             geological and grade continuity for reporting of a Mineral Resources.
                                                          establish the degree of geological and grade continuity appropriate for the
Drill samples were composited to 1m for use in the estimate.
                                                          Mineral Resource and Ore Reserve estimation procedure(s) and classifications
 
                                                          applied.

•        Whether sample compositing has been applied.
 Orientation of data in relation to geological structure                                                                                   Geological structures are interpreted to be steeply-dipping to the

•        Whether the orientation of sampling achieves unbiased                  south-southeast. Drilling intersects structures from the north and south
                                                          sampling of possible structures and the extent to which this is known,           sides, generally dipping -60⁰ below horizontal, with azi-muths at
                                                          considering the deposit type.                                                    approximately 315⁰.

•        If the relationship between the drilling orientation and the
Drill orientation was designed perpendicular to the modelled min-eralisation
                                                          orientation of key mineralised structures is considered to have introduced a     dipped at about 60⁰ to the south-southeast.
                                                          sampling bias, this should be assessed and re-ported if material.
The drilling orientation is adequate for a non-biased assessment of the
                                                                                                                                           orebody with respect to interpreted structures and inter-preted controls on
                                                                                                                                           mineralisation.
 Sample security

•        The measures taken to ensure sample security.
Labelling and submission of samples complies with industry standard.
 Audits or reviews                                        •        The results of any audits or reviews of sampling techniques
                                                          and data.
The competent person audited the sample preparation laboratory in 2025. No
                                                                                                                                           material issues were found.

 

() Section 2 Reporting of Exploration Results

 Criteria                                                          JORC Code explanation                                                            Commentary
 Mineral tenement and land tenure status                           •           Type, reference name/number, location and ownership                  •           The LaDebo Permit is held by Jofema Mineral Resources.
                                                                   including agreements or material issues with third parties such as joint         Toro Gold Limited is in a joint Venture with Jofema with Toro being the
                                                                   ventures, partnerships, overriding royalties, native title interests,            manager and sole funder of the joint Venture. Toro Gold Limited is a company
                                                                   historical sites, wilderness or national park and environmental settings.        controlled by Resolute Mining Limited. The permit is in good standing.

•           The security of the tenure held at the time of
 
                                                                   reporting along with any known impediments to obtaining a licence to operate
                                                                   in the area.
 Exploration done by other parties                                 •          Acknowledgment and appraisal of exploration by other                  •           Past exploration has been performed by Jofema with
                                                                   parties.                                                                         previous partners. Jofema had undertaken soil geochemistry, surface mapping,
                                                                                                                                                    on the entire Research Permit. Pitting, Trenching, re-gional Auger drilling
                                                                                                                                                    and RAB drilling have identified gold anomalism which Jofema followed up with
                                                                                                                                                    Diamond and Re-verse Circulation drilling

 
 Geology                                                           •          Deposit type, geological setting and style of                         •           Mineralisation is currently interpreted to be a
                                                                   mineralisation.                                                                  standard Birimian oro-genic gold deposit style. Gold is related to shears
                                                                                                                                                    within meta-sedi-ments and volcanics. Intensity of gold mineralisation appears
                                                                                                                                                    to cor-relate with the intensity quartz-tourmaline-pyrite veins or
                                                                                                                                                    dissemi-nated pyrite and veinlets within a shear.

•           Geometry of the gold mineralisation is generally NNE
                                                                                                                                                    to NE striking and steeply south-easterly dipping. The zones vary between 3m
                                                                                                                                                    and 20m wide.

 
 Drill hole Information                                            •          A summary of all information material to the                          •           Easting, Northing and RL of the drill hole collars are
                                                                   understanding of the exploration results including a tabulation of the           based on the UTM29N grid on the WGS84 (northern hemisphere) projection.
                                                                   follow-ing information for all Material drill holes:
•           The MRE has used drill hole collar RL derived from the

◦          easting and northing of the drill hole collar                        topographical surface.

◦          elevation or RL (Reduced Level – elevation above sea
•           Dip is the inclination of the hole from the
                                                                   level in metres) of the drill hole collar                                        horizontal. For example, a vertically down drilled hole from the surface is

◦          dip and azimuth of the hole                                          -90°. Azimuth is re-ported in degrees as the grid direction toward which the

◦          down hole length and interception depth                              hole is drilled.

◦          hole length.
•           Down hole length of the hole is the distance from the

•          If the exclusion of this information is justified on the             surface to the end of the hole, as measured along the drill trace.
                                                                   basis that the information is not Material and this exclusion does not detract   Intersection depth is the distance down the hole as measured along the drill
                                                                   from the understanding of the report, the Competent Person should clearly        trace. Inter-section width is the downhole distance of an intersection as
                                                                   explain why this is the case.                                                    meas-ured along the drill trace.

 
•           Drill hole length is the distance from the surface to
                                                                                                                                                    the end of the hole, as measured along the drill trace.
 Data aggregation methods                                          •           In reporting Exploration Results, weighting averaging                •           Samples intervals in this document are all 1m and are
                                                                   tech-niques, maximum and/or minimum grade truncations (e.g. cutting of high      not com-posited in the drill intersections.
                                                                   grades) and cut-off grades are usually Mate-rial and should be stated.
•           Cut-off grade for reporting is >= 0.5g/t Au with

•           Where aggregate intercepts incorporate short lengths                maximum 3m con-secutive interval dilution.
                                                                   of high grade results and longer lengths of low grade results, the procedure
•           Top-cuts have not been used in the drill
                                                                   used for such aggregation should be stated and some typical examples of such     intersections.
                                                                   aggregations should be shown in detail.
•           The assay intervals are reported as down hole length

•           The assumptions used for any reporting of metal                     as the true width variable is not known.
                                                                   equivalent values should be clearly stated.
•           Gold assays are rounded to two decimal places.

 
•           No metal equivalent reporting is used or applied.
 Relationship between mineralisation widths and intercept lengths  •           These relationships are particularly important in the                •           The intersection width is measured down the hole trace
                                                                   reporting of Exploration Results.                                                and may not be the true width.

•           If the geometry of the mineralisation with respect to
•           All drill results are downhole intervals only due to
                                                                   the drill hole angle is known, its nature should be reported.                    the variable ori-entation of the

•           If it is not known and only the down hole lengths are               mineralisation.
                                                                   reported, there should be a clear statement to this effect (e.g. ‘down hole
                                                                   length, true width not known’).

 
 Diagrams                                                          •           Appropriate maps and sections (with scales) and                      •           A plan view is contained within this document. New
                                                                   tabulations of intercepts should be included for any significant discovery       cross-sec-tional interpretations are included.
                                                                   being reported These should include, but not be limited to a plan view of
                                                                   drill hole collar locations and appropriate sec-tional views.
 Balanced reporting                                                •           Where comprehensive reporting of all Exploration                     •           All significant assay results from Resolute work are
                                                                   Results is not practicable, representative reporting of both low and high        provided in this report.
                                                                   grades and/or widths should be practiced to avoid misleading reporting of
•           The report is considered balanced and provided in
                                                                   Exploration Results.                                                             context.
 Other substantive exploration data                                •           Other exploration data, if meaningful and material,                  •           No other exploration data is considered meaningful and
                                                                   should be reported including (but not limited to): geological observa-tions;     material to this document.
                                                                   geophysical survey results; geochemical survey re-sults; bulk samples – size
                                                                   and method of treatment; metal-lurgical test results; bulk density,
                                                                   groundwater, geotechnical and rock characteristics; potential deleterious or
                                                                   contaminat-ing substances.
 Further work                                                      •           The nature and scale of planned further work (e.g.                   •           Further regional exploration work including Auger
                                                                   tests for lateral extensions or depth extensions or large-scale step-out         drilling and geological mapping is underway over the rest of the permit to
                                                                   drilling).                                                                       identified additional RC and DD drill targets for additional resources.

•           Diagrams clearly highlighting the areas of possible                 Geophysical exploration will be planned as part of the future exploration of
                                                                   exten-sions, including the main geological interpretations and fu-ture           the permit.
                                                                   drilling areas, provided this information is not commer-cially sensitive.

 

 

() Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to
this section.)

 

 Criteria                                     JORC Code explanation                                                            Commentary
 Database integrity                           •           Measures taken to ensure that data has not been                      •           Data has been compiled into a relational SQL database
                                              corrupted by, for example, transcription or keying errors, between its initial   which includes validation protocols which preclude the loading of erroneous
                                              collection and its use for Mineral Resource estimation purposes.                 data. The data is managed using the DataShed© (MaxGeo) drill hole management

•           Data validation procedures used.                                    software. Validation checks are conducted using SQL and DataShed© relational
                                                                                                                               database standards. Data has also been checked against original hard copies
                                                                                                                               for 100% of the data, and where possible, loaded from original data sources.

•           Resolute completed the following basic validation
                                                                                                                               checks on the data supplied prior to resource estimation:

◦          Drill holes with overlapping sample intervals.

◦          Sample intervals with no assay data or duplicate
                                                                                                                               records.

◦          Assay grade ranges

◦          Collar coordinate ranges

◦          Valid hole orientation
                                                                                                                               data.                                  No
                                                                                                                               significant issues were identified in the
                                                                                                                               data
 Site visits                                  •           Comment on any site visits undertaken by the Competent               •           The Competent Person visited the project site in
                                              Person and the outcome of those visits.                                          September 2025. This included company offices, core processing and sample

•           If no site visits have been undertaken indicate why                 storage facilities and several drill hole sites. An audit of the 3rd party
                                              this is the case.                                                                laboratory facility in Yamoussoukro was also made. In the opinion of the
                                                                                                                               Competent Person, all processes are well managed and executed to a good
                                                                                                                               standard. No site related factors were identified that might materially reduce
                                                                                                                               the validity of the input data to the Mineral Resource Estimate.
 Geological interpretation                    •           Confidence in (or conversely, the uncertainty of ) the               •           The geological logging data for key features
                                              geological interpretation of the mineral deposit.                                coincident with mineralisation were used to validate the mineralisation model.

•           Nature of the data used and of any assumptions made.                Overall, the geology and mineralisation data correlate as expected according

•           The effect, if any, of alternative interpretations on               to the prevailing geological interpretation.
                                              Mineral Resource estimation.
•           For the G3 North prospect, the mineralised domains

•           The use of geology in guiding and controlling Mineral               remain unchanged from the previous model released in July 2025. For G3 South
                                              Resource estimation.                                                             updated domains were built using the ‘Vein Modelling’ workflow in Leapfrog

•           The factors affecting continuity both of grade and                  software. The mineralised envelope was constructed with a lower cut-off of 0.2
                                              geology.                                                                         g/t Au. Within the overall mineralised envelope, higher grade sub-domains were
                                                                                                                               built using the Vein Modelling workflow, based on a 1.5g/t cut off grade, with
                                                                                                                               some flexibility to include occasional lower grade samples where it resulted
                                                                                                                               in more realistic domain continuity.

•           There is a moderate level of confidence in the
                                                                                                                               interpretation of the mineralised zones, especially for the broader 0.2g/t
                                                                                                                               envelope for which geological continuity is well established. The high-grade
                                                                                                                               sub domains carry higher uncertainty at the current drill spacing.

•           The factors affecting continuity of both grade and
                                                                                                                               geology are likely to be associated with local complexity related to the
                                                                                                                               understanding of fluid pathways in the host rock. Knowledge of these is
                                                                                                                               somewhat limited with the current spacing of information.

 

 

 
 Dimensions                                   •           The extent and variability of the Mineral Resource                   •           The total estimated Mineral Resource covers two
                                              expressed as length (along strike or otherwise), plan width, and depth below     separate prospects, G3 North and G3 South. The estimate for the G3 North zone
                                              surface to the upper and lower limits of the Mineral Resource.                   remains unchanged from the estimate made and published in July 2025.

•           G3 North shows an unbroken mineralised zone of
                                                                                                                               approximately 1.5km striking at 030°. The mineralised zone dips at
                                                                                                                               approximately 60° to the ESE and shows a relatively tabular zone which
                                                                                                                               anastomoses into two zones at the southern extent. Thickness varies from
                                                                                                                               approximately 10 to 20m per zone along the strike length, measured across the
                                                                                                                               zones from hangingwall to footwall. Mineralisation is defined to approximately
                                                                                                                               240m vertical depth from the topography and is encountered from surface. The
                                                                                                                               mineralisation is apparently open to depth.

 

•           G3 South shows a similar mineralised strike length of
                                                                                                                               approximately 1.5km, striking at 030°, albeit broken into northern and
                                                                                                                               southern zones, separated by a 200m zone of minor anomalism which may define a
                                                                                                                               fault offset. Both north and south zones consist of two main stacked tabular
                                                                                                                               zones, dipping at approximately 60° to the ESE, with a combined thickness of
                                                                                                                               up to 30m measured across the zones from hangingwall to footwall. The southern
                                                                                                                               zone shows an apparent plunge to the northeast. Mineralisation is defined to
                                                                                                                               approximately 380m vertical depth from the topography and is encountered from
                                                                                                                               surface. The mineralisation apparently remains open to depth
 Estimation and modelling techniques          •           The nature and appropriateness of the estimation                     Software used for the Mineral Resource estimate included Leapfrog Geo for
                                              technique(s) applied and key assumptions, including treatment of extreme grade   modelling of geology and mineralisation zones, Datamine Supervisor for
                                              values, domaining, interpolation parameters and maximum distance of              geostatistical analysis and continuity modelling, and Datamine Studio RM for
                                              extrapolation from data points. If a computer assisted estimation method was     Estimation.
                                              chosen include a description of computer software and parameters used.
Estimation of gold grade used an Ordinary Kriging (OK) workflow in Datamine

•           The availability of check estimates, previous                       Studio RM software. Mineralisation was constrained using 0.2g/t and 1.5g/t
                                              estimates and/or mine production records and whether the Mineral Resource        wireframes constructed in Leapfrog Geo. These wireframes defined domain codes
                                              estimate takes appropriate account of such data.                                 for estimation. Drillholes were flagged with the domain code

•           The assumptions made regarding recovery of
Domain boundary analysis identified hard boundaries were appropriate for all
                                              by-products.                                                                     domains.

•           Estimation of deleterious elements or other non-grade
 Drillholes were composited to 1m intervals Datamine Studio RM, with residual
                                              variables of economic significance (eg sulphur for acid mine drainage            lengths distributed evenly across all composites within the domain.
                                              characterisation).
The influence of extreme gold assays was limited by top-cutting assays across

•           In the case of block model interpolation, the block                 all domains. Top-cuts were determined using a combination of log probability,
                                              size in relation to the average sample spacing and the search employed.          log histogram, and mean variance plots in Snowden-Optiro Supervisor software

•           Any assumptions behind modelling of selective mining                for each estimated domain and applied to the composites on a domain-by-domain
                                              units.                                                                           basis.

•           Any assumptions about correlation between variables.
Variograms were calculated and modelled for each domain using composite data

•           Description of how the geological interpretation was                transformed into Gaussian space, using Supervisor software. Back transformed
                                              used to control the resource estimates.                                          variograms are applied to the estimate.

•           Discussion of basis for using or not using grade
Drillhole data spacing averages 50m x 50m, with consistent spatial coverage
                                              cutting or capping.                                                              across the prospects.

•           The process of validation, the checking process used,
The block model parent block size is 20m (X) by 20m (Y) by 5m (Z) , with a
                                              the comparison of model data to drill hole data, and use of reconciliation       minimum sub-block size of 1.25 m × 1.25 m × 0.625 m. The estimate was
                                              data if available.                                                               performed at the parent block scale, and sub-blocks were assigned the grade of

                                                                                the relevant parent block. The parent block size is considered appropriate for
                                                                                                                               the drillhole spacing throughout the deposit, and the sub-blocking results in
                                                                                                                               excellent volumetric replication of the domains compared to the input
                                                                                                                               wireframes. The estimate is not localised to an assumed selective mining unit.
                                                                                                                               Material outside the modelled mineralized lodes was assigned a default waste
                                                                                                                               grade of 0.005 g/t Au

Grade estimation used three passes to maximise the proportion of estimated
                                                                                                                               blocks, with each subsequent pass using a broader search and few minimum
                                                                                                                               samples than the previous pass. Spatial restriction of higher grades was
                                                                                                                               applied where necessary to prevent overinfluence of the highest grade
                                                                                                                               composites. This was applied to one of the 0.2g/t domains and two of the
                                                                                                                               higher grade sub domains. The 3 pass strategy resulted in >90% of blocks
                                                                                                                               being estimated. Unestimated blocks were given the lower cut off grade used
                                                                                                                               during domain construction, i.e. 0.2g/t of the broader zones and 1.5 for the
                                                                                                                               internal sub-domains. The background ‘waste’ zone was not estimated, but
                                                                                                                               given a default value of 0.005g/t.

The mineral resource estimate has been validated using visual validation
                                                                                                                               tools, mean grade comparisons between the block model and declustered
                                                                                                                               composite grade means, and swath plots comparing the input composite grades
                                                                                                                               and the estimated block model grades by Northing, Easting, and RL. The
                                                                                                                               estimate is considered an appropriate representation of the volume and grade
                                                                                                                               distribution of the gold mineralisation.

No by-product recoveries were considered, with gold grade the only estimated
                                                                                                                               variable
 Moisture                                     •           Whether the tonnages are estimated on a dry basis or                 •           Tonnages have been estimated on a dry basis.
                                              with natural moisture, and the method of determination of the moisture
                                              content.
 Cut-off parameters                           •           The basis of the adopted cut-off grade(s) or quality                 •           A nominal lower cut-off grade of 0.2g/t Au was used to
                                              parameters applied.                                                              define the mineralised domains to encompass the complete mineralised
                                                                                                                               distribution. The modelling of higher grade sub-domains, internal to the
                                                                                                                               0.2g/t domains used a guiding cut off grade of 1.5g/t. The choice to use
                                                                                                                               1.5g/t for the sub-domains is somewhat arbitrary, with no appreciable
                                                                                                                               geostatistical signature to support 1.5g/t. Several cut-off grades for the sub
                                                                                                                               domains were tested. The sub domains built using 1.5g/t provided good spatial
                                                                                                                               and volumetric representation of the observed higher grade zones consistently
                                                                                                                               observed in many drillholes.

•           The cut-off grade for reporting (above 0.5g/t Au) is
                                                                                                                               assumed to be the likely cut-off grade for mining a deposit of similar grade,
                                                                                                                               dimensions and proximity to surface in  an open pit setting. A reporting
                                                                                                                               cut-off grade of 1.5g/t is applied to assess the potential for mining portions
                                                                                                                               of the Mineral Resource using underground mining methods.

 
 Mining factors or assumptions                •           Assumptions made regarding possible mining methods,                  •           The shallow occurrence of the mineralisation and
                                              minimum mining dimensions and internal (or, if applicable, external) mining      average grade profile suggest that eventual extraction of the resources by
                                              dilution. It is always necessary as part of the process of determining           open pit mining methods is a reasonable assumption. Furthermore, the modelled
                                              reasonable prospects for eventual economic extraction to consider potential      continuity of higher-grade sub-domains, and their elevated average estimated
                                              mining methods, but the assumptions made regarding mining methods and            grades, suggest potential for extraction of downdip portions of the Resources
                                              parameters when estimating Mineral Resources may not always be rigorous. Where   by underground mining methods, At this stage, no detailed mining optimisation
                                              this is the case, this should be reported with an explanation of the basis of    work has been completed.
                                              the mining assumptions made.
 
 Metallurgical factors or assumptions         •           The basis for assumptions or predictions regarding                   •           The assumption is made that the Mineral Resource
                                              metallurgical amenability. It is always necessary as part of the process of      displays metallurgical properties amenable to the eventual economic extraction
                                              determining reasonable prospects for eventual economic extraction to consider    of gold. To date only basic metallurgical testwork has been completed.
                                              potential metallurgical methods, but the assumptions regarding metallurgical
 
                                              treatment processes and parameters made when reporting Mineral Resources may
                                              not always be rigorous. Where this is the case, this should be reported with
                                              an explanation of the basis of the metallurgical assumptions made.
 Environmental factors or assumptions         •           Assumptions made regarding possible waste and process                •           The project area resides in an area of established
                                              residue disposal options. It is always necessary as part of the process of       agriculture, including crops such as rubber, cocoa, coffee and plantains.
                                              determining reasonable prospects for eventual economic extraction to consider    Future mining would require community engagement and compensation for lost
                                              the potential environmental impacts of the mining and processing operation.      crops. This process is well established and understood, with current
                                              While at this stage the determination of potential environmental impacts,        exploration activities involving regular community engagement by local
                                              particularly for a greenfields project, may not always be well advanced, the     specialists employed by the company. The likely scope of community related
                                              status of early consideration of these potential environmental impacts should    factors is not deemed a material risk to eventual development of the project.
                                              be reported. Where these aspects have not been considered this should be
                                              reported with an explanation of the environmental assumptions made.
 Bulk density                                 •           Whether assumed or determined. If assumed, the basis                 •           Specific gravity values were measured based on the
                                              for the assumptions. If determined, the method used, whether wet or dry, the     Archimedean Principle using the immersion method for individual core samples.
                                              frequency of the measurements, the nature, size and representativeness of the    A total of 4,864 readings were available for G3 South. This data has been used
                                              samples.                                                                         as the basis of the block model bulk density.

•           The bulk density for bulk material must have been
•           No relationship between density and gold content was
                                              measured by methods that adequately account for void spaces (vugs, porosity,     established.
                                              etc), moisture and differences between rock and alteration zones within the
•           An average bulk density was applied to each modelled
                                              deposit.                                                                         oxidation zone, where 2.0t/m3 was assigned to the oxidised zone, 2.4t/m3

•           Discuss assumptions for bulk density estimates used in              assigned to transitional rock and 2.7t/m3 was assigned to fresh rock.
                                              the evaluation process of the different materials.

 
 Classification                               •           The basis for the classification of the Mineral                      •           The entire Mineral Resource at both G3 North and G3
                                              Resources into varying confidence categories.                                    South is classified as Inferred based on confidence in the geology and

•           Whether appropriate account has been taken of all                   mineralisation models, and quality of or confidence in the estimate using the
                                              relevant factors (ie relative confidence in tonnage/grade estimations,           currently available data.
                                              reliability of input data, confidence in continuity of geology and metal
•           The Mineral Resource estimate appropriately reflects
                                              values, quality, quantity and distribution of the data).                         the Competent Person’s view of the deposit.

•           Whether the result appropriately reflects the
 
                                              Competent Person’s view of the deposit
 

 
 Audits or reviews                            •           The results of any audits or reviews of Mineral                      •           No external reviews have been completed.
                                              Resource estimates.
 Discussion of relative accuracy/ confidence  •           Where appropriate a statement of the relative accuracy               •           The Mineral Resource Estimate has been classified
                                              and confidence level in the Mineral Resource estimate using an approach or       based on the quality of the data collected, the density of the data, the
                                              procedure deemed appropriate by the Competent Person. For example, the           confidence of the geologic and mineralisation models, and the grade estimation
                                              application of statistical or geostatistical procedures to quantify the          quality. No relative statistical or geostatistical confidence or risk measure
                                              relative accuracy of the resource within stated confidence limits, or, if such   has been applied.
                                              an approach is not deemed appropriate, a qualitative discussion of the factors
•           In a qualitative sense, the relative accuracy and
                                              that could affect the relative accuracy and confidence of the estimate.          confidence of the Mineral Resource Estimate is considered moderate, reflecting

•           The statement should specify whether it relates to                  the current spacing of information. The expectation is that broad properties
                                              global or local estimates, and, if local, state the relevant tonnages, which     such as global volume, shape and extent of mineralisation will remain
                                              should be relevant to technical and economic evaluation. Documentation should    consistent with additional (closer spaced) data. But the grade distribution
                                              include assumptions made and the procedures used.                                may improve or decline at a local scale. This is consistent with the Inferred

•           These statements of relative accuracy and confidence                classification.
                                              of the estimate should be compared with production data, where available.
•           No production data is available for comparison.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact
rns@lseg.com (mailto:rns@lseg.com)
 or visit
www.rns.com (http://www.rns.com/)
.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our
Privacy Policy (https://www.lseg.com/privacy-and-cookie-policy)
.   END  UPDUWOURNNURUUA



            Copyright 2019 Regulatory News Service, all rights reserved
        

Recent news on Resolute Mining

See all news